MAHG17-1084_Addendum_1.pdf
PDF 11 KB Posted
- Attached to
- Replace AHUS Federal contract opportunity
- Solicitation number
- FA3010-18-R-0018
About this file
Please see attached
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_3.pdf | ||
| Attachment_11_B6901a.pdf | ||
| Attachment_10_MAHG17-1084_Addendum_2.pdf | ||
| Amend_2.pdf | ||
| Amend_0001.pdf | ||
| Sign_in.pdf | ||
| Attachment_3_-Wage_Determination.pdf | ||
| Attachment_2_-MAHG171084_REPLACE_AHUS_6_7_9_13_B6901_SOW.pdf | ||
| Attachment_4_-MAHG171084_REPLACE_AHUS_6_7_9_13_B6901_DWG.pdf | ||
| Attachment_5_-_PPQ.pdf | ||
| Attachment_6_-_Reference_List.pdf | ||
| Attachment_7_-__Notice_of_Compliance.pdf | ||
| Attachment_1_-MAHG171084_REPLACE_AHUS_6_7_9_13_B6901_SPEC.pdf | ||
| Attachment_8_-_SF_1444.pdf | ||
| 18R0018.pdf | ||
| Synopsis_signed.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1 Date: April 19, 2018
PROJECT NAME: REPAIR-REPLACE AHUs 6 7 9 AND 13 BRYAN HALL
LOCATION: Building 6901 – Keesler AFB, Mississippi
PROJECT NUMBER: MAHG 17-1084
This Amendment is hereby part of the Bid/Contract Documents and as must be acknowledged with the Bid. Failure to do so may subject the Bidder to disqualification. The following conditions take precedence over conflict conditions in the Specifications, on the Drawings, and in any other Contract Document. When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing and electrical drawings. The Bid/Contract Documents are hereby amended in the following particulars:
DRAWINGS:
SHEET 7 of 7 Note 3: Remove requirement to install new disconnect switches in all three mechanical rooms.
SOW:
3.2.4 SCOPE: Add
“Project is to be phased in order to minimize impact on building occupants. As such, only one working AHU will allowed to be taken out of service at a time.
Contractor will work with owner/occupants to determine order of phasing.”
3.2.4 SCOPE:
PROVIDE AND INSTALL NEW:
Remove requirement for aluminum jacket on new piping.
Remove requirement for new disconnect switches at air handling units.
Add requirement to supply signage for all new piping and duct insulation that states “Asbestos Free”.
ATTACHMENTS:
NONE
END OF ADDENDUM 1