STATEMENT OF WORK
JBSF122000D
REPAIR ROOF B-2735
JOINT BASE SAN ANTONIO – FORT SAM
HOUSTON, TX
Date Prepared:
10 March 2017
Revised: 28 June 2017
Prepared by:
Johnny Almaguer
JBSA-CES/CENME-Design
STATEMENT OF WORK
CONTRACT NO: TBD
1. PROJECT NUMBER:
JBSF122000D
2. TITLE:
Repair Roof Bldg 2735
3. PROJECT LOCATION:
Building 2735, Joint Base San Antonio-Fort Sam Houston, Texas
4. GENERAL DESCRIPTION OF WORK:
Project involves the removal of the existing built up roof system at building 2735 and the installation of a new, fully adhered Thermoplastic Polyolefin (TPO) white reflective roof system
(non-ballasted) with a 72 mil minimum thickness, welded seams, the repair of the existing two and half inch Gypsum roof deck and other work as described in this Statement of Work (SOW). The windstorm classification shall meet a minimum Class 1A-105. Repair of metal entry canopy.
5. APPLICABLE DETAILED SPECIFICATIONS:
DIVISION 01
01 01 00.00 44 - Work Plan Requirements
01 14 00 - Work Restrictions
01 33 00 - Submittal Procedures
01 35 29 - Occupational Safety and Health
01 35 30 - Safety, Health and Emergency Response
01 45 00.10 20 - Contractor Quality Control
01 54 23.00 - Scaffolding Tubular Steel
01 56 00.00 44 - Dust Control
01 71 23.16 - Cutting and Patching
01 72 00.00 44 - Alterations to Existing Facilities
01 74 19.00 - Construction Waste Management
01 77 00.00 20 - Contract Closeout
01 78 00 - Closeout Submittals
01 80 00.10 - Warranty of Construction Roofs
DIVISION 02
02 41 00 - Demolition and Deconstruction
02 81 00 00 - Disposal of Hazardous Materials
02 82 14 00 10 - Asbestos Hazard Control Activities
02 82 33.13 20 - Removal -Control and Disposal of Paint with Lead
DIVISION 03
03 50 00 10- Gypsum Deck Repair
DIVISION 05
05 72 00 - Decorative Metals Specialties
DIVISION 06
06 10 00 - Rough Carpentry
DIVISION 07
07 22 00 - Roof and Deck Insulation
07 54 23 Thermoplastic Polyolefin (TPO) Roofing
07 60 00 - Flashing and Sheet Metal
07 92 00 - Joint Sealants
DIVISION 09
09 90 00 - Paints and Coatings
6. GENERAL SCOPE OF WORK:
6.1. All construction accomplished pursuant to this Contract shall comply with the latest edition of the following documents at the time of contract award:
a) International Building Code (IBC)
b) UFC 1-200-01 DoD Building Code (General Building Requirements) 20 June 2016
c) NFPA 70 - National Electrical Code
d) NFPA 72 - Fire Alarm and Signaling Code
e) NFPA 90A - Standard For The Installation of Air-Conditioning and Ventilating
Systems
f) NFPA 241 - Standard For Safeguarding Construction, Alteration, and Demolition
Operations
g) NFPA 101 Life Safety Code
h) TRADOC Regulation (TR) 3 50-6, 1 Jul 09
i) AFI 3 1-101 Air Force Physical Security Program
j) AR 190-13 Army Physical Security Program
k) Fire Prevention Plan IAW NFPA 24
6.2. Security:
All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://jkodirect.jten.mil. Access and general protection policy and procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative).
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
iWATCH and/or CorpsWatch Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say
Something program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after contract award.
7. DETAILED SCOPE OF WORK:
7.1. Work Plan(s):
7.1.1. Provide roof manufacturer’s approved shop drawings and schedule to include all covering work to be performed, roof plan and temporary protection plan. Shop drawings to be approved by the Government prior to any work beginning.
The building is occupied and will remain occupied during the duration of this project. Contractor to insure protection of the interior of the building during all roof work. Work will be coordinated so that there is minimal impact to the building occupants and their business.
A registered Architect or Engineer is not required to seal the shop drawings.
Contractor to provide Typical shop drawings as developed by the roofing manufacturer and roofing to be installed as per the roofing manufacturer’s details provided in the shop drawings. A roofing manufacturer Technical Representative will be on site to insure compliance with all details. Shop Drawings to be provided as a submittal to be approved by the Government.
7.2. Demolition Work:
Civil/Site:
Activities shall be planned and implemented in a manner that protects existing site utilities, structures, surface features, service operations, and the general site environment. This includes the protection of trees, shrubs, and other vegetation not in the affected zone from dust damage, soil compaction, and physical contact with machines and equipment. All reasonable measures shall be taken to minimize and suppress fugitive emissions of dust, vapors, and other site materials during work.
7.2.1. Architectural
7.2.1.1. Remove roof system to include the following components:
a. Four ply built-up Roof (modified bitumen)
b. Protection Board
c. Tapered Insulation
d. Rigid Insulation
e. Vapor barrier
f. Curbs
g. Expansion Joints System
h. Equipment and Equipment Supports
i. Pipe Supports
j. Pitch Pockets
k. Crickets
l. Abandoned and capped exhaust vents.
m. Thru wall scuppers
n. Conductor heads
o. Downspouts
p. Front Entry Canopy flashing, roofing and fascia.
q. Remove all flashing around small A/C through the wall units.
7.2.1.1 Contractor to provide a third party inspector as approved and qualified by the roofing manufacturer.
7.2.2. Structural
7.2.2.1. Assume 25% of existing gypsum roof deck has deteriorated and will need to be removed and replaced/repaired. See Gypsum Roof Deck Repair Specifications.
