CIRCUIT 7
| CONSTRUCTION COST ESTIMATE | DATE: | ||||||||||
| CONTRACTOR: | ADDRESS: | ||||||||||
| PROJECT TITLE: Replace Circuit 7, Overhead to Underground | PROPOSED TOTAL CONTRACT PRICE: | ||||||||||
| PURCHASE REQUEST NUMBER: | PROJECT NUMBER: VNVP 1310061 | WORK LOCATION: Sheppard AFB, TX | |||||||||
| MATERIAL | LABOR | EQUIPMENT | TOTAL | ||||||||
| Bid Item | Description | Qty. | Unit | Cost / Unit | Total Cost | Cost / Unit | Total Cost | Cost / Unit | Total Cost | Cost / Unit | Total Cost |
| CIRCUIT 7 | |||||||||||
| Total Length: | 15,203 | LF | |||||||||
| Total Bore Length: | 927 | LF | |||||||||
| Total Trench Length: | 14,178 | LF | |||||||||
| Total Trench Volume: | 12,590 | CY | 3.00 | 8.00 | |||||||
| Asphalt Demolition: | 5,540 | SY | |||||||||
| Concrete Demolition: | 737 | SY | |||||||||
| Saw cutting Asphalt: | 4,313 | LF | |||||||||
| Saw cutting Concrete: | 696 | LF |
| 1 | SITE WORK | |
| Pavement | ||
| Saw Cut Asphalt Pavement | LF | |
| Saw Cut Concrete Sidewalk | LF | |
| Remove Concrete Sidewalk | SY | |
| Remove Load & Haul Asphalt Pavement | CY |
| Scarify Compact Subgrade & Fine Grade | SY |
| Sub Base, Type II Aggregate | CY |
| Bituminous Surface - Repair | SY |
| Replace Concrete Sidewalk | SF |
| SUB TOTAL | ||
| 11 | ELECTRICAL | |
| Demolition | ||
| Remove Primary Circuit Pole, Incl. Appurtenances | EA | |
| Remove Primary Circuit Aerial | LF | |
| Remove Communication Aerial (Tele, Fiber & CATV) | LF | |
| Remove Pole Mounted Light Fixture | EA | |
| Remove Conductor In Existing Conduit | LF | |
| Abandon Manhole | EA |
Remove Vacuum Circuit Breaker, Class 15kv, Incl Support, Wire & Conduit Termination EA
| Transformer, Demolition | ||||
| Transformer, 5 Or 15 kV Primary, 208/120 V Secondary, 112.5 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 3.5 | 5.714 |
| Transformer, 5 Or 15 kV Primary, 208/120 V Secondary, 150 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 3.5 | 5.714 |
| Transformer, 5 Or 15 kV Primary, 208/120 V Secondary, 225 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 3.5 | 5.714 |
| Transformer, 5 Or 15 kV Primary, 208/120 V Secondary, 300 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 3.5 | 5.714 |
| Transformer, 5 Or 15 kV Primary, 208/120 V Secondary, 500 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 3.5 | 5.714 |
| Transformer, 5 Or 15 kV primary, 277/480 V Secondary, 150 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 2.7 | 7.407 |
| Transformer, 5 Or 15 kV Primary, 277/480 V Secondary, 225 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 2.3 | 8.696 |
| Transformer, 5 Or 15 kV Primary, 277/480 V Secondary, 500 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 1.45 | 13.793 |
| Transformer, 5 Or 15 kV Primary, 277/480 V Secondary, 750 kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA | R3 | 1.33 | 15.038 |
| Transformer, 5 Or 15 kV Primary, 277/480 V Secondary, 1000kVA, Electrical Demolition, Remove, Incl Support, Wire & Conduit Termination | EA |
| Apparatus | |
| Transformer, 15kV, 3 Phase, Oil-Filled, Pad Mounted, With Taps | |
| 480/277V Secondary, 150 kVA | EA |
| 480/277V Secondary, 225 kVA | EA |
| 480/277V Secondary, 300 kVA | EA |
| 480/277V Secondary, 500 kVA | EA |
| 480/277V Secondary, 750 kVA | EA |
| 480/277V Secondary, 1000 kVA | EA |
| 208/120V Secondary, 500 kVA | EA |
| 208/120V Secondary, 300 kVA | EA |
| 208/120V Secondary, 225 kVA | EA |
| 208/120V Secondary, 150 kVA | EA |
| 208/120V Secondary, 112.5 kVA | EA |
| 208/120V Secondary,167 kVA SP | EA |
| 240V Secondary, 25 kVA Sp | EA |
| Switching | |
| Vacuum Circuit Breaker, Class 15kv, Sectionalizing Gear Pedestal & Concrete Surround | EA |
| Apparatus Grounding | |
| Cad Weld | EA |
| CU Bare Conductor 1/0 | LF |
| Ground Rod 3/4" x 10' | EA |
