Drawing EL-1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_and_A.pdf | ||
| Att_2_-_SOW_Interior.pdf | ||
| FA3030-17-R-0007-0001.pdf | ||
| Att_1_-_SOW_Exterior.pdf | ||
| Att 8 - EX-2.pdf | ||
| Att 6 - EL-2.pdf | ||
| Att 11 - Base Access Letter Template.pdf | ||
| Att 1 - SOW Exterior.pdf | ||
| Att 7 - EX-1.pdf | ||
| Att 10 - Past Performance Questionaire.pdf | ||
| Att 2 - SOW Interior.pdf | ||
| FA3030-17-R-0007_-_Paint_Water_Tower_RFP.pdf | ||
| Att 4 - CS-1.pdf | ||
| Att 3 - DBA Wage Determination.pdf | ||
| Att 9 - AF Form 66.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JC
M
V T
D
1. Contractor shall clean and weld existing ladder bracket. Paint affected areas as per SOW.
CONCRETE FOUNDATIONS
EAST WATER TOWER ELEVATION
EAST WATER TOWER
LADDER BRACKET LOCATION AT TANK
LADDER BRACKET DETAIL SEE BELOW
NOTE:
02 3
19 June 2017
Attachment 5 - 19 Jun 17