15 DKFX 1096883 - AF 66.pdf

PDF 172 KB Posted

Attached to
B248 Alert Facility Repair HVAC System Federal contract opportunity
Solicitation number
FA441822R0017
Issued by
Department of the Air Force Air Mobility Command

About this file

This document includes a solicitation for a firm-fixed price contract to complete repairs to the HVAC system for Building B248 at Joint Base Charleston. The contractor shall demolish an existing large gable roof dormer and associated HVAC equipment and ductwork on the rear of the building. A new mono-slope dormer and associated walls and roof framing will be constructed to create a new attic mechanical room. Existing chilled water lines from attic HVAC equipment to an existing 70-ton chiller will be demolished. New chilled water lines from the 70-ton chiller to new HVAC equipment in the new attic mechanical room will be installed, along with tying exterior lines to a relocated central chilled water loop north of the building. The contractor must clean all existing ductwork to remain and provide new or repaired finishes matching existing.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No.

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

1 01 14 00 1.3.6 Air Force ‐ Base Civil Engineering ‐ Dig Permit Request x FIO 0 2 01 14 00 1.3.5 Approved Utility Outage Request x FIO 0 3 01 14 00 1.3.5 Approved Road Closure Request x FIO 0 4 01 14 00 1.3.1.1 List of Contact Personnel x FIO 0 5 01 30 00 1.6.2 Resume for the Proposed Superintendent x G 0 6 01 30 00 1.3 Preconstruction Survey x FIO 0 7 01 30 00 1.2 Color Boards x G 0 8 01 30 00 1.3 Progress and Completion Pictures x FIO 0 9 01 32 00 1.2 Project Scheduler Qualifications x G 0 10 01 32 00 3.5 Baseline Cost Loaded Critical Path Method (CPM) Project Schedule x G 0 11 01 32 00 3.2 Schedule and Pay Request Calendar x G 0 12 01 32 00 3.6.2 Monthly Cost Loaded CPM Project Schedule Updates x G 0 13 01 32 00 3.4.3 As‐Built Schedule x G 0 14 01 33 00 1.7 JB CHS Form 4288‐R ‐ Submittal Register x G 0 15 01 33 00 1.7.2 JB CHS Form 4288‐R ‐ Monthly Submittal Register Updates x FIO 0 16 01 33 00 1.8 JB CHS Form 4288‐R ‐ Monthly RFI Register Updates x FIO 0 17 01 35 26 1.6 Accident Prevention Plan (APP) x G 0 18 01 35 26 1.11 Notifications and Reports x FIO 0 19 01 35 26 1.11.2 Accident Reports x G 0 20 01 35 26 1.11.3 Crane Reports x FIO 0 21 01 35 26 1.7 Activity Hazard Analysis x FIO 0 22 01 35 26 1.6.1.1 Crane Critical Lift Plan x G 0 23 01 35 26 1.5.1.3 Proof of Qualification for Crane Operators x G 0 24 01 35 26 1.15 Confined Space Entry Permit x FIO 0 25 01 35 26 1.12 Hot Work Permit x FIO 0 26 01 35 26 1.13 License Certificates x FIO 0 27 01 45 00 3.2 Contractor Quality Control (CQC) Plan x G 0 28 01 45 00 3.9.4 Contractor Code Compliance Affidavit x G 0 29 01 45 35 3.1 SIOR Letter of Acceptance x G 0 30 01 45 35 3.1 Special Inspections Project Manual x G 0 31 01 45 35 3.1 Special Inspections Agency's Written NDT Practices x G 0 32 01 45 35 3.1 Special Inspections Daily Reports x FIO 0 33 01 45 35 3.1 Special Inspections Biweekly Reports x FIO 0 34 01 45 35 2.1 AISC Certifiied Steel Fabricator x FIO 0 35 01 45 35 2.1 Certificate of Compliance x G 0 36 01 45 35 1.5 Special Inspector of Record Qualifications x G 0 37 01 45 35 1.5 Special Inspector Qualifications x G 0 38 01 45 35 3.1 Qualification Records for NDT Technicians x G 0 39 01 45 35 3.1 Interim Report of Special Inspections for Each DFOW x G 0

