Attachment_2_-_Design_Drawings,_B448.pdf
PDF 6 MB Posted
- Attached to
- Replace Cooling System B448 Federal contract opportunity
- Solicitation number
- FA3099-18-R-0012
About this file
Design Drawings
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pr oj ec t M an ag em en t I ni tia ls
D es ig ne r:
C he ck ed
Ap pr ov ed
Fi le na m e:
AN
SI
D
2" x
4" La st P lo tte d:
Project Issue Date:
Project Status:
Project Address:
Project #:
Name:
Project Prepared for
Project Information
Project Issued for:
ARCHITECTURE STRUCTURAL MECHANICAL ELECTRICAL PLUMBING
D :\R ev it\
6 6
_B
8_ M
EC
H
_R
_v ic to r ia
.h er m an
.rv t
4/
/2
5:
:5
P
M C he ck er D es ig ne r
LAUGHLIN A.F.B. B448 HVAC REPLACEMENT
MXDP 16-1040, CONTRACT NUMBER 3099-13-D-0001, TASK ORDER
FA3099-17-F-0039
04/18/2018
100% CORRECTED FINAL DESIGN
60556601
LAUGHLIN A.F.B.
47TH CONTRACTING FLIGHT/LGCB
171 ALABAMA AVE, BUILDING 7
LAUGHLIN AFB, TX 78843-5102
C
R E
G I S
T E R E D A R C
H
IT
E
C T
S
T A T E O F T E X A S
HR I S HE I K K I L A
c
DRAWN BY
S H
EE
T
TI
TL
E
P R
O
JE
C T
TI
TL
E
OF 21
LEAD DESIGNER
CLIENT PROJECT NUMBERTECH REVIEWER
SHEETDESIGNED BY
DATE
SCALE
DATE
TEXAS SERIAL NO.
AS NOTED
C O
N
TR
A C
T N
U M
B E
R
9-
-D
-0
T
A S
K O
R D
E R
F A
-1 7-
F-
1 2 3 4 5
C
B
A
CHRISTOPHER O. HEIKKILA
15555
TEXAS REGISTRATION NO: 3580
4/
/2
5:
:5
P
M D
:\R ev it\
_B
8_
M
EC
H _R
_v ic to ria .h er m an .rv t
04/18/2018
04/18/2018
G
EN
ER
AL
N O
TE
S
A
ND
S H
EE
T
IN
DE
X
G-002
S.K
V.H
V.H V.H
LAUGHLIN A.F.B.
DEL RIO, TX
AECOM
http://www.aecom.com
19219 KATY FREEWAY
SUITE 100
HOUSTON, TX 77094
LA
U
G H
LI
N
A .F
.B . B
H
VA
C R
EP
LA
CE
M
EN
T
MXDP 16-1040
04/18/2018
1. DO NOT SCALE DRAWINGS. USE PRINTED DIMENSIONS ONLY. VERIFY ALL DIMENSIONS PRIOR TO START OF WORK. IN THE EVENT
OF ANY DISCREPANCY, NOTIFY AECOM AND OBTAIN RESOLUTION BEFORE PROCEEDING.
2. PROJECT DIMENSIONING CONVENTION:
A - EXTERIOR PLAN DIMENSIONS ARE FROM THE PROPERTY LINE TO THE EXTERIOR FACE OF CONCRETE, MASONRY OR STEEL WALL GIRT UNLESS NOTED OTHERWISE. OTHER EXTERIOR PLAN DIMENSIONS ARE TO CENTERLINE OF COLUMNS
AND TO ROUGH OPENINGS OF DOORS, WINDOWS AND LOUVERS, UNLESS NOTED OTHERWISE.
B - INTERIOR PLAN DIMENSIONS ARE TO FACE OF FINISH, JAMBS OF DOORS AND WINDOWS IN STUD WALLS, CENTERLINE OF COLUMNS, FACE OF CONCRETE OR MASONRY WALLS, ROUGH OPENING OF DOORS, WINDOWS AND LOUVERS IN CONCRETE OR MASONRY WALLS AND CLEAR OPENING OF COILING DOORS. OTHER INTERIOR PLAN DIMENSIONS ARE TO CENTERLINE
OF FLOOR MOUNTED FIXTURES AND HAND OR GUARD RAILS, UNLESS NOTED OTHERWISE.
3. CONDITIONS DEPICTED ON DRAWINGS HAVE BEEN COMPILED FROM AVAILABLE INFORMATION AND MUST BE VERIFIED WITH ON-
SITE CONDITIONS.
4. NOTIFY AECOM OF ANY AND ALL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS BEFORE PROCEEDING WITH THAT PORTION OF THE WORK. FAILURE TO NOTIFY AECOM WILL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO PERFORM THE WORK AS INTENDED BY THE CONTRACT DOCUMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL WORK ARISING FROM SUCH FAILURE TO COORDINATE DISCREPANCIES TO THE SATISFACTION OF AECOM.
5. PROTECT AND PRESERVE ALL EXISTING ITEMS SCHEDULED TO REMAIN. REPAIR AND/OR REPLACE ANY ITEMS DAMAGED DURING THE COURSE OF THE WORK TO THE SATISFACTION AND APPROVAL OF AECOM WITHOUT ADDITIONAL COST.
6. VERIFY ALL EXISTING DIMENSIONS, CONDITIONS AND CLEARANCES PRIOR TO THE SUBMITTAL OF SHOP DRAWINGS.
7. ALL SLEEVES, OPENINGS, ETC. FOR CONDUIT, PIPES, DUCTS, ETC. THROUGH FLOOR SLABS AND RATED PARTITIONS ARE TO BE FIRE SEALED IN ACCORDANCE WITH FIRE RATED ASSEMBLY DESIGNS, APPLICABLE CODES AND FIRE MARSHALL'S REQUIREMENTS.
8. PROVIDE ALL BLOCKING AND ANCHORAGE AS NECESSARY FOR PROPER INSTALLATION OF NEW WORK. REFER TO
SPECIFICATIONS AND DRAWINGS.
9. WHERE WORK OCCURS IN AREAS WITH EXISTING FINISHES TO REMAIN, REFINISH DISTURBED AREAS TO MATCH EXISTING
FINISHES AND MATERIALS, UNLESS NOTED OR DIRECTED OTHERWISE.
10. PROVIDE LINTELS WHERE REQUIRED, OVER ALL OPENINGS IN MASONRY PARTITIONS AND WALLS FOR DOORS, WINDOWS, DUCTWORK, ETC.
11. FOR GENERAL DEMOLITION AND REPAIR NOTES, REFER TO DEMOLITION PLANS.
12. THE FACE OF EVERY CONTINUOUS PARTITION SHALL BE FLUSH WITHOUT OFFSET. CHANGES IN PARTITION THICKNESS SHALL OCCUR AT CORNERS OR OTHER LOCATIONS OR FEATURES WHICH INTERRUPT THE PLANE OF THE PARTITION. FACES OF CORRIDOR PARTITIONS SHALL ALIGN ALONG THEIR ENTIRE LENGTH, REGARDLESS OF CHANGES OF THE CORRIDOR PARTITIONS.
13. ADDITIONAL PLAN INFORMATION IS SHOWN ON LARGER SCALE PLANS WHERE INDICATED BY KEYED REFERENCE. LARGE SCALE
DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
14. COORDINATE CONCRETE CURBS AND PADS WITH EQUIPMENT AS REQUIRED.
15. FOR FIRE RATED PARTITION INFORMATION SEE LIFE SAFETY PLANS.
17. ALL MISCELLANEOUS WOOD BLOCKING, GROUNDS AND FURRING, AS REQUIRED, SHALL BE FIRE RETARDANT TREATED. REFER
TO SPECIFICATIONS.
18. ANY MATERIALS DELIVERED OR WORK PERFORMED, CONTRARY TO THE DRAWINGS, SPECIFICATIONS AND APPROVED SHOP DRAWINGS, SHALL BE REMOVED BY THE CONTRACTOR AT THEIR OWN EXPENSE. THE SAME SHALL BE REPLACED WITH OTHER MATERIALS OR WORK SATISFACTORY TO AECOM. THE CONTRACTOR SHALL ALSO ASSUME THE COST OF REPLACING THE WORK
WHICH MAY BE DISTURBED.
19. FOR ALL PARTITIONS REFER TO PARTITION SYMBOLS ON DRAWINGS AND THE PARTITION TYPE SCHEDULE FOR PARTITION MATERIALS AND FINISHES. REFER TO LIFE SAFETY DRAWINGS FOR LOCATION OF FIRE RATED PARTITIONS AND SMOKE PARTITIONS.
20. PROTECT THE OWNER'S PROPERTY, EQUIPMENT AND EMPLOYEES FROM INJURY AND DAMAGE.
21. ALL HVAC, PLUMBING, SPRINKLER AND ELECTRICAL LINES ARE TO BE COORDINATED TO PREVENT ANY CONFLICTS. ANY CONFLICTS WHICH RESULT IN A RELOCATION OF A FINISHED SURFACE MUST BE BROUGHT TO THE ATTENTION OF AECOM PRIOR TO
INSTALLATION.
22. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED EQUIPMENT, LIGHTING OR OTHER
MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS TO ASSURE A SECURE INSTALLATION.
23. FIRESTOPPING SHALL BE INSTALLED IN WALL CAVITIES AT ALL ELECTRICAL OUTLETS, JUNCTION BOXES, SWITCH BOXES, THERMOSTAT BOXES, PHONE JACK, CARD READERS OR SIMILAR OBJECTS THAT PENETRATE FIRE RATED WALLS.
24. ACOUSTICAL INSULATION SHALL BE INSTALLED IN WALL CAVITIES AT LOCATIONS INDICATED ON ARCHITECTURAL PLANS AND
PARTITION TYPE DESIGNATIONS.
25. REFER TO REFLECTED CEILING PLANS FOR CEILING SYMBOLS LEGEND.
26. ALL ABBREVIATIONS OR SYMBOLS INDICATED ARE NOT NECESSARILY REFERRED TO OR CONTAINED WITHIN THESE
CONSTRUCTION DOCUMENTS.
