Attach 1 - Form 66 Submittal Schedule B530 0.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- B530 Chiller Replacement Federal contract opportunity
- Solicitation number
- FA303021QA001
About this file
This document contains a schedule of material submittals for a federal contract to replace chillers at Building 530. The contract, solicitation number FA303021QA001, was issued by the Department of the Air Force Air Education and Training Command to remove one existing chiller, repair another, and provide and install one new chiller and two new variable frequency drives. The schedule outlines 15 required submittals including work schedules, safety and accident plans, warranties, parking and storage plans, utility outage notices, waste disposal plans, hazardous material records and lists, air emissions reports, construction waste management forms, training certificates, and quality control reports. It specifies the number of copies required, relevant specification paragraphs, required submission dates before or after notice to proceed or final acceptance, and whether the submittals require certification of compliance, shop drawings, samples, color selection, manufacturer recommendations, warranties, operating instructions, or other documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - FA303021QA001 - QA Amended.pdf | ||
| Attach 2 - Bldg 530 Chiller SOW 30 July.pdf | ||
| Attach 2 - Bldg 530 Chiller SOW 30 July.pdf | ||
| Attach 2 - TE-4 Trane Pictures.pdf | ||
| Attach 6 - Questions and Answers.pdf | ||
| Combo - FA303021QA001 - Final.pdf | ||
| Combo - FA303021QA001 - Final.pdf | ||
| Attach 2 - SOW B530.pdf | ||
| Attach 2 - Bldg 530 Chiller SOW.pdf | ||
| Attach 4 - Evaluation Criteria.pdf | ||
| Attach 2 - TE-2 Chiller Controls Diagram.pdf | ||
| Attach 3 - DoD Contractor Guide B530.docx | DOCX document | |
| Attach 2 - TE-3 Photos.pptx | PPTX presentation | |
| Attach 1 - Form 66 Submittal Schedule.xls | XLS spreadsheet | |
| Attach 5a - Det 7 (AETC) CM4 Chiller Approval Memo_signed.pdf | ||
| Attach 3 - DoD Contractor Guide B530.pdf | ||
| Attach 5 - HVAC Chiller System Justification and Approval.pdf | ||
| Attach 2 - TE-1 B530 - DWG.pdf | ||
| Combo - FA303021QA001 - Final.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT: B530 Replace (2) Air Cooled Chillers | SOLICITATION/CONTRACT NO. | ||||||||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.) | CERTIFICATION | OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S | RECOMMENDATIONS | MANUFACTURER'S | WARRANTY | OPERATING | INSTRUCTIONS | SEE PARA | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACT-TOR RE- SUBMIT- TAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||||||
| 1 | Para. 1.5.1 - Work Schedule | 1 | 14 Days Prior (e) | GA | ||||||||||||||||||||
| 2 | Para 1.7.1 Company Safety Policy and Accident Prevention Plan | 1 | x | (c) | FIO | |||||||||||||||||||
| 3 | Para 1.12 List of Warranties and Certificates | 1 | Upon Final Acceptance by Gov | GA | ||||||||||||||||||||
| 4 | Para 1.13.1 Parking & Storage | 1 | (e) | GA | ||||||||||||||||||||
| 5 | Para 1.14.1.1 AF Form 103 Base Work Clearance Request | 1 | (e) | GA | ||||||||||||||||||||
| 6 | Para 1.14.2 Utility Outages | 1 | 14 Days Prior (e) | GA | ||||||||||||||||||||
| 7 | Para 1.15 Waste Disposal | 1 | (d) | GA | ||||||||||||||||||||
| 8 | Para 2.2 Hazardous Waste Records | 2 | x | (b) | GA | |||||||||||||||||||
| 9 | Para 2.5 Haz. Material List with worksheet for each SDS | 2 | x | (c) | GA | |||||||||||||||||||
| 10 | Para 2.8 Air Emissions Reports | 2 | x | (b) | GA | |||||||||||||||||||
| 11 | Para 2.9 Construction Waste Management Form | 2 | (b) | GA | ||||||||||||||||||||
| 12 | Para 2.10 EMS Awareness Training Certificate | 2 | (e) | FIO | ||||||||||||||||||||
| 13 | Para 2.11.2.2 Contractor Responsibility | 2 | (e) | FIO | ||||||||||||||||||||
| 14 | Para 3.4 CPM: Manufacturer's Specifications | 3 | (e) | FIO | ||||||||||||||||||||
| 15 | Para 4.3 Contractor Quality Control Daily Reports | 4 | (f) | FIO | ||||||||||||||||||||
| AF Form 66, SEP 86 | ||||||||||||||||||||||||
| (a) As soon as possible but in no case later than 45 calendar days after NTP. | ||||||||||||||||||||||||
| (b) Prior to Final Inspection. | ||||||||||||||||||||||||
| (c) Prior to Use. | ||||||||||||||||||||||||
| (d) As Required. | ||||||||||||||||||||||||
| (e) Prior to start of work. | ||||||||||||||||||||||||
| (f) Weekly. |