| Trench & Backfill Machine Chain Trencher | LF |
| Transformer & Switch Pads 6'X6'X8" | EA |
| Clear & Excavate For Pad | EA |
| Edge Form | LF |
| Reinforcing Steel | LB |
| Place & Finish Concrete | CY |
| Areal Extension | |
| Utility Pole, 40' | EA |
| Cross Arms w/ Hardware & Insulators, 6' | EA |
| Insulators | EA |
| Fused Cut Out 15 Kv | EA |
| Pole Riser Conduit Assembly w/ Weather Head | EA |
| Primary Duct Bank & Distribution | ||||
| Clearance & Excavation | ||||
| Excavating, Trench Common Earth, 3/4 C.Y. | BCY | B13G | 212 | 0.075 |
| Backfill, 1 C.Y. Bucket, Minimal Haul, Front End Loader, Wheel Mounted | CY | B10R | 400 | 0.02 |
| For Tamping Backfilled Trenches, 6" Lift, Air Tamped, Add | ECY | A1G | 100 | 0.08 |
| Backfill & Compact, By Hand, 12" Layers, Compaction In Layers, Hand Tamp, Add To Above | ECY | 1 Clab | 34 | 0.235 |
| Trench Bedding, Dead Or Bank Sand, Spread Excludes Compaction | CY | B15 | 600 | 0.047 |
| Add For Crossing Under Utility | EA | |||
| Dewatering, Pump | DAY | B10H | 4 | 2 |
| Load Haul & Waste | LCY | B34A | 88 | 0.091 |
| Duct | ||||
| Underground Tape, Detectable, Reinforced, Aluminum Foil Core, 2" | CLF | 1 Clab | 150 | 0.053 |
| Electrical Underground Duct Banks Ready For Concrete Fill, PVC, Type EB, 2 @ 5" Diameter, Excludes Excavation, Backfill & Concrete | LF | 2 Elec | 160 | 0.1 |
| Electrical Underground Duct Banks Ready For Concrete Fill, PVC, Type EB, 4 @ 4" Diameter, Excludes Excavation, Backfill & Concrete | L.F. | 2 Elec | 80 | 0.2 |
| Concrete Fill Duct Bank | CY | C6 | 24 | 2 |
| Hand Excavate & Connection Existing Long Rad Eles To New Primary @ Transformers | EA |
| Incoming Duct New Configuration @ Existing Transformer Pad | EA |
| Manholes | ||||
| Electrical Underground Manhole, Precast w/Iron Racks & Pulling Irons, C.I. Frame & Cover, 7' x 7' x 7' Deep, Excludes Excavation, Backfill | EA | B13 | 1.9 | 25.263 |
| Comm Manhole, Precast w/ Iron Racks & Pulling Irons, C.I. Frame & Cover, 4' x 6' x 7' Deep, Excludes Excavation, Backfill | EA | B13 | 2 | 24 |
| Electrical Manhole Precast Concrete, w/ Concrete Cover, 4'x4'x4' Deep, Excludes Excavation, Backfill | EA | R3 | 1.4 | 14.286 |
| Ground Rod & Connection | EA |
| Bore & Jack Horizontal | LF | |||
| Directional Drilling, Mobilization & Demobilization Includes Pits | EA | B82A | 1 | 32 |
| Directional Drilling, Hard Clay, Cobble Per Linear Feet, 18" Diameter | LF | B82B | 145 | 0.221 |
| Directional Drilling, Hard Clay, Per Linear Feet, 24" Diameter | LF | B82B | 105 | 0.305 |
| Horizontal Boring, Jack, Casing 1/2" Thick Wall, 24" Diameter | LF | B42 | 20 | 2.8 |
| Conductor | ||||
| Medium-Cable Single Cable, Copper, XLP Shielding Concetric neutral , 15 kV, 500 kcmil, In Conduit, Excl Splicing & Terminations | CLF | 3 Elec | 3.6 | 6.667 |
| Medium-Cable Copper, PVC Jacket, 15 kV, single Conductor, XLP Shielding Concetric neutral , 15 kV #2 | LF | 2 Elec | 260 | 0.062 |
| Cable Terminations, Outdoor Systems, 15 kV, 500 kcmil To 750 kcmil Stranded | EA | 1 Elec | 4.6 | 1.739 |
| Cable Terminations, Outdoor Systems, 15 kV, #2 to 4/0 Stranded | EA | 1 Elec | 4.8 | 1.667 |
| Cable Terminations Secondary Reconnect | EA |
Communication Cable & Fiber By Others NIC
| Site Lighting | |
| Light Pole Base 24" Dia X 8' | LS |
| Light Pole 30' Steel | EA |
| Light Pole 20' Steel | EA |
| Ground Rod & Leader | EA |
| Fixture Arm | EA |
| Underground Street Light Circuit | |
| Trench & Backfill Machine Chain Trencher | LF |
| PVC Conduit w/ FTGS 1-1/4" | LF |
| Conductor #4, Copper, XLP Shielded | LF |
| Conductor #12, Copper, XLP Shielded | LF |
| Reinstall Salvaged Fixture | EA |
| Light Fixture ARE-EDG-2M-DA-60-D-BZ-350 | EA |
| Light Fixture MLED-BOUL-5K-M-BZ-PRU-SP | EA |
SUB TOTAL
| TOTAL DIRECT COST |
| SUBTOTAL |
| OVERHEAD |
| PROFIT |
| BONDS |
| TOTAL PROJECT COST |