362d_Statement_of_Objectives_Aircraft_Marshalling_Training_Simulator.docx

DOCX document 15 KB Posted

Attached to
Airplane Marshalling Simulator
Solicitation number
FA302019QA024
Issued by

About this file

Statement Of Objectives (SOO)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objective The desired objectives are to enhance student training/quality of instruction, increase crew chief ability to incorporate emerging technologies, relieve instructor workload, and provide syllabus relief.

We are looking to enhance the ability for students to prepare for flight line aircraft marshaling outside of the confines of the syllabus by providing an accurate marshalling virtual/mixed reality simulator.

The ideal solution would put this model in an environment that accurately resembles the geography and topography of flight line environments. Additionally, the software will accurately replicate the flight line characteristics.

The contractor shall provide a turnkey solution incorporating all hardware, software, and support staff necessary to develop, setup, update, maintain, and troubleshoot this system.

Items
Description
Quantity
Student Work Station
Virtual Reality capable computer/game system with motion sensing input device (example: Xbox One w/ Microsoft Kinect or equal)”
Program Software
Software will train students to demonstrate proficiency for 16 marshalling signals, (This Marshaller, Proceed to next Marshaller, Start Engine, Cut Engine, Move Ahead, Turn to Left, Turn to Right, Slow Down, Move Back, Auxiliary Power Unit (connected), Auxiliary Power Unit (Disconnected), Chocks (Inserted), Chocks (Removed), Affirmative (All Clear or “OK”), Fire in the Engine or Auxiliary Power Unit (APU), etc.), require directed to marshal two different types of aircraft – a smaller fighter jet and a larger 4 engine transport for different response times needed.
10
Warranty Plan
Product will have a warranty period which will begin the day the client signs off on the project delivery. Contractor will resolve any defects, failures, bugs, or glitches detected during the warranty period, ensuring the development operates in accordance with all specifications and requirements of the project scope.

File details come from the government source that posted it.