Attachment_12__Schedule_B-_Cost_Estimation_Breakdown.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Replace Mechanical Components HVAC B 5010 Federal contract opportunity
- Solicitation number
- FA3016-17-R-0033
About this file
Attachment 12 - Schedule B - Cost Estimate Breakdown (1 page)
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||||
| CONTRACTOR | ||||||||||||||
| ADDRESS | ||||||||||||||
| General Construction Subtotal | ||||||||||||||
| General Construction Labor Burden | ||||||||||||||
| RSMeans San Antonio, TX CCI | ||||||||||||||
| General Construction Prime Contractor Overhead | ||||||||||||||
| General Construction Prime Contractor Profit | ||||||||||||||
| General Construction Prime Contractor Bonding | ||||||||||||||
| General Construction Contingency | ||||||||||||||
| CONTRACT FOR (Work to be performed) | This cost proposal is valid for days | Proposed Project Amount | ||||||||||||
| RPR-Mechanical�Components B-5010 | The period of performance to perform this work is days. | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | |||||||||||||
| CYRB110224 | WORK LOCATIOND | |||||||||||||
| LINE NO. | ITEM DESCRIPTION | UNIT OF MEASURE | ||||||||||||
| QUANTITY | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE TOTAL | |||||||||
| UNIT | TOTAL | CREW | LABOR HOURS | AVERAGE RATE | TOTAL | UNIT | TOTAL | UNIT | TOTAL | |||||
| 1 | 01-11-31-20-0070 Construction management fees, for work to $250,000 | Project | ||||||||||||
| 2 | 01-31-13-20-0160 Field personnel, general purpose laborer, average | Week | ||||||||||||
| 3 | 01-31-13-20-0200 Field personnel, project manager, average | Week | ||||||||||||
| 4 | 01-31-13-20-0260 Field personnel, superintendent, average | Week | ||||||||||||
| 5 | 22-11-13-23-1120 Pipe/tube, copper, solder joints, type K tubing, couplings and clevis hanger assemblies, 10' O.C., 3/8" diameter | L.F. | ||||||||||||
| 6 | 22-11-13-23-1160 Pipe/tube, copper, solder joints, type K tubing, couplings and clevis hanger assemblies, 10' O.C., 5/8" diameter | L.F. | ||||||||||||
| 7 | 23-05-05-10-0100 HVAC demolition, air conditioner, split unit, 3 ton | Ea. | ||||||||||||
| 8 | 23-09-53-10-5200 Control components, thermostats, 24 hour, automatic, clock | Ea. | ||||||||||||
| 9 | 23-23-23-20-4440 Refrigerant, refrigerant, R-408A, 25 lbs. disposable cylinder | Lb. | ||||||||||||
| 10 | 23-81-23-10-1120 Computer room units, air cooled, includes remote condenser, excluding interconnecting tubing or refrigerant, 5 ton | Ea. | ||||||||||||
| 11 | 26-28-16-20-4340 Safety switches, heavy duty, 240 volt, 2 pole, NEMA 1, fusible, 30 amp | Ea. |
Attachment 12_ Schedule B- Cost Estimation Breakdown