7.2.3. Mechanical
7.2.3.1. Existing RTU to remain in place during roof replacement. If during the project the unit needs to be disconnected and moved by the roofing contractor. The Contractor shall notify the designated government representative to schedule an outage. The outage shall be conducted after hours or on the weekend. Contractor shall allow for a seven day coordination effort.
7.2.4. Electrical
7.2.4.1. Not part of this solicitation.
7.2.5. Plumbing
7.2.5.1. Remove nonfunctioning/abandoned 8” roof vent penetrations (17) and repair roof to install new roofing, contractor to verify exact roof penetrations to remove.
Contractor to submit product data, shop drawings, details on how penetrations will be repaired.
7.2.6. Environmental:
7.2.6.1. Hazardous Material Surveys have been provided by Government – See
Append ix D. Survey indicates NO Asbestos NO Lead.
7.2.7. Fire- Not Applicable
7.3. New Work:
7.3.1. Civil / Site
No details were provided in the plans for this project. Contractor to provide shop drawings indicating location of fascia, metal roofing, leader heads, thru wall scuppers, downspouts and gutter work at existing conditions for government approval. Front Canopy gutter and downspout work, to be located as to not interfere with pedestrians or pose safety or drainage issues. Water to not be released on walking surfaces that may cause a slippery walking surface.
7.3.2. Architectural
7.3.2.1. Provide new roof system to include but not limited to the following components:
a. TPO roof membrane
b. Protection Board
c. Tapered Insulation
d. Rigid Insulation
e. Wood Blocking
f. Curbs (Perimeter and Equipment)
g. Expansion Joints
h. Equipment Supports
i. Pipe Supports
j. Pocket Flashing
k. Flashing
l. Roof Decking (repair)
m. Crickets
n. Thru wall scuppers
o. Conductor heads
p. Downspouts- prefinished-electro-paint coated.
q. Splash blocks at non-concrete downspout areas
r. Front Entry Canopy flashing, metal roofing, fascia, gutter and downspouts
All downspouts and gutters to be pre-finished electro-paint coated.
s. All flashing around small A/C’s through the wall units on canopy.
Roofing system to be installed by TPO Factory-Certified Contractor ensuring all manufacture warranties remain in effect upon completion.
Roof currently has an issue with drainage. There is currently very little slope.
Low parapets and thru wall scuppers are restricting the slope that can be incorporated with the new roof installation. Contractor to work with roofing manufacturer to provide as much slope as possible to remove water off the roof given the existing conditions. Most manufacturers on new construction require
1/8” per foot to prevent holding water and roof deflection.
7.3.2.2. Provide new metal flashings system/coping.
a. Match existing profile at perimeter of roof
7.3.3. Structural
a. Repair roof deck as required. Contractor shall submit product data and shop drawings that show how the repairs will be made as part of the work plan in
Paragraph 7.1 above.
7.3.4. Mechanical – Not Applicable
7.3.5. Electrical – Not Applicable
7.3.6. Plumbing – Not Applicable
7.3.7. Environmental – Not Applicable
7.3.8. Fire – Not Applicable
8. PERFORMANCE PERIOD/LIQUIDATED DAMAGES:
Performance Period shall be 180 days. Liquidated damages will be assessed as determined by
Contracting Officer for failure to complete the work within the specified time.
9. PHASING REQUIREMENTS AND HOURS OF OPERATIONS:
No phasing of the project is required by the Government. Normal working hours shall be Monday thru
Friday 7:30 am to 5:00 pm. Work days and hours other than indicated must be approved by Contracting
Officer. Repairs to roof must be conducted while the building is occupied. Tenants must be notified and approvals given by the tenants prior to any repairs that may affect the business.
All roof access should be from the rear and sides that will not impact the businesses. Front canopy work must be coordinated with the tenants and the Government.
10. GOVERNMENT FURNISHED ITEMS:
10.1. See Paragraph 12 (for Appendices)
11. NOTED CONTRACTOR REQUIREMENTS:
11.1. Prior to Contract Award:
11.1.1. Attend a Pre-Bid site visit to verify measurements, quantities and investigate existing site conditions.
11.2. After Contract Award:
11.2.1. Submit roof manufacturer’s approved shop drawings describing roof system to include plans and details covering all aspects of work.
11.2.2. Refer to appropriate specification sections located in Appendix B
11.3. Debris and Cleanup: Refer to appropriate specification sections located in Appendix D.
11.3.1. Toilet Facilities per specification section 01 52 13.00
11.4. After construction completion and prior to final payment, the contractor shall provide the following:
11.4.1. Contract Closeout
11.4.2. Closeout Submittals
11.4.3. Operation and Maintenance Data
11.4.4. Warranty of Construction
11.4.5. Warranty of Construction (Roofs) per specification section 01 80 00.10
(Appendix B)
12. THIS SCOPE OF WORK INCLUDES THE FOLLOWING APPENDICES:
12.1. Appendix A – Photos of Existing Conditions
12.2. Appendix B – 01 80 00.10 Warranty of Construction Roofs
12.3. Appendix C – Record Drawings
12.4. Appendix D – Hazardous Materials Report
12.5. Appendix E – Specifications
End of SOW
APPENDIX A - PHOTOS
A. NE Elevation B. SE Elevation
C. West Elevation D. North Elevation
E. Gypsum roof deck. F. Billowing cap sheet
G. Existing mechanical equipment. H. Damaged gypsum roof deck.
I. Parapet wall
APPENDIX B- ROOF
WARRANTY
APPENDIX B- ROOF
WARRANTY
Repair Roof, B2735 JBSF122000D
SECTION 07 54 19 Page 1
TPO ROOF WARRNATY
1.1 Warranty
Provide roof system material and workmanship warranties. Provide revision or amendment to standard membrane manufacturer warranty as required to comply with the specified requirements. Minimum manufacturer warranty shall have no dollar limit, cover full system water-tightness, and shall have a minimum duration of 20 years. Submit sample certificate.