GENERAL NOTES:
SHEET INDEX
SHEET
NUMBER SHEET NAME
SHEET ISSUE
DATE
G-001 COVER SHEET 04/18/2018
G-002 GENERAL NOTES AND SHEET INDEX 04/18/2018
AS-101 EQUIP SCREEN PLAN, ELEVATIONS, & SECTION 03/05/2018
S-001 GENERAL NOTES & SPECIAL INSPECTIONS 04/18/2018
S-101 FOUNDATION AND WALL FRAMING PLAN AND DETAILS 04/18/2018
M-001 SYMBOLS, LEGENDS, GENERAL NOTES 04/18/2018
MD-101 MECHANICAL DEMOLITION PLAN 04/18/2018
MD-102 MECHANICAL DEMOLITION PHOTOS 04/18/2018
M-101 MECHANICAL RENOVATION PLAN 04/18/2018
M-102 MEP SITE PLAN 04/18/2018
M-501 MECHANICAL DETAILS 04/18/2018
M-601 MECHANICAL SCHEDULES AND DETAILS 04/18/2018
M-701 CHILLED WATER CONTROLS 04/18/2018
M-702 CONTROL SCHEMATICS 04/18/2018
E-000 ELECTRICAL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS 03/05/2018
ED101 ELECTRICAL DEMOLITION PLAN 03/05/2018
ES101 ELECTRICAL PARTIAL SITE PLAN 03/05/2018
EP101 ELECTRICAL RENOVATION PLAN 03/05/2018
E-500 DETAILS 03/05/2018
E-601 ELECTRICAL ONE-LINE DIAGRAM 03/05/2018
E-602 ELECTRICAL PANEL SCHEDULES 03/05/2018
1. CONTRACTOR SHALL INCLUDING PHASING IN THE DEMOLITION PLAN AND PROJECT SCHEDULE.
2. PHASING SHALL BE APPROVED BY CONTRACTING OFFICER PRIOR TO IMPLEMENTATION. PLAN SHALL INCLUDE DETAILED INFORMATION REGARDING ALL SYSTEM DOWNTIMES WHEN HEATING, COOLING, AND/OR POWER WILL BE UNAVAILABLE.
3. WORK SHALL BE SCHEDULED TO LIMIT DOWN TIME OF THE CENTRAL UTILITY PLANT.
4. THE PHASING PLAN SHALL INCLUDE THE FOLLOWING:
A. OPERATION OF TEMPORARY CHILLER AS NEEDED TO PROVIDE COOLING DURING CHILLER, COOLING TOWER AND
ASSOCIATED SYSTEM DEMOLITION. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TEMPORARY MEASURES REQUIRED, INCLUDING, BUT NOT LIMITED TO: CHILLERS, PUMPS, POWER AND CONTROLS.
B. EXISTING CHILLED WATER PUMP OPERATION AS NEEDED UNTIL NEW OR TEMPORARY PUMPS ARE PROVIDED.
C. EXISTING TRANSFORMER TO REMAIN OPERATIONAL UNTIL NEW TRANSFORMER HAS BEEN TESTED.
D. WORK IN BUILDINGS 449 AND 450 SCHEDULED WITH ADVANCED NOTICE TO OCCUPANTS.
PHASING NOTES:
N o.
R ev is io n / I ss ue
D at e By
Ap p' d
0%
C O
R R
EC
TE
D F
IN
A
L D
ES
IG
N
/1 8/
AS-101 2
AS-101
NEW CHILLER
RE: MECHANCIAL
EXISTING MECHANICAL YARD & SCREEN
AS-101
1'
4"
1'
4"
0"
1' - 4" 8' - 2" 1' - 4" 8' - 2" 1' - 4" 8' - 2" 1' - 4"
329' - 1 1/4"
AS-101
01 FIRST FLOOR
EL 0' - 0"
9'
0"
TO SOG
EL 0' - 0"
TO WALL
EL 8' - 8"
A
9'
0"
BRICK TIE @ 24"
O.C.
FACE BRICK
TO MATCH EXISTING
CONCRETE SLAB
AND GRADE BEAM
01 FIRST FLOOR
EL 0' - 0"
9'
0"
8'
8"
C
R E
G I S
T E R E D A R C
H
IT
E
C T
S
T A T E O F T E X A S
HR I S HE I K K I L A
N
N c
DRAWN BY
S H
EE
T
TI
TL
E
P R
O
JE
C T
TI
TL
E
LEAD DESIGNER
CLIENT PROJECT NUMBERTECH REVIEWER
SHEETDESIGNED BY
DATE
SCALE
DATE
TEXAS SERIAL NO.
NORTH
PROJECT
NORTH
AS NOTED
C O
N
TR
A C
T N
U M
B E
R
9-
-D
-0
T
A S
K O
R D
E R
F A
-1 7-
F-
1 2 3 4 5
C
B
A
CHRISTOPHER O. HEIKKILA
15555
3/
/2
:5 5:
A
M D
:\R ev it\
_B
8_
AR
C
H _R
_v ic to ria .h er m an .rv t
04/18/2018
04/03/2018
EQ
U
IP
S
C
RE
EN
P
LA
N, E
LE
VA
TI
O N
S, S
EC
TI
O
N
AS-101
VH
JG
JG JG
LAUGHLIN A.F.B.
DEL RIO, TX
AECOM
http://www.aecom.com
19219 KATY FREEWAY
SUITE 100
HOUSTON, TX 77094
LA
U
G H
LI
N
A .F
.B . B
H
VA
C R
EP
LA
CE
M
EN
T
03/05/2018
Scale: 1/2" = 1'-0"
EQUIPMENT SCREEN WALL - PLAN1
Scale: 1/2" = 1'-0"AS-101
EQUIPMENT SCREEN WALL @ WEST WALL
(EAST WALL SIM)2
AS-101 Scale: 3/4" = 1'-0"
4 EQUIPMENT SCREEN - SECTION
Scale: 1/2" = 1'-0"AS-101
EQUIPMENT SCREEN ELEVATION @ NORTH WALL3
NOTE: EAST AND WEST WALLS TO
MATCH EXISTING WING WALLS.
RE: PHOTO ABOVE
NOTE: WALL TO MATCH EXISTING
NORTH WALL.
RE: PHOTO ABOVE
N o.
R ev is io n / I ss ue
D at e By
Ap p' d
0%
C O
R R
E C
TE
D
F
IN
A L
D
ES
IG
N
4/
/2
IBC 1704.2.5
INSPECTION OF FABRICATORS PER IBC 1704
1. WHERE FABRICATION OF STRUCTURAL LOAD-BEARING MEMBERS AND ASSEMBLIES IS BEING PERFORMED ON THE PREMISES OF A FABRICATOR'S SHOP, SPECIAL INSPECTION OF THE FABRICATED ITEMS IS REQUIRED.
2. THE SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR MAINTAINS DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES THAT PROVIDE A BASIS FOR INSPECTION, CONTROL OF THE WORKMANSHIP, AND THE FABRICATOR'S ABILITY TO CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS. THE SPECIAL INSPECTOR SHALL REVIEW THE PROCEDURES FOR COMPLETENESS AND ADEQUACY
RELATIVE TO THE CODE REQUIREMENTS FOR THE FABRICATOR'S SCOPE OF WORK.
3. SPECIAL INSPECTIONS ARE NOT REQUIRED WHERE THE WORK IS DONE ON THE PREMISES OF A FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. APPROVAL SHALL BE BASED UPON REVIEW OF THE FABRICATOR'S WRITTEN PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC AUDITING OF FABRICATION PRACTICES BY AN APPROVED SPECIAL INSPECTION AGENCY. AT COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE BUILDING OFFICIAL, ENGINEER, AND OWNER STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH THE
APPROVED CONSTRUCTION DOCUMENTS.
IBC 1705.6
REQUIRED VERIFICATION AND INSPECTION OF SOILS
1. VERIFICATION OF SOILS AND SPECIAL INSPECTIONS FOR SUBGRADE SHALL BE AS REQUIRED IN THE FOLLOWING
TABLE.
2. THE GEOTECHNICAL ENGINEERING REPORT NOTED IN THE CONSTRUCTION DOCUMENTS SHALL BE USED TO
DETERMINE COMPLIANCE.
3. REFER TO PROJECT SPECIFICATIONS FOR QUANTITY AND FREQUENCY OF INSPECTIONS AND TESTS.
VERIFICATION AND INSPECTION
C O
N T
IN
U
O U
S
P E
R
IO
D
IC
N O
T
A P
P L
IC
A
B L
E
REFERENCED
STANDARD
IBC
REFERENCE
PROJECT
SPECIFICATION
SECTION
1.VERIFY MATERIALS BELOW SHALLOW
FOUNDATIONS ARE ADEQUATE TO
ACHEIVE THE DESIGN BEARING
CAPACITY.
2.
X
GEOTECHNICAL
ENGINEERING REPORT
1705.6
02210, PART 3, FIELD
QUALITY CONTROL
VERIFY EXCAVATIONS ARE EXTENDED
TO PROPER DEPTH AND HAVE
REACHED PROPER MATERIAL
X
GEOTECHNICAL
ENGINEERING REPORT
1705.6
02210, PART 3, FIELD
QUALITY CONTROL
3. PERFORM CLASSIFICATION AND
TESTING OF COMPACTED FILL
MATERIALS
X
GEOTECHNICAL
ENGINEERING REPORT
1705.6
02210, PART 3, FIELD
QUALITY CONTROL
4. VERIFY USE OF PROPER MATERIALS,
DENSITIES AND LIFT THICKNESSES
DURING PLACEMENT AND
COMPACTION OF COMPACTED FILL.
X
GEOTECHNICAL
ENGINEERING REPORT
1705.6
02210, PART 3, FIELD
QUALITY CONTROL
5. PRIOR TO PLACEMENT OF
COMPACTED FILL, OBSERVE
SUBGRADE AND VERIFY THAT SITE
HAS BEEN PREPARED PROPERLY.
X
GEOTECHNICAL
ENGINEERING REPORT
1705.6
02210, PART 3, FIELD
QUALITY CONTROL
c
DRAWN BY
S H
E E
T T
IT
L
E
P R
O J E
C T
T
IT
L E
LEAD DESIGNER
CLIENT PROJECT NUMBERTECH REVIEWER
SHEETDESIGNED BY
DATE
SCALE
DATE
TEXAS SERIAL NO.
AS NOTED
C O
N T
R A
C T
N U
M B
E R
-1
-D
-0
S
K O
R D
E R
F A
-1
-F
-0
1 2 3 4 5
C
B
A
/2
/2
:5 :4
A
M C
R e v itL o c a l\6
B
S
T R
R je re m y .k u n k e l@ a e c o m .c o m
.r v t
04/18/18
G E
N E
R A
L N
O T
E S
S
P E
C
IA
L
IN
S
P E
C T
IO
N
S
S-001
ER
CM
JK JK
LAUGHLIN A.F.B.
