FA3016-16-R-0021_Amendment_0002.pdf

PDF 16 KB Posted

Attached to
Install Variable Frequency Drive, Bldg. 395 Federal contract opportunity
Solicitation number
FA3016-16-R-0021
Issued by
Department of the Air Force Air Education and Training Command

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Install Variable Frequency Drive, Bldg. 395, newest first.
File Type Posted
Attch_6 _FA3016-16-R-0021 _Wage_Determination_Revised_on_23_March_16.pdf PDF
FA3016-16-R-0021 _Amendment_0003.pdf PDF
Attach_1 _SOW_Dated_09_Mar_16 _Amendment_0002.pdf PDF
Attch_4 _FA3016-16-R-0021_Revised_9_Mar_16 _B395.xlsx XLSX spreadsheet
Attch_1 _FA3016-16-R-0021 _SOW_Revised_25_Feb_16.pdf PDF
Amendment_0001_to_FA3016-16-R-0021.doc.pdf PDF
Attch_9 _FA3016-16-R-0021 _Financial_Information_Questionnaire.docx DOCX document
Attch_6 _FA3016-16-R-0021 _Wage_Determination.pdf PDF
RFP_FA3016-16-R-0021_Install_Variable_Frequency.pdf PDF
Attch_1 _FA3016-16-R-0021 _SOW.pdf PDF
Attch_8 _FA3016-16-R-0021_Base_Pass_Req_Form.docx DOCX document
Attch_3 _FA3016-16-R-0021 _Appendix_B_Trane_Chiller_Retrofit_VFD_spec..pdf PDF
Attch_11 _FA3016-16-R-0021 _CONSTRUCTION_COST_ESTIMATE_BREAKDOWN.xlsx XLSX spreadsheet
Attch_10 _FA3016-16-R-0021 _Past_Performance_Questionnaire.docx DOCX document
Attch_12_VFD _Trane_VFD _Brand_Name.pdf PDF
Attch_2 _FA3016-16-R-0021 _Security_Requirements.PDF PDF
Attch_5 _FA3016-16-R-0021_AETC_From_47.pdf PDF
Attch_4 _FA3016-16-R-0021_AF_Form_66_B395.xlsx XLSX spreadsheet
Attch_7 _FA3016-16-R-0021_Hazardous_Materials_Disclosure.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYMX148002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of amendment 0002 is to answ er industry generated questions, replace attachment # 4 w ith revised on 09 Mar 2016 attachment #4, add clause FAR 52.215-8 to the solicitation, and replace the SOW dated 25 Feb 2016 w ith the SOW dated 09 Mar 2016. (See

Summary of Changes)

POC: Jarek Majdanik, 201-652-8429, jaroslaw .majdanik@us.af.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Mar-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3016-16-R-0021

X 9B. DATED (SEE ITEM 11)

23-Feb-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2016

CODE

502D CONTRACTING SQUADRON

395 B STREET WEST, SUITE 2, BLDG 224

JBSA RANDOLPH TX 78150-4525

FA3016 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA3016-16-R-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

A. The purpose of amendment 0002 is to answer industry generated questions, replace attachment # 4 with revised on 09 Mar 2016 attachment #4, add clause FAR 52.215-8 to the solicitation, and replace the SOW dated 25 Feb

2016 with the SOW dated 09 Mar 2016.

B. This amendment provides answers to and questions received in response to the solicitation. The questions are provided for all potential offerors to review. Note that questions(s) may have been edited for clarity and duplicative question(s) may have been combined or deleted.

Question 1:

Would it be possible to submit a proposal to actually install a new Variable Speed Drive chiller in lieu of the specified VFD only?

Answer 1:

The chiller is less than 5 years old and this work is not in the SOW. The Government does not want to replace the chiller.

D. All other terms and conditions of this solicitation remain unchanged.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

(End of Summary of Changes)