RFP_Atch_11_Form_3052_Install_VFD_B496.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Install Variable Frequency Drive, Bldg 496 Federal contract opportunity
- Solicitation number
- FA3016-16-R-0032
About this file
Atch 11 Construction Cost Breakdown
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | OMB No. 0704-0193 FA3016-16-R-0032 Atch 11 | ||
| CONTRACTOR | ADDRESS | ||
| Line Items Subtotal | |||
| Labor Burden | |||
| Subtotal | |||
| RSMeans San Antonio, TX CCI 2015Q4 | |||
| Overhead | |||
| Profit | |||
| Bonding |
| CONTRACT FOR (Work to be performed) | Proposed Total Project Price | |||
| Install Variable Frequency Drive Central Chiller Plant B496 | ||||
| PROJECT NUMBER | ||||
| TYMX148002 | WORK LOCATION |
JBSA-Randolph TX
| LINE NO. | ITEM DESCRIPTION | UNIT OF MEASURE | |||||||||||
| QUANTITY | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE TOTAL | ||||||||
| UNIT | TOTAL | Crew | Man-hours | Average Rate | TOTAL | UNIT | TOTAL | UNIT | TOTAL | ||||
| 1 | 01-11-31-30-0300 Engineering fees, electrical, maximum | Contrct | |||||||||||
| 2 | 01-11-31-30-1300 Engineering fees, structural, maximum | Project | |||||||||||
| 3 | 01-21-55-50-0500 Job conditions, modifications to applicable cost summaries, general | ||||||||||||
| contractor management, experienced, deduct | Project | ||||||||||||
| 4 | 01-31-13-20-0120 Field personnel, field engineer, average | Week | |||||||||||
| 5 | 01-31-13-20-0160 Field personnel, general purpose laborer, average | Week | |||||||||||
| 6 | 01-31-13-20-0200 Field personnel, project manager, average | Week | |||||||||||
| 7 | 01-31-13-20-0260 Field personnel, superintendent, average | Week | |||||||||||
| 8 | 01-52-13-20-0350 Office and storage space, office trailer, furnished, no hookups, 32' x 8', | ||||||||||||
| rent per month | Ea. | ||||||||||||
| 9 | 01-52-13-40-0100 Field office expense, office equipment rental, average | Month | |||||||||||
| 10 | 01-52-13-40-0120 Field office expense, office supplies, average | Month | |||||||||||
| 11 | 01-52-13-40-0140 Field office expense, telephone bill, average bill per month including long | ||||||||||||
| distance | Month | ||||||||||||
| 12 | 01-52-13-40-0160 Field office expense, lights and HVAC | Month | |||||||||||
| 13 | 01-54-16-50-0100 Weekly forklift crew, all-terrain forklift, 45' lift, 35' reach, 9000 lb. capacity | Week | |||||||||||
| 14 | 01-54-19-50-0500 Daily crane crews, for small jobs, portal to portal, truck-mounted hydraulic | ||||||||||||
| crane, 80-ton | Day | ||||||||||||
| 15 | 01-54-23-70-0906 Scaffolding, complete system for face of walls, no plank, material only rent | ||||||||||||
| by month | C.S.F. | ||||||||||||
| 16 | 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, | ||||||||||||
| portable chemical | Ea. | ||||||||||||
| 17 | 01-54-33-40-7100-4 Rent per month for general equipment rental, without operators, truck, | ||||||||||||
| pickup, 3/4 ton, 2 wheel drive | Ea. | ||||||||||||
| 18 | 01-56-26-50-0200 Temporary fencing, rented chain link, 6' high, to 1000', up to 12 months | L.F. | |||||||||||
