Addendum_1.pdf
PDF 123 KB Posted
- Attached to
- Fiber Optic Cable Installation Federal contract opportunity
- Solicitation number
- FA301018R0023_Fiber-Optic
About this file
Addendum 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_1.pdf | ||
| Sign-In_Sheet.pdf | ||
| Attachment_1_-_SOW_1_C2-D2-FOC_B-404_81_to_B223_ITN.pdf | ||
| Attachment_8_-_SF_1444.pdf | ||
| Attachment_5_-_Reference_List.pdf | ||
| Attachment_7_-_Notice_of_Compliance.pdf | ||
| Attachment_2_-_SOW_2_C2-D2-FOC_Fuels_Depot.pdf | ||
| Attachment_3_-_SOW_3_FOC_3501-1101.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire.pdf | ||
| FA301018R0023.pdf | ||
| Attachment_6_-_Wage_Det_MS180141.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15 June 2018
ADDENDUM NO. 1
C2-DS-FOC Critical Path for B3501 Security Forces, B404 Medical Group UCC, and Fuels Depot Keesler Air Force Base Biloxi, Mississippi
This Addendum consists of 7 pages, 4 Specification Sections and 0 Drawing Sheets.
CHANGES TO ALL PROJECTS:
1. SOW: ALL; References to NEMA 3r:
All references to NEMA 3r J-Boxes in ALL.
Finding:
SOWs not consistent with current J-Box requirements.
SOLUTION/CHANGES TO ORIGINAL PROJECT MANUAL:
All references to NEMA 3r are to be replaced with NEMA 4 J-Boxes
2. SOW: ALL; References to Maintenance Hole sizes:
All references to Maintenance Hole sizes being 6 feet by 12 feet by 7 feet (6’ x 12’ x 7’).
Finding:
SOWs not consistent with current Maintenance Hole size requirements.
SOLUTION/CHANGES TO ORIGINAL PROJECT MANUAL:
All Maintenance Holes will be at minimum 6 feet by 6 feet by 6 feet (6’ x 6’ x 6’).
Note: This does not change Hand Hole sizes. This remains at 4’ x 4’ x 4’.
CHANGES SPECIFIC TO FOC INSTALL FROM B404 TO B223:
3. SOW: 404 to 223; Section 2.2.14.11. page 12 of 30 SOW; Maintenance Holes and
Hand Holes:
The Contractor shall provide and install one (1) new hand hole (HH) at locations shown on Figures 1, 3, and 4. The dimensions of the HH shall be 4 feet x 4 feet x 4 feet.
Coordinate the exact HH location with Keesler AFB 81 CS/SCXP.
Install the following Hand-Holes (HH) HH # See Figure Dimensions Note
Proposed
HH-02G
1, 3, 4 4’ x 4’ x 4’ 2pc. Torsion Lid HH
Approximately 220 feet SW of B-404
Finding:
Lid style not consistent with section 2.2.10 requirement of same SOW.
The Contractor shall provide and install one (1) new hand hole (HH) at locations shown on Figures 1, 3, and 4. The dimensions of the HH shall be 4 feet x 4 feet x 4 feet.
Coordinate the exact HH location with Keesler AFB 81 CS/SCXP.
Install the following Hand-Holes (HH)
Proposed
HH-02G
1, 3, 4 4’ x 4’ x 4’ Round Lid HH
Approximately 220 feet SW of B-404
CHANGES SPECIFIC TO FOC INSTALL FROM B3501 TO B1101:
4. SOW: 3501 to 1101; Section 2.2.14.1.1 page 14 of 33 SOW; Maintenance Holes and
Install the following Maintenance-Holes (MH)
Proposed
MH-05K
1, 2, 3 6’ x 6’ x 6’ Approximately 250 ft. northeast of B-
Proposed
MH-05J
1, 3, 4 6’ x 6’ x 6’ Approximately 360 ft. north of MH- 05K
Proposed MH- 114A
1, 5, 6 6’ x 6’ x 6’ Approximately 180 ft. west of MH- 05C
Section does not reflect Figure 7 for Proposed HH-166A.
Install the following Maintenance-Holes (MH) and Hand Holes (HH)
Proposed
MH-05K
1, 2, 3 6’ x 6’ x 6’ Approximately 250 ft. northeast of B-
Proposed
MH-05J
1, 3, 4 6’ x 6’ x 6’ Approximately 360 ft. north of MH- 05K
Proposed MH- 114A
1, 5, 6 6’ x 6’ x 6’ Approximately 180 ft. west of MH- 05C Proposed HH-
116A 7 4’ x 4’ x 4’ Approximately 100 ft. west of MH-
5. SOW: 3501 to 1101; Section 2.2.14.1.2 page 14 of 33 SOW; Duct bank
Infrastructure:
PVC Duct-banks (Directional Drilling)
From
To
Qty.