DEL RIO, TX
AECOM
http://www.aecom.com
19219 KATY FREEWAY
SUITE 100
HOUSTON, TX 77094
L A
U G
H L
IN
A
.F .B
B
H
V A
C
R E
P L
A C
E M
E N
T
03/01/18
01 00 00 GENERAL CONDITIONS
1. THE STRUCTURAL ENGINEERING LOAD CRITERIA AND DESIGN IS BASED ON AND IN ACCORDANCE WITH UFC 1-200-01 (INTERNATIONAL BUILDING CODE [IBC] 2015), UFC 3-301-01 AND ASCE-7, LATEST EDITION.
2. COORDINATE WITH ALL DRAWINGS FOR PERTINENT INFORMATION RELATED TO THE STRUCTURAL WORK.
ANY CHANGES TO THE STRUCTURAL SYSTEMS SHALL BE RE-DESIGNED BY A PROFESSIONAL ENGINEER AT NO COST TO THE OWNER OR A/E AND SUBMITTED TO THE A/E FOR REVIEW. SUBMITTAL SHALL BE
ACKNOWLEDGED IN WRITING BEFORE BEGINNING CONSTRUCTION.
3. SEE THE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS NOT SHOWN ON THE STRUCTURAL DRAWINGS.
ALL DIMENSIONS AND ELEVATIONS SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE VERIFIED BY THE CONTRACTOR AND SHALL CONFORM TO THOSE SHOWN ON THE ARCHITECTURAL DRAWINGS. REPORT ALL DISCREPANCIES TO THE A/E FOR RESOLUTION BEFORE PROCEEDING. THE CONTRACTOR SHALL COORDINATE STRUCTURAL PLANS WITH ALL OTHER CONSTRUCTION DOCUMENTS AND SHALL VERIFY THE SIZE, WEIGHT, AND LOCATION OF MECHANICAL EQUIPMENT, OPENINGS, HOLES, AND SLEEVES THROUGH ALL STRUCTURAL ELEMENTS WITH MECHANICAL, ELECTRICAL AND PLUMBING CONTRACTORS. NOTIFY ARCHITECT OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH WORK.
4. ALL DETAILS AND SECTIONS SHOWN ON THE STRUCTURAL DRAWINGS ARE INTENDED TO BE TYPICAL AND
SHALL BE CONSTRUED TO APPLY TO SIMILAR CONDITIONS ELSEWHERE.
5. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR CONSTRUCTION TESTING AND INSPECTION
AS OUTLINED IN THE STATEMENT OF SPECIAL INSPECTIONS.
6. THE PROJECT SPECIFICATIONS SHALL BE CONSIDERED AN INTEGRAL PART OF THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL REVIEW THE SPECIFICATIONS PRIOR TO CONSTRUCTION AND NOTIFY THE
ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
5. GENERAL CONTRACTOR SHALL SCHEDULE SUBMITTALS SUFFICIENTLY IN ADVANCE OF THE DATE REQUIRED TO ALLOW REASONABLE TIME FOR DELIVERY, PROCESSING AND REVIEW BY THE DESIGN TEAM. THIS SHALL INCLUDE A MINIMUM OF TEN (10) WORKING DAYS, EXCLUDING DELIVERY TIME, FOR ENGINEER'S PROCESSING AND REVIEW OF SHOP DRAWINGS. INCLUDE TIME FOR CONTRACTOR’S RESUBMISSION AND SUBSEQUENT REVIEW IF
NECESSARY.
REVIEW PERIODS CAN NOT BE HONORED WHEN LARGE QUANTITIES OF SHOP DRAWINGS ARE SUBMITTED AT ONE TIME. WHEN THIS HAPPENS, THE CONTRACTOR SHALL SUBMIT AN ITEMIZED LIST INDICATING PRIORITIES AND
REASONABLE RETURN DATES.
4. CONCRETE IS A PRE-ENGINEERED MATERIAL DESIGNED BY THE SUPPLIER TO MEET THE STRENGTH AND PERFORMANCE CRITERIA SPECIFIED IN THE CONTRACT DOCUMENTS. CONCRETE MIX DESIGNS SHALL BE IN CONFORMANCE WITH ACI 318, AND SHALL BE SUBMITTED TO THE INDEPENDENT TESTING LAB WITH APPROPRIATE HISTORICAL TEST DATA AND ANALYSIS FOR REVIEW AND APPROVAL. SUBMIT MIX DESIGNS AND
THE TESTING LAB REVIEW TO THE ARCHITECT/ENGINEER FOR REVIEW.
3. SHOP DRAWINGS AND/OR PRODUCT DATA FOR THE FOLLOWING ITEMS ARE TO BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW. THE ENGINEER’S REVIEW WILL BE LIMITED TO CONFORMANCE WITH
DESIGN AND PERFORMANCE CRITERIA SPECIFIED IN THE CONSTRUCTION DOCUMENTS. THE
MANUFACTURER/SUPPLIER AND IT’S SPECIALTY STRUCTURAL ENGINEER ARE RESPONSIBLE FOR THE DESIGN OF THE ITEM(S)/SYSTEM AND WILL RETAIN ALL RIGHTS AND RESPONSIBILITIES FOR THE DESIGN OF THE PRODUCT
AND THE CONNECTIONS TO THE BUILDING STRUCTURE.
A.CONCRETE MIXES
B.CONCRETE FORMWORK
C.COLD-FORMED METAL FRAMING
NO WORK ON STRUCTURAL ELEMENTS SUPPORTING OR RELATED TO THESE ITEMS IS TO PROCEED UNLESS THE REVIEW STAMP CLEARLY INDICATES "REVIEWED" OR "REVIEWED, SEE COMMENTS" BY THE STRUCTURAL
ENGINEER.
2. SHOP DRAWINGS AND/OR PRODUCT DATA FOR THE FOLLOWING ITEMS ARE TO BE SUBMITTED TO THE
STRUCTURAL ENGINEER FOR REVIEW AND APPROVAL:
A.REINFORCING STEEL
B.STRUCTURAL STEEL
C.METAL DECKING
SHOP DRAWINGS ARE TO BE DISTRIBUTED ONLY FROM RETURNED SUBMITTALS BEARING AN INITIALED REVIEW STAMP AND WORK ON THESE ITEMS SHALL NOT PROCEED UNLESS THE STAMP CLEARLY INDICATES THE
DRAWINGS ARE "APPROVED" OR "APPROVED AS NOTED."
1. REFER TO PROJECT SPECIFICATIONS FOR SUBMITTAL REQUIREMENTS.
SHOP DRAWINGS AND SUBMITTALS WILL BE REVIEWED FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH INFORMATION GIVEN AND THE DESIGN CONCEPT EXPRESSED IN THE CONTRACT
DOCUMENTS.
SUBMITTAL REVIEW WILL NOT BE CONDUCTED FOR THE PURPOSE OF DETERMINING THE ACCURACY AND COMPLETENESS OF OTHER DETAILED INFORMATION SUCH AS DIMENSIONS AND QUANTITIES, OR FOR SUBSTANTIATING INSTRUCTIONS FOR INSTALLATION OR PERFORMANCE OF EQUIPMENT OR SYSTEMS DESIGNED
BY THE CONTRACTOR. ALL OF THIS REMAINS THE RESPONSIBILITY OF THE CONTRACTOR.
REVIEW SHALL NOT CONSTITUTE APPROVAL OF SAFETY PRECAUTIONS OR OF ANY CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURE.
01 30 00 SUBMITTALS AND SHOP DRAWINGS
EQUIVALENT LATERAL FORCE PROCEDURE DESIGN
BASE SHEAR = V = 0.042W
DEFLECTION AMPLIFICATION FACTOR (Cd) 3
RESPONSE MODIFICATION FACTOR (R) 3
BEARING WALL - ORDINARY REINFORCED
MASONRY SHEAR WALLS
SEISMIC RESPONSE COEFFICIENT (Cs) 0.042
SEISMIC DESIGN CATEGORY (Ie) 1.0
BUILDING RISK CATEGORY I
1 SECOND PERIODS (S d1) 0.060
DESIGN SPECTRAL RESPONSE ACCELERATION
SHORT PERIODS (S ds) 0.083
DESIGN SPECTRAL RESPONSE ACCELERATION
(S1) 0.053
(Ss) 0.103
MAPPED SPECTRAL RESPONSE ACCELERATION
SOIL SITE CLASS D (ASSUMED)
4. SEISMIC DESIGN PARAMETERS ARE AS FOLLOWS:
DIRECTIONALITY FACTOR, Kd 1.00
TOPOGRAPHIC FACTOR, Kzt 1.00
INTERNAL PRESSURE COEFFICIENT, GCpi ±0.18
WIND EXPOSURE CATEGORY EXPOSURE C
BASIC WIND SPEED (V), (3 SECOND GUST) 105 MPH
3. WIND DESIGN PARAMETERS ARE AS FOLLOWS:
FLAT-ROOF SNOW LOAD (Pf) 0 PSF
GROUND SNOW LOAD (Pg) 0 PSF
2. SNOW LOAD DESIGN PARAMETERS ARE AS FOLLOWS:
BUILDING COMPONENTS SELFWEIGHT
1. DESIGN DEAD LOADS:
01 80 00 STRUCTURAL DESIGN LOADS
02 30 00 FOUNDATIONS
1. FOUNDATIONS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT “"FINAL FOUNDATION AND PAVEMENT DESIGN ANALYSIS, LAUGHLIN AIR FORCE BASE, TEXAS-SECURITY FORCES COMPLEX, BY CESWF-EC-DG, U.S. ARMY CORPS OF ENGINEERS, FORT WORTH DISTRICT", DATED JUNE 2002.
MAXIMUM ALLOWABLE BEARING PRESSURE = 5000 PSF (NET)
FOOTINGS SHALL BE "SOCKETED" 6 INCHES INTO THE WHITE AND BROWN LIMESTONE. THE ACTUAL BEARING
DEPTH SHALL BE DETERMINED IN THE FIELD BY GENERAL CONTRACTOR.
FOR BID PURPOSES ONLY, ASSUME BOTTOM OF FOOTING ELEVATION FOR BUILDING IS 5 FEET BELOW FINISHED
FLOOR.
2. GEOTECHNICAL INFORMATION INDICATED IN THE STRUCTURAL CONSTRUCTION DOCUMENTS IS INTENDED TO REPLICATE THE RECOMMENDATIONS STATED IN THE GEOTECHNICAL ENGINEERING REPORT. PRESENTATION OF THIS INFORMATION IN THE STRUCTURAL DOCUMENTS DOES NOT DEMONSTRATE, STATE OR IMPLY GEOTECHNICAL EXPERTISE ON THE PART OF STRUCTURAL ENGINEER OF RECORD. THE CONTRACTOR SHALL OBTAIN A COPY OF THE REPORT AND COMPLY WITH THE RECOMMENDATIONS INDICATED THEREIN.
