Atch_5._Schedule_B__8-4-2015.pdf
PDF 687 KB Posted
- Attached to
- Repair Airfield Pavement Pads Federal contract opportunity
- Solicitation number
- FA3047-15-R-0069
About this file
FA3047-15-R-0069 Kelly Airfield Pavement Pads Attachment 5 Schedule B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| FA3047-15-R-0069.pdf | ||
| FA3047-15-R-0069.pdf | ||
| Amendment_1.doc | DOC document | |
| Atch_4._Schedule_of_Materials_Submittals__24_Aug_15.xlsx | XLSX spreadsheet | |
| SF_1442_Solicitation.pdf | ||
| Atch_3._Wage_Determination_Heavy__Highway_TX150016_01022015__TX16.pdf | ||
| Atch_2._Appendix_A-N_1_June_2015.pdf | ||
| RFP_15-R-0069.pdf | ||
| Atch_1._SOW_Kelly_Airfield_Pavement_Pads_-_27July2015.docx | DOCX document | |
| Atch_4._Schedule_of_Materials_Submittals__18_Jun_2015.xlsx | XLSX spreadsheet | |
| Map__JBSA-Lackland_Visitor_Center.jpg | JPG image |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUANTITY UNIT TOTAL CREW
LABOR
HOURS
AVERAGE
RATE TOTAL UNIT TOTAL UNIT TOTAL
1 01-21-16-50-0150 Contingencies, add to estimate, final working drawing stage Project
2 01-21-53-50-0500-L Factors, cost adjustments, add to construction costs for particular job requirements, cut and patch to match existing construction, add, minimum
Costs
3 01-21-53-50-0800-L Factors, cost adjustments, add to construction costs for particular job requirements, dust protection, add, minimum
Costs
4 01-21-53-50-2000-L Factors, cost adjustments, add to construction costs for particular job requirements, shift work requirements, add, minimum
Costs
5 01-21-53-50-2400-L Factors, cost adjustments, add to construction costs for particular job requirements, work inside prisons and high security areas, add, minumum
Costs
6 01-31-13-20-0120 Field personnel, field engineer, average Week
7 01-31-13-20-0260 Field personnel, superintendent, average Week
8 01-32-13-50-0400 Scheduling, computer-update, micro, including plots, maximum Ea.
9 01-54-33-10-1700-4 Rent per month for concrete equipment rental, without operators, grinder, concrete and terrazzo, electric, wall grinder
Ea.
10 01-54-33-10-2700-4 Rent per month for concrete equipment rental, without operators, vibrators, concrete, electric, 60 cycle, 2 H.P.
Ea.
11 01-54-33-20-2600-4 Rent per month for earthwork equipment rental, without operators, hammer, vibrating, electric hammer or extractor, 200 KW diesel generator, 150 H.P.
Ea.
12 01-54-33-20-4880-4 Rent per month for earthwork equipment rental, without operators, skid steer loader, wheeled, 10 C.F., 30 H.P. gas
Ea.
13 01-54-33-20-5250-4 Rent per month for earthwork equipment rental, without operators, truck, dump, two axle, 12 ton, 8 C.Y. payload, 220 H.P.
Ea.
14 01-54-33-40-1960-4 Rent per month for general equipment rental, without operators, floodlights, trailer mounted with generator, 2 - 1000 watt lights
Ea.
15 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, portable chemical 1 x 10 months
Ea.
16 01-54-33-40-6900-4 Rent per month for general equipment rental, without operators, trailer, water tank, engine driven discharge, 5000 gallons
Ea.
17 01-54-33-50-3450-4 Rent per month for highway equipment rental, without operators, road sweeper, vacuum assisted, 4 C.Y., 220 gallons
Ea.
18 01-54-36-50-1300 Mobilization, up to 25 mile haul distance, 50 miles round trip for mobilization or demobilization crew, equipment hauled on towed trailer, 3-ton capacity
Ea.
19 01-56-23-10-0020 Barricades, 5' high, 3 rail @ 2" x 8", fixed L.F.
20 01-74-13-20-0050 Cleaning up, cleanup of floor area, continuous, per day, during construction M.S.F.
21 01-74-13-20-0100 Cleaning up, cleanup of floor area, final by General Contractor at end of job M.S.F.
22 02-41-19-19-2000 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Load, haul, dump and return, 0' to 50' haul, hand carried
C.Y.
23 03-15-16-30-1100 Expansion joints, rubberized asphalt, hot applied, fuel resistant, 1/2" x 1" 102 slabs cut into quarters = 6 sides x 12.5 feet long
L.F.
24 03-81-13-50-0300 Concrete floor and/or slab cutting, includes blade cost, layout and set-up time, saw cut concrete slabs, plain, up to 3" deep
L.F.
25 07-91-23-10-0092 Backer rods, backer rod, polyethylene, 1" diameter L.F.
General Construction Prime Contractor Bonding
CONTRACTOR
Prepared by:
General Construction Contingency
KELL905421A
WORK LOCATION
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days The period of performance to perform this work is ___________ days.
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO.
UNIT OF
MEASUREITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBER
CONTRACT FOR (Work to be performed)
PURCHASE REQUEST NUMBER
General Construction Subtotal
General Construction Prime Contractor Overhead
ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
ITEMS LISTED ARE NOT ALL INCLUSIVE
Attachment 5
4 Aug 15
KELL905421A Airfield Pavement Pads
QUANTITY UNIT TOTAL CREW
LABOR
HOURS
AVERAGE
RATE TOTAL UNIT TOTAL UNIT TOTAL
General Construction Prime Contractor Bonding
CONTRACTOR
Prepared by:
General Construction Contingency
KELL905421A
WORK LOCATION
LINE
TOTAL
EQUIPMENT COSTS OTHER COSTSLABOR COSTS
Proposed Project AmountThis cost proposal is valid for ______________________________days The period of performance to perform this work is ___________ days.
CONSTRUCTION COST ESTIMATE BREAKDOWN
LINE
NO.
UNIT OF
MEASUREITEM DESCRIPTION
MATERIAL COSTS
PROJECT NUMBER
CONTRACT FOR (Work to be performed)
PURCHASE REQUEST NUMBER
General Construction Subtotal
General Construction Prime Contractor Overhead
ADDRESS
General Construction Prime Contractor Profit
General Construction Labor Burden
26 31-23-23-20-9066 Hauling, excavated or borrow, loose cubic yards, excluding loading equipment, including hauling, waiting, loading and dumping, time per cycle (wait, load, travel, unload or dump and return), 18 C.Y.
L.C.Y.
27 31-23-23-25-0700 Compaction, airports, airport subgrade, compaction, non cohesive soils, 90% proctor, 24" depth
S.Y.
28 32-01-29-70-1370 Full depth patching of rigid pavement, pavement preparation includes sawcut, remove pavement and replace 6 inches of subbase and two layers of reinforcement, excluding trucking and haulaway
Ea.
29 32-17-23-13-1110 Painted pavement markings, airport painted markings, painting, white or yellow, taxiway markings, with 12 lb. beads per 100 S.F.
S.F.
Note: this document does not represent all line items required by the SOW
ITEMS LISTED ARE NOT ALL INCLUSIVE
Attachment 5
4 Aug 15
KELL905421A Airfield Pavement Pads
File details come from the government source that posted it. Updated .