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

40 01 45 35 3.1 Comprehensive Final Report of Special Inspections x G 0 41 01 54 00.00 31 1.5.2.1 Affirmative Procurement Reporting Form x G 0 42 01 54 00.00 31 1.5.2 Proposed Environmentally Preferred Products x G 0 43 01 57 19.00 31 1.7.1 Preconstruction Survey x G 0 44 01 57 19.00 31 1.8.3 Regulatory Notifications x G 0 45 01 57 19.00 31 1.5 Environmental Protection Plan (EPP) x G 0 46 01 57 19.00 31 1.6 Dirt and Dust Control Plan x G 0 47 01 57 19.00 31 3.9.2 Disposal Requirements x G 0 48 01 57 19.00 31 3.4 Erosion and Sediment Control Inspection Reports x G 0 49 01 57 19.00 31 3.4.2 Storm Water Inspection Reports for General Permit x G 0 50 01 57 19.00 31 1.8.5 Solid Waste Disposal Report x G 0 51 01 57 19.00 31 1.8.2 Contractor 40 CFR Employee Training Records x G 0 52 01 57 19.00 31 3.4.2 Storm Water Pollution Prevention Plan (SWPPP) Compliance Notebook x G 0 53 01 57 19.00 31 1.8 Waste Determination Documentation x G 0 54 01 57 19.00 31 1.8.1 Disposal Documentation for Hazardous and Regulated Waste x G 0 55 01 57 19.00 31 1.8.2 Contractor 40 CFR Employee Training Records x G 0 56 01 57 19.00 31 1.7.2 Solid Waste Disposal Permit x G 0 57 01 57 19.00 31 1.8.5 Solid Waste Disposal Report x G 0 58 01 57 19.00 31 3.7.2 Hazardous Waste/Debris Management x G 0 59 01 57 19.00 31 1.8.3 Regulatory Notifications x G 0 60 01 57 20 1.2 Safety Data Sheets (SDS) x G 0 61 01 57 20 1.2 Monthly Green Procurement Report x G 0 62 01 57 20 1.2 Annual Green Procurement Report x G 0 63 01 57 20 1.2 Monthly Recycling Report x G 0 64 01 57 20 1.2 Annual Recycling Report x G 0 65 01 74 19.00 31 1.3.3 Construction Waste Management Plan x G 0 66 01 78 00 1.12.1 Warranty Management Plan x G 0 67 01 78 00 1.12.5 Warranty Tags x FIO 0 68 01 78 00 1.11 Spare Parts Data x FIO 0 69 01 78 00 3.9 Draft DD Form 1354 x G 0 70 01 78 00 1.12.1 Posted Instructions x FIO 0 71 01 78 00 1.8.2 Preventative Maintenance x G 0 72 01 78 00 1.8.2.2 Condition Monitoring (Predictive Testing) x G 0 73 01 78 00 1.8.2 Inspection Schedule x G 0 74 01 78 00 3.7 Operation and Maintenance (O&M) Manuals x G 0 75 01 78 00 1.6 O&M Database x G 0 76 01 78 00 3.7.1.1 Training Plan x G 0 77 01 78 00 3.7.1.1 Training Outline x G 0 78 01 78 00 3.7.1.1 Training Content x G 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

79 01 78 00 3.7.1.1 Training Video Recording x G 0 80 01 78 00 3.7.1.1 Validation of Training Completion x G 0 81 01 78 00 3.8 Final Cleaning x FIO 0 82 01 78 00 3.1 As‐Built Drawings x G 0 83 01 78 00 3.3 Record Drawings x G 0 84 01 78 00 3.6 As‐Built Record of Equipment and Materials x FIO 0 85 01 78 00 3.4 Final Approved Shop Drawings x G 0 86 01 78 00 3.5 Construction Contract Specifications x G 0 87 01 78 00 3.9 Checklist for DD Form 1354 x G 0 88 01 78 00 3.9 Final DD Form 1354 x G 0 89 01 91 00.15 10 1.7 Commissioning Firm x G 0 90 01 91 00.15 10 1.7.1 Lead Commissioning Specialist x G 0 91 01 91 00.15 10 1.7.2 Technical Commissioning Specialists x G 0 92 01 91 00.15 10 3.1.2.1 Construction Phase Commissioning Plan x G 0 93 01 91 00.15 10 3.1.4.2 Pre‐Functional Checklists x G 0 94 01 91 00.15 10 1.8 Issues Log x 0 95 01 91 00.15 10 3.2 Commissioning Report x G 0 96 01 91 00.15 10 3.3.1 Post‐Construction Trend Log Report x G 0 97 01 91 00.15 10 1.9 Certificate of Readiness x G 0 98 01 91 00.15 10 3.1.5 Training Plan x G 0 99 01 91 00.15 10 3.1.5 Training Attendance Rosters x G 0 100 01 91 00.15 10 3.2 Commissioning Report x G 0 101 01 91 00.15 10 3.1.2.1 Construction Phase Commissioning Plan x G 0 102 02 41 00 1.2.2 Demolition Plan x G 0 103 02 41 00 1.9 Existing Conditions x 0 104 02 41 00 1.6 Notification of Demolition and Renovation x 0 105 02 41 00 3.3.4 Receipts x 0 106 03 30 00 1.6.5 Quality Control Plan x G 0 107 03 30 00 1.6.6 Quality Control Personnel Certifications x G 0 108 03 30 00 1.6.6 Quality Control Organizational Chart x 0 109 03 30 00 1.6.8 Laboratory Accreditation x G 0 110 03 30 00 3.3.8 Maturity Method Data x 0 111 03 30 00 1.6.2.1 Reinforcing Steel x G 0 112 03 30 00 2.3.1 Cementitious Materials x 0 113 03 30 00 2.4.1 Concrete Curing Materials x 0 114 03 30 00 2.6 Reinforcement x 0 115 03 30 00 2.3.4 Admixtures x 0 116 03 30 00 2.2.2 Biodegradable Form Release Agent x 0 117 03 30 00 2.4.2 Nonshrink Grout x 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

118 03 30 00 1.6.1.1 Concrete Mix Design x G 0 119 03 30 00 1.6.1.1 Concrete Mix Design x G 0 120 03 30 00 1.6.4.1 Fly Ash x 0 121 03 30 00 1.6.4.1 Pozzolan x 0 122 03 30 00 1.6.4.2 Slag Cement x 0 123 03 30 00 3.11.2.3 Compressive Strength Tests x G 0 124 03 30 00 3.11.2.5 Unit Weight of Structural Concrete x 0 125 03 30 00 3.11.2.4 Air Content x 0 126 03 30 00 3.11.2.1 Slump Tests x 0 127 03 30 00 2.3.2 Water x 0 128 03 30 00 2.6.1 Reinforcing Bars x 0 129 03 30 00 1.6.3.1 Safety Data Sheets x 0 130 03 30 00 1.6.6.2 Field Testing Technician and Testing Agency x 0 131 03 30 00 2.4.1 Curing Compound x 0 132 05 12 00 1.4.1.1 Erection and Erection Bracing Drawings x G 0 133 05 12 00 1.4.2 Fabrication Drawings x G 0 134 05 12 00 2.6.2 Shop Primer x 0 135 05 12 00 2.4.1 Welding Electrodes and Rods x 0 136 05 12 00 2.3.2.3 Direct Tension Indicator Washers x 0 137 05 12 00 2.4.2 Non‐Shrink Grout x 0 138 05 12 00 2.3.3 Tension Control Bolts x 0 139 05 12 00 2.6.2 Class B Coating x 0 140 05 12 00 2.3 Bolts, Nuts, and Washers x 0 141 05 12 00 3.7.1.2 Weld Inspection Reports x 0 142 05 12 00 3.7.2.1 Direct Tension Indicator Washer Inspection Reports x 0 143 05 12 00 3.7.3.1 Bolt Testing Reports x 0 144 05 12 00 2.2 Steel x 0 145 05 12 00 2.3 Bolts, Nuts, and Washers x 0 146 05 12 00 1.3 AISC Structural Steel Fabricator Quality Certification x 0 147 05 12 00 1.4.3.1 Welding Procedures and Qualifications x 0 148 05 12 00 2.4.1 Welding Electrodes and Rods x 0 149 05 12 00 3.7.1.1 Certified Welding Inspector x 0 150 05 12 00 3.7.1.2 NDT Technician x 0 151 05 12 00 3.4 Welding Procedure Specifications (WPS) x 0 152 05 51 33 2.3 Ladders x 0 153 05 51 33 2.3.1 Ship's Ladder x 0 154 05 51 33 1.3 Fabricator Certification for Ships Ladder Assembly x 0 155 06 10 00 1.4.3 Preservative‐treated x 0 156 06 10 00 1.9.1 Certificates of Grade x 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