3. IF DISCREPANCIES BETWEEN THE REPORT AND CONSTRUCTION DOCUMENTS ARE DISCOVERED, THE REPORT SHALL GOVERN. ALL CLARIFICATIONS AND INTERPRETATIONS OF THE REPORT SHALL BE MADE BY THE GEOTECHINCAL ENGINEER OF RECORD (GER) AND REPORTED TO THE ARCHITECT FOR COORDINATION WITH
THE DESIGN TEAM.
4. NOTIFY THE A/E AS SOON AS POSSIBLE OF ANY UNUSUAL SOIL CONDITIONS OR SOIL CONDITIONS AT VARIANCE WITH TEST BORINGS, SUCH AS UNEXPECTED SPRING OR SEEPAGE WATER, MATERIAL DIFFERING FROM TEST
BORINGS OR SOIL OF QUESTIONABLE BEARING CAPACITY.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN, INSTALLATION AND FINAL CLEARANCE OF ANY
REQUIRED NEEDLING, UNDERPINNING, SHORING OR BRACING OF EXISTING STRUCTURES.
10. COMPLY WITH THE ARCHITECTURAL DRAWINGS FOR LOCATION AND EXTENT OF SPECIAL FINISHES OR
TREATMENTS TO EXPOSED CONCRETE.
9. WELDING OF REINFORCING STEEL IS NOT PERMITTED.
8. THE HARDENED CONCRETE OF HORIZONTAL CONSTRUCTION JOINTS SHALL BE DAMPENED AND THEN THOROUGHLY COVERED WITH A COAT OF CEMENT GROUT OF SIMILAR PROPORTIONS TO THE MORTAR IN THE CONCRETE. THE FRESH CONCRETE SHALL BE PLACED BEFORE THE GROUT HAS ATTAINED ITS INITIAL SET.
7. ALL CONSTRUCTION JOINTS BELOW GRADE SHALL HAVE WATERSTOPS.
6. WHERE CONSTRUCTION JOINTS ARE REQUIRED BUT ARE NOT INDICATED ON THE DRAWINGS, THEY SHALL BE LOCATED AT THE MID-SPAN OF BEAMS, SLABS AND WALLS AND SHALL BE SUBJECT TO REVIEW BY THE A/E.
UNLESS NOTED OTHERWISE OR SHOWN ON THE DRAWINGS, PROVIDE A CONTINUOUS SHEAR KEY IN SLABS AND WALLS, AND A MINIMUM OF TWO (2) CONTINUOUS HORIZONTAL KEYS IN BEAMS AND EACH JOIST. THE MINIMUM
KEY SIZE SHALL BE 1 1/2" DEEP X 1/3 THE DEPTH OR WIDTH OF THE MEMBER.
5. WHERE BAR LENGTHS ARE GIVEN ON THE DRAWINGS, THE LENGTH OF ANY HOOK, IF REQUIRED, IS NOT
INCLUDED. USE STANDARD 90° BAR HOOK UNLESS NOTED OTHERWISE.
4. THE CONTRACTOR SHALL REVIEW ALL DRAWINGS FOR SIZE AND LOCATION OF ALL EMBEDDED ITEMS, SLEEVES, SLAB DEPRESSIONS, OPENINGS, ETC. REQUIRED BY OTHER TRADES. RECONCILE THEIR EXACT SIZES AND LOCATIONS BEFORE PROCEEDING WITH THE WORK. ALL ITEMS SHALL BE FURNISHED AND INSTALLED PRIOR TO PLACEMENT OF CONCRETE. SECURE THE APPROVAL OF THE STRUCTURAL ENGINEER PRIOR TO PLACING OPENINGS NOT SHOWN ON THE STRUCTURAL DRAWINGS. DO NOT CORE DRILL THROUGH BEAMS, JOISTS, GIRDERS, AND WALLS. NO CONDUIT SHALL BE PLACED IN CONCRETE LABS OR BEAMS UNLESS SPECIFICALLY
SHOWN ON THE STRUCTURAL DRAWINGS.
3. ALL REINFORCING STEEL SHALL BE NEW DOMESTIC DEFORMED BILLET STEEL CONFORMING TO ASTM A615 GR...
3000 PSI FOR ALL CONCRETE, UNLESS SPECIFICALLY NOTED OTHERWISE.
2. CONCRETE SHALL HAVE THE FOLLOWING MINIMUM COMPRESSIVE STRENGTHS AT 28 DAYS:
1. CAST-IN-PLACE CONCRETE WORK SHALL CONFORM TO THE PROJECT MANUAL AND LATEST AMERICAN CONCRETE INSTITUTE CODES AND STANDARDS, INCLUDING, BUT NOT LIMITED TO, ACI 301, ACI 315 AND ACI 318.
03 30 00 CAST-IN-PLACE CONCRETE
LOCATION
TYPICAL REINFORCING BAR CLEARANCE TABLE
TABLE #1
BEAMS 3"
BEAM STIRRUPS 1 1/2"
WALLS (INTERIOR FACE) 1"
WALLS (EXTERIOR FACE, #5 AND SMALLER) 1 1/2"
SURFACES EXPOSED TO LIQUIDS 2"
SLABS ON GRADE (BOTTOM REINFORCING) 2"
SLABS ON GRADE (WELDED WIRE FABRIC) 1/3 SLAB THICKENED FROM TOP
CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3"
G. THE SUBGRADE SURFACE SHALL BE KEPT MOIST PRIOR TO FLOOR SLAB CONCRETE PLACEMENT. SOIL EXPOSED BENEATH FLOOR SLAB AREA SHALL NOT BE ALLOWED TO DRY OUT, AND SHALL BE MAINTAINED AT, OR ABOVE THE NATURAL OPTIMUM MOISTURE CONTENT (OMC) BY SPRINKLING, IF NECESSARY.
F. CONTRACTOR SHALL BE PREPARED TO DEWATER THE SITE/EXCAVATIONS IN CASE THE ACCUMULATION OF
WATER AND/OR SEEPAGE OCCURS.
E. PLACE A MINIMUM 10 MIL VAPER RETARDER BENERATH ALL FLOOR SLABS.
D. NONEXPANSIVE BACKFILL MATERIAL SHALL BE COMPACTED TO AT LEAST 92% OF ITS MAXIMUM DRY
DENSITY AS DETERMINED BY THE MODIFIED PROCTOR DENSITY TEST (ASTM D-1557).
C. THE SLAB ON GRADE SHALL BE BACKFILLED WITH PROPERLY COMPACTED, NONEXPANSIVE FILL MATERIAL.
NONEXPANSIVE FILL SHALL MEET REQUIREMENTS OF TEXAS DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATION FOR BASE COURSE, ITEM 247, TYPE A, GRADE 1 OR 2.
B. REMOVE 6 FEET (MAX) OF EXISTING SOILS OR EXCAVATE TO TOP OF LIMESTONE AND REPLACE WITH COMPACTED, NONEXPANSIVE FILL UNDER SLAB-ON-GRADE CONSTRUCTION. ANY ADDITIONAL FILL
REQUIRED SHALL BE NONEXPANSIVE.
A. STRIP THE VEGETATION, ORGANIC AND OTHER DELETERIOUS MATERIAL FROM THE BUILDING PAD AREA.
2. THE SUBGRADE PREPARATION SHOULD BE AS FOLLOWS:
1. THE FOLLOWING EARTHWORK RECOMMENDATIONS ARE BASED ON THE GEOTECHNICAL REPORT.
31 23 03 STRUCTURAL EARTHWORK
11. SPECIAL INSPECTION AND TESTING SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 1704 OF THE 2003
INTERNATIONAL BUILDING CODE. SEE FIELD OBSERVATIONS SECTION.
10. ALL UNITS SHALL BE LAID WITH FULL MORTAR COVERAGE ON HEAD, BED (FACE SHELLS), WEBS AND COLLAR
JOINTS, UNLESS NOTED OTHERWISE.
9. SPLICED WIRE REINFORCEMENT SHALL BE LAPPED AT LEAST 6" AND CONTAIN AT LEAST ONE CROSS WIRE OF
EACH PIECE OF REINFORCEMENT WITHIN THE 6".
8. WHEN A FOUNDATION DOWEL DOES NOT LINE UP WITH A VERTICAL CORE, IT SHALL NOT BE SLOPED MORE THAN ONE HORIZONTAL IN SIX VERTICAL. DOWELS SHALL BE GROUTED INTO A CORE IN VERTICAL ALIGNMENT, EVEN
THOUGH IT IS IN AN ADJACENT CELL TO THE VERTICAL WALL REINFORCEMENT.
7. BRICK WALLS SHALL RECEIVE TEMPORARY BRACING. TEMPORARY BRACING SHALL NOT BE REMOVED UNTIL
WALL IS PERMANENTLY BRACED BY THE ROOF OR FLOOR.
6. VERTICAL REINFORCEMENT SHALL BE AS NOTED ON THE DRAWINGS WITH CELLS FILLED WITH COARSE GROUT.
5. BRICK MASONRY SHALL BE LAID IN RUNNING (COMMON) BOND.
4. HORIZONTAL REINFORCEMENT SHALL CONFORM TO ASTM A951.
3. VERTICAL REINFORCEMENT SHALL CONFORM TO ASTM A615 GRADE 60. WHERE SPLICES ARE REQUIRED, PROVIDE MINIMUM (40) BAR DIAMETER LAP. HORIZONTAL JOINT REINFORCING SHALL BE STANDARD WEIGHT 'DUR-O-WALL' OR EQUIVALENT AT 16" O.C MAXIMUM. PROVIDE PREFABRICATED CORNER AND TEE SECTIONS AT
WALL CORNERS AND INTERSECTIONS.
2. BRICK UNITS SHALL BE MEDIUM WEIGHT UNITS WITH A DRY NET WEIGHT OF NOT MORE THAN 115 PCF. MORTAR FOR LOAD BEARING WALLS, EXTERIOR WALLS, SHEAR WALLS AND VERTICALLY REINFORCED MASONRY WALLS SHALL BE ASTM C-270, TYPE M, WITH A MINIMUM COMPRESSIVE STRENGTH OF 2500 PSI IN 28 DAYS. COARSE GROUT FOR REINFORCED MASONRY CONSTRUCTION SHALL CONFORM TO ASTM C-476 WITH A MAXIMUM AGGREGATE SIZE OF 3/8" AND A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI. BRICK SHALL HAVE A MINIMUM
ULTIMATE COMPRESSIVE STRENGTH (F'M) OF 1700 PSI.
