Attach 2 - TE-3 Photos.pptx
PPTX presentation 4 MB Posted
- Attached to
- B530 Chiller Replacement Federal contract opportunity
- Solicitation number
- FA303021QA001
About this file
This document includes a federal contract opportunity for the replacement of chillers and pump controls at Building 530. The solicitation requests the removal of one existing air-cooled chiller and repair of another, as well as the provision and installation of a new Trane air-cooled chiller. Two existing variable frequency drive units will be removed and replaced with new Teco or equivalent drives. This is a women-owned small business set aside solicitation issued by the Department of the Air Force Air Education and Training Command. The solicitation number is FA303021QA001 and is titled B530 Chiller Replacement. The opportunity type is listed as a solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - FA303021QA001 - QA Amended.pdf | ||
| Attach 2 - Bldg 530 Chiller SOW 30 July.pdf | ||
| Attach 2 - Bldg 530 Chiller SOW 30 July.pdf | ||
| Attach 2 - TE-4 Trane Pictures.pdf | ||
| Attach 6 - Questions and Answers.pdf | ||
| Combo - FA303021QA001 - Final.pdf | ||
| Combo - FA303021QA001 - Final.pdf | ||
| Attach 1 - Form 66 Submittal Schedule B530 0.xlsx | XLSX spreadsheet | |
| Attach 2 - SOW B530.pdf | ||
| Attach 2 - Bldg 530 Chiller SOW.pdf | ||
| Attach 3 - DoD Contractor Guide B530.docx | DOCX document | |
| Attach 1 - Form 66 Submittal Schedule.xls | XLS spreadsheet | |
| Attach 5a - Det 7 (AETC) CM4 Chiller Approval Memo_signed.pdf | ||
| Attach 3 - DoD Contractor Guide B530.pdf | ||
| Attach 5 - HVAC Chiller System Justification and Approval.pdf | ||
| Attach 2 - TE-1 B530 - DWG.pdf | ||
| Combo - FA303021QA001 - Final.pdf | ||
| Attach 4 - Evaluation Criteria.pdf | ||
| Attach 2 - TE-2 Chiller Controls Diagram.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 530
CHILLERS
AND
PUMP CONTROLS
BUILDING 530 CHILLERS TO BE REMOVED
EAST
WEST
VFD
CONTROL PANELS
for
CHILLER PUMPS
CHILLER PIPING
CHILLER BYPASS VALVES
image1.jpeg image2.jpeg image3.jpeg image4.jpeg