ADD/Alter Space Deficiencies, 8 SOS, Bldg 90145
Solicitation number
FA441723R0002
Issued by

About this file

This document is an amendment to a solicitation for construction services to ADD/Alter Space Deficiencies at Building 90145 for the 8th Special Operations Squadron. The amendment extends the proposal due date to August 11, 2023 at 2:00PM CST due to technical difficulties. It adds Questions and Answers as an attachment, the B90145 GEOTech Report from March 31, 2023 as an attachment, and a Table Graphics Reference for Section M as an attachment. It also revises the allowed page count for past performance information from 20 to 10 pages. The solicitation is seeking a best value award for construction work including mobilization, submittals, demolition, major work elements by specification division, final inspection, demobilization, and close-out documents. The Department of the Air Force Special Operations Command is the issuing agency.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date 28 Jul 2023 11 Aug 2023

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Section J - List of Attachments

Attachment 1 - B90145 Specifications, dated 31 March 20 (800 pages)

Attachment 2 - Bldg 90145 Drawings, dated 2 May 23 (51 pages)

Attachment 3 - WD FL20220217, dated 13 Jan 2023 (6 pages)

Attachment 4 - Past Present Performance Questionnaire (PPPQ), dated 2 June 2023 (4 pages)

Attachment 5 - Financial Reference Sheet, dated 02 Jun 2023 (1 page)

Attachment 6 - 50 Division Construction Cost Estimate Worksheet (Excel worksheet w/ 33 tabs), Undated

Attachment 7: Questions and Answers, dated 21 July 2023 (4 pages)

Attachment 8: B90145 GEOTech Report, dated 31 March 2023 (37 pages)

Attachment 9: Table Graphics Reference Section M, undated (2 pages)

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

1.0 GENERAL INSTRUCTIONS

1.1 General Information

1.1.1 The offeror's proposal must include all data and information requested by these Instructions to Offerors and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the Specifications and Solicitation. Non-conformance with the instructions provided in these Instructions to Offerors may result in an unfavorable proposal evaluation.

1.1.2 The proposal acceptance period is specified in Block 13, SF 1442, of this solicitation. By signing block 20B of the SF 1442, the offeror certifies that the proposal is valid from the due date and time listed in block 13A through the entire period specified in block 13D.

FA441723R00020003

1.1.3 All referenced documents for this solicitation are available on the Contract Opportunities website at https://sam.gov/. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

1.1.4 The Government reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time. Such revisions or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted on the SAM.gov website. If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by completing SF 1442 Block 19, providing signed copies of the amendments with their proposal (Section III), or by separate letter which includes a reference to the solicitation and amendment numbers.

1.1.5 The Contracting Officer listed below is the Government's sole point of contact for this acquisition. Address any questions or concerns you may have to the Contracting Officer. Written requests for clarification may be sent to the Contracting Officer at the following email address: Richard T.

Beaty, Email: richard.beaty.3@us.af.mil . Please copy the following Contract Specialist for this project on any correspondence sent to the Contracting Officer: Alyssa Jesmain, Email: alyssa.jesmain@us.af.mil

1.1.6 In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain a copy of all unsuccessful proposals.

1.1.7 The Contracting Officer will promptly notify offerors of any decision to exclude them from the competition; whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Excluded offerors may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post award debriefing. However, excluded offerors are entitled to no more than one debriefing for each proposal. The Contracting Officer will notify unsuccessful offerors of the source selection decision in accordance with FAR 15.503. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or FAR 15.506, as applicable.

1.1.8 If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale as well as the remedies the offeror is asking the Contracting Officer to consider as related to the claimed omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions. This reservation includes matters of additional or substitute pages of the initial proposal.

1.1.9 The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the Contracting Officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

1.1.10 Who Can Participate. Proposals may only be submitted by Certified Women-Owned Small Business firms. At the time of initial contract offer and at time of award, each business must be a Certified Women-Owned Small Business in order to submit an offer on a solicitation, each business concern in a Teaming Agreement or Joint Venture must be a women-owned small business under the designated NAICS size standard, and must also be a small business when combined in the aggregate of all teaming affiliates.

