| Use the information from the provided prefilled division sheets to fill in the 50 Divisions Cost Estimate CSI Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. |
| The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs. |
Summary
| CONSTRUCTION COST ESTIMATE | Date: | |
| | 19-May-23 |
| COMPANY | | |
| IGE | | |
| PROJECT | | | |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | |
| LOCATION | | PROJECT NO. | CP1033732 |
| HURLBURT FIELD, FLORIDA | | | |
| DIVISION | DESCRIPTION | % by | |
| Division | Division Total | | | |
| DIVISION 02 | EXISTING CONDITIONS | 3.1% | 42,758.20 | |
| DIVISION 03 | CONCRETE WORK | 10.4% | 145,370.38 | FILL IN AS REQUIRED (this will link to the entire document) |
davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| DIVISION 04 | MASONRY | 11.7% | 163,804.05 | | |
| DIVISION 05 | METALS | 1.7% | 24,406.91 | | |
| DIVISION 06 | WOOD, PLASTICS AND COMPOSITES | 0.5% | 6,500.00 | GC Overhead | 15.00% |
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | 11.6% | 162,457.68 | GC Protit | 10.00% |
| DIVISION 08 | OPENINGS | 1.6% | 22,122.80 | Sub Overhead | 0.00% |
| DIVISION 09 | FINISHES | 1.6% | 22,962.07 | Sub Profit | 0.00% |
| DIVISION 10 | SPECIALTIES | 0.0% | 277.90 | Sales Tax | 7.00% |
| DIVISION 13 | SPECIAL CONSTRUCTION | 35.5% | 494,869.00 | This spreadsheet contains many formulas, please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas | |
| DIVISION 21 | FIRE SUPRESSION | 1.2% | 16,403.89 | | |
| DIVISION 22 | PLUMBING | 0.0% | - 0 | | |
| DIVISION 23 | HEATING, VENTILATING AND A/C | 4.1% | 57,404.39 | | |
| DIVISION 26 | ELECTRICAL | 5.8% | 80,567.00 | | |
| DIVISION 27 | COMMUNICATIONS | 0.2% | 2,645.75 | | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | 2.0% | 27,888.70 | | |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | 6.6% | 92,448.95 | | |
| DIVISION 33 | UTILITIES | 2.3% | 32,136.75 | | |
HARD COST TOTAL 100% 1,395,024.41
| GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 15% | 209,253.66 |
| SUBTOTAL | | 1,604,278.08 |
| GENERAL CONTRACTOR'S PROFIT(Fill in%) | 10% | 160,427.81 |
| SUBTOTAL | | 1,764,705.88 |
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 2% | 35,294.12 |
| CONTRACT TOTAL | | $ 1,800,000.00 |
&"Arial"&8&B SHEET &P OF &N
Div1
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ERROR:#REF! | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Superintendent | 8 | MO | 4,800.00 | 38,400.00 | - 0 | - 0 | 38,400.00 |
| Site Clean-Up/Dumpster | 8 | MO | 200.00 | 1,600.00 | 1,250.00 | 10,000.00 | 11,600.00 |
| Portable Toilet | 8 | MO | | - 0 | 250.00 | 2,000.00 | 2,000.00 |
| Temp. Office | 8 | MO | | - 0 | 1,000.00 | 8,000.00 | 8,000.00 |
| Site Phone | 8 | MO | | - 0 | 100.00 | 800.00 | 800.00 |
| Safety Measures | 8 | MO | | - 0 | 1,500.00 | 12,000.00 | 12,000.00 |
| Superintendent Truck | 8 | MO | | - 0 | 950.00 | 7,600.00 | 7,600.00 |
| Material Handling/Forklift | 8 | MO | | - 0 | 2,500.00 | 20,000.00 | 20,000.00 |
| Project Sign | 1 | EA | 250.00 | 250.00 | 250.00 | 250.00 | 500.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 40,250.00 | | 60,650.00 | |
| SUBTOTAL | | | | | | | 100,900.00 |
| Sub-Contractor's Overhead | | | | | | 0.00% | 1.01 |
| Sub-Contractor's Profit | | | | | | 0.00% | 1.01 |
| FL State Sales Tax | | | | | | 7.00% | 4,245.50 |
| TOTAL | | | | | | | $ 105,147.52 |
Div2
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXISTING CONDITIONS | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| Construction Layout | 1 | EA | 4,500.00 | 4,500.00 | | - 0 | 4,500.00 |
| Erosion Control/Inlet Protection | 1 | LS | 5,000.00 | 5,000.00 | | - 0 | 5,000.00 |
| Remove Magnolia Tree | 1 | EA | 500.00 | 500.00 | | - 0 | 500.00 |
| Remove Curb and Gutter | 217 | LF | 5.35 | 1,160.95 | | - 0 | 1,160.95 |
| Remove Water Line | 92 | LF | 10.00 | 920.00 | | - 0 | 920.00 |
| Remove Concrete Island and Walks | 328 | SY | 25.00 | 8,200.00 | | - 0 | 8,200.00 |
| Remove Gravel | 110 | SY | 8.00 | 880.00 | | - 0 | 880.00 |
| Remove Asphalt | 332 | SY | 20.00 | 6,640.00 | | - 0 | 6,640.00 |
| Partial Demolition at Connection | 2 | EA | 1,500.00 | 3,000.00 | | - 0 | 3,000.00 |
| Remove Canopy System and Concrete | 1 | EA | 3,000.00 | 3,000.00 | | - 0 | 3,000.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 33,800.95 | | - 0 | |
| SUBTOTAL | | | | | | | 33,800.95 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 5,070.14 |
| Sub-Contractor's Profit | | | | | | 10.00% | 3,887.11 |
| FL State Sales Tax | | | | | | 7.00% | - 0 |
| TOTAL | | | | | | | $ 42,758.20 |
Div3
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONCRETE WORK | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Excavate Footings | 1500 | CF | 5.50 | 8,250.00 | 1.50 | 2,250.00 | 10,500.00 |
| Reinforcing Steel | 6.2 | Ton | 1,850.00 | 11,470.00 | 2,000.00 | 12,400.00 | 23,870.00 |
| Concrete Footings | 70 | CY | 190.00 | 13,300.00 | 165.00 | 11,550.00 | 24,850.00 |
| 6" Slab Concrete | 68 | CY | 285.00 | 19,380.00 | 165.00 | 11,220.00 | 30,600.00 |
| Finish Slab Concrete | 3670 | SF | 0.95 | 3,486.50 | 0.25 | 917.50 | 4,404.00 |
| Cure & Seal Concrete | 3670 | SF | 0.25 | 917.50 | 0.45 | 1,651.50 | 2,569.00 |
| Exterior Concrete Slab | 1700 | SF | 2.50 | 4,250.00 | 6.50 | 11,050.00 | 15,300.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 61,054.00 | | 51,039.00 | |
| SUBTOTAL | | | | | | | 112,093.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 16,813.95 |
| Sub-Contractor's Profit | | | | | | 10.00% | 12,890.70 |
| FL State Sales Tax | | | | | | 7.00% | 3,572.73 |
| TOTAL | | | | | | | $ 145,370.38 |
Div4
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MASONRY | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| 8" Split Faced Fluted CMU | 700 | SF | 16.00 | 11,200.00 | 9.50 | 6,650.00 | 17,850.00 |
| 12" Regular CMU | 2030 | SF | 14.75 | 29,942.50 | 8.00 | 16,240.00 | 46,182.50 |
| 4" Split Faced Fluted CMU | 2320 | SF | 15.00 | 34,800.00 | 8.00 | 18,560.00 | 53,360.00 |
| Grout Fill | 5 | CY | 185.00 | 925.00 | 165.00 | 825.00 | 1,750.00 |
| Cell Reinforcing | 0.5 | Ton | 975.00 | 487.50 | 1,875.00 | 937.50 | 1,425.00 |
| Mortar - Type N | 60 | CF | 2.50 | 150.00 | 6.50 | 390.00 | 540.00 |
| Sand - Builders | 190 | CF | - 0 | - 0 | 9.00 | 1,710.00 | 1,710.00 |
| Masonry Ties | 15 | C | 80.00 | 1,200.00 | 60.00 | 900.00 | 2,100.00 |
| Thru-Wall Flashing | 185 | SF | 2.40 | 444.00 | 4.00 | 730.00 | 1,174.00 |
| Weeps | 1 | LS | 700.00 | 700.00 | 95.00 | 95.00 | 795.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 79,849.00 | | 47,037.50 | |
| SUBTOTAL | | | | | | | $ 126,886.50 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 19,032.98 |
| Sub-Contractor's Profit | | | | | | 10.00% | 14,591.95 |
| FL State Sales Tax | | | | | | 7.00% | 3,292.63 |
| TOTAL | | | | | | | $ 163,804.05 |
Div5