1. MASONRY WORK SHALL CONFORM TO THE LATEST EDITIONS OF ACI 530 AND 530.1, AND THE PROJECT
SPECIFICATIONS.
04 20 00 MASONRY
6. GALVANIZING OF STEEL MEMBERS SHALL CONFORM TO ASTM A123/ASTM123M. ALL STEEL COMPONENTS SHALL
BE COATED TO A G185 THICKNESS.
5. FIELD QUALITY CONTROL: INSPECT IN ACCORDANCE WITH AISC SPECIFICATIONS. MATERIALS ENGINEER SHALL BE AWS CERTIFIED AND SHALL VISUALLY INSPECT ALL FIELD WELDED CONNECTIONS (100%) AND VISUALLY INSPECT ALL BOLTED CONNECTIONS (100%) TO ASCERTAIN THAT ALL WELDS, BOLTS, NUTS AND REQUIRED WASHERS HAVE BEEN INSTALLED AND ARE OF PROPER TYPE AND THAT ALL FACING SURFACES HAVE BEEN BROUGHT INTO SNUG CONTACT. MATERIALS ENGINEER SHALL INSPECT 10% OF THE BOLTS (MINIMUM OF 2) IN EACH HIGH STRENGTH BOLTED AND SLIP CRITICAL (SC) CONNECTIONS. PROVIDE 10% MAGNETIC PARTICLE
TESTING OF ALL PENETRATION WELDS AND MOMENT FRAME CONNECTIONS.
4. WELDING ELECTRODES SHALL BE E70 XX (LOW HYDROGEN) OR BETTER. FOR WELDING SYMBOLS WITH NO LENGTH DIMENSION GIVEN, THE WELDING SHALL BE CONTINUOUS BETWEEN ABRUPT CHANGES IN DIRECTION.
WELDS NOT OTHERWISE NOTED SHALL BE 1/4" IN SIZE.
3. SHOP CONNECTIONS SHALL BE WELDED WITH E70XX ELECTRODES AND GROUND SMOOTH WHERE EXPOSED.
FIELD CONNECTIONS SHALL BE MADE WITH BOLTS CONFORMING TO ASTM A325N UNLESS OTHERWISE NOTED.
FIELD WELDS SHALL BE MADE WITH E70XX ELECTRODES. ALL WELDING SHALL BE IN ACCORDANCE WITH AWS "STRUCTURAL WELDING CODE", LATEST EDITION AND PERFORMED BY CERTIFIED, LICENSED WELDERS.
ADHESIVE ANCHORS - HILTI HVA ADHESIVE ANCHORING SYSTEM OR APPROVED EQUAL.
EXPANSION BOLTS - HILTI "KWIK-BOLT 3" OR APPROVED EQUAL.
ASTM A500, GRADE B - TUBING.
ASTM A53, TYPE E OR S, GRADE B - STEEL PIPE.
ASTM A36 (Fy=36 KSI) - ROLLED STEEL PLATES, ANGLES, BARS AND RODS AS NOTED ON THE
DRAWINGS.
ASTM A992 (Fy=50 KSI) - ROLLED STEEL SHAPES, WIDE FLANGE, AND CHANNELS UNLESS
NOTED ON THE DRAWINGS.
2. STRUCTURAL STEEL:
1. STRUCTURAL STEEL, INCLUDING CAST IN ANGLES, PLATES OR OTHER SECTIONS SHALL BE DETAILED AND ERECTED IN ACCORDANCE WITH THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) SPECIFICATIONS AND CODE OF STANDARD PRACTICE, LATEST EDITION. WELDED CONNECTIONS SHALL CONFORM TO THE LATEST
REVISED CODE OF THE AMERICAN WELDING SOCIETY, AWS D1.1, LATEST EDITION.
05 12 00 STRUCTURAL STEEL
N o
R e v is io n
I s s u e D a te
B y
A p p 'd
C O
R R
E C
T E
D F
IN
A
L D
E S
/1
/1
116972
ELIAS REESE IV
TEXAS REGISTRATION NO: 3580
8" 8" 8' - 2" 1' - 4" 8' - 2" 1' - 4" 8' - 1 1/2" 8" 8"
EXISTING MECHANICAL YARD & SCREEN
EQUIPMENT PAD
-SEE MECH FOR EXTENTS
SITE PAVING
A B
28' - 5 1/2"
S-101
S-101
S-101
S-101
S-101
8" 4" 27' - 10" 4" 8"
29' - 9 1/2"
TO SOG
EL 0' - 0"
TO WALL
EL 8' - 8"
1 25 S-101
SEE ARCH FOR
BRICK OPENING
TYP 9
SITE PAVING
S-101
T Y
P
1/8" Ø WELDED WIRE TIES
@ 6" OC (MAX)
#3 BAR EA CORNER
TO SOG
EL 0' - 0"
1' - 4"P E
R F
O R
A T
IO
N
I N
T O
L
IM
E S
T O
N E
16X16 FOOTING
REINF:
8-#4 VERT
TOP - #3 STIRRUP
MID - #3 STIRRUP @ 10" OC MAX
BOT - #3 STIRRUP
#3 DOWEL EA CORNER
SITE PAVING
TO SOG
EL 0' - 0"
TO WALL
EL 8' - 8"
GRADE BEAM REINF:
3-#5 TOP
3-#5 BOTTOM
#3 STIRRUPS @ 10"
OC TYP
DOUBLE WYTHE BRICK
WALL
SITE PAVING
1/4" x 6" STL PLATE AT EA
CONTINUOUS HORIZONTAL
BRICK SECTION - BEAR 3"
MIN ON BRICK COLUMN EA
END - PLATE SHALL BE
HOT-DIPPED GALVANIZED
P E
N E
T R
A T
IO
N
I N
T O
L
IM
E S
T O
N E
ISOLATED PAD SECTION
#6 @ 12" EA. WAY
TOP AND BOTTOM
MIN 1'-0" LARGER ALL
AROUND THAN EQUIPMENT
/2
C L
R
3/4" CHAMFER
FILLER AND SEALER
NOTES:
1. COORDINATE MECHANICAL PAD SIZE, LOCATION AND EMBEDDED
ITEMS WITH MEP DRAWINGS AND EQUIPMENT MANUFACTURER.
N
N c
DRAWN BY
S H
E E
T T
IT
L
E
P R
O J E
C T
T
IT
L E
LEAD DESIGNER
CLIENT PROJECT NUMBERTECH REVIEWER
SHEETDESIGNED BY
DATE
SCALE
DATE
TEXAS SERIAL NO.
NORTH
PROJECT
NORTH
AS NOTED
C O
N T
R A
C T
N U
M B
E R
-1
-D
-0
S
K O
R D
E R
F A
-1
-F
-0
1 2 3 4 5
C
B
A
/2
/2
:5 :4
A
M C
R e v itL o c a l\6
B
S
T R
R je re m y .k u n k e l@ a e c o m .c o m
.r v t
04/18/18
F O
U N
D A
T
IO
N A
N D
W A
L L
F R
A M
IN
G
P L
A N
A N
D D
E T
A
IL
S
S-101
ER
CM
JK JK
LAUGHLIN A.F.B.
DEL RIO, TX
AECOM
http://www.aecom.com
19219 KATY FREEWAY
SUITE 100
HOUSTON, TX 77094
L A
U G
H L
IN
A
.F .B
B
H
V A
C
R E
P L
A C
E M
E N
T
03/01/18
Scale: 1/2" = 1'-0"
1 EQUIPEMENT SCREEN - FRAMING PLAN
S-101 Scale: 1/2" = 1'-0"
2 EQUIPMENT SCREEN ELEVATION
S-101 Scale: 1" = 1'-0"
3 COLUMN DETAIL
S-101 Scale: 3/4" = 1'-0"
4 TYPICAL COLUMN SECTION
S-101 Scale: 3/4" = 1'-0"
5 TYPICAL FOUNDATION AND WALL SECTION
S-101 Scale: 3/4" = 1'-0"
6 TYPICAL PAD DETAIL
N o
R e v is io n
I s s u e D a te
B y
A p p 'd
C O
R R
E C
T E
D F
IN
A
L D
E S
/1
/1
116972
ELIAS REESE IV
TEXAS REGISTRATION NO: 3580
FLOW ARROW
CONNECT TO EXISTING
PIPE CAPPED
END OF DEMOLITION
AIRFLOW ARROW
DESCRIPTIONSYMBOL
MECHANICAL SYMBOLS LIST
NOTE: NOT ALL SYMBOLS MAY BE USED.
TEMPERATURE SENSOR
HUMIDITY SENSOR
PIPE UNION
REDUCED PRESSURE BACKFLOW PREVENTER
THREE-WAY CONTROL VALVE
TWO-WAY CONTROL VALVE
GENERAL SERVICE VALVE (SEE SPECIFICATIONS
FOR VALVE TYPE PER APPLICATION)
CHECK VALVE (ARROW INDICATES
DIRECTION OF FLOW)
AUTOMATIC BALANCING VALVE
AUTOMATIC AIR VENT
TEMPERATURE/PRESSURE TEST PLUG (PETE'S
PLUG)
DRAIN VALVE WITH THREADED
HOSE CONNECTION
THERMOMETER
STRAINER WITH BLOW DOWN VALVE
PRESSURE GAUGE WITH STOPCOCK
PITCH DOWN IN DIRECTION OF ARROW
FLEXIBLE PIPE CONNECTION
PIPE ANCHOR
MANUAL AIR VENT
PIPE GUIDES OR SLEEVES
FLOW METER
RELIEF VALVE
PRESSURE REDUCING VALVE
MANUAL BALANCING VALVEM
A
AV
MAV
TWO-WAY PRESSURE INDEPENDENT
CONTROL AND BALANCE VALVE
COCO CLEAN OUT
PICBV
THERMOSTAT WITH ADJUSTABLE CONTROLT
HUMIDISTAT WITH ADJUSTABLE CONTROLH
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
CO2
CO
NO2
H
T
STEAM TRAP
STEAM PRESSURE REGULATING VALVE
OCCUPANCY SENSOROS
PIPE DROP
PIPE RISE
PIPE TEE DOWN
PIPE REDUCER
DESCRIPTIONSYMBOL
MECHANICAL SYMBOLS LIST CONT.
NOTE: NOT ALL SYMBOLS MAY BE USED.