| 19 | 01-74-13-20-0020 Cleaning up, after job completion, allow, minimum | Job | |||||||||||
| 20 | 01-91-13-50-0100 Commissioning, including documentation of design intent, performance | ||||||||||||
| verification, operations and maintenance, training, minimum | Project | ||||||||||||
| 21 | 02-41-19-19-0800 Selective demolition, rubbish handling, the following are to be added to the | ||||||||||||
| demolition prices. Dumpster, weekly rental, includes one dump per week, 30 C.Y. capacity, 7 tons | Week | ||||||||||||
| 22 | 02-41-19-20-0300 Selective demolition, dump charges, typical urban city, tipping fees only, | ||||||||||||
| rubbish only | Ton | ||||||||||||
| 23 | 03-11-13-40-0020 Forms in place, equipment foundations, includes erecting, bracing, | ||||||||||||
| stripping and cleaning, 1 use | SFCA | ||||||||||||
| 24 | 03-21-11-60-0602 Reinforcing in place, 50 to 60 ton lots, A615 Grade 60, includes labor, | ||||||||||||
| excludes material cost, to install accessories, slab on grade, #3 to #7 | Lb. | ||||||||||||
| 25 | 03-31-13-35-0150 Heavyweight concrete, ready mix, delivered, includes local aggregate, sand, portland cement Type I, and water, excludes all additives and treatments, 3000 psi | C.Y. | |||||||||||
| 26 | 22-05-53-10-0200 Piping system identification labels, indicate contents and flow direction, | ||||||||||||
| pipe markers, plastic snap around, over 10" pipe size | Ea. | ||||||||||||
| 27 | 22-07-19-10-7650 Piping insulation, price copper tube one size less than IPS, fiberglass, with | ||||||||||||
| all service jacket, 3" wall, 10" iron pipe size | L.F. | ||||||||||||
| 28 | 22-07-19-10-7650-1080 Labor adjustment factors, add to labor for elevated installation, | ||||||||||||
| above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | L.F. | ||||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | OMB No. 0704-0193 | ||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| Line Items Subtotal | |||||||||||||
| Labor Burden | |||||||||||||
| Subtotal | |||||||||||||
| RSMeans San Antonio, TX CCI 2015Q4 | |||||||||||||
| Overhead | |||||||||||||
| Profit | |||||||||||||
| Bonding |
| CONTRACT FOR (Work to be performed) | Proposed Total Project Price | |||
| Install Variable Frequency Drive Central Chiller Plant B496 | ||||
| PROJECT NUMBER | ||||
| TYMX148002 | WORK LOCATION |
JBSA-Randolph TX
| LINE NO. | ITEM DESCRIPTION | UNIT OF MEASURE | |||||||||||
| QUANTITY | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE TOTAL | ||||||||
| UNIT | TOTAL | Crew | Man-hours | Average Rate | TOTAL | UNIT | TOTAL | UNIT | TOTAL | ||||
| 29 | 23-73-13-20-1200 Air handling units, packaged indoor type, chilled water at 700 FPM face | ||||||||||||
| velocity, constant volume, 2000 CFM | Ea. | ||||||||||||
| 30 | 23-73-13-20-1200-1080 Labor adjustment factors, add to labor for elevated installation, | ||||||||||||
| above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | ||||||||||||
| 31 | 23-73-13-20-1200-5140 Labor adjustment factors, add to labor, miscellaneous, congested | ||||||||||||
| area (Modified using 22-01-02-20-5140) | Ea. | ||||||||||||