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | CP1033732 | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| METALS | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Structural Steel System (Canopy) | 2.5 | Ton | 4,500.00 | 11,250.00 | 2,500.00 | 6,250.00 | 17,500.00 |
| Steel Decking (Canopy) | 330 | SF | 1.75 | 577.50 | 2.50 | 825.00 | 1,402.50 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 11,827.50 | | 7,075.00 | |
| SUBTOTAL | | | | | | | $ 18,902.50 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 2,835.38 |
| Sub-Contractor's Profit | | | | | | 10.00% | 2,173.79 |
| FL State Sales Tax | | | | | | 7.00% | 495.25 |
| TOTAL | | | | | | | $ 24,406.91 |
Div6
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WOOD, PLASTICS AND COMPOSITES | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Rough Blocking | 1 | LS | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 5,000.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 2,500.00 | | 2,500.00 | |
| SUBTOTAL | | | | | | | 5,000.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 750.00 |
| Sub-Contractor's Profit | | | | | | 10.00% | 575.00 |
| FL State Sales Tax | | | | | | 7.00% | 175.00 |
| TOTAL | | | | | | | $ 6,500.00 |
Div7
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| THERMAL AND MOISTURE PROTECTION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| Simple Saver Insulation System | 4500 | SF | 5.25 | 23,625.00 | 3.75 | 16,875.00 | 40,500.00 |
| Rigid Insulation - End Walls | 2466 | SF | 0.90 | 2,219.40 | 1.50 | 3,699.00 | 5,918.40 |
| Air/Moisture Barrier - Roof | 4901 | SF | 0.90 | 4,410.90 | 0.85 | 4,165.85 | 8,576.75 |
| Air/Moisture Barrier - Wall | 4682 | SF | 0.24 | 1,123.68 | 0.01 | 46.82 | 1,170.50 |
| Prefinished Fascia Panels | 516 | SF | 3.75 | 1,935.00 | 5.25 | 2,709.00 | 4,644.00 |
| Prefinished Metal Canopy @ Coiling Door | 50 | SF | 5.00 | 250.00 | 7.00 | 350.00 | 600.00 |
| Downspout Boots | 10 | EA | 7.00 | 70.00 | 20.00 | 200.00 | 270.00 |
| Joint Sealants | 1 | LS | 550.00 | 550.00 | 150.00 | 150.00 | 700.00 |
| 2" Prefinished Metal Wall Panels | 2580 | SF | 3.48 | 8,978.40 | 13.20 | 34,056.00 | 43,034.40 |
| Prefinished Soffit | 433 | SF | 3.75 | 1,623.75 | 4.85 | 2,100.05 | 3,723.80 |
| Flashing at End Walls | 91 | LF | 2.65 | 241.15 | 1.25 | 113.75 | 354.90 |
| Foam Fill Insulation - Low CMU Walls | 916 | SF | 2.00 | 1,832.00 | 1.50 | 1,374.00 | 3,206.00 |
| Roof Fall Protection System | 300 | LF | 35.00 | 10,500.00 | 5.00 | 1,500.00 | 12,000.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 57,359.28 | | 67,339.47 | |
| SUBTOTAL | | | | | | | 124,698.75 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 18,704.81 |
| Sub-Contractor's Profit | | | | | | 10.00% | 14,340.36 |
| FL State Sales Tax | | | | | | 7.00% | 4,713.76 |
| TOTAL | | | | | | | $ 162,457.68 |
Div8
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| OPENINGS | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Galv. Insul. Steel Doors, 3'-0" W x 7'-0" | 6 | EA | 53.00 | 318.00 | 610.00 | 3,660.00 | 3,978.00 |
| Steel Frames, 3'-0" W x 7'-0" | 4 | EA | 216.00 | 864.00 | 56.00 | 224.00 | 1,088.00 |
| Steel Frames, 6'-0" W x 7'-0" | 1 | EA | 244.00 | 244.00 | 62.00 | 62.00 | 306.00 |
| Exterior Hardware Sets | 5 | EA | 400.00 | 2,000.00 | 1,200.00 | 6,000.00 | 8,000.00 |
| Overhead Insulated Coiling Doors 12'x12' | 1 | EA | 400.00 | 400.00 | 3,000.00 | 3,000.00 | 3,400.00 |
| | | | - 0 | - 0 | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 3,826.00 | | 12,946.00 | |
