Question-Answer_FA4417-15-R-0015.docx
DOCX document 24 KB Posted
- Attached to
- Repair HVAC EOD Bldg 90621 Federal contract opportunity
- Solicitation number
- FA4417-15-R-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4417-15-R-0015-0001_Amendment_1.pdf | ||
| Pre-Proposal_Site_Visit_Memo_ _Sign-In_Sheet.pdf | ||
| Pre-Proposal_Site_Visit_Memo_ _Sign-In_Sheet.pdf | ||
| FA4417-15-R-0015_REPAIR_HVAC_EOD_BLDG_90621.pdf | ||
| Atch_3_-_Wage_Determination.pdf | ||
| Atch_1_Specifications_FTEV_12-1101.pdf | ||
| Atch_5_-_Financial_Reference_Sheet.pdf | ||
| Atch_4_-_Past_Performance_Questionnaire.pdf | ||
| Atch_2_Drawings_FTEV_12-1101.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. FA4417-15-R-0015
Repair HVAC EOD, Bldg 90621
QUESTIONS & ANSWERS
22 April 2015
Question 1: Plans specify 2'-6" of spray foam insulation around the perimeter of the building where the roof/wall join. However, the floor plan is not to scale and no dimensions are given. So, there is no accurate way to calculate area of foam insulation.
Answer: The reflective ceiling plan shown on sheet A-1 is drawn to scale, 1/8" = 1'-0. If they plot the drawing out to actual size they will be able to scale the drawing.
-END QUESTIONS & ANSWERS -