2.0 SPECIFIC INSTRUCTIONS

2.1 The following instructions are to aid in the evaluation process.

2.1.1 Offerors are responsible for submitting proposals (including any revisions, and amendments) so as to reach the Government office designated in this solicitation by the time specified in this solicitation. Bid bonds must be included with the proposal package and be received at or before the time specified in this solicitation. Only electronic versions of the proposals will be accepted. Paper copies of proposals will not be evaluated, will be rejected, and will not be considered for award.

2.1.1.1

Prospective offerors will be required to deliver proposals through the Solicitation Module in Procurement Integrated Enterprise Environment (PIEE).

Offerors are responsible for submitting proposals (including any revisions, and amendments) so as to reach the Government office designated in the solicitation by the time specified in the solicitation. PIEE Registration should be completed at least one (1) week prior to the anticipated solicitation closing date. See the links below.

Vendor Registration:

https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf

Solicitation Module Training: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml

For instructions on how to post an offer, please refer to the Posting Offer demo:

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based

Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml.

The Government will not notify directly Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. All contractors must be registered in the System for Award Management (SAM) IAW FAR

4.1102, or their proposal will not be considered. Contractors can obtain further information on the System for Award Management (SAM) at web site https://www.sam.gov.

The points of contact for this procurement are the following individuals:

Contract Specialist Ms. Alyssa Jesmain alyssa.jesmain@us.af.mil

Contracting Officer Mr. Richard Beaty richard.beaty.3@us.af.mil

2.1.1.2 Proposals shall be marked as "Controlled Unclassified Information" and "Source Selection Information - See FAR 2.101 and FAR 3.104".

2.1.2 Any proposal, bond, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals will be "late" and will not be considered unless the Contracting Officer determines the criteria set forth in FAR 15.208 exists.

2.1.3 Proposals shall be complete, clearly presented, and include sufficient detail for effective evaluation as detailed in section M of this solicitation and for substantiating validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of the offeror's facilities and/or experience and will rely heavily, on the information presented in the offeror's proposal. Proposals shall be neat, indexed (cross-indexed as appropriate) and assembled electronically in an orderly manner. Elaborate artwork and expensive visual and other presentation aids are neither necessary nor desired. Include only information that is relevant to this source selection.

2.1.4 Organization/Number of Copies/Page Limits.

2.1.4.1 A complete proposal shall consist of three (3) volumes: Volume I, Technical Proposal; Volume II (a), Past Performance; Volume II (b), Signed Teaming or Joint Venture (JV) Agreement (if applicable); and Volume III, Cost/Price Proposal (Executed RFP Documents)/Contractor Responsibility. Specific guidance regarding the content of each volume will be discussed further below. Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. When Evaluation Notices (ENs) are necessary, the Government will issue them by electronic means to prospective offerors. Page limitations may be placed on responses to these ENs and such limitations will be provided at the time the EN is issued.

2.1.4.2 Electronic Page Size, Format and Limit.

2.1.4.2.1 An electronic page is defined as each face of an 8 1/2" X 11" electronic sheet of paper containing information. Page limits apply to all electronic files. Pages in excess of the maximum page limits defined below will not be evaluated. For the purposes of formatting, the type font shall not be less than 12 pitch. Pages shall be numbered sequentially by volume.

Volume I - Technical Proposal: Subfactor 1: 20 Page Limit

Volume II (a) - Past Performance: 10 Page Limit Volume II (b) - Signed Teaming or JV Agreement (required if Teaming or JV is proposed): No page limit Volume III - Cost/ Price Proposal and

Contractor Responsibility: No Page Limit

2.1.4.2.2 All pages of each volume shall be appropriately numbered and identified with the Request for Proposal (RFP) number.