| SUBTOTAL | | | | | | | 16,772.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 2,515.80 |
| Sub-Contractor's Profit | | | | | | 10.00% | 1,928.78 |
| FL State Sales Tax | | | | | | 7.00% | 906.22 |
| TOTAL | | | | | | | $ 22,122.80 |
Div9
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | CP1033732 | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FINISHES | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| Interior Paint - Steel | 440 | SF | 1.85 | 814.00 | 0.96 | 422.40 | 1,236.40 |
| Interior Paint - CMU | 2102 | SF | 1.09 | 2,291.18 | 0.33 | 693.66 | 2,984.84 |
| Finish Doors | 6 | EA | 25.00 | 150.00 | 15.00 | 90.00 | 240.00 |
| Metal Studs | 700 | SF | 0.86 | 602.00 | 0.55 | 385.00 | 987.00 |
| Gypsum Board | 1300 | SF | 1.00 | 1,300.00 | 1.50 | 1,950.00 | 3,250.00 |
| Paint Gypsum Board | 1300 | SF | 0.85 | 1,105.00 | 0.65 | 845.00 | 1,950.00 |
| Accoustical lay-in Ceiling System | 1236 | SF | 3.50 | 4,326.00 | 2.25 | 2,781.00 | 7,107.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 10,588.18 | | 7,167.06 | |
| SUBTOTAL | | | | | | | $ 17,755.24 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 2,663.29 |
| Sub-Contractor's Profit | | | | | | 10.00% | 2,041.85 |
| FL State Sales Tax | | | | | | 7.00% | 501.69 |
| TOTAL | | | | | | | $ 22,962.07 |
Div10
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | CP1033732 | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIALTIES | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Signage | 5 | EA | 7.00 | 35.00 | 35.00 | 175.00 | 210.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 35.00 | | 175.00 | |
| SUBTOTAL | | | | | | | $ 210.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 31.50 |
| Sub-Contractor's Profit | | | | | | 10.00% | 24.15 |
| FL State Sales Tax | | | | | | 7.00% | 12.25 |
| TOTAL | | | | | | | $ 277.90 |
Div13
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIAL CONSTRUCTION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| PEMB-Main | 4000 | SF | 32.00 | 128,000.00 | 62.35 | 249,400.00 | 377,400.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 128,000.00 | | 249,400.00 | |
| SUBTOTAL | | | | | | | 377,400.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 56,610.00 |
| Sub-Contractor's Profit | | | | | | 10.00% | 43,401.00 |
| FL State Sales Tax | | | | | | 7.00% | 17,458.00 |
| TOTAL | | | | | | | $ 494,869.00 |
Div21
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FIRE SUPRESSION | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Wet pipe Fire Suppression | 3950 | SF | 2.65 | 10,467.50 | | - 0 | 10,467.50 |
| Test | 1 | EA | 2,500.00 | 2,500.00 | | - 0 | 2,500.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 12,967.50 | | - 0 | |
| SUBTOTAL | | | | | | | 12,967.50 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 1,945.13 |
| Sub-Contractor's Profit | | | | | | 10.00% | 1,491.26 |
| FL State Sales Tax | | | | | | 7.00% | - 0 |
| TOTAL | | | | | | | $ 16,403.89 |
Div22
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PLUMBING | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | - 0 | | - 0 | |
| SUBTOTAL | | | | | | | $ - 0 |
| Sub-Contractor's Overhead | | | | | | 0.00% | - 0 |
| Sub-Contractor's Profit | | | | | | 0.00% | - 0 |
| FL State Sales Tax | | | | | | 7.00% | - 0 |
| TOTAL | | | | | | | $ - 0 |
Div23
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| HEATING, VENTILATING AND A/C | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| CHW AHU | 1 | EA | 2,200.00 | 2,200.00 | 15,000.00 | 15,000.00 | 17,200.00 |