1.1.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 15-year, no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation, and accessories necessary for a watertight roof system construction. Provide warranty directly to the Government and commence warranty effective date at time of Government's acceptance of the roof work. The warranty must state that:
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, splits, tears, cracks, delaminates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship are the responsibility of the roof membrane manufacturer. All costs associated with the repair or replacement work are the responsibility of the roof membrane manufacturer.
b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, emergency temporary repairs performed by others does not void the warranty.
1.1.2 Roofing System Installer Warranty
The roof system installer shall warrant for a minimum period of five years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
1.1.3 Continuance of Warranty
Approve repair or replacement work that becomes necessary within the warranty period and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the roof membrane manufacturer warranty for the remainder of the manufacturer warranty period.
APPENDIX C- RECORD
DRAWINGS
APPENDIX C- RECORD
DRAWINGS
B2735
B2745
B2750
B2791
B2797 johnny.r.almaguer Polygon
APPENDIX D-
ASBESTOS/ LEAD
REPORTS
APPENDIX D-
ASBESTOS/ LEAD
REPORTS
LIMITED ASBESTOS INSPECTION
Building 2735 Roof Only
Ft. Sam Houston, TX for Gregory W. Belnap
Engineering Technician Fort Sam Houston, TX gregory.w.belnap2.civ@mail.mil (210)221-5183
AEHS, Inc.
4402 Center Gate San Antonio, Texas 78217
(210) 656-9300 www.aehs-sa.com mailto:gregory.w.belnap2.civ@mail.mil�
Asbestos Inspection AEHS, Inc.
Building 2735 Roof, Ft. Sam Houston, TX Environmental, Health, and Safety Consulting August 2015
ASBESTOS INSPECTION
Roof Only
Ft. Sam Houston, Texas
The on-site consultation was performed by Matthew Louderback, under the overall direction of Ronald M. Bishop, MPH, CIH. Matt Louderback is a Texas Department of State Health Services (TDSHS) licensed Asbestos Inspector (60- 2816) and Lead Risk Assessor (2070871). Ron Bishop is a TDSHS licensed Asbestos Consultant, Lead Project Designer, and Mold Consultant as well as a Certified Industrial Hygienist, Certified Safety Executive, Registered Sanitarian, Diplomate in Environmental Health, Registered Environmental Professional and Environmental Manager, Certified Environmental and Safety Compliance Officer, and Green Consultant.
1.0. GENERAL.
1.1. Construction materials containing asbestos have been used extensively in buildings because it possesses excellent properties for fire-proofing, insulation, and condensation control. Asbestos may be found in: (1) cement products; (2) spray applied or trowel applied materials on ceiling, walls, and other surfaces; (3) insulation on pipes, boilers, tanks, ducts, and other equipment; (4) vinyl floor tiles; (5) roofing; (6) flooring coatings; and (7) other miscellaneous products.
1.2. Friable materials are those materials that when dry can be crumbled, pulverized, or reduced to powder by hand pressure. Material that contains more than one percent asbestos by weight is considered to be asbestos containing material. Some of these asbestos-containing building materials are not considered friable now, but could become friable if not properly managed and maintained under an asbestos management program.
1.3. The concern about exposure to asbestos in buildings is based on evidence linking various respiratory diseases with occupational exposure in the shipbuilding, mining, milling, and fabricating industries. The presence of asbestos in a building does not mean that there is a significant health risk to building occupants. As long as asbestos-containing materials remain in good condition and are not disturbed, exposure is unlikely. Through proper control of building operations and maintenance activities, disturbance or damage to asbestos-containing materials is minimized, thus limiting the building occupant's exposure to airborne asbestos fibers.
1.4. Building alterations and/or demolition require knowledge of what materials contain asbestos and if they will be removed or disturbed during the project. Under the Clean Air Act, EPA has issued a National Emission Standard for Asbestos (40 CFR 61.140 - 61.156). This Standard regulates reporting requirements, work practices, waste disposal, and emissions from facility modification and/or demolition operations. The Standard applies only to materials containing more than one percent asbestos. The State of Texas has adopted a set of regulations (25 TAC 295.31 - 295.70) known as "Texas Asbestos Health Protection Rules" which govern asbestos removal, encapsulation, or enclosure, including licensing and regulation, in all buildings of public occupancy or access. Any disturbance or removal of ACBM in the building or facilities is subject to this Texas Statute.
2.0. BACKGROUND.
2.1. AEHS, Inc. was contacted by Ft. Sam Houston personnel, concerning the need for an Asbestos Inspection at Building 2735.
2.2. The initial request was from Mr. Greg Belnap for the roof only.
3.0. SCOPE OF WORK.
3.1. The inspection of building 2735 roof was performed on 12 August 2015 and consisted of visual assessments to determine the presence of suspect ACBM. Bulk samples of suspect ACBM (materials which possibly contain asbestos, as determined by an accredited EPA AHERA Building Inspector/ Consultant) were collected. The visual inspection, bulk sampling, and inspection documentation was performed by Matthew Louderback [Asbestos Inspector (No. 60-2816)].
3.2. AEHS, Inc. is a TDSHS Licensed Asbestos Consultant Agency (No.10-0335), PCM Laboratory (No. 30-0295), and an Asbestos Training Provider (No. 00-0068).