157 06 10 00 1.7 Preservative Treatment x 0 158 07 21 16 2.1 Blanket Insulation x 0 159 07 21 16 2.1.2 Recycled Content for Insulation Materials x G 0 160 07 21 16 2.3 Accessories x 0 161 07 21 16 2.1.4 Indoor Air Quality for Insulation Materials x G 0 162 07 21 16 2.3.1 Indoor Air Quality for Adhesives x G 0 163 07 21 16 3.3.1 Insulation x 0 164 07 27 36 1.8.1 Qualification of Manufacturer x G 0 165 07 27 36 1.8.2 Qualification of Installer x G 0 166 07 27 36 1.9 Quality Control Plan x G 0 167 07 27 36 1.9 Safety Plan x G 0 168 07 27 36 1.7.1 Fire Prevention Plan x G 0 169 07 27 36 1.7.2 Respirator Plan x G 0 170 07 27 36 1.4 Spray Foam Air Barrier x 0 171 07 27 36 1.9 Foam Air Barrier System x G 0 172 07 27 36 2.1.2 Closed Cell x G 0 173 07 27 36 2.2 Primers, Adhesives, and Mastics x G 0 174 07 27 36 Sealants x G 0 175 07 27 36 1.4.2 Safety Data Sheets x G 0 176 07 27 36 2.1.1 Ignition Barrier Coatings x G 0 177 07 27 36 2.1.6 Accessories x G 0 178 07 27 36 1.4 Spray Foam Air Barrier x G 0 179 07 27 36 1.4.4 Field Peel Adhesion Test x G 0 180 07 27 36 1.4.3 Primers x G 0 181 07 27 36 1.4.4 Fire‐Ratings Of Ignition Barrier Materials x G 0 182 07 27 36 1.4.4 Flame Spread And Smoke Developed Index Ratings Of SPF Products x G 0 183 07 27 36 1.4.4 Flame Propagation Of Wall Assemblies x G 0 184 07 27 36 3.4.1 Site Inspections x G 0 185 07 27 36 2.1.2 Closed cell x G 0 186 07 27 36 2.1.5 Indoor Air Quality for Spray Foam Air Barrier x S 0 187 07 27 36 1.5.1 SPF Handling, Storage, and Spray Procedures x G 0 188 07 27 36 3.2.1 Substrate Preparation x G 0 189 07 27 36 1.4.1 Ignition Barrier x G 0 190 07 27 36 2.2 Primers, Adhesives, and Mastics x G 0 191 07 27 36 1.9 Core Samples x 0 192 07 27 36 3.3.2 Daily Work Record x 0 193 07 41 13 1.4.5 Roofing Panels x G 0 194 07 41 13 1.4.5 Flashing and Accessories x G 0 195 07 41 13 1.4.5 Gutter/Downspout Assembly x G 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

196 07 41 13 2.1 Roof Panels x G 0 197 07 41 13 2.1.1 Recycled Content for Steel Roof Panels x S 0 198 07 41 13 1.4.5 Factory‐Applied Color Finish x G 0 199 07 41 13 2.4 Accessories x G 0 200 07 41 13 1.4.5 Fasteners x G 0 201 07 41 13 1.4.5 Pressure Sensitive Tape x G 0 202 07 41 13 2.6 Underlayments x G 0 203 07 41 13 2.7 Gaskets and Sealing/Insulating Compounds x G 0 204 07 41 13 1.4.5 Coil Stock x G 0 205 07 41 13 1.4.5 Enamel Repair Paint x G 0 206 07 41 13 2.1 Roof Panels x G 0 207 07 41 13 1.4.5 Factory‐applied Color Finish x G 0 208 07 41 13 2.4 Accessories x G 0 209 07 41 13 1.4.5 Fasteners x G 0 210 07 41 13 1.4.5 Gaskets and Sealant/Insulating Compounds x G 0 211 07 41 13 1.4.6 Engineering Calculations x G 0 212 07 41 13 1.2.1.2 Wind Uplift Resistance x G 0 213 07 41 13 1.2.1.1 Leakage Test Report x G 0 214 07 41 13 1.2.1.2 Wind Uplift Test Report x G 0 215 07 41 13 2.2 Factory Finish and Color Performance Requirements x G 0 216 07 41 13 2.1 Roof Panels x G 0 217 07 41 13 1.4.5 Coil Stock Compatibility x G 0 218 07 41 13 2.6.1 Self‐Adhering Modified Bitumen Underlayment x G 0 219 07 41 13 1.4.1 Qualification of Manufacturer x G 0 220 07 41 13 1.4.2 Qualification of Applicator x G 0 221 07 41 13 1.4.5 Installation Manual x G 0 222 07 41 13 3.9.1 Manufacturer's Field Inspection Reports x G 0 223 07 41 13 1.8 Warranties x G 0 224 07 41 13 3.1 Information Card x G 0 225 07 41 13 3.11 Date Of Installation Wall‐Mounted Placard x G 0 226 08 11 13 2.1 Doors x G 0 227 08 11 13 2.5 Frames x G 0 228 08 11 13 2.8.2 Accessories x 0 229 08 11 13 2.1 Doors x G 0 230 08 11 13 2.1 Recycled Content for Steel Door Product x S 0 231 08 11 13 2.5 Frames x G 0 232 08 11 13 2.5 Recycled Content for Steel Frame Product x S 0 233 08 11 13 2.8.2 Accessories x 0 234 08 71 00 1.3 Manufacturer's Detail Drawings x G 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

