Atch 9. Schedule of Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_FA309919RA0080005_SF_30.pdf | ||
| Amendment_Attachment_1_Responses_to_Questions.pdf | ||
| FA309919RA0080004_SF_30.pdf | ||
| Solicitation_Amendment_FA309919RA0080003_SF_30.pdf | ||
| Solicitation_Amendment_FA309919RA0080002_SF_30.pdf | ||
| SOW_18-1007_Repair_CDC_Kitchen_B476_(003).pdf | ||
| 10_-_AF_3000_(Example).pdf | ||
| 6_-_LAFB_Specific_Environmental_Requirements.pdf | ||
| 12_-_DD_1354.pdf | ||
| 3_-_LAFB_Division_01_Specifications.pdf | ||
| 7_-_AF_Form_3952.pdf | ||
| 8_-_AF_Form_103.pdf | ||
| 4_-_Kitchen_Layout_(Sections).pdf | ||
| MFR__Atch_2_LAFB_Architectual_Compatibility.pdf | ||
| 11_-_Progress_Schedule_&_Report.xlsx | XLSX spreadsheet | |
| Solicitation_-_FA309919RA008.pdf | ||
| 1_-_AETC_Installation_Excellence_Guide.pdf | ||
| 5_-_Existing_Pictures.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittals Schedule
| SCHEDULE OF SUBMITTALS | PROJECT # MXDP 18-1007 | PROJECT TITLE Repair Kitchen CDC, B476 | SOLICITATION / CONTRACT NO. | ||||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | STATEMENT OF OBJECTIVES REFERENCE | CERTIFICATION OF COMPLIANCE | DESIGN DRAWINGS | SPECIFICATIONS | DESIGN CALCULATIONS | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA/ MSDS | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPR | DIS | ||||||||||||||||||||||||||
| Pre-Construction Submittals | |||||||||||||||||||||||||||
| AF IMT 103 | SOW Paragraph 4.5 | 1 | NLT 5 days after NTP #1 | ||||||||||||||||||||||||
| Progress Schedule | SOW Paragraph 5.3 | 1 | NLT 5 days after NTP #1 | ||||||||||||||||||||||||
| Resumes for QC Manager and Site Superintendent | Div 1 Specs Paragrah 4 | 1 | NLT 5 days after NTP #1 | ||||||||||||||||||||||||
| Quality Control Plan | Div 1 Specs Paragrah 4 | 1 | NLT 14 days after NTP #1 | ||||||||||||||||||||||||
| Safety Plan | Div 1 Specs Paragrah 3 | 1 | NLT 14 days after NTP #1 | ||||||||||||||||||||||||
| Construction Site Plan | Div 1 Specs Paragrah 12 | 1 | NLT 14 days after NTP #1 | ||||||||||||||||||||||||
| Certificate of Contractor's Safety Compliance | Div 1 Specs Paragrah 3 | 1 | NLT 14 days after NTP #1 | ||||||||||||||||||||||||
| Construction Submittals | |||||||||||||||||||||||||||
| Progress Report | SOW Paragraph 5.3 | 1 | Bi-Weekly | ||||||||||||||||||||||||
| Material Submittals | |||||||||||||||||||||||||||
| Food Safe Textured Epoxy | SOW Paragrpah 3.2 | 1 | 1 | 1 | 1 | 1 | 1 | NLT 14 days after NTP #1 | |||||||||||||||||||
| Tile Flooring | SOW Paragrpah 3.2 | 1 | 1 | 1 | 1 | 1 | 1 | NLT 14 days after NTP #1 | |||||||||||||||||||
| Paint | SOW Paragrpah 3.1 | 1 | 1 | 1 | 1 | 1 | 1 | NLT 14 days after NTP #1 | |||||||||||||||||||
| Lower Wall Protectors | SOW Paragrpah 3.1 | 1 | 1 | 1 | 1 | 1 | 1 | NLT 14 days after NTP #1 | |||||||||||||||||||
| Baseboard | SOW Paragrpah 3.2 | 1 | 1 | 1 | 1 | 1 | 1 | NLT 14 days after NTP #1 | |||||||||||||||||||
| Ceiling Tiles | SOW Paragrpah 3.3 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | NLT 14 days after NTP #1 | ||||||||||||||||||
| Cabinets | SOW Paragrpah 3.4 | 1 | 1 | 1 | 1 | 1 | NLT 14 days after NTP #1 | ||||||||||||||||||||
| Close-Out Submittals | |||||||||||||||||||||||||||
| Punch List | Div 1 Specs Paragrah 13 | 1 | 1 | Prior to requesting pre-final inspection | |||||||||||||||||||||||
| Warranty Management Plan | Div 1 Specs Paragrah 10 | 1 | NLT 7 days after Final Inspection | ||||||||||||||||||||||||
| Interim DD 1354 | Div 1 Specs Paragrah 13 | 1 | NLT 14 days prior to Pre-Final Inspection | ||||||||||||||||||||||||
| Final DD 1354 | Div 1 Specs Paragrah 13 | 1 | At Final Inspection | ||||||||||||||||||||||||
| Schedule of Submittals Template, Feb 05 (SAF/AQCP) |
&R&"Times New Roman,Regular"&12Page &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal