Atch_4._Schedule_of_Materials_Submittals__24_Aug_15.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Repair Airfield Pavement Pads Federal contract opportunity
- Solicitation number
- FA3047-15-R-0069
About this file
Schedule Of Materials Submittal 24 Aug 15
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| FA3047-15-R-0069.pdf | ||
| FA3047-15-R-0069.pdf | ||
| Amendment_1.doc | DOC document | |
| SF_1442_Solicitation.pdf | ||
| Atch_3._Wage_Determination_Heavy__Highway_TX150016_01022015__TX16.pdf | ||
| Atch_2._Appendix_A-N_1_June_2015.pdf | ||
| RFP_15-R-0069.pdf | ||
| Atch_1._SOW_Kelly_Airfield_Pavement_Pads_-_27July2015.docx | DOCX document | |
| Atch_4._Schedule_of_Materials_Submittals__18_Jun_2015.xlsx | XLSX spreadsheet | |
| Atch_5._Schedule_B__8-4-2015.pdf | ||
| Map__JBSA-Lackland_Visitor_Center.jpg | JPG image |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Schedule of Material Submittals Attachment 4 / 24 Jun 15 Attachment 4 | |||
| Project Number: | |||
| KELL905421A | Project Title: | ||
| Pavement Pads Phase 2 | Solicitation / Contract Number: |
FA3047-15-R-0069
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||
| Item or Description of Item, Contract | ||||||||||||||||||||
| Reference, Type of Submittal | Number of Copies Required | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||||||||||||
| Notified | Contractor Resubmittal | Final Approval | Remarks | |||||||||||||||||
| SD-01 Preconstruction Submittals | SD-02 Shop Drawings | SD-03 Product Data | SD-04 Samples | SD-05 Design Data | SD-06 Test Reports | SD-07 Certificates | SD-08 Manufacturer's Instructions | SD-09 Manufacturer's Field Reports | SD-10 Operation and Maintenance Data | SD-11 Closeout Submittals | ||||||||||
| Approved | Disapproved | |||||||||||||||||||
| 1 | Batch Plant layout SOW ¶ 1.4.4.D | x | ||||||||||||||||||
| 2 | Dig permit SOW ¶1.4.3.H | X | ||||||||||||||||||
| 3 | 01 32 16.00 16 Construction schedule/ Phasing plan ¶1.3 & SOW ¶1.4.3.A | x | ||||||||||||||||||
| 4 | 01 35 26 monthly updates ¶1.4 | x | ||||||||||||||||||
| 5 | 01 35 26 APP ¶1.6 | x | x | |||||||||||||||||
| 6 | 01 35 26 AHA ¶1.7 | x | ||||||||||||||||||
| 7 | 01 35 26 Crane Critical Lift Plan ¶1.11 | x | x | |||||||||||||||||
| 8 | 01 35 26 Notifications and Reports ¶1.11 | x | ||||||||||||||||||
| 9 | 01 35 26 Confined Space ¶1.12 | x | ||||||||||||||||||
| 10 | 01 35 26 Hot Work permit ¶1.12 | x | ||||||||||||||||||
| 11 | 01 35 26 Cert of compliance (crane) ¶1.11 | x | ||||||||||||||||||
| 12 | 01 35 35 Hazardous Materials List and MSDS ¶11.1 | x | ||||||||||||||||||
| 13 | 01 35 35 manifest request ¶10.1 | x | ||||||||||||||||||
| 14 | 01 45 00.00 40 Quality Control Plan ¶3.2 | x | x | |||||||||||||||||
| 15 | 01 45 00.00 40 Field Tests ¶3.7 | x | ||||||||||||||||||
| 16 | 01 45 00.00 40 Monthy Reports | x | ||||||||||||||||||
| 17 | 32 01 11.53 Joint sealant and backer rod ¶2.0 | x | x | |||||||||||||||||
| 18 | 32 01 26.71 equipment ¶2.0 | x | ||||||||||||||||||
| 19 | 32 01 26.71 proceedures ¶3.0 | x | ||||||||||||||||||
| 20 | 32 13 10 cold/hot weather plan ¶1.7 | x | ||||||||||||||||||
| 21 | 32 13 10 Techrete or Equivalent ¶2.3 | x | ||||||||||||||||||
| 22 | 32 13 10 Primer ¶2.1 | x | ||||||||||||||||||
| 23 | 32 13 10 Backer Materials¶2.1 | x | ||||||||||||||||||
| 24 | 32 13 10 compation curve ¶3.6 | x | ||||||||||||||||||
| 25 | 32 13 10 density test ¶3.6 | x | ||||||||||||||||||
| 26 | 32 13 11 Equipment ¶2.10 | x | ||||||||||||||||||
| 27 | 32 13 11 Concrete Mix design | x | ||||||||||||||||||
| 28 | 32 13 11 Dowels ¶2.8 | x | ||||||||||||||||||
| 29 | 32 13 11 Dowel Bar Assemblies ¶2.8 | x | ||||||||||||||||||
| 30 | 32 13 11 Materials Test Reports ¶2.0 | x | ||||||||||||||||||
| 31 | 32 13 11 Product Test Reports ¶3.12 | x | ||||||||||||||||||
| 32 | 32 17 23.00 Paint ¶2.1 | x | x | x | x | |||||||||||||||
| 33 | 32 17 23.00 Reflective media ¶2.1 | x | x | x | x | |||||||||||||||
| 34 | 32 73 13.00 Mooring Devices ¶2.0 | x | ||||||||||||||||||
| 35 | 32 73 13.00 Grounding Rods¶2.0 | x | ||||||||||||||||||
| 36 | 32 73 13.00 Copper Connectors ¶2.0 | x | ||||||||||||||||||
| 37 | 32 73 13.00 Welding Qualifications ¶2.7 | x | ||||||||||||||||||
| 38 | 32 73 13.00 WeldingCertificates ¶2.7 | x | x | |||||||||||||||||
| 39 | 32 92 23 Sod ¶2.1 | x | x | |||||||||||||||||
| 40 | 32 92 23 Existing Top soil ¶3.0 | x | ||||||||||||||||||
| 41 | 32 92 23 Contractor provided Top Soil ¶2.3 | x | ||||||||||||||||||
| 42 | 32 92 23 Fertilizer ¶3.0 (If required) | x | ||||||||||||||||||
| 43 | As built drawings | x | ||||||||||||||||||
| 44 | DD1354 | x | ||||||||||||||||||
| 45 | Hazardous materials monthly quantities | x | ||||||||||||||||||
| 46 | Warranty letter | x | ||||||||||||||||||
| 47 | Release of Claim | x | ||||||||||||||||||
| 48 | ||||||||||||||||||||
| 49 | ||||||||||||||||||||
| 25 |