| Commissioning | 1 | LOT | 3,500.00 | 3,500.00 | - 0 | - 0 | 3,500.00 |
| Controls | 1 | LOT | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 6,000.00 |
| Ductwork | 180 | LF | 15.00 | 2,700.00 | 8.65 | 1,557.00 | 4,257.00 |
| Grilles | 15 | EA | 35.00 | 525.00 | 60.00 | 900.00 | 1,425.00 |
| CHW Piping | 220 | LF | 12.25 | 2,695.00 | 5.40 | 1,188.00 | 3,883.00 |
| CHW Pump | 1 | EA | 750.21 | 750.21 | 3,500.00 | 3,500.00 | 4,250.21 |
| Test and Balance | 1 | LOT | 3,500.00 | 3,500.00 | - 0 | - 0 | 3,500.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 19,370.21 | | 24,645.00 | |
| SUBTOTAL | | | | | | | $ 44,015.21 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 6,602.28 |
| Sub-Contractor's Profit | | | | | | 10.00% | 5,061.75 |
| FL State Sales Tax | | | | | | 7.00% | 1,725.15 |
| TOTAL | | | | | | | $ 57,404.39 |
Div26
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRICAL | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Elec. Demolition | 1 | LS | 700.00 | 700.00 | 500.00 | 500.00 | 1,200.00 |
| | | | - 0 | | - 0 | - 0 |
| NEW WORK | | | | - 0 | | - 0 | - 0 |
| Lighting Fixtures | 1 | LS | 6,000.00 | 6,000.00 | 12,000.00 | 12,000.00 | 18,000.00 |
| Emergency Lighting System | 1 | LS | - 0 | - 0 | 2,750.00 | 2,750.00 | 2,750.00 |
| Lighting Controls (includes plug load) | 1 | LS | 550.00 | 550.00 | 1,200.00 | 1,200.00 | 1,750.00 |
| Exterior Lighting | 1 | LS | 2,200.00 | 2,200.00 | 2,200.00 | 2,200.00 | 4,400.00 |
| Receptacles | 1 | LS | 2,750.00 | 2,750.00 | 1,200.00 | 1,200.00 | 3,950.00 |
| HVAC Equipment Connections | 1 | LS | 1,800.00 | 1,800.00 | 1,700.00 | 1,700.00 | 3,500.00 |
| 125 Amp Breaker | 1 | EA | 700.00 | 700.00 | 1,700.00 | 1,700.00 | 2,400.00 |
| 45KVA Transformer | 1 | EA | 1,800.00 | 1,800.00 | 2,500.00 | 2,500.00 | 4,300.00 |
| Panel Feeder | 1 | LS | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 | 10,500.00 |
| New Panelboard | 2 | EA | 1,000.00 | 2,000.00 | 2,000.00 | 4,000.00 | 6,000.00 |
| Branch Circuits | 1 | LS | 1,750.00 | 1,750.00 | 1,200.00 | 1,200.00 | 2,950.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 25,750.00 | | 35,950.00 | |
| SUBTOTAL | | | | | | | 61,700.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 9,255.00 |
| Sub-Contractor's Profit | | | | | | 10.00% | 7,095.50 |
| FL State Sales Tax | | | | | | 7.00% | 2,516.50 |
| TOTAL | | | | | | | $ 80,567.00 |
Div27
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| COMMUNICATIONS | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| NIPR/TELE Outlets | 1 | EA | 300.00 | 300.00 | 250.00 | 250.00 | 550.00 |
| 1" Conduit | 1 | LS | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 1,500.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 1,300.00 | | 750.00 | |
| SUBTOTAL | | | | | | | 2,050.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 307.50 |
| Sub-Contractor's Profit | | | | | | 10.00% | 235.75 |
| FL State Sales Tax | | | | | | 7.00% | 52.50 |
| TOTAL | | | | | | | $ 2,645.75 |
Div28
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRONIC SAFETY AND SECURITY | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Wall Speakers/Stobes | 5 | EA | 120.00 | 600.00 | 220.00 | 1,100.00 | 1,700.00 |
| Ceiling Strobes | 2 | EA | 100.00 | 200.00 | 160.00 | 320.00 | 520.00 |
| Pull Stations | 5 | EA | 60.00 | 300.00 | 100.00 | 500.00 | 800.00 |