| 32 | 23-73-13-20-1200-5180 Labor adjustment factors, add to labor, miscellaneous, excessive | ||||||||||||
| heat or cold (Modified using 22-01-02-20-5180) | Ea. | ||||||||||||
| 33 | 26-05-19-90-0960 Wire, 600 volt, copper type THWN-THHN, solid, #10 | C.L.F. | |||||||||||
| 34 | 26-05-19-90-0960 Wire, 600 volt, copper type THWN-THHN, solid, #10 | C.L.F. | |||||||||||
| 35 | 26-05-19-90-0960 Wire, 600 volt, copper type THWN-THHN, solid, #10 | C.L.F. | |||||||||||
| 36 | 26-05-19-90-1350 Wire, 600 volt, copper type THWN-THHN, stranded, #6 | C.L.F. | |||||||||||
| 37 | 26-05-19-90-1350 Wire, 600 volt, copper type THWN-THHN, stranded, #6 | C.L.F. | |||||||||||
| 38 | 26-05-19-90-1350 Wire, 600 volt, copper type THWN-THHN, stranded, #6 | C.L.F. | |||||||||||
| 39 | 26-05-19-90-1400 Wire, 600 volt, copper type THWN-THHN, stranded, #4 | C.L.F. | |||||||||||
| 40 | 26-05-19-90-1400 Wire, 600 volt, copper type THWN-THHN, stranded, #4 | C.L.F. | |||||||||||
| 41 | 26-05-19-90-1400 Wire, 600 volt, copper type THWN-THHN, stranded, #4 | C.L.F. | |||||||||||
| 42 | 26-05-19-90-1450 Wire, 600 volt, copper type THWN-THHN, stranded, #3 | C.L.F. | |||||||||||
| 43 | 26-05-19-90-1450 Wire, 600 volt, copper type THWN-THHN, stranded, #3 | C.L.F. | |||||||||||
| 44 | 26-05-19-90-1450 Wire, 600 volt, copper type THWN-THHN, stranded, #3 | C.L.F. | |||||||||||
| 45 | 26-05-19-90-1550 Wire, 600 volt, copper type THWN-THHN, stranded, #1 | C.L.F. | |||||||||||
| 46 | 26-05-19-90-1550 Wire, 600 volt, copper type THWN-THHN, stranded, #1 | C.L.F. | |||||||||||
| 47 | 26-05-19-90-1550 Wire, 600 volt, copper type THWN-THHN, stranded, #1 | C.L.F. | |||||||||||
| 48 | 26-05-19-90-2000 Wire, 600 volt, copper type THWN-THHN, stranded, 4/0 | C.L.F. | |||||||||||
| 49 | 26-05-19-90-2000 Wire, 600 volt, copper type THWN-THHN, stranded, 4/0 | C.L.F. | |||||||||||
| 50 | 26-05-19-90-2000 Wire, 600 volt, copper type THWN-THHN, stranded, 4/0 | C.L.F. | |||||||||||
| 51 | 26-05-26-80-0100 Grounding, rod, copper clad, 10' long, 3/4" diameter | Ea. | |||||||||||
| 52 | 26-05-26-80-0250 Grounding, clamp, bronze, 3/4" diameter | Ea. | |||||||||||
| 53 | 26-05-26-80-0350 Grounding, wire ground, bare copper wire, solid, #8 | C.L.F. | |||||||||||
| 54 | 26-13-16-10-1000 Switchgear, pothead, one 3 conductor or three 1 conductor | Ea. | |||||||||||
| 55 | 26-13-16-10-1500 Switchgear, pothead, lightning arresters, intermediate class or line type, | ||||||||||||
| 13.8 kV | Ea. | ||||||||||||
| 56 | 26-24-13-20-1840 In plant distribution switchboards, motor operated main breaker, 1200 to | ||||||||||||
| 2000 amp | Ea. | ||||||||||||
| 57 | 26-27-26-20-3170 Wiring devices elements, wall plates, switch cover, weatherproof, 1 gang | Ea. | |||||||||||
| 58 | 26-29-23-10-1230 Variable frequency drives and adjustable frequency drives, custom | ||||||||||||
| engineered, 460 volt, 125 HP motor size | Ea. | ||||||||||||
| 59 | 28-05-13-23-1850 Fire alarm communications conductors and cables, fire alarm FEP teflon | ||||||||||||
| 150 volt to 200°C, #18, 1 pair | C.L.F. |
RFP FA3016-16-R-0032 Atch 11