SUPPLY DIFFUSER WITH FLEXIBLE DUCT
SUPPLY DIFFUSER
RETURN/EXHAUST GRILLE
SIDEWALL SUPPLY DIFFUSER
SIDEWALL RETURN/EXHAUST GRILLE
DAMPERS
BDD: BACKDRAFT DAMPER
FSD: FIRE/SMOKE DAMPER
FD: FIRE DAMPER
MD: MOTORIZED DAMPER
SD: SMOKE DAMPER
VD: VOLUME DAMPER
BDD
TAG - NECK SIZE
AIRFLOW (CFM)
TAG - NECK SIZE
AIRFLOW (CFM)
TAG - NECK SIZE
AIRFLOW (CFM)
TAG - NECK SIZE
AIRFLOW (CFM)
TAG - NECK SIZE
AIRFLOW (CFM)
S1-6ø
TAG EXAMPLE:
S1-6ø
TAG EXAMPLE:
R1-22x10
TAG EXAMPLE:
S2-12x8
TAG EXAMPLE:
R2-12x8
TAG EXAMPLE:
E1-22x10
E2-12x8
RECTANGULAR DUCT ELBOW UP
SUPPLY AND OUTDOOR AIR
OVAL DUCT ELBOW UP
ROUND DUCT ELBOW UP
RECTANGULAR DUCT ELBOW UP
RETURN, RELIEF, AND EXHAUST AIR
OVAL DUCT ELBOW UP
ROUND DUCT ELBOW UP
NEW WORK DUCTWORK
EXISTING DUCTWORK
DEMOLITION DUCTWORK
NEW WORK PIPING
EXISTING PIPING
DEMOLISHED PIPING
NEW WORK MECHANICAL EQUIPMENT
(WITH CLEARANCE SHOWN)
EXISTING MECHANICAL EQUIPMENT
DEMOLISHED MECHANICAL EQUIPMENT
VAV TERMINAL BOX (WITH REHEAT)
VAV TERMINAL BOX (NO REHEAT)
GENERIC FAN
GENERIC PUMP
RECTANGULAR DUCT ELBOW DOWN
SUPPLY AND OUTDOOR AIR
OVAL DUCT ELBOW DOWN
ROUND DUCT ELBOW DOWN
RECTANGULAR DUCT ELBOW DOWN
RETURN, RELIEF, AND EXHAUST AIR
OVAL DUCT ELBOW DOWN
ROUND DUCT ELBOW DOWN
1. IF MIN COOLING CFM IS NOT SHOWN ON
PLANS, THEN MIN COOLING CFM IS
EQUAL TO 30% OF MAX COOLING CFM.
2. HEATING CFM IS EQUAL TO MIN COOLING
CFM.
TAG EXAMPLES:
DUCTWORK PLANS
TAG
MAX COOLING CFM / MIN COOLING CFM
PIPING PLANS
TAG
GPM
TERMINAL BOXES
TB1
0.5
TB1
500/200
TB1
DUCTWORK
PLANS
PIPING
PLANS
TERMINAL BOX NOTES
ACCESS DOOR
DESCRIPTIONSYMBOL
MECHANICAL CONTROLS SYMBOLS LIST
NOTE: NOT ALL SYMBOLS MAY BE USED.
AIR FLOW MEASURING DEVICEAF
AIR SWITCHAS
MS CONDUCTIVITY TRANSMITTER
CURRENT SENSORCS
DIFFERENTIAL PRESSURE TRANSMITTERDP
EPT ELECTRONIC PNEUMATIC TRANSDUCER
END SWITCHES
FLOW METERFM
HAND-OFF-AUTO SWITCHHOA
LEVEL TRANSMITTERLT
METERM
PHT PH TRANSMITTER
PRESSURE SWITCHPS
PRESSURE TRANSMITTERPT
SMOKE DETECTORSD
MS STARTER
TEMPERATURE SWITCHTS
VARIABLE FREQUENCY DRIVEVFD
FS WATER FLOW SWITCH
VIBRATION TRANSMITTERMS
c
DRAWN BY
S H
EE
T
TI
TL
E
P R
O
JE
C T
TI
TL
E
OF 21
LEAD DESIGNER
CLIENT PROJECT NUMBERTECH REVIEWER
SHEETDESIGNED BY
DATE
SCALE
DATE
TEXAS SERIAL NO.
AS NOTED
C O
N
TR
A C
T N
U M
B E
R
9-
-D
-0
T
A S
K O
R D
E R
F A
-1 7-
F-
1 2 3 4 5
C
B
A
04/03/2018
VICTORIA ROSE OWENS HERMAN
120708
TEXAS REGISTRATION NO: 3580
4/
/2
5:
:5
P
M D
:\R ev it\
_B
8_
M
EC
H _R
_v ic to ria .h er m an .rv t
04/18/2018
SY
M
B O
LS
, L
EG
EN
D S, G
EN
ER
A
L N
O
TE
S
M-001
S.K
V.H
V.H V.H
LAUGHLIN A.F.B.
DEL RIO, TX
AECOM
http://www.aecom.com
19219 KATY FREEWAY
SUITE 100
HOUSTON, TX 77094
LA
U
G H
LI
N
A .F
.B . B
H
VA
C R
EP
LA
CE
M
EN
T
MXDP 16-1040
04/18/2018
MECHANICAL SYSTEM TYPES AND ABBREVIATIONS
NOTE: NOT ALL ABBREVIATIONS MAY BE USED.
ABBREVIATION DESCRIPTION
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DRAIN
EA EXHAUST AIR
GR GEOTHERMAL RETURN
GS GEOTHERMAL SUPPLY
HR HEAT PUMP RETURN
HS HEAT PUMP SUPPLY
HWR HEATIN HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
MW MAKEUP WATER - GENERIC
OA OUTDOOR AIR
PC PUMPED CONDENSATE
R REFRIGERANT
RA RETURN AIR
REL RELIEF AIR
SA SUPPLY AIR
MECHANICAL GENERAL NOTES
19. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE
MANUFACTURER’S RECOMMENDATIONS AND DIRECTION. PROVIDE STRAIGHT INLET AND
OUTLET DUCTS/PIPES BASED ON MANUFACTURER’S RECOMMENDATIONS. IF IN CONFLICT
WITH THE DESIGN INDICATED HEREIN, ADVISE THE ENGINEERS PRIOR TO INSTALLATION
FOR CLARIFICATION.
20. PROVIDE ROOM TEMPERATURE THERMOSTATS FOR ALL EQUIPMENT THAT MAINTAINS
SPACE TEMPERATURE. PREFERRED LOCATIONS ARE SHOWN ON THE PLANS.
THERMOSTATS SHALL BE MOUNTED AT 48" ABOVE FINISHED FLOOR, UNLESS NOTED
OTHERWISE. COORDINATE THE EXACT LOCATIONS OF THERMOSTATS WITH
MARKERBOARDS, SWITCHES, AND ANY OTHER WALL MOUNTED FIXTURES PRIOR TO ROUGH
IN.
21. UNLESS NOTED OTHERWISE, MINIMUM PIPE SIZE SHALL BE 3/4 INCH AND MINIMUM FLOW
SHALL BE 0.5 GPM.
22. PROVIDE SHUT-OFF VALVES WITHIN ALL SUPPLY PIPING BRANCH TAKEOFFS FROM MAINS.
PROVIDE A MANUAL BALANCE VALVE AND A SEPARATE SHUT-OFF VALVE WITHIN ALL
RETURN PIPING BRANCH TAKE-OFFS FROM MAINS. LOCATE VALVES IN ACCESSIBLE
LOCATIONS.
23. INSTALL ALL PIPING IN LOCATIONS AND ELEVATIONS SUCH THAT COILS, TUBES, AND
FILTERS CAN BE REMOVED AND REPLACED WITHOUT MAJOR PIPING REMOVAL. LOCATE
VALVES IN APPROPRIATE PLACES TO ACCOMMODATE MAINTENANCE. FOR GRAVITY FLOW
PIPING, ADEQUATE SLOPE SHALL BE PROVIDED.
24. INSTALL TWO-WAY CONTROL VALVES ON ALL EQUIPMENT UNLESS NOTED OTHERWISE.
25. AT TIME OF ROUGH INSTALLATION, DURING STORAGE ON THE CONSTRUCTION SITE, AND
UNTIL FINAL STARTUP OF THE HEATING AND COOLING EQUIPMENT, ALL DUCT AND OTHER
RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE,
PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE FOR PROTECTION TO THE
ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST OR DEBRIS WHICH MAY COLLECT
IN THE SYSTEM(S).
26. INSTALLATION OF HVAC, REFRIGERATION, AND FIRE SUPPRESSION EQUIPMENT SHALL NOT
CONTAIN ANY CFCS OR HALONS.
27. ALL SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SYSTEMS, DEVICES SHALL BE
FROM THE BUILDING STRUCTURE. SUPPORT FROM STRUCTURAL BRIDGING IS
UNACCEPTABLE.
28. INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC., IN A LOCATION OR IN A MANNER THAT WILL
ALLOW FREEZING AND/OR THE COLLECTION OF CONDENSATION.
29. CONTRACTOR IS RESPONSIBLE FOR DRAINING, FLUSHING, PURGING, AND FILLING ALL
PIPING SYSTEMS AS REQUIRED. THESE SYSTEMS INCLUDE (BUT MAY NOT BE LIMITED TO):
HEATING HOT WATER SYSTEMS, CHILLED WATER SYSTEMS AND MAKE-UP WATER
CONNECTIONS.
30. WHERE CEILINGS ARE INDICATED, ALL DUCTS AND PIPES SHALL BE ROUTED ABOVE
CEILING. IN EXPOSED CONDITIONS, INSTALL DUCTWORK AND PIPING TIGHT TO THE
BOTTOM OF STRUCTURE.
31 HEAT TRACING SHALL COMPLY WITH IEEE 515.1, AND SHALL BE MAX 6 W/FT, 277V.
TERMINATE WITH WATERPROOF, FACTORY-ASSEMBLED, NONHEATING LEADS WITH
CONNECTORS AT ONE END, AND SEAL THE OPPOSITE END WATERTIGHT. PROVIDE WITH
REMOTE BULB UNIT WITH ADJUSTABLE TEMPERATURE CONTROLS. INSTALL ELECTRIC
HEATING CABLE ACROSS EXPANSION JOINTS ACCORDING TO MANUFACTURER'S WRITTEN
INSTRUCTIONS; USE SLACK CABLE TO ALLOW MOVEMENT WITHOUT DAMAGE TO CABLE.
MECHANICAL GENERAL NOTES
1. VISIT THE SITE OF THE WORK TO GAIN AN ACCEPTABLE KNOWLEDGE OF CONDITIONS
AFFECTING THE EXECUTION OF THE WORK. AFTER VISITING THE SITE, REQUEST SUCH
INFORMATION AND/OR CLARIFICATIONS AS NECESSARY TO FULLY UNDERSTAND THE WORK
REQUIRED AND TO PROPERLY ESTIMATE COSTS.
