Att 9 - AF Form 66.pdf
PDF 689 KB Posted
- Attached to
- Paint Water Tower Federal contract opportunity
- Solicitation number
- FA3030-17-R-0007
About this file
AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_and_A.pdf | ||
| Att_2_-_SOW_Interior.pdf | ||
| FA3030-17-R-0007-0001.pdf | ||
| Att_1_-_SOW_Exterior.pdf | ||
| Att 10 - Past Performance Questionaire.pdf | ||
| Att 2 - SOW Interior.pdf | ||
| FA3030-17-R-0007_-_Paint_Water_Tower_RFP.pdf | ||
| Att 4 - CS-1.pdf | ||
| Att 3 - DBA Wage Determination.pdf | ||
| Att 5 - EL-1.pdf | ||
| Att 8 - EX-2.pdf | ||
| Att 6 - EL-2.pdf | ||
| Att 11 - Base Access Letter Template.pdf | ||
| Att 1 - SOW Exterior.pdf | ||
| Att 7 - EX-1.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER
JCGU 18-1000 &
JCGU 12-1062
APPROVED DISAPPROVED
1 Part 1, 1.7, Company Safety Policy and Accident Prev Plan
1 (c)
2 Part 1, 1.11, Warranties 1 (d)
3 Part 1, 1.12, Contractor Storage
1 (c)
4 AF Form 103 Work Clearance Permit
1 (c)
5 Technical Exhibit 1, AF signage
1 (a)
6 Environmental form G0104
2 (a)
7 Part 2, 2.4, AF Form 3952 HAZMAT Request
2 (b)
8 Scaffolding erection Work Plan
(c)
9 Part 3, 3.3.2, Coatings SDS, Safety Data Sheets
3 x (c)
10 Part 4, 4.2.3, Coating Certificates
4 x (b)
11 Tank Disinfection Certificate
3 (a)
12 Cathodic Protection Attach. 2
4 (c)
13 Cathodic Prot.
Installer credentials
4 (c)
PROJECT NUMBER
JCGU 18-1000 &
JCGU 12-1062
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT TITLE: PAINT INTERIOR AND
EXTERIOR ELEVATED BASE EAST WATER
TOWER – FACILITY 3475
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION OF
ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
NO. OF COPIES REQUIRED
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CON-
TRACTING
FINAL
APPROVAL REMARKSCE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R S
EL
EC
TI
ON
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S
W
AR
RA
NT
Y
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
PA
RA
OT
HE
RS
A
S
SP
EC
IF
IE
D
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE FOLLOW UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR
RE- SUBMITAL
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT TITLE: PAINT INTERIOR AND
EXTERIOR ELEVATED BASE EAST WATER
TOWER – FACILITY 3475
SOLICITATION/CONTRACT NO.
Attachment 9 - 25 Jul 17
APPROVED DISAPPROVED
14 Para. 1.53 Work Management Plan
(c)
15 Part 1, 1.13.4.1, AF Form 592 Welding, Cutting, Brazing permit
1 x (d)
AF Form 66
(a) As soon as possible but in no case later then 45 calendar days after NTP
(b) Prior to Final Inspection
(c) As soon as possible but in no case later then 14 calendar days after NTP
(d) As required
(e) Contractor shall notify 14 days in advance prior commencing work.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION OF
ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
NO. OF COPIES REQUIRED
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CON-
TRACTING
FINAL
APPROVAL REMARKSCE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R S
EL
EC
TI
ON
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
PA
RA
OT
HE
RS
A
S
SP
EC
IF
IE
D
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE FOLLOW UP
DATE CONTRACTOR
NOTIFIED CONTRACT- TOR
RE- SUBMIT- TAL
Attachment 9
Table 1
File details come from the government source that posted it. Updated .