235 08 71 00 1.3 Verification of Existing Conditions x G 0 236 08 71 00 1.5 Hardware Schedule x G 0 237 08 71 00 2.3 Hardware Items x G 0 238 08 71 00 3.1 Installation x 0 239 08 71 00 1.5 Hardware Schedule x G 0 240 08 71 00 1.6.1 Key Bitting x 0 241 08 91 00 1.4 Wall Louvers x 0 242 08 91 00 2.2 Metal Wall Louvers x 0 243 08 91 00 1.5 Wall Louver Samples x G 0 244 09 22 00 2.1 Metal Support Systems x 0 245 09 24 23 3.4 Lath x 0 246 09 24 23 3.7 Proportions and Mixing x 0 247 09 24 23 2.2 Colored Stucco Finish Coat x 0 248 09 24 23 1.3 Sample Panel x G 0 249 09 29 00 2.1.6 Accessories x 0 250 09 29 00 2.1.1 Gypsum Board x 0 251 09 29 00 2.1.2 VOC Content of Joint Compound x G 0 252 09 29 00 2.1 Asbestos Free Materials x G 0 253 09 29 00 2.1 Safety Data Sheets x 0 254 09 29 00 2.1 Manufacturer Maintenance Instructions x 0 255 09 51 00 2.2.1.1 Acoustical Ceiling Tiles x G 0 256 09 65 00 2.7 Resilient Flooring and Accessories x G 0 257 09 65 00 2.7 Resilient Flooring and Accessories x G 0 258 09 65 00 2.4 Adhesives x 0 259 09 65 00 2.1 Luxury Vinyl Tile x 0 260 09 65 00 2.3 Wall Base x 0 261 09 65 00 2.7 Resilient Flooring and Accessories x G 0 262 09 65 00 3.3 Moisture, Alkalinity and Bond Tests x G 0 263 09 65 00 3.2 Surface Preparation x G 0 264 09 65 00 3.1 Installation x G 0 265 09 65 00 2.7 Resilient Flooring and Accessories x G 0 266 09 90 00 2.1 Coating x G 0 267 09 90 00 2.1 Product Data Sheets x 0 268 09 90 00 2.2 Color x G 0 269 09 90 00 1.5.3 Indoor Air Quality for Paints and Primers x 0 270 09 90 00 1.5.3 Indoor Air Quality for Consolidated Latex Paints x 0 271 09 90 00 3.3 Application Instructions x 0 272 09 90 00 2.1 Mixing x 0 273 09 90 00 1.7.1 Manufacturer's Safety Data Sheets x 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

274 09 90 00 2.1 Coatings x G 0 275 21 13 16 1.2.2 Qualified Fire Protection Engineer (QFPE) x G 0 276 21 13 16 1.4.2.1 Sprinkler System Designer x G 0 277 21 13 16 1.4.2.2 Sprinkler System Installer x G 0 278 21 13 16 1.2.2 Shop Drawing x G 0 279 21 13 16 2.2.1.1 Pipe x G 0 280 21 13 16 2.2.1.2 Fittings x G 0 281 21 13 16 2.2.3 Valves x G 0 282 21 13 16 2.3 Sprinklers x G 0 283 21 13 16 2.2.2 Pipe Hangers and Supports x G 0 284 21 13 16 2.2.2 Seismic Bracing x G 0 285 21 13 16 3.5.1 Test Procedures x G 0 286 21 13 16 3.5.2.1 Verification of Compliant Installation x G 0 287 21 13 16 3.5.2.2 Request for Government Final Test x G 0 288 21 13 16 3.7 Operating and Maintenance (O&M) Instructions x G 0 289 21 13 16 1.6 Spare Parts x G 0 290 21 13 16 3.7 As‐built drawings x 0 291 23 01 30.41 3.1.1.1 Record of Existing Conditions x 0 292 23 01 30.41 3.1.1.2 Coordination Plan x 0 293 23 01 30.41 1.4.1 NADCA Firm x 0 294 23 01 30.41 1.4.1 NADCA Team Assistants x 0 295 23 01 30.41 1.4.1 NADCA Air System Cleaning Specialist (ASCS) x 0 296 23 01 30.41 1.4.1 NADCA Supervisor Qualifications x 0 297 23 01 30.41 1.4.2 Records of Experience in the Field of HVAC System Cleaning x 0 298 23 01 30.41 1.5.1 NADCA Work Execution Schedule x 0 299 23 01 30.41 1.4.3 Safety Data Sheets (SDS) x 0 300 23 01 30.41 3.3.2 Testing Procedures Summary x 0 301 23 01 30.41 3.3.1.3 Gravimetric Analysis x 0 302 23 01 30.41 3.3.2 Post‐Project Report x 0 303 23 05 48.19 3.1 Coupling and Bracing x 0 304 23 05 48.19 3.3 Flexible Couplings or Joints x 0 305 23 05 48.19 2.2 Equipment Restraint x 0 306 23 05 48.19 1.2.4 Contractor Designed Bracing x G 0 307 23 05 48.19 3.1 Coupling and Bracing x G 0 308 23 05 48.19 3.3 Flexible Couplings Or Joints x G 0 309 23 05 48.19 2.2 Equipment Restraint x G 0 310 23 05 48.19 1.2.4 Contractor Designed Bracing x G 0 311 23 05 48.19 2.6 Snubbers x 0 312 23 05 48.19 3.9 Anchor Bolts x 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