2. REVIEW ALL DRAWINGS TO VERIFY EXTENT AND SCHEDULING OF ALL DEMOLITION
ACTIVITIES PRIOR TO COMMENCING DEMOLITION WORK. FIELD VERIFY ALL SIZES AND
LOCATIONS OF EXISTING DUCTWORK AND PIPING TO REMAIN. NOTIFY
ARCHITECT/ENGINEER OF DEVIATIONS WHICH AFFECT RENOVATION WORK PRIOR TO
PROCEEDING WITH THE WORK.
3. ITEMS NOTED TO BE DEMOLISHED INCLUDES BUT IS NOT LIMITED TO ALL ASSOCIATED
COMPONENTS, CONTROL WIRING, PIPING, DUCTWORK, ELECTRICAL CONNECTIONS,
SUPPORTS, INSULATION, ETC. COORDINATE WITH OTHER TRADES AS REQUIRED.
4. ALL WORK IS TO BE PHASED AS INDICATED ON THE ARCHITECTURAL DRAWINGS.
COORDINATE PHASING OF ALL DEMOLITION, RENOVATION, AND NEW WORK WITH OTHER
TRADES. CLOSELY COORDINATE PHASING OF WORK WITHIN CORRIDORS WITH THE OWNER.
CORRIDORS CANNOT BE COMPLETELY CLOSED OFF TO PEDESTRIAN TRAFFIC. TO
ACCOMMODATE PHASING, CORRIDOR ACCESS WORK MAY NEED TO BE PERFORMED
DURING OFF PEAK PERIODS. PRIOR TO MOVING ON TO THE NEXT PHASE, ALL WORK IN
PREVIOUSLY PHASED AREAS MUST BE COMPLETE AND OPERATIONAL.
5. ENSURE THAT THE WORK WILL NOT INTERFERE OR INTERRUPT SERVICES TO AREAS
OUTSIDE OF THE DESIGNATED CONTRACT AREAS. SCHEDULE ALL WORK AS TO CAUSE
MINIMAL SERVICE INTERRUPTIONS FOR THE OWNER. UNAVOIDABLE INTERRUPTIONS ARE
TO BE SCHEDULED WITH THE OWNER NO LESS THAN TWO WEEKS PRIOR TO THEIR
EXPECTED COMMENCEMENT. WORK SHALL BE PERFORMED AT SUCH TIMES AS DIRECTED
BY THE OWNER AND, IF POSSIBLE, ARE TO OCCUR DURING OFF PEAK PERIODS.
6. THE CONTRACTOR IS TO VERIFY THE EXACT SERVICE OF ANY EXISTING PIPING OR
DUCTWORK PRIOR TO INSTALLING ANY NEW CONNECTIONS. ANY DISCREPANCIES BETWEEN
THE CONSTRUCTION DOCUMENTS OR THE DESIGN INTENT AND ACTUAL CONDITIONS ARE
TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY, PRIOR TO
FABRICATION OR INSTALLATION.
7. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE SYSTEMS AS INDICATED ON THE DRAWINGS AND
SPECIFICATIONS. INCLUDE ALL NECESSARY AND APPLICABLE APPURTENANCES, WHETHER
INDICATED OR NOT.
8. ANY DEVIATIONS FROM THE BASIS OF DESIGN THAT REQUIRE ADDITIONAL PROVISIONS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
9. COORDINATE THE EXACT REQUIREMENTS AND LOCATION OF WORK WITH THE WORK OF
OTHER TRADES PRIOR TO FABRICATION AND INSTALLATION. PROVIDE ADDITIONAL OFFSETS
AND SECTIONS IN DUCTWORK AND/OR PIPING REQUIRED TO MEET THE APPLICABLE JOB
CONDITION REQUIREMENTS. VERIFY JOB SITE ELEVATIONS, DIMENSIONS, AND CONDITIONS,
PRIOR TO FABRICATION OR INSTALLATION OF THE WORK. COORDINATE EXACT ROUTING OF
DUCTWORK AND PIPING WITH OTHER TRADES SO THAT NO CONFLICTS OCCUR WITH
DUCTWORK, PIPING, LIGHTS, STRUCTURE, ETC. PROVIDE ALL PERTINENT DATA
CONCERNING THE LOCATION, DIMENSIONS, ETC., OF THE MECHANICAL EQUIPMENT THAT
REQUIRES BASES, CURBS AND SUPPORTS TO THE APPROPRIATE TRADES.
10. ALL ITEMS THAT REQUIRE MAINTENANCE OR ADJUSTMENT MUST BE INSTALLED IN
ACCESSIBLE LOCATIONS. PROVIDE AN APPROPRIATELY SIZED ACCESS DOOR AS REQUIRED.
11. ALL SEALS, BEARINGS, PACKINGS, AND ACCESSORIES FOR ALL EQUIPMENT AND PIPING
SPECIALTIES SHALL BE SUITABLE FOR THE CONTINUOUS OPERATIONAL TEMPERATURES,
PRESSURES AND CHARACTERISTICS, OF THE SYSTEM THEY SERVE.
12. EACH TRADE SHALL PAY THE GENERAL CONTRACTOR TO PATCH FLOOR SLAB AND WALL
PENETRATIONS TO MATCH EXISTING WHERE THEIR PIPING, DUCT OR EQUIPMENT IS BEING
REMOVED OR INSTALLED.
13. INSTALL ALL WORK TO COMPLY WITH ALL LAWS, REGULATIONS, CODES, AND STANDARDS
(FEDERAL, STATE, AND LOCAL), UNIFIED FACILITIES CRITERIA, AS ADOPTED BY THE
AGENCIES HAVING JURISDICTION, INCLUDING REASONABLY ANTICIPATED REVISIONS BASED
ON EMERGING TRENDS IN BUILDING REGULATIONS. WHERE ANY OF THESE DIFFER, THE
MOST STRINGENT SHALL APPLY.
14. CONTRACT DOCUMENTS FOR MECHANICAL WORK ARE SCHEMATIC IN NATURE AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
15. ALL ROOFING MODIFICATIONS SHALL BE DONE BY OWNER’S ROOFING VENDOR TO MAINTAIN
ANY AND ALL WARRANTIES. COST TO BE INCLUDED IN THIS CONTRACT UNLESS
SPECIFICALLY INCLUDED IN GENERAL TRADES CONTRACTOR’S SCOPE OF WORK.
16. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED
AND/OR REMOVED IN THE PERFORMANCE OF WORK FOR THIS PROJECT.
17. FOR RENOVATION WORK, IT IS PROHIBITED TO SUSPEND NEW WORK FROM THE EXISTING
FLOOR SLAB OR ROOF DECK.
18. PERFORM A COMPLETE WATER SYSTEM FLOW BALANCE FOR ALL EQUIPMENT THAT IS
SHOWN, SCHEDULED OR OTHERWISE IDENTIFIED, AT THE END OF CONSTRUCTION.
MECHANICAL ABBREVIATIONS
NOTE: NOT ALL ABBREVIATIONS MAY BE
USED.
ABBREVIATION DESCRIPTION
ID INNER DIAMETER
IPLV INTEGRATED PART LOAD VALUE
KW KILOWATTS
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MBH THOUSAND BTUH
MCA MAXIMUM CURRENT AMPACITY
MFR MANUFACTURER
MOCP MAXIMUM OVERCURRENT PROTECTION
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOX NITROUS OXIDE
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
PD PRESSURE DROP
PG PROPYLENE GLYCOL
PPH POUNDS PER HOUR
PPM PARTS PER MILLION
PRV PRESSURE REDUCING VALVE
PSI PUNDS PER SQUARE INCH
REFRIG REFRIGERANT
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
SEER SEASONAL ENERGY EFFICIENCY RATIO
SP STATIC PRESSURE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
W WATTS
WB WET BULB
WG WATER GAUGE
WPD WATER PRESSURE DROP
MECHANICAL ABBREVIATIONS
NOTE: NOT ALL ABBREVIATIONS MAY BE
USED.
ABBREVIATION DESCRIPTION
(D) EXISTING TO BE DEMOLISHED
(E) EXISTING TO REMAIN
(F) FUTURE
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
APD AIR PRESSURE DROP
BAS BUILDING AUTOMATION SYSTEM
BFP BACKFLOW PREVENTOR
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STRUCTURE
BTUH BRITISH TEHRMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CO CLEAN OUT
COMPR COMPRESSOR
COP COEFFICIENT OF PERFORMANCE
CV CONSTANT VOLUME
DB DRY BULB
DIA DIAMETER
DN DOWN
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EG ETHYLENE GLYCOL
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
FLA FULL LOAD AMPS
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
GAL GALLONS
GPM GALLONS PER MINUTE
HD HEAD
HP HORSEPOWER
N o.
R ev is io n / I ss ue
D at e By
Ap p' d
0%
C O
R R
EC
TE
D F
IN
A
L D
ES
IG
N
/1 8/
(D)
COOLING
TOWER
(D) EXISTING
TRANSFORMER.
RE: ED-101
HWR
HWS
G
(E)
BOILER
(E)
HWP-1 CHWP-1 CWP--1 CHILLER
CHWR
CHWS
CWRCWS
EXISTING STORAGE SHED
EXPANSION
TANK
PROVIDE INFILL OF WALL AFTER DEMO
PIPING BELOW GRADE TO REMAIN.
RE: M-102 FOR CONT
PROVIDE INFILL, REFER TO
SPECIFICATIONS
N
N c
DRAWN BY
S H
EE
T
TI
TL
E
P R
O
JE
C T
TI
TL
E
OF 21
LEAD DESIGNER
CLIENT PROJECT NUMBERTECH REVIEWER
SHEETDESIGNED BY
DATE
SCALE
DATE
TEXAS SERIAL NO.
NORTH
PROJECT
NORTH
AS NOTED
C O
N
TR
A C
T N
U M
B E
R
9-
-D
-0
T
A S
K O
R D
E R
F A
-1 7-
F-
1 2 3 4 5
C
B
A
04/03/2018
VICTORIA ROSE OWENS HERMAN
120708
TEXAS REGISTRATION NO: 3580
4/
/2
5:
:5
P
M D
:\R ev it\
_B
8_
M
EC
H _R
_v ic to ria .h er m an .rv t
04/18/2018
M
EC
H
AN
IC
A
L
DE
M O
LI
TI
O N
P
LA
N
MD-101
S.K
V.H
V.H V.H
LAUGHLIN A.F.B.