2.1.4.3 Cost or Pricing Related Data. All cost and/or pricing data shall ONLY be addressed in the Cost/Price Proposal Volume.

2.1.4.4 Indexing. Electronic files should be titled appropriately so as to easily discern each volume as outlined in paragraph 2.1.4.1. Each file shall contain a more detailed table of contents to delineate the subparagraphs within that file. Tab indexing shall be used to identify sections. Indexing is not included in the page limitations.

2.1.4.5 Proposal Acceptance Period. The proposal acceptance period is specified in Block 13d of the Standard Form 1442 of the Solicitation. In accordance with Block 17, the number inserted must be equal to or greater than the number of days listed in Block 13d.

3.0 GENERAL: The Technical proposal shall be prepared in accordance with these instructions and shall be evaluated in accordance with the evaluation criteria and evaluation standards in Section M, Evaluation Factors for Award. Technical proposals shall include necessary information to enable the evaluators to form a definitive conclusion concerning the offeror's ability to perform the required construction.

3.1 FACTOR 1, Volume 1 - Technical Proposal. Offerors shall submit two versions of the Technical Proposal. Submit one (1) original and one (1) "sanitized copy" utilizing company CAGE code only in place of Company Name. Sanitized copy shall be provided as a separate file name. (e.g., "Volume 1 Sanitized Tech Proposal CAGE#").

3.1.1 TECHNICAL FACTOR - Project Schedule: Using the provided specifications, the offeror must provide a project schedule and narrative supporting the schedule. The proposal shall describe procedures, processes, and methods for tracking the progress of the project and interface with the Government and contractor team from beginning to end. The project schedule and supporting narrative shall identify the separate work elements of the project, the order of work elements to include project phasing, number of days for each work element, and the identification of long lead time materials. Long lead items such as major equipment, electrical equipment, pre-engineered piping, etc., must be specifically identified in the Technical proposal. If there are no Long Lead Time Materials, the proposal must state that there are no Long Lead Time Materials. At a minimum, the project schedule must include mobilization, submittals, demolition, and major work elements by specification division, final inspection, demobilization, and close-out documents. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form. The AF Form 3064, Contract Progress Schedule may also be used for submission of this item, and is recommended. Offerors should only include the work elements necessary to complete the required work. The AF Form 3064, Contract Progress Schedule shall reflect a 258-day performance period. This list is provided as a guide and is not all inclusive or exclusive. It is the offeror's responsibility to identify all necessary work elements. The form must show major measurable line items of the construction project, percentage/value each line item represents in the total proposal cost and a timeline when each line item is scheduled to be completed. The project schedule itself shall visually depict and address each of the following elements:

3.1.1.1 Identification of separate work elements.

3.1.1.2 Order of work elements to include project phasing

3.1.1.3 Identification of work elements in the critical path

3.1.1.4 Number of days for each work element.

3.1.1.5 Identification of Long Lead Time Materials (Long lead items such as major equipment, electrical equipment, pre-engineered piping, etc., must be specifically identified in the technical proposal. If there are no Long Lead Time Materials, the proposal must state that there are no Long Lead Time Materials).

4.0 FACTOR 2, PAST PERFORMANCE. Submit one (1) copy only; a "sanitized copy" of Past Performance is NOT REQUIRED. Volume II (a) is limited to 10 pages and Volume II (b) - Signed Teaming or JV Agreement has no page limit. Past Performance Questionnaires and Contractor Performance Assessment Reporting System (CPARS) evaluations that accompany the offerors proposal are not included in the page limitation.

4.1 Volume II (a) - Past Performance - Offerors shall provide adequate past performance information on completed or current contracts (including Federal, State, local government and private) considered most relevant in demonstrating the ability to perform the proposed work as identified within the Specifications. Offerors must provide past performance information to establish Recency and Relevancy on all Federal contracts before State, local government or private contracts. The Government's evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects (see Teaming Agreements and JV's, para 4.2 and 4.3), when such information is relevant to the instant acquisition. Offerors are required to explain what aspects of each contract are deemed relevant to complexity and magnitude as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating, (i.e. aspects of previous projects should match work elements identified in the Solicitation/ specification).