313 23 05 48.19 2.2.2 Vibration Isolators x 0 314 23 05 48.19 1.2.4 Design Calculations x 0 315 23 05 48.19 3.9 Anchor Bolts x G 0 316 23 05 93 1.3.3 Records of Existing Conditions x G 0 317 23 05 93 1.5.3.1 TAB Firm x G 0 318 23 05 93 1.2 TAB Team Assistants x G 0 319 23 05 93 1.2 TAB Team Engineer x G 0 320 23 05 93 1.5.3.2 TAB Specialist x G 0 321 23 05 93 1.2 TAB Team Field Leader x G 0 322 23 05 93 1.3.3 TAB Schematic Drawings and Report Forms x G 0 323 23 05 93 1.3 Equipment and Performance Data x G 0 324 23 05 93 1.5.3.4 TAB Related HVAC Submittals x G 0 325 23 05 93 1.5.2 TAB Procedures x G 0 326 23 05 93 1.5.2 Calibration x G 0 327 23 05 93 1.3.3 Systems Readiness Check x G 0 328 23 05 93 1.5.4 TAB Execution x G 0 329 23 05 93 1.6.1.1 TAB Design Review Report x G 0 330 23 05 93 1.5.5.1 TAB Report x G 0 331 23 05 93 1.5.1 Independent TAB Agency and Personnel Qualifications x G 0 332 23 05 93 1.6.1 TAB Submittal and Work Schedule x G 0 333 23 05 93 1.6.1.2 TAB Pre‐Field Engineering Report x G 0 334 23 05 93 1.5.3.1 TAB Firm x G 0 335 23 05 93 1.3.3 Design Review Report x G 0 336 23 05 93 1.6.1 Advanced Notice for TAB Field Work x G 0 337 23 05 93 1.6.1 Prerequisite HVAC Work Check Out List x G 0 338 23 07 00 2.3 Pipe Insulation Systems x 0 339 23 07 00 2.4 Duct Insulation Systems x 0 340 23 07 00 2.5 Equipment Insulation Systems x 0 341 23 07 00 2.3 Pipe Insulation Systems x G 0 342 23 07 00 2.4 Duct Insulation Systems x G 0 343 23 07 00 2.5 Equipment Insulation Systems x G 0 344 23 07 00 2.3 Pipe Insulation Systems x G 0 345 23 07 00 2.4 Duct Insulation Systems x G 0 346 23 07 00 2.5 Equipment Insulation Systems G 0 347 23 09 00 3.3 DDC Contractor Design Drawings x G 0 348 23 09 00 3.3 Draft As‐Built Drawings x G 0 349 23 09 00 3.3 Final As‐Built Drawings x G 0 350 23 09 00 1.8.3 Programming Software x G 0 351 23 09 00 1.8.4 Controller Application Programs x G 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