DEL RIO, TX
AECOM
http://www.aecom.com
19219 KATY FREEWAY
SUITE 100
HOUSTON, TX 77094
LA
U
G H
LI
N
A .F
.B . B
H
VA
C R
EP
LA
CE
M
EN
T
MXDP 16-1040
04/18/2018
Scale: 3/8" = 1'-0"
1 MECHANICAL DEMOLITION PLAN
MECHANICAL KEYNOTES
1 DEMOLISH AND REMOVE EXISTING CHILLER AND ASSOCIATED PIPING.
2 DEMOLISH AND REMOVE EXISTING COOLING TOWER AND ASSOCIATED PIPING.
3 DEMOLISH AND REMOVE EXISTING CHILLED AND CONDENSER WATER PUMPS AND
ASSOCIATED PIPING.
4 EXISTING CHWS/CHWR PIPING TO BUILDING 449 & 450 TO REMAIN AND BE RE-USED.
5 DEMOLISH AND REMOVE CHILLED/CONDENSER WATER CHEMICAL TREATMENT
SYSTEM
6 DEMOLISH AND REMOVE EXISTING CHILLED WATER EXPANSION TANKS
7 DEMOLISH AND REMOVE EXISTING CHEMICAL SHOT FEEDER.
8 DEMOLISH AND REMOVE EXISTING REFRIGERANT SENSOR, EXHAUST FAN AND
ASSOCIATED DUCTWORK.
1. THE MECHANICAL RELATED DEMOLITION WORK INDICATED ON THE PLANS,
SPECIFICATIONS, AND NOTES IS TO BE CLOSELY COORDINATED WITH THE OWNER'S
REPRESENTATIVE. NO DEMOLITION SHALL TAKE PLACE IN ANY AREA OR BUILDING UNTIL
THE CONTRACTOR HAS BEEN GIVEN APPROVAL TO PROCEED IN THAT SPECIFIC LOCATION.
REFER TO ELECTRICAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION AND
DEMOLITION SCOPE OF WORK.
2. IF IT BECOMES NECESSARY DURING DEMOLITION TO TEMPORARILY REMOVE ANY
EQUIPMENT, PIPING, ETC. WHICH IS NOT SPECIFICALLY NOTED TO BE REMOVED (THEREBY
IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR SHALL
REINSTALL SAID SYSTEMS TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL
LOCATIONS.
3. DISPOSE OF ALL REMOVED EQUIPMENT AS DIRECTED BY THE OWNER.
4. CONTRACTOR SHALL OBTAIN ALL PERMITS AND PAY ALL FEES.
5. ALL DEMOLITION WORK SHALL BE SCHEDULED WITH THE OWNER AT LEAST 48 HOURS
PRIOR TO THE WORK. SYSTEM SHUT DOWNS AFFECTING OTHER BUILDINGS MAY REQUIRE
ADDITIONAL TIME AN COORDINATION WITH THE OWNER.
6. PATCH ALL OPENINGS IN WALLS, FLOORS AND CEILINGS WHICH ARE MADE FOR ACCESS
TO THE EXISTING EQUIPMENT BEING DEMOLISHED OR OTHERWISE MODIFIED.
7. ANY DAMAGE TO THE OWNER'S OR TENANT'S PROPERTY, TO THE STRUCTURE OR
BUILDING, OR TO EQUIPMENT RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL
BE REPAIRED OR REPLACED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER
WITHOUT ADDITIONAL COST TO THE OWNER. REPAIR OR REPLACEMENT SHALL, AS A
MINIMUM, EQUAL EXISTING CONDITIONS.
8. FIRE-PROOFING ON EXISTING STRUCTURE SHALL BE REPLACED OR TOUCHED-UP WHERE
DISTURBED FOR THE INSTALLATION OF THE MECHANICAL SYSTEMS.
9. ANY EXISTING EQUIPMENT, DUCTS, OR PIPING THAT ARE DESIGNATED TO BE REUSED OR
CONNECTED TO WHICH ARE FOUND TO BE DAMAGED OR NON-OPERABLE SHALL BE
BROUGHT TO THE ATTENTION OF THE OWNER AND ENGINEER IMMEDIATELY. INSPECT THE
EXISTING SYSTEM. BRING TO THE ATTENTION OF THE OWNER AND ENGINEER ANY
UNUSUAL, DAMAGED, OR NON-OPERATION CONDITION OF THE EXISTING SYSTEM BEFORE
PROCEEDING WITH RELATED WORK.
10. MAINTAIN THE SECURITY OF THE FACILITY AT ALL TIMES
11. MAINTAIN THE FIRE AND SMOKE CONSTRUCTION INTEGRITY OF THE EXISTING FACILITY.
12. THE INFORMATION DEPICTED ON THESE DRAWINGS HAS BEEN DERIVED FROM FIELD
OBSERVATIONS OF THE EXISTING CONDITIONS AND FROM EXISTING DRAWINGS. NOT ALL
CONDITIONS COULD BE VERIFIED. THE CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS PRIOR TO STARTING WORK. THE CONTRACTOR SHALL NOTIFY THE
ENGINEER OF ANY DISCREPANCIES IN CONDITIONS WHICH WILL AFFECT THE WORK.
13. REMOVE AND DEMOLISH - CONTRACTOR SHALL REMOVE ITEM INDICATED AND DISPOSE
OF ITEM. CONTRACTOR SHALL BE RESPONSIBLE FOR DISCONNECTION OF ALL SERVICES,
APPURTENANCES, AND ACCESSORIES OF ITEM INDICATED. COORDINATE DISCONNECTION
OF ANY ELECTRICAL SERVICES AS REQUIRED. DISPOSAL OF EQUIPMENT SHALL MEET ALL
LOCAL, STATE AND FEDERAL REGULATIONS.
14. REMOVE AND SALVAGE - CONTRACTOR SHALL REMOVE ITEM INDICATED AND PROVIDE TO
OWNER FOR USE BY OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISCONNECTION OF ALL SERVICES, APPURTENANCES, AND ACCESSORIES OF ITEM
INDICATED. COORDINATE DISCONNECTION OF ANY ELECTRICAL SERVICES WITH
ELECTRICAL CONTRACTOR.
15. REMOVE AND RE-USE - CONTRACTOR SHALL REMOVE ITEM FOR RE-USE ON THIS
PROJECT. CONTRACTOR SHALL BE RESPONSIBLE FOR DISCONNECTION OF ALL SERVICES,
APPURTENANCES, AND ACCESSORIES OF ITEM INDICATED. COORDINATE DISCONNECTION
OF ANY ELECTRICAL SERVICES AS REQUIRED. IN INTERIM TIME BETWEEN REMOVAL AND
RE-INSTALLATION, CONTRACTOR SHALL STORE ITEM AT SITE AND PROTECT FROM
DAMAGE. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING EXISTING CONDITION
OF ITEM AND FOR COSTS INCURRED FOR REPLACEMENT/REPAIR OF ITEM TO PRESENT
CONDITION.
MECHANICAL DEMOLITION GENERAL NOTES
N o.
R ev is io n / I ss ue
D at e By
Ap p' d
0%
C O
R R
EC
TE
D F
IN
A
L D
ES
IG
N
/1 8/ c
DRAWN BY
S H
EE
T
TI
TL
E
P R
O
JE
C T
TI
TL
E
OF 21
LEAD DESIGNER
CLIENT PROJECT NUMBERTECH REVIEWER
SHEETDESIGNED BY
DATE
SCALE
DATE
TEXAS SERIAL NO.
AS NOTED
C O
N
TR
A C
T N
U M
B E
R
9-
-D
-0
T
A S
K O
R D
E R
F A
-1 7-
F-
1 2 3 4 5
C
B
A
04/03/2018
VICTORIA ROSE OWENS HERMAN
120708
TEXAS REGISTRATION NO: 3580
4/
/2
5:
:0
P
M D
:\R ev it\
_B
8_
M
EC
H _R
_v ic to ria .h er m an .rv t
04/18/2018
M
EC
H A
NI
C
AL
D
EM
O
LI
TI
O N
P H
O
TO
S
MD-102
S.K
V.H
V.H V.H
LAUGHLIN A.F.B.
DEL RIO, TX
AECOM
http://www.aecom.com
19219 KATY FREEWAY
SUITE 100
HOUSTON, TX 77094
LA
U
G H
LI
N
A .F
.B . B
H
VA
C R
EP
LA
CE
M
EN
T
MXDP 16-1040
04/18/2018
NTS
6 EXISTING BOILER
NTS
EXISTING CHILLER AND CHEMICAL TREATMENT
SYSTEM
NTS
5 NORTH WEST WALL
NTS
4 EXISTING CHILLED WATER PUMPS TO BE REMOVED
NTS
2 CHWS, CHWR, HWS & HWR PIPING
NTS
1 EXISTING COOLING TOWER TO BE REMOVED
EXISTING CHWR, CHWS
TO BE REMOVED
CHILLER TO BE REMOVED
EXISTING CHEMICAL FEED
SYSTEM TO BE REMOVED
EXHAUST FAN TO
BE DEMOLISHED
NTS
EXISTING REFRIGERANT SENSORS TO BE
REMOVED
NTS
7 CHWS, CHWR, HWS & HWR BUILDING ENTRY POINT
EXISTING EYE WASH STATION
TO REMAIN
EXISTING PUMP TO BE DEMOLISHED
EXSTING PIPING
TO REMAIN
EXISTING PIPING INTO BUILDING
TO REMAIN
N o.
R ev is io n / I ss ue
D at e By
Ap p' d
0%
C O
R R
EC
TE
D F
IN
A
L D
ES
IG
N
/1 8/
HWR
HWS
G
(E)
BOILER
(E)
HWP-1
CHWP-1 CHWP-2
ET-1
CH-1
EXISTING STORAGE SHED
AS-1
CHWR
CHWS
PROVIDE PIPE SUPPORT (TYP)
CSF
PROVIDE BLIND FLANGE FOR
FUTURE CONNECTION.
NEW MECH YARD, RE: ARCH
6"ø CHWR 6"ø CHWS
BLIND FLANGE
NEW AIR COOLED CHILLER.
RE: DETAILS FOR PIPING AND
INSTALLATION, (TYP.)
CH-2
AIRFLOW AND
MAINTENANCE CLEARANCE (TYP.)
PROVIDE NEW
EQUIPMENT PADS
PROVIDE NEW COMPLETE
CHILLED WATER CHEMICAL
FEED SYSTEM
TRANSFORMER
CHILLED WATER
BYPASS
PROVIDE HEAT TRACING
FOR ABOVE GROUND
CHILLED…