3.3. The specific objectives of the survey were to:
• Perform a visual inspection and physical assessment following the Asbestos
Hazard Emergency Response Act (AHERA) protocol as a guideline to identify, quantify, and assess accessible friable and non-friable ACBM;
• Collect and analyze bulk samples of suspect material for asbestos content and identification by an American Industrial Hygiene Association Accredited Laboratory that is also licensed by the Texas Department of State Health Services;
• Ensure the technical quality of all work by using the AHERA protocol and a TDSHS licensed consultant and inspector for the inspection; and
• Ιssue a final report that includes findings, bulk sample locations, and confirmed asbestos-containing building materials.
4.0. DESCRIPTION.
4.1. Building 2735 consists of multiple offices and retail facilities.
4.2. Renovation will include re-roofing.
5.0. INVESTIGATIVE METHODS.
5.1. Visual Inspection.
5.1.1. Building materials were inspected and assessed using the methods presented in the federal AHERA regulations (40 CFR, Part 763) as a guideline. The procedures mandated are considered the industry standard and are applied to all surveys performed by AEHS, Inc.
5.1.2. The suspect ACBM consisted of, Building 2735: roof penetration mastic, roof parapet mastic, and roof core.
5.2. Bulk Sampling.
5.2.1. Bulk samples of all homogeneous materials from identified functional spaces containing suspect ACBM were collected. A homogeneous material is defined as a surfacing material, thermal system insulation, or miscellaneous material that is uniform in use, color and texture. Examples of homogeneous materials include:
• Pipe insulation produced by the same manufacturer and installed during the same time period;
• Floor or ceiling tile of identical size, color and/or pattern;
• Sprayed-on acoustical ceiling materials located in contiguous areas; and
• Trowelled on plaster of same texture and location.
5.2.2. A functional space is defined as any spatially distinct unit within a building that contains identifiable populations of current or previous building occupants. Examples of functional spaces include:
• Office areas;
• Storage (warehousing) areas; and
• Living quarters.
The functional space concept is helpful in determining the use and occupancy of building areas containing confirmed ACBM. Knowing the types of occupants and their use of an area also may influence the selection of an asbestos management option and/or corrective action. If multiple corrective actions are necessary, the occupancy and use of individual areas may also become important factors when establishing the priority, or ranking, of each corrective action.
5.2.3. Prior to obtaining the samples, all friable suspect material are sprayed with amended (surfactant added) water to minimize fiber release. Small pieces of the suspect material were sampled by cutting off a sufficient quantity of the wetted suspect material in an inconspicuous location and securing the sample in a plastic bag. Samples were extracted from the center of the wetted area. The tool used to collect the suspect sample was then cleaned to ensure no cross-contamination occurred between samples. A plastic bag was used to contain the samples of the suspect material and quickly sealed to prevent the escape of the material or the introduction of ACBM contamination from outside sources.
5.3. Bulk Sample Analysis.
5.3.1. All bulk samples collected during this survey were analyzed by Environmental
Hazards Services, Inc.’s Laboratory in Richmond, Virginia. Environmental Hazards Services laboratory is accredited under the National Institute of Standards and Technology’s National Voluntary Laboratory Accreditation Program (NVLAP) and the American Industrial Hygiene Association. Additionally, the laboratory is a TDSHS licensed (No. 30-0188) Asbestos Laboratory (Polarized Light Microscopy). Their address, telephone number, and quality assurance review are depicted on their laboratory reports.
5.3.2. All asbestos samples were analyzed using Polarized Light Microscopy/Dispersion Staining (PLM/DS) techniques in accordance with methodology approved by the U.S.
Environmental Protection Agency (EPA), method number 600/R-93/116. The percentage of asbestos present in the samples was determined on the basis of a visual area estimation as set forth in 40 CFR Part 763, Appendix A, Subpart F, Section 1.2 and 1.7.2.4. The lower limit of reliable detection for asbestos using the PLM/DS method is approximately 1% by volume.
5.3.2.1. The Environmental Protection Agency considers materials with greater than one percent (>1%) asbestos content to be asbestos containing. Therefore, when asbestos containing building material (ACBM) appear in this report, it should be interpreted as meaning the sample(s) taken contained greater than (>1%) asbestos and is considered a regulated material. However, material that contains equal to or less than one percent is not considered to be asbestos containing material. If the results of sampling indicate that the asbestos containing material is a trace or up to 10% asbestos, the results must be verified by polarized light microscopy point counting or presumed to be asbestos. For this survey, AEHS personnel used their experience with similar materials.
5.3.2.2. When “No Asbestos Detected” (NAD) appears in this report, it should be interpreted as meaning no asbestos was observed in the sample material above the reliable limit of detection for the PLM/DS method.
5.3.2.3. The Texas Department of State Health Services requires a minimum of three samples to be collected from each homogeneous area. In order for a material to be considered negative, all samples must be negative. On the other hand, if one of the three samples is positive, then the material is considered positive.
6.0. RESULTS OF INSPECTION.
6.1. Analytical Results. The analytical results from the inspection and chain of custody are at Appendix A. A total of nine (9) samples were collected which resulted in eight (8) analyses due to layering and first positive stop.
6.2. Summary Positive Asbestos Containing Building Materials.
6.2.1. Roof Penetration Mastic – 2% Chrysotile Asbestos, approximately 100 square feet.
6.3. Photographs. Photographs are located at Appendix B
7.0. ASSESSMENT.
7.1. Friable Asbestos Material. None.
7.2. Non-Friable Materials. Roof penetration mastic.
8.0. RECOMMENDATIONS.
8.1. Maintain a copy of this report with the project files.
8.2. Abate the asbestos containing roofing material prior to re-roofing.
8.3. The abatement fall under NESHAPS; therefore, air monitoring nor specifications are required.
8.4. A TDSHS notification is not required because the quantity is below the NESHAPS threshold..
8.5. The contractor must follow the specific roofing requirements outlined in 29 CFR 1926.1101(g)(ii).
9.0. COST ESTIMATES.
Abatement – $1000.00
DISCLAIMER
This report, which contains inspections/measurements for hazardous material is given for the sole benefit of the aforementioned client (s). The client expressly confirms their understanding that the conclusions/ recommendations stated in this report are limited to and based solely upon the scope of the assignment, and samples and field measurements taken. In addition, the client understands that any field observations contained herein reflect the conditions present on the date and time of inspection. No representations or warranties are made or may be implied as to the validity of their applicability to any other days or times.