352 23 09 00 1.8.1 Configuration Software x G 0 353 23 09 00 1.8.2 Controller Configuration Settings x G 0 354 23 09 00 2.2 Manufacturer's Product Data x G 0 355 23 09 00 1.9 Boiler Or Chiller Plant Gateway Request x 0 356 23 09 00 3.1.1 Existing Conditions Report x 0 357 23 09 00 3.5.2 Start‐Up Testing Report x G 0 358 23 09 00 3.6.1 PVT Procedures x G 0 359 23 09 00 3.6.3 PVT Report x G 0 360 23 09 00 1.10.1 Pre‐Construction Quality Control (QC) Checklist x G 0 361 23 09 00 1.10.2 Post‐Construction Quality Control (QC) Checklist x G 0 362 23 09 00 3.7 Operation and Maintenance (O&M) Instructions x G 0 363 23 09 00 3.8.1 Training Documentation x G 0 364 23 09 00 2.5 Enclosure Keys x G 0 365 23 09 00 3.2.6.1 Password Summary Report x G 0 366 23 09 00 1.10.3 Closeout Quality Control (QC) Checklist x G 0 367 23 21 23 2.2.4 Equipment Data x G 0 368 23 21 23 3.5.2 Training Period x G 0 369 23 21 23 3.3 Field Quality Control x 0 370 23 21 23 3.5.1 Operation and Maintenance Manuals x G 0 371 23 21 23 3.5.2 Training x G 0 372 23 30 00 1.4.3 Detail Drawings x G 0 373 23 30 00 2.9.1.1 Metallic Flexible Duct x 0 374 23 30 00 2.9.1.2 Insulated Nonmetallic Flexible Duct Runouts x 0 375 23 30 00 2.9.1.2 Duct Connectors x 0 376 23 30 00 2.9.2 Duct Access Doors x G 0 377 23 30 00 2.9.3 Manual Balancing Dampers x G 0 378 23 30 00 2.9.7.1 Diffusers x 0 379 23 30 00 2.9.7.2 Registers and Grilles x 0 380 23 30 00 2.10.1.1 In‐Line Centrifugal Fans x 0 381 23 30 00 2.11 Air Handling Units x G 0 382 23 30 00 2.12.1.1 Variable Volume, Single Duct Terminal Units x G 0 383 23 30 00 2.13 Energy Recovery Devices x G 0 384 23 30 00 1.4.4 Test Procedures x 0 385 23 30 00 3.9 Performance Tests x G 0 386 23 30 00 3.2 Manufacturer's Installation Instructions x 0 387 23 30 00 3.11.2 Operation and Maintenance Training x 0 388 23 30 00 3.11.1 Operation and Maintenance Manuals x G 0 389 23 30 00 2.10.1.1 In‐Line Centrifugal Fans x G 0 390 23 30 00 2.11 Air Handling Units x G 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

391 23 30 00 2.12.1.1 Variable Volume, Single Duct Terminal Units x G 0 392 23 30 00 2.12.1.2 Reheat Units x G 0 393 23 30 00 2.13 Energy Recovery Devices x G 0 394 23 30 00 3.1 Indoor Air Quality During Construction x G 0 395 23 64 26 2.2.2.4 Grooved Mechanical Connections For Steel x G 0 396 23 64 26 2.3.3 Grooved Mechanical Connections For Copper x G 0 397 23 64 26 2.4.8 Calibrated Balancing Valves x G 0 398 23 64 26 2.4.9 Pump Discharge Valve x 0 399 23 64 26 2.4.11 Pressure Relief Valve x 0 400 23 64 26 2.5.9 Expansion Joints x G 0 401 23 64 26 2.5.3 Combination Strainer and Pump Suction Diffuser x 0 402 23 64 26 2.6 Expansion Tanks x 0 403 23 64 26 2.7 Air Separator Tanks x 0 404 23 64 26 3.1.1.3 Piping Welds NDE Report x 0 405 23 64 26 3.4.2 Pressure Tests Reports x G 0 406 23 64 26 3.1.1.1 Employer's Record Documents (For Welding) x 0 407 23 64 26 3.1.1.2 Welding Procedures and Qualifications x 0 408 23 64 26 2.4.8 Calibrated Balancing Valves x G 0 409 23 64 26 2.4.9 Pump Discharge Valve x G 0 410 23 64 26 2.4.10 Water Pressure Reducing Valve x G 0 411 23 64 26 2.4.11 Pressure Relief Valve x G 0 412 23 64 26 2.5.9 Expansion Joints x G 0 413 23 64 26 2.5.3 Combination Strainer and Pump Suction Diffuser x G 0 414 23 64 26 2.6 Expansion Tanks x G 0 415 23 64 26 2.7 Air Separator Tanks x G 0 416 25 10 10 3.2.2 UMCS Contractor Design Drawings x 0 417 25 10 10 3.2.3 Draft As‐Built Drawings x 0 418 25 10 10 3.2.3 Final As‐Built Drawings x 0 419 25 10 10 2.1.5 Product Data Sheets x 0 420 25 10 10 2.4 Computer Software x 0 421 25 10 10 2.6.1 Enclosure Keys x 0 422 25 10 10 3.2.1 UMCS IP Network Bandwidth Usage Estimate x 0 423 25 10 10 1.6 Pre‐Construction QC Checklist x 0 424 25 10 10 1.6 Post‐Construction QC Checklist x 0 425 25 10 10 3.1 Existing Conditions Report x 0 426 25 10 10 3.6 Start‐Up and Start‐Up Testing Report x G 0 427 25 10 10 3.7.1 PVT Phase I Procedures x 0 428 25 10 10 3.7.2 PVT Phase I Report x G 0 429 25 10 10 3.7.3 PVT Phase II Report x G 0