| Replace Existing System | 1 | LS | 4,000.00 | 4,000.00 | 5,400.00 | 5,400.00 | 9,400.00 |
| System Wiring and Conduit | 1 | LS | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | 6,500.00 |
| Testing | 1 | LS | 2,000.00 | 2,000.00 | 500.00 | 500.00 | 2,500.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 10,100.00 | | 11,320.00 | |
| SUBTOTAL | | | | | | | 21,420.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 3,213.00 |
| Sub-Contractor's Profit | | | | | | 10.00% | 2,463.30 |
| FL State Sales Tax | | | | | | 7.00% | 792.40 |
| TOTAL | | | | | | | $ 27,888.70 |
Div32
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| Fill Material/Compaction/Grading | 250 | CY | 22.00 | 5,500.00 | 22.00 | 5,500.00 | 11,000.00 |
| Concrete | 222 | SY | 8.00 | 1,776.00 | 25.00 | 5,550.00 | 7,326.00 |
| FDOT SP 12.5 Asphalt | 116 | SY | 6.00 | 696.00 | 22.00 | 2,552.00 | 3,248.00 |
| 6" Graded Aggregate Base | 116 | SY | 5.00 | 580.00 | 18.50 | 2,146.00 | 2,726.00 |
| 12" Compacted Subgrade | 116 | SY | 3.00 | 348.00 | - 0 | - 0 | 348.00 |
| FDOT Type F Curb | 143 | LF | 6.00 | 858.00 | 22.00 | 3,146.00 | 4,004.00 |
| 8" PVC Roof Collection System | 142 | LF | 32.50 | 4,615.00 | 25.00 | 3,550.00 | 8,165.00 |
| | | | - 0 | | - 0 | - 0 |
| 12" PVC Roof Collection System | 62 | LF | 35.00 | 2,170.00 | 28.00 | 1,736.00 | 3,906.00 |
| 18" HDPE Stormwater Piping | 75 | LF | 42.00 | 3,150.00 | 32.00 | 2,400.00 | 5,550.00 |
| 18" Nyloplast Inlet | 2 | EA | 1,300.00 | 2,600.00 | 2,400.00 | 4,800.00 | 7,400.00 |
| Doghouse Stormwater Manhole | 1 | EA | 4,500.00 | 4,500.00 | 4,800.00 | 4,800.00 | 9,300.00 |
| Stormwater Cleanout | 4 | EA | 450.00 | 1,800.00 | 1,200.00 | 4,800.00 | 6,600.00 |
| Place/Water Sod | 150 | SY | 3.00 | 450.00 | 5.00 | 750.00 | 1,200.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 29,043.00 | | 41,730.00 | |
| SUBTOTAL | | | | | | | 70,773.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 10,615.95 |
| Sub-Contractor's Profit | | | | | | 10.00% | 8,138.90 |
| FL State Sales Tax | | | | | | 7.00% | 2,921.10 |
| TOTAL | | | | | | | $ 92,448.95 |
Div33
| CONSTRUCTION COST ESTIMATE | | | DATE | |
| | | 45,065.00 | |
| PROJECT | | | | BASIS FOR ESTIMATE |
| CP1033732 ADD/ALTER SPACE DEFADD/ALTER SPACE DEFIECIENCES 8 SOS BUILDING 90145 | | | | CODE A (No design completed) |
| LOCATION | | | | CODE B (Preliminary design) |
| HURLBURT FIELD, FLORIDA | | | | CODE C (Final design) |
| COMPANY | | PROJECT NO. | | OTHER (Specify) |
| IGE | | | CP1033732 | |
| DRAWING NO. | ESTIMATOR | | | CHECKED BY |
| QUANTITY | | LABOR | | MATERIAL | | |
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| UTILITIES | | | | | | | |
| | | | - 0 | | - 0 | - 0 |
| 10" Water line-fittings included | 86 | LF | 65.00 | 5,590.00 | 80.00 | 6,880.00 | 12,470.00 |
| 4" Sewer Lateral | 1 | LS | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | 4,000.00 |
| 2" Water service | 1 | LS | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | 5,000.00 |
| Bollards | 8 | EA | 160.00 | 1,280.00 | 230.00 | 1,840.00 | 3,120.00 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| | | | - 0 | | - 0 | - 0 |
| TOTAL LABOR/MATERIALS | | | | 9,870.00 | | 14,720.00 | |
| SUBTOTAL | | | | | | | 24,590.00 |
| Sub-Contractor's Overhead | | | | | | 15.00% | 3,688.50 |
| Sub-Contractor's Profit | | | | | | 10.00% | 2,827.85 |
| FL State Sales Tax | | | | | | 7.00% | 1,030.40 |
| TOTAL | | | | | | | $ 32,136.75 |