Ronald M. Bishop, MPH, CIH ABIH Certification No. 814 TDSHS Asbestos Consultant (10-5492) 20 August 2015
Appendix A
Asbestos Lab Results
Asbestos Bulk Analysis Report
Client:
Report Number:
Project/Test Address:
Client Number:
Reported Date:
Received Date:
Analyzed Date:
AEHS 08/13/2015
45-5371
08/18/2015
15-08-01864
7469 Whitepine Rd
Telephone: 800.347.4010
Richmond, VA 23237
Environmental Hazards Services, L.L.C.
Building 2735 Roof; Ft. Sam Houston, TX
Laboratory Results Fax Number:
210-656-8499
4402 Center Gate San Antonio, TX 78217
08/18/2015
Layer Type AsbestosClient Sample Number
Other Materials
Lab Gross DescriptionLab Sample Number
Gray Soft; Black Tar-Like;
Brown/Tan Paint-Like;
Inhomogenous
15-08-01864-001 RPEN-A1 15% Cellulose 85% Non-Fibrous
NAD
Black Tar-Like; Tan Paint-Like; Inhomogenous
15-08-01864-002 RPEN-A2 2% Cellulose 96% Non-Fibrous
2% Chrysotile
Chrysotile present throughout
2%Total Asbestos:
15-08-01864-003 RPEN-A3 Did Not Analyze (Positive Stop)
Gray Aggregate; Black Tar-Like; Inhomogenous
15-08-01864-004 RPARA-A4 20% Cellulose 80% Non-Fibrous
NAD
Gray Aggregate; Black Tar-Like; Inhomogenous
15-08-01864-005 RPARA-A5 20% Cellulose 80% Non-Fibrous
NAD
1 of 3Page
Black Tar-Like Fibrous;
Homogenous
15-08-01864-006 RPARA-A6 20% Cellulose 10% Fibrous Glass 70% Non-Fibrous
NAD
Tan Chalky; Black Tar-Like Fibrous;
Inhomogenous
15-08-01864-007 RC-A7 35% Cellulose 5% Fibrous Glass 60% Non-Fibrous
NAD
Tan Chalky; Black Tar-Like Fibrous;
Inhomogenous
15-08-01864-008 RC-A8 35% Cellulose 5% Fibrous Glass 60% Non-Fibrous
NAD
Tan Chalky; Black Tar-Like Fibrous;
Inhomogenous
15-08-01864-009 RC-A9 35% Cellulose 5% Fibrous Glass 60% Non-Fibrous
NAD
Environmental Hazards Services, L.L.C
Project/Test Address:
Client Number: Report Number:45-5371 15-08-01864
Building 2735 Roof; Ft. Sam Houston, TX
Other Materials
AsbestosLab Sample Number
Layer Type Lab Gross DescriptionClient Sample Number
2 of 3Page
Environmental Hazards Services, L.L.C
Project/Test Address:
Client Number: Report Number:45-5371 15-08-01864
Building 2735 Roof; Ft. Sam Houston, TX
Other Materials
AsbestosLab Sample Number
Layer Type Lab Gross DescriptionClient Sample Number
Tasha Eaddy
1% Asbestos
Analyst:
Reporting Limit:
Method:
QC Blank:
QC Sample:
Meredith Outlaw
EPA Method 600/R-93/116, EPA Method 600/M4-82-020
QA/QC Clerk
Reviewed By Authorized Signatory:
73-M12009-4
SRM 1866 Fiberglass
NAD = no asbestos detectedLEGEND:
The condition of the samples analyzed was acceptable upon receipt per laboratory protocol unless otherwise noted on this report. Each distinct component in an inhomogeneous sample was analyzed separately and reported as a composite. Results represent the analysis of samples submitted by the client. Sample location, description, area, volume, etc., was provided by the client. This report cannot be used by the client to claim product endorsement by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without the written consent of the Environmental Hazards Service, L.L.C. California Certification #2319 NY ELAP #11714 NVLAP #101882-0 VELAP 460172. All information concerning sampling location, date, and time can be found on Chain-of-Custody. Environmental Hazards Services, L.L.C. does not perform any sample collection.
Environmental Hazards Services, L.L.C. recommends reanalysis by point count (for more accurate quantification) or Transmission Electron Microscopy (TEM), (for enhanced detection capabilities) for materials regulated by EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by polarized light microscopy (PLM). Both services are available for an additional fee.
400 Point Count Analysis, where noted, performed per EPA Method 600/R-93/116 with a Reporting Limit of 0.25%.
* All California samples analyzed by Polarized Light Microscopy, EPA Method 600/M4-82-020, Dec. 1982.
3 of 3Page
Appendix B
Photographs
Building2735 Asbestos Inspection Roof Only
Ft. Sam Houston, TX
1. Front of Building Inspected 2. Roof Penetration Mastic – 2% Chrysotile Asbestos Roof Penetrations
3. Roof Parapet Mastic – No Asbestos 4. Roof Core – No Asbestos Detected (NAD) Detected (NAD) Roof Parapet Walls
5. Roof Pic #1 6. Roof Pic #2
LIMITED
ASBESTOS AND LEAD
EXTERIOR INSPECTIONS
Fort Sam Houston, Texas 78224 for
Mr. Jonathan Scoggins Design Section
502d Civil Engineer Squadron Fort Sam Houston, Texas by
4402 Center Gate
San Antonio, Texas 78217
(210) 656-9300 www.aehs-sa.com
Asbestos and Lead Inspections AEHS, Inc.
Building 2735, Fort Sam Houston, Texas Environmental, Health, and Safety Consulting July 2013
ASBESTOS AND LEAD INSPECTIONS
Fort Sam Houston, Texas
This report is divided into two sections corresponding to the consulting performed. The on-site consultations were performed by Matthew E. Bishop, CHSP and Ronald M. Bishop, MPH, CIH. Matt Bishop is a Texas Department of State Health Services (TDSHS) licensed Asbestos Inspector/Management Planner and Lead Risk Assessor. Ron Bishop is a TDSHS licensed Asbestos Consultant, Lead Project Designer, and Mold Consultant as well as a Certified Industrial Hygienist, Certified Safety Executive, Registered Sanitarian, Diplomate in Environmental Health, and Registered Environmental Professional, Registered Environmental Manager, Certified Environmental and Safety Compliance Officer, and Green Consultant.
A. ASBESTOS INSPECTION
1.1. Construction materials containing asbestos have been used extensively in buildings because it possesses excellent properties for fire-proofing, insulation, and condensation control. Asbestos may be found in: (1) cement products; (2) spray applied or trowel applied materials on ceiling, walls, and other surfaces; (3) insulation on pipes, boilers, tanks, ducts, and other equipment; (4) vinyl floor tiles; (5) roofing; (6) flooring coatings; and (7) other miscellaneous products.
1.2. Friable materials are those materials that when dry can be crumbled, pulverized, or reduced to powder by hand pressure. Material that contains more than one percent asbestos by weight is considered to be asbestos containing material. Some of these asbestos-containing building materials are not considered friable now, but could become friable if not properly managed and maintained under an asbestos management program.
1.3. The concern about exposure to asbestos in buildings is based on evidence linking various respiratory diseases with occupational exposure in the shipbuilding, mining, milling, and fabricating industries. The presence of asbestos in a building does not mean that there is a significant health risk to building occupants. As long as asbestos-containing materials remain in good condition and are not disturbed, exposure is unlikely. Through proper control of building operations and maintenance activities, disturbance or damage to asbestos-containing materials is minimized, thus limiting the building occupant's exposure to airborne asbestos fibers.
1.4. Building alterations and/or demolition require knowledge of what materials contain asbestos and if they will be removed or disturbed during the project. Under the Clean Air Act, EPA has issued a National Emission Standard for Asbestos (40 CFR 61.140 - 61.156). This Standard regulates reporting requirements, work practices, waste disposal, and emissions from facility modification and/or demolition operations. The Standard applies only to materials containing more than one percent asbestos. The State of Texas has adopted a set of regulations (25 TAC 295.31 - 295.70) known as "Texas Asbestos Health Protection Rules" which govern asbestos removal, encapsulation, or enclosure, including licensing and regulation, in all buildings of public occupancy or access. Any disturbance or removal of ACBM in the building or facilities are subject to this Texas Statute.
2.0. BACKGROUND.
2.1. AEHS, Inc. was contacted by Ms. Leslie Armstrong, 502nd Civil Engineering Squadron, concerning the need for Asbestos and Lead Inspections of the Exterior of Building 2735, Fort Sam Houston Texas, Texas.
2.2. The Point of Contact was Mr. Jonathon Scoggins, 502nd Civil Engineering Squadron.
2.3. The structure consisted of offices and restrooms for vendor operations.
3.0. SCOPE OF WORK.
3.1. The inspections were performed on 19 July 2013 and consisted of visual assessments to determine the presence of suspect ACBM. Bulk samples of suspect ACBM (materials which possibly contain asbestos, as determined by an accredited EPA AHERA Building Inspector/Consultant) were collected. The visual inspection, bulk sampling, and inspection documentation was performed by Matthew J. Louderback [Asbestos Inspector - (No. 60- 2816)].
3.2. AEHS, Inc. is a TDSHS Licensed Asbestos Constant Agency (No.10-0335), PCM Laboratory (No. 30-0295), and Training Provider (No. 00-0068).
3.3. The specific objectives of the survey were to:
• Perform a visual inspection and physical assessment following the Asbestos
Hazard Emergency Response Act (AHERA) protocol as a guideline to identify, quantify, and assess accessible friable and non-friable ACBM;
• Collect and analyze bulk samples of suspect material for asbestos content and identification by an American Industrial Hygiene Association Accredited Laboratory that is also licensed by the Texas Department of State Health Services;
• Ensure the technical quality of all work by using the AHERA protocol and a TDSHS licensed consultant and inspector for the inspection.
• Ιssue a final report that includes findings, bulk sample locations, and confirmed asbestos-containing building materials.
4.0. DESCRIPTION.
4.1. The inspection was of exterior surface only.
4.2. The exterior consisted of metal and stucco building materials.
5.0. INVESTIGATIVE METHODS.
5.1. Visual Inspection.
5.1.1. Building materials were inspected and assessed using the methods presented in the federal AHERA regulations (40 CFR, Part 763) as a guideline. The procedures mandated are considered the industry standard and are applied to all surveys performed by
5.1.2. The suspect ACBM consisted of stucco substrate.
5.2. Bulk Sampling.
5.2.1. Bulk samples of all homogeneous materials from identified functional spaces containing suspect ACBM were collected. A homogeneous material is defined as a surfacing material, thermal system insulation, or miscellaneous material that is uniform in use, color and texture. Examples of homogeneous materials include:
• Pipe insulation produced by the same manufacturer and installed during the same time period;
• Floor or ceiling tile of identical size, color and/or pattern;
• Sprayed-on acoustical ceiling materials located in contiguous areas; and
• Trowelled on plaster of same texture and location.