Classification Code

Contractor Action

SD

‐0 ‐ P re co ns tr uc tio n

SD

‐0 ‐ S ho p Dr aw in gs

SD

‐0 ‐ P ro du ct D at a

SD

‐0 ‐ S am pl es

SD

‐0 ‐ D es ig n Da ta

SD

‐0 ‐ T es t R ep or ts

SD

‐0 ‐ C er tif ic at es

SD

‐0 ‐ M an uf ac tu re r's In st ru ct io ns

SD

‐0 ‐ M an uf ac tu re r's F ie ld R ep or ts

SD

‐1 ‐ O

M D at a

SD

‐1 ‐ C lo se ou t

FI

O , G

A, D A, C R, D A/

CR

, D A/ G A

CP

M S ch ed ul e Ac tiv ity

ID

Su m bi t B y

Ap pr ov al N ee de d By

M at er ia l N ee de d By

Da te S ub m itt ed to G ov er nm en t

G ov er nm en t A ct io n Co de

Da te R et ur ne d

G ov er nm en t R ev ie w T im e

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z.

Contractor Schedule Dates Government Action

Re m ar ks

Tr an sm itt al N o

Ite m N o

Sp ec ifi ca tio n Se ct io n or D ra w in g Sh ee t

Re fe re nc e

Sp ec ifi ca tio n Pa ra gr ap h N um be r

De sc rip tio n of S ub m itt al It em

Submittal Type Code

SUBMITTAL REGISTER

JB CHS ENG FORM 4288‐R

Project Title and Location Contractor

430 25 10 10 1.7 Operation and Maintenance (O&M) Instructions x 0 431 25 10 10 3.8.6.1 Preventive Maintenance Work Plan x 0 432 25 10 10 3.9.1 Basic Training Documentation x 0 433 25 10 10 3.9.1 Advanced Training Documentation x 0 434 25 10 10 3.9.1 Refresher Training Documentation x 0 435 25 10 10 1.6 Closeout QC Checklist x 0 436 26 05 48.00 10 3.2 Lighting Fixtures in Buildings x 0 437 26 05 48.00 10 1.3 Equipment Requirements x 0 438 26 05 48.00 10 3.2 Lighting Fixtures in Buildings x G 0 439 26 05 48.00 10 1.3 Equipment Requirements x G 0 440 26 05 48.00 10 1.2.4 Contractor Designed Bracing x G 0 441 26 20 00 2.9 Panelboards x G 0 442 26 20 00 2.8 Receptacles x G 0 443 26 20 00 2.9.3 Circuit Breakers x G 0 444 26 20 00 2.11 Motor Controllers x G 0 445 26 20 00 2.12 Manual Motor Starters x G 0 446 26 20 00 3.5.2 600‐volt Wiring Test x G 0 447 26 20 00 3.5.4 Grounding System Test x G 0 448 26 20 00 3.5.3 Ground‐fault Receptacle Test x G 0 449 26 20 00 1.5.1 Electrical Systems x G 0 450 26 29 23 1.5.1 Schematic Diagrams x G 0 451 26 29 23 1.5.2 Interconnecting Diagrams x G 0 452 26 29 23 2.1 Adjustable Speed Drives x G 0 453 26 29 23 2.3 Wires and Cables x 0 454 26 29 23 1.5.3 Equipment Schedule x 0 455 26 29 23 3.3.1 ASD Test x 0 456 26 29 23 3.3.2 Performance Verification Tests x 0 457 26 29 23 3.3.3 Endurance Test x 0 458 26 29 23 1.5.4 Installation instructions x 0 459 26 29 23 2.5.1 ASD Test Plan x G 0 460 26 29 23 1.5.5 Standard Products x 0 461 26 29 23 2.1 Adjustable Speed Drives x 0