4.1.1 Provide a summary of the previous contracts described above. The summary should explain what aspects of each contract are deemed recent and relevant as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating, (i.e. aspects of previous projects should match work elements identified in the solicitation/specification). The summary should not exceed 1 page per reference (maximum total of 10 pages) and include:

a) Name of project (Contract number, if applicable)

b) Name and address of customer or Government agency

c) Name, telephone, fax number and/or email of customer contact or contracting officer

d) Dollar value

e) Period of performance/Completion date

f) Brief description of work performed, and why the effort is relevant

g) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions

4.1.1.1 Each proposal shall provide current and relevant information regarding an offeror's actions under previously awarded contracts:

a) Recency Assessment:

An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past six (6) years from the issuance month of this solicitation. Past performance information that fails this condition will not be evaluated.

b) Relevancy Assessment:

The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the products provided /services performed under those contracts relate to the Technical factor and Cost/Price factor, including their relative order of importance [reference Section M, para 2.1]. Consideration will be given to projects involving the type of construction and work elements described in the attached Specifications. Relevant past performance information must demonstrate construction experience involving the type of construction and work elements described in the attached Specifications, Section 01 10 00, paragraph 1.01, and costs comparable to the project magnitude as specified in Block 10 for the SF 1442, Request for Proposal. A relevancy determination of the offeror's past performance will be made based upon the aforementioned considerations, including joint venture partner(s). In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror or teaming partner whose contract is being reviewed and evaluated. The past performance questionnaires and information obtained from other sources will be used to establish the degree of relevancy of past performance.

4.1.2 Complete Section A, Contractor Information, of Attachment 4, Past Performance Questionnaire and mail, or email the attached Past/Present Performance Questionnaire to all past performance references in the list you provide and instruct them to return the completed questionnaire to the individual(s) indicated in paragraph 4.1.3 below. Evaluators are only allowed to use the government provided Past Performance Questionnaire form found in Section J of the solicitation, Attachment 4. Company developed questionnaires or questionnaires developed by other organizations will not be evaluated. Also, Questionnaires must be completed by Project Owners, Inspectors, Contracting Officers or their authorized representatives only.

Questionnaires will not be accepted from Prime Contractors, Subcontractors, or Manufacturers.

4.1.3 Inform your references that they shall forward questionnaires electronically by email directly to the address below. Questionnaires must be received in the 1st Special Operations Contracting Squadron office not later than the closing date of the solicitation. Offerors are responsible for ensuring their references transmit the questionnaire to the Contracting Office. In lieu of a Past/Present Performance Questionnaire, if a project is currently available in the Contractor Performance Assessment Reporting System (CPARS), the contractor should attach the evaluation to the questionnaire with the relevant solicitation number and submit directly to the1st Special Operations Contracting Squadron office before the official closing date and time.

Electronic submission of Questionnaires shall be sent to:

Richard Beaty, Email: richard.beaty.3@us.af.mil Alyssa Jesmain, Email: alyssa.jesmain@us.af.mil

4.1.4 Lack of any past performance will not automatically disqualify an offeror, but it is a factor that is considered in the Performance Price Trade-Off Source Selection described in Section M.

4.1.5 If the offeror claims there is no past performance, then that status must be identified to the Contracting Officer not later than the date/time proposals are due from all offerors.

4.2 Volume II (b) Signed Teaming Agreement - If Teaming Agreements are contemplated they must comply with 13 CFR Part 121 - Small Business Size Regulations. The teaming members must provide complete information as to relevant and recent past performance information on previous teaming agreements. If this is a first time joint effort, each party to the teaming agreement must provide information on all relevant contracts as specified in paragraph 4.1. The maximum number of references combined shall not exceed 10 per teaming partner.