5.2.2. A functional space is defined as any spatially distinct unit within a building that contains identifiable populations of current or previous building occupants. Examples of functional spaces include:
• Office areas;
• Storage (warehousing) areas; and
• Living quarters.
The functional space concept is helpful in determining the use and occupancy of building areas containing confirmed ACBM. Knowing the types of occupants and their use of an area also may influence the selection of an asbestos management option and/or corrective action. If multiple corrective actions are necessary, the occupancy and use of individual areas may also become important factors when establishing the priority, or ranking, of each corrective action.
5.2.3. Prior to obtaining the samples, all friable suspect material are sprayed with amended (surfactant added) water to minimize fiber release. Small pieces of the suspect material were sampled by cutting off a sufficient quantity of the wetted suspect material in an inconspicuous location and securing the sample in a plastic bag. Samples were extracted from the center of the wetted area. The tool used to collect the suspect sample was then cleaned to ensure no cross-contamination occurred between samples. A plastic bag was used to contain the samples of the suspect material and quickly sealed to prevent the escape of the material or the introduction of ACBM contamination from outside sources.
5.3. Bulk Sample Analysis.
5.3.1. All bulk samples collected during this survey were analyzed by Environmental
Hazards Services, Inc.’s Laboratory in Richmond, Virginia. Environmental Hazards Services laboratory is accredited under the National Institute of Standards and Technology’s National Voluntary Laboratory Accreditation Program (NVLAP) and the American Industrial Hygiene Association. Additionally, the laboratory is a TDSHS licensed (No. 30-0188) Asbestos Laboratory (Polarized Light Microscopy). Their address, telephone number, and quality assurance review are depicted on their laboratory reports.
5.3.2. All asbestos samples were analyzed using Polarized Light Microscopy/Dispersion Staining (PLM/DS) techniques in accordance with methodology approved by the U.S.
Environmental Protection Agency (EPA), method number 600/R-93/116. The percentage of asbestos present in the samples was determined on the basis of a visual area estimation as set forth in 40 CFR Part 763, Appendix A, Subpart F, Section 1.2 and 1.7.2.4. The lower limit of reliable detection for asbestos using the PLM/DS method is approximately 1% by volume.
5.3.2.1. The Environmental Protection Agency and the Texas Department of State Health Services considers materials with greater than one percent (>1%) asbestos content to be asbestos containing. Therefore, when asbestos containing building material (ACBM) appear in this report, it should be interpreted as meaning the sample(s) taken contained greater than (>1%) asbestos and is considered a regulated material. However, material that contains equal to or less than one percent is not considered to be asbestos containing material. If the results of sampling indicate that the asbestos containing material is a trace or up to 10% asbestos, the results must be verified by polarized light microscopy point counting or presumed to be asbestos. For this survey, AEHS personnel used their experience with similar materials.
5.3.2.2. When “No Asbestos Detected” (NAD) appears in this report, it should be interpreted as meaning no asbestos was observed in the sample material above the reliable limit of detection for the PLM/DS method.
5.3.2.3. The Texas Department of State Health Services requires a minimum of three samples to be collected from each homogeneous area. In order for a material to be considered negative, all samples must be negative. On the other hand, if one of the three samples is positive, then the material is considered positive.
6.0. RESULTS OF INSPECTION.
6.1. Three (3) samples were collected which resulted in three (3) analyses. All results indicated 2% Chrysotile Asbestos with the actual laboratory results are at Appendix A. The three samples were point counted with the results being below the standard of greater than 1% of asbestos containing material; therefore, the exterior can be considered to NOT be asbestos containing material by EPA and the TDSHS – see paragraph 5.3.2.1., above.
6.2. Photographs are at Appendix B.
7.0. ASSESSMENT.
7.1. Friable Asbestos Material. None.
7.2. Non-Friable Materials. None.
8.0. RECOMMENDATION. Maintain a copy of this report with the project files.
B. LEAD BASE PAINT
1.1. Background.
1.1.1. Inspections and risk assessments for lead base paint (LBP) hazards emerged in response to an insurance problem in the nation’s public housing programs after children in housing units throughout the nation were found to contain elevated blood lead levels.
When investigations pursued, the houses were found to contain LBP where deterioration was extensive and the children were ingesting the paint directly (chewing on the sills, etc.)
or indirectly by placing contaminated items into their mouths.
1.1.2. At the present time, many of the standards used in lead hazard assessments are not health-based standards. A limit that will not produce adverse health affects has not been established for lead content of paint, dust or in soil. This is due in part to differences in individual behavior, particularly with respect to hand-to-mouth activity. However, the limits that are established in the various standards will significantly reduce the health impacts. Also, these limits dictate requirements for action, if exceeded.
1.1.3. The reason lead base paint inspections are conducted for commercial facilities is to determine potential worker exposure and environmental insult during demolition and disposal of the wastes based on the lead content.
1.2. Standards. As indicated in the Table 1 below, there are various standards that currently define lead base paint. The applicable standards to this project include the OSHA requirements, for worker protection performing the renovation, and the environmental requirements for disposal of materials painted with lead base paint.