Size
Approximate Distance
(Feet)
Figure
Comment
B-3501 Proposed
MH-05K 2 4” 250 1, 2,
Under the street, parking lot and sidewalks.
Approximately 50’ south of D
St.
Proposed
MH-05J
4”
Under D St.
MH-05B-1
Approx.
50 ft. N.
of Meadow
Under Meadow Dr.
Approx. 50 ft.
S. of G St. MH-05C 2 4” 70 5 Under G St.
Approximately 50 ft. E. of
Bowling Center
W. side of sidewalk of Bowing
Center
Under driveway of parking lot, and under sidewalk to Bowling Center
E. side of 3rd
Street W. side of 3rd Street 2 4” 100 6 Under 3rd Street
MH-116
Approx.
10 ft. W.
of B-1101
6, 7 Will go under a metal fence, and driveway.
PVC Duct-banks Schedule (Trench and Place)
Qty.
Proposed
MH-05K
Proposed
MH-05J 2 4” 360 1, 2,
3, 4
MH-05J MH-05 2 4” 420 1, 2,
3, 4 MH-05 is in the sidewalk
MH-05 MH-05B-1 2 4” 370 1, 4
Approx. 50
ft. N. of Meadow Dr.
Approx. 50
ft. S. of G St.
MH-05C Proposed
MH-
2 4” 180 5, 6
114A
Approx. 50
ft. E. of Bowling
Approaching driveway of parking lot
Approx. 50
ft. W. of Bowling sidewalk
Approx. 50
ft. E. of 3rd
Street
Approx. 10
ft. W. of B-
J-Box of B- 1101
6, 7
PVC Duct-banks (Directional Drilling)
Qty
B-3501 Proposed
MH-05K 2 4” 250 1, 2,
Under the street, parking lot and sidewalks.
Approximately 50’ south of D
St.
MH-05J
Under D St.
MH-05B-1
ft. N. of Meadow
Dr.
Under Meadow Dr.
Approx. 50 ft.
S. of G St. MH-05C 2 4” 70 5 Under G St.
Approximately 50 ft. E. of
Bowling Center
W. side of sidewalk of Bowing
Under driveway of parking lot, and under sidewalk to Bowling Center
E. side of 3rd
Street W. side of 3rd Street 2 4” 100 6 Under 3rd Street
MH-116
HH-116A
6, 7 Will go under a metal fence, and driveway.
PVC Duct-banks Schedule (Trench and Place)
Qty
MH-05K
Proposed
MH-05J 2 4” 360 1, 2,
3, 4
MH-05J MH-05 2 4” 420 1, 2,
3, 4 MH-05 is in the sidewalk
MH-05 MH-05B-1 2 4” 370 1, 4
Approx. 50
ft. N. of Meadow Dr.
ft. S. of G St.
MH-05C Proposed
MH-114A 2 4” 180 5, 6
114A
Approx. 50
ft. E. of Bowling
Approaching driveway of parking lot
Approx. 50
ft. W. of Bowling sidewalk
ft. E. of 3rd
Street
HH-116A J-Box of B-
6, 7
6. SOW: 3501 to 1101; Section 2.2.14.1.1 page 14 of 33 SOW; Maintenance Holes and
Geotextile Inner-Duct Installation From To Qty. of
3x3” packs
Approx.
Distance (Feet)
Figure Comment
B-3501 Proposed
MH-05K
6 250 1, 2, 3 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Proposed
MH-05K
Proposed
MH-05J
6 360 1, 2, 3, Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Proposed
MH-05J
MH-05 6 420 1, 3, 4 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-05 MH-05B-
6 370 1, 3, 4 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-05B-
MH-05C 6 500 1, 5, 6 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-05C Proposed
MH-
114A
6 180 1, 6 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Proposed
MH-
114A
MH-114 6 550 1, 6, 7 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-116 B-1101
J-Box
6 115 1, 7 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Geotextile Inner-Duct Installation From To Qty. of
3x3” packs
Approx.
Distance (Feet)
Figure Comment
B-3501 Proposed
MH-05K
6 250 1, 2, 3 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Proposed
MH-05K
Proposed
MH-05J
6 360 1, 2, 3, Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Proposed
MH-05J
MH-05 6 420 1, 3, 4 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-05 MH-05B-
6 370 1, 3, 4 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-05B-
MH-05C 6 500 1, 5, 6 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-05C Proposed
MH-
114A
6 180 1, 6 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Proposed
MH-
114A
MH-114 6 550 1, 6, 7 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
MH-116 Proposed
HH-116A
6 100 1, 7 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.
Proposed
HH-116A
B-1101 J-Box
6 15 7 Install three 3x3” packs in each of the two conduits: one pack to be detectable in each conduit.