4.2.1 The Government will recognize the integrity and validity of formal contractor Teaming Agreements; provided, the agreements are identified and company relationships are fully disclosed in an offer. A Teaming Agreement must establish each party's role in the proposal preparation process and will be incorporated into the contract. Failure to clearly define roles and/or provide a Teaming Agreement with a proposal shall make teaming arrangements and related subcontractor past performance ineligible for evaluation and consideration of award. The prime contractor shall remain fully responsible for contract performance, regardless of any Teaming Agreement between the prime contractor and its subcontractors. Teaming Agreements must provide the following information as part of their proposal, Volume II (b), not later than the date/ time proposals are due:

4.2.1.1 Clearly establish roles of each party (who is prime and who is subcontractor, who is responsible for what tasks, contract administration, proposals, work management, etc.)

4.2.1.2 Provide for protection of competition-sensitive proprietary information. (Subcontractor past performance cannot be disclosed to the prime offeror without the subcontractor's consent). Provide a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor, only if it is being used as part of the past performance evaluation.

4.2.1.3 Identify each member's share of the prospective contract, 50/50, 51/49, etc.

4.2.1.4 Exclusivity. Assurance that the team member will not be replaced for the duration of the contract, any exceptions should be identified.

Assurance that the team members are not teaming with another firm for the same procurement.

4.2.1.5 Statement of acknowledgement that the Prime Contractor is responsible for adhering to contract terms and conditions and daily management.

The Prime Contractor is obligated to negotiate in good faith and responsible for conveying mandatory government terms and conditions to subcontractors.

4.2.1.6 The prime contractor shall remain fully responsible for contract performance, regardless of any teaming agreement between the prime contractor and its subcontractors.

4.2.2 At the time of initial contract offer and at time of award, each business must be a women-owned small business. In order to submit an offer on a contract, each business concern in a Teaming Agreement must be a women owned small business under the designated NAICS size standard, and must also be small when combined in the aggregate of all teaming affiliates.

4.3 Volume II (b) Joint Ventures - A certified women-owned small business concern may enter into a joint venture agreement with one or more other women-owned small business concerns, or with an approved mentor authorized by 13 C.F.R. (S) 125.8 (or, if also an 8(a) BD Participant, with an approved mentor authorized by 13 C.F.R (S) 124.520), for the purpose of submitting an offer for a women-owned small business contract.

4.3.1 A joint venture of at least one certified women-owned small business concern and one or more other business concerns may submit an offer as a women-owned small business for a women-owned small business procurement or sale so long as each is determined small under the size standard corresponding to the NAICS code assigned to the procurement.

4.3.2 A joint venture between a protege firm and its SBA-approved mentor (see 13 C.F.R (S) 125.9) will be deemed small provided the protege qualifies as small for the size standard corresponding to the NAICS code assigned to the women-owned small business procurement.

4.3.3 As part of the proposal, Volume II (b), Joint Venture Agreements must meet the criteria set forth in 13 CFR (S) 125.8.

5.0 FACTOR 3, VOLUME III - PRICE/COST PROPOSAL. (Submit the Standard Form 1442 and all pages originally included in the RFP. Submit one (1) copy.)

5.1 Complete blocks 14, 15, 16, 17, 19, and 20a-c of the SF 1442, Solicitation, Offer, and Award. An authorized official of the firm submitting the offer must sign and date the SF 1442 in block 20a-c. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP, Sections A through K.

5.2 Insert prices in Section B for each Contract Line Items, including all options. All line items must be filled in. Failure to provide prices for all line items may eliminate you from competition.

5.3 In addition to the line item pricing in section B, the contractor shall complete the 50 Division Construction Cost Estimate Worksheet (Attachment 7). Contractor shall fill in construction cost estimate worksheet to include the summary and specific divisions to be utilized for this project. At a minimum, each division should include breakdowns of specific labor and material cost. The use of lump sum or lot pricing should be avoided. The 50 Division Worksheet ONLY, may be submitted electronically by close of business 2 business days after proposal submission. The total amount on the 50 Division Worksheet must match total price as submitted in Volume III Cost Proposal with variance authorized for rounding. Submit the worksheet to the following individuals:

Richard Beaty, Email: richard.beaty.3@us.af.mil Alyssa Jesmain, Email: alyssa.jesmain@us.af.mil

5.4 Complete representations and certifications in Section K or the System for Award Management (SAM).

5.5 Submit the Financial Reference Sheet (Attachment 5) with the top portion only completed.

5.6 Submit an electronic copy of the original Bid Bond with the proposal package.

6.0 RELATIONSHIP BETWEEN INSTRUCTIONS AND EVALUATION.

Your attention is directed to the functional relationship between Sections L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all inclusive. Section M describes evaluation factors for award. Since the Government evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation.

7.0 AMENDMENT OF SOLICITATION PRIOR TO CLOSING.

The Government reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time. Such reservations or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted on the Contract Opportunities website (https://sam.gov/). If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by completing SF 1442 Block 19, providing signed copies of the amendments with their proposal (Section III), or by separate letter which includes a reference to the solicitation and amendment numbers.

8.0 QUESTIONS.

All questions regarding this solicitation must be submitted in writing. All questions and subsequent answers will be posted to the Contract Opportunities website https://sam.gov/. It is the responsibility of the contractor to continuously monitor the site for updates. To mitigate the risks associated with the cancellation of this solicitation due to untimely submission of questions, all questions must be submitted electronically to the individual(s) listed below no later than close of business 5 business days after the site visit. Any questions submitted after this period may not be answered.

Richard Beaty, Email: richard.beaty.3@us.af.mil Alyssa Jesmain, Email: alyssa.jesmain@us.af.mil

ADDITIONAL CLAUSES INCORPORATED by FULL TEXT 52.228-1 Bid Guarantee (1996 - 09) As prescribed in 28.101-2, Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter or credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

Section M - Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

1.0 BASIS FOR CONTRACT AWARD

1.1 General Information.

This is a best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FAR Site. The Best Value technique chosen for this particular acquisition will be a Subjective Tradeoff. The Government will select the best overall offer, based upon an integrated assessment of Technical/Technical Risk, Past Performance, and Cost/Price. Contract(s) may be awarded to the offeror who is deemed responsible in accordance with the FAR, as supplemented, whose proposal conforms to the solicitation's requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors to represent the best value to the Government. The Government seeks to award to the offeror who gives the Air Force the greatest confidence that it will best meet, or exceed, the requirements. This may result in an award to a higher rated, higher priced offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the technical and/or past performance of the higher price offeror outweighs the cost difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below). While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; and therefore, professional judgment is implicit throughout the entire process.

1.2 Discussions.

If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the offeror's proposal has been evaluated at the time discussions are closed, any changes or exceptions in the Final Proposal Revision are subject to evaluation and may introduce risk to the offeror's proposal that may change the rating of the offeror's proposal.

2.0 EVALUATION FACTORS.

The following evaluation factors will be used to evaluate each proposal: Award will be made to the offeror proposing the combination most advantageous to the Government based upon an integrated assessment of the evaluation factors described below.

Factor 1: Technical - Project Schedule Factor 2: Past Performance Factor 3: Cost/Price

2.1 Relative Importance of Factors.

The relative importance of each factor and subfactor is as follows: Past Performance, Technical, and Cost/Price.

Order of importance: Factor 2 (Past Performance) being most important, Factor 1 (Technical) next in importance, and Factor 3 (Cost/Price) is last in importance. In accordance with FAR 15.304(e), all evaluation factors other than Cost/Price, when combined, are significantly more important than cost or price.

3.0 TECHNICAL EVALUATION FACTORS.

The Technical evaluation provides for two distinct but related assessments into one rating: the Technical and the Technical Risk. These two have equal impact for the rating of each Technical factor. 3.1 Technical Assessment. The technical assessment provides an assessment of the quality of the offeror's solution for meeting the Government's requirement. The assessment will focus on the strengths and deficiencies of the offeror's proposal, and how well the offeror's proposal meets the Technical factor requirements.

3.2 Technical Risk Assessment.

The Assessment of Technical Risk, which is manifested by the identification of weakness (es), considers potential for disruption of schedule, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. The risk rating considers the risk associated with the technical approach in meeting the requirement.

3.3 Technical Subfactor Ratings.

Each Technical subfactor will receive one of the color ratings described in DoD Source Selection Procedures, Table3 - Combined Technical/Risk Ratings, excerpted below. The Technical Risk descriptions identified in the Combined Technical/Risk Rating description are further defined in DoD Source Selection Procedures, Table 2B - Technical Risk Descriptions, excerpted below. Factor ratings shall not be rolled up into an overall color rating for the Technical factor.

Table 3. Combined Technical/Risk Rating Method

Please reference Attachment 9 - Table Graphics Reference Section M document.

Table 2B - Technical Risk Descriptions

Please reference Attachment 9 - Table Graphics Reference Section M document.

3.4 FACTOR 1, Technical, Project Schedule.

Using the provided specifications, the offeror must provide a project schedule and narrative supporting the schedule. The proposal shall describe procedures, processes and methods for tracking the progress of the project and interface with the Government and contractor team from beginning to end.

3.4.1 The progress schedule and supporting narrative will be evaluated on how well the offeror captured the separate work elements of the project, the order of work elements to include project phasing, number of days for each work element, and the identification of long lead time materials. Long lead items such as major equipment, electrical equipment, pre-engineered piping, etc., must be specifically identified in the technical proposal. If there are no Long Lead Time Materials, the proposal must state that there are no Long Lead Time Materials. The AF Form 3064, Contract Progress Schedule shall reflect a 258-day performance period. At a minimum, the project must include: mobilization, submittals, demolition, and major work elements by specification division, final inspection, demobilization, and close-out documents. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period.

3.4.2 The project schedule itself shall be evaluated to determine if it visually depicts and addresses each of the following elements:

3.4.2.1 Identification of separate work elements.

3.4.2.2 Order of work elements to include project phasing

3.4.2.3 Identification of work elements in the critical path

3.4.2.4 Number of days for each work element.

3.4.2.5 Identification of Long Lead Time Materials (Long lead items such as major equipment, electrical equipment, pre- engineered piping, etc., must be specifically identified in the technical proposal. If there are no Long Lead Time Materials, the proposal must state that there are no Long Lead Time Materials).

4.0. PAST PERFORMANCE FACTOR.

The Past Performance evaluation will result in an overall performance confidence assessment as defined below. This performance confidence assessment represents the Government evaluation team's judgment of the probability of an offeror successfully accomplishing the proposed effort based on the offeror's demonstrated past and present performance. The performance confidence assessments are defined in the DoD Source Selection Procedures, Table 5 and as follows:

TABLE 5 - PERFORMANCE CONFIDENCE ASSESSMENTS

Please reference Attachment 9 - Table Graphics Reference Section M document.

4.1 Evaluation Process: The past performance evaluation considers each offeror's demonstrated recent and relevant record of performance in supplying products and services that meet the contract's requirements. Performance confidence is assessed at the overall Past Performance factor level after evaluating aspects of the offeror's recent past performance, focusing on performance that is relevant to the Technical factors and Cost/Price factor taking into consideration their relative order of importance stated in Section M, paragraph 2.1. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror's Past Performance proposal volume and information obtained from other sources available to the Government, to include, but not limited to, the Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS) or other databases; interviews with Program Managers and Contracting Officers; the Defense Contract Management Agency (DCMA), and commercial sources.

4.1.1 Recency Assessment: An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past six (6) years from the issuance month of this solicitation. Past performance information that fails this condition will not be evaluated.

4.1.2 Relevancy Assessment: The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the products provided/services performed under those contracts relate to the Technical factor and Cost/Price factor, including their relative order of importance (reference Section M, 2.1). Consideration will be given to projects involving the type of construction and work elements described in the attached Specifications. Relevant past performance information must demonstrate construction experience involving the type of construction and work elements described in the attached Specifications, Section 01 10 00, and costs comparable to the project magnitude as specified in Block 10 for the SF 1442, Request for Proposal. A relevancy determination of the offeror's past performance will be made based upon the aforementioned considerations, including joint venture partner(s). In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror or teaming partner whose contract is being reviewed and evaluated. The past performance questionnaires and information obtained from other sources will be used to establish the degree of relevancy of past performance. A relevancy determination of the offeror's past performance will be made based upon the aforementioned considerations, including joint venture partner (s). In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror or teaming partner whose contract is being reviewed and evaluated. The past performance questionnaires and information obtained from other sources will be used to establish the degree of relevancy of past performance. The Government will use the following relevancy definitions from the DoD

Source Selection Procedures, Table 4 when assessing recent contracts:

Please reference Attachment 9 - Table Graphics Reference Section M document.

4.1.3 Quality of Performance. All recent past performance that is determined to be somewhat relevant, relevant, or very relevant will be reviewed to determine the quality of the offeror's performance, general trends, and the usefulness of the performance. This information will be used by the evaluation team in determining the overall performance confidence assessment rating.

4.1.4 Assigning Ratings: As a result of the relevancy of the recent contracts evaluated, offerors will receive an integrated performance confidence assessment rating. Although the past performance evaluation focuses on performance that is relevant to the Technical factors and cost/price factor, the resulting performance confidence assessment rating is made at the factor level and represents an overall evaluation of contractor performance.

Offerors without a record of recent/relevant past performance or for whom information on past performance is so sparse that no meaningful confidence assessment rating can be reasonably assigned will not be evaluated favorably or unfavorably on past performance and, as a result, will receive an "Unknown Confidence" rating for the Past Performance factor. More recent performance will have a greater impact on the Performance Confidence Assessment than less recent or relevant effort. A strong record of relevant past performance may be considered more advantageous to the Government than an "Unknown Confidence" rating. Likewise, a more relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance.

4.1.5 If a Teaming Agreement is submitted as part of the proposal as outlined in Section L para 4.2, each teaming offeror's past performance will be evaluated separately using the same evaluation methods described above. The Prime Contractor's past performance will be weighted slightly more than equal based on their overall responsibility for contract management. The separate ratings of each party in the Teaming Agreement will be combined to determine an aggregate PERFORMANCE ASSESSMENT CONFIDENCE RATING as defined in Section M.

4.1.6 If an offer is submitted as a Joint Venture under a Mentor-Protege program as outline in Section L para 4.3, the Government will evaluate past performance for each partner to the Joint Venture individually as well as past performance accomplished by the Joint Venture itself. The separate ratings of each party in the Joint Venture will be combined to determine an aggregate PERFORMANCE ASSESSMENT CONFIDENCE RATING as defined in Section M

5.0 COST OR PRICE FACTOR.

The offeror's Cost/Price proposal will be evaluated to ensure it is reasonable, pursuant to FAR 15.404.

5.1 Cost/Price will be evaluated for the period of which funding is made available. If certified funds are made available on or before 30 September 2023, Cost/Price evaluation will accomplished using CLIN 0001 ONLY.

5.2 Reasonable: Must represent a price to the Government that a prudent person would pay in the conduct of competitive business.

6.0 CLARIFICATIONS, DISCUSSIONS, AND NEGOTIATIONS.

The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offerors initial offer should contain the offeror's best terms from a price and technical standpoint. In accordance with FAR 15.306, Offerors may be asked to clarify certain aspects of their proposal (for example, relevance of past performance information). Communications (Clarifications) conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. Discussions or negotiations may be conducted with all offerors in the competitive range.