Table 1
Lead Standards
Standard/Regulation Level Remarks
Consumer Product Safety Commission 600 ppm 0.06% parts per million % by weight
HUD – 24 CFR Part 35 0.5% by weight
1.0 mg/cm2
NLLAP Accredited Lab
XRF
TELLR - Texas Environmental Lead Reduction Rules
0.5% by weight
1.0 mg/cm2
NLLAP Accredited Lab
XRF
OSHA - 29 CFR 1926.62 - Lead in Construction; Interim Final Rule Any amount Worker Protection
EPA - 40 CFR 261 - Identification and Listing of Hazardous Wastes 5 ppm TCLP TCLP - Toxicity Characteristic
Leaching Procedure
1.3. Lead Risk Assessment.
1.3.1. A Lead Risk Assessment is to determine, and then report on the existence, nature, severity, and location of lead base paint hazards in residential dwellings through on-site investigations. Normally, risk assessments determine the immediately available sources of lead in a dwelling and provides advice on long-term and/or short-term responses to any hazards found. In general, inspections measure lead base paint concentrations while risk assessments measure lead base paint hazards.
1.3.2. The specific differences between an Inspection and a Risk Assessment depicted in Table 2, below.
Table 2 Inspections/Risk Assessments
Inspections Risk Assessments
Measure the concentration of lead in the paint on a surface-by-surface basis
Measure the level of lead in dust and soil and deteriorated paint
Identify the presence of lead base paint on all components
Identity the location and nature of all lead base paint hazards (primary prevention)
Allow the owner to avoid treating paint that is not lead base paint
Consider information about past maintenance and management practices
Allow the owner to treat all lead hazards present
Limited Risk Assessment/Inspection A combination of the Inspection and Risk Assessment tailored to the specific renovations to be performed under the specifications.
2.0. APPROACH.
2.1. Limited Inspection. A limited lead base paint inspection was conducted on 19 July 2013 at the location as described in paragraphs 2 and 4 of the Asbestos Section.
2.2. Credentials.
2.2.1. The Limited Inspection was performed by Matthew E. Bishop. Matt is a TDSHS certified Lead Risk Assessor (No. 2070727), which includes Lead Inspector.
2.2.2. AEHS, Inc. is a TDSHS certified/licensed Lead Firm (No. 21100283) and Lead Training Provider (No. 20439)
2.3. Methodology. XRF measurements were taken at representative locations on interior painted surfaces in the area of concern. XRF Niton Model XLp 300A (Serial No. 10381) was used in the testing for lead base paint. Calibrations were performed prior to and after testing each building in accordance with Performance Characteristics Sheets (PCS). See Appendix C for a table of the results.
3.0. RESULTS.
3.1. Seven (7) measurements were made with the XRF for lead content in paint.
3.2. Results.
Exterior. None.
4.0. DISCUSSION/CONCLUSIONS.
4.1. The HUD/EPA guidance for target housing is 1 mg/cm2 while the Toxic Characteristic Leaching Procedure (TCLP) limit for lead is 5 parts per million (ppm).
4.2. The OSHA requirements, as promulgated in 29 CFR 1926.62 (Lead Standard for the Construction Industry), considers any amount of lead as lead containing paint; however, any measured surface below 0.1 mg/cm2 should be considered negative for lead base paint.
4.3. Based on the measured results, it is highly unlikely that the debris will exceed the TCLP limit; therefore, a TCLP of the debris is not required.
5.0. RECOMMENDATIONS.
5.1. Maintain a copy of this report with the project files.
5.2. Provide a copy of this report to the contractor/owner and inform them that if the porch roofs are going to be disturbed, the contractor performing the work must adhere to 29 CFR
1926.62 – Lead Exposure in the Construction Industry.
DISCLAIMER
This report, which contains inspections/measurements for hazardous material is given for the sole benefit of the aforementioned client (s). The client expressly confirms their understanding that the conclusions/ recommendations stated in this report are limited to and based solely upon the scope of the assignment, and samples and field measurements taken. In addition, the client understands that any field observations contained herein reflect the conditions present on the date and time of inspection. No representations or warranties are made or may be implied as to the validity of their applicability to any other days or times.
Ronald M. Bishop, MPH, CIH ESH Consultant 26 July 2013
Appendix A
Photographs
Asbestos Bulk
Client:
Report Number:
Project/Test Address:
Client Number:
Reported Date:
Received Date:
Analyzed Date:
AEHS 07/22/2013
45-5371
07/25/2013
13-07-03199
7469 Whitepine Rd
Telephone: 800.347.4010
Richmond, VA 23237
Environmental Hazards Services, L.L.C.
Bldg 2735; Fort Sam Houston, TX
Laboratory Results Fax Number:
210-656-8499
4402 Center Gate San Antonio, TX 78217
07/23/2013
Layer Type AsbestosClient Sample Number
Other Materials
Lab Gross DescriptionLab Sample Number
Pale Pink-Tan Cementitious;
Homogeneous
13-07-03199-001 EP-1 98% Non-Fibrous2% Chrysotile
2%Total Asbestos:
Pale Pink-Tan Cementitious;
Homogeneous
13-07-03199-002 EP-2 98% Non-Fibrous2% Chrysotile
2%Total Asbestos:
Pale Pink-Tan Cementitious;
Homogeneous
13-07-03199-003 EP-3 98% Non-Fibrous2% Chrysotile
2%Total Asbestos:
1 of 2Page
Environmental Hazards Services, L.L.C
Project/Test Address:
Client Number: Report Number:45-5371 13-07-03199
Bldg 2735; Fort Sam Houston, TX
Other Materials
AsbestosLab Sample Number
Layer Type Lab Gross DescriptionClient Sample Number
Howard Varner
1% Asbestos
Analyst:
Reporting Limit:
Method:
QC Blank:
QC Sample:
Mark Case
EPA Method 600/R-93/116, EPA Method 600/M4-82-020
General Manager
Reviewed By Authorized Signatory:
13-M11996-1
SRM 1866 Fiberglass
NAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .