Attachment_10_MAHG17-1084_Addendum_2.pdf

PDF 9 KB Posted

Attached to
Replace AHUS Federal contract opportunity
Solicitation number
FA3010-18-R-0018
Issued by
Department of the Air Force Air Education and Training Command

About this file

Please see attached.

View the file

Other files for this federal contract opportunity

Other files attached to Replace AHUS, newest first.
File Type Posted
Amend_3.pdf PDF
Attachment_11_B6901a.pdf PDF
Amend_2.pdf PDF
Amend_0001.pdf PDF
MAHG17-1084_Addendum_1.pdf PDF
Sign_in.pdf PDF
Attachment_1_-MAHG171084_REPLACE_AHUS_6_7_9_13_B6901_SPEC.pdf PDF
Attachment_8_-_SF_1444.pdf PDF
18R0018.pdf PDF
Attachment_3_-Wage_Determination.pdf PDF
Attachment_2_-MAHG171084_REPLACE_AHUS_6_7_9_13_B6901_SOW.pdf PDF
Attachment_4_-MAHG171084_REPLACE_AHUS_6_7_9_13_B6901_DWG.pdf PDF
Attachment_5_-_PPQ.pdf PDF
Attachment_6_-_Reference_List.pdf PDF
Attachment_7_-__Notice_of_Compliance.pdf PDF
Synopsis_signed.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #2 Date: April 30, 2018

PROJECT NAME: REPAIR-REPLACE AHUs 6 7 9 AND 13 BRYAN HALL

LOCATION: Building 6901 – Keesler AFB, Mississippi

PROJECT NUMBER: MAHG 17-1084

The following conditions take precedence over conflict conditions in the Specifications, on the Drawings, and in any other Contract Document. When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing and electrical drawings. The Bid/Contract Documents are hereby amended in the following particulars.

SOW:

3.2.4 SCOPE: PROVIDE AND INSTALL NEW:

ADD: On each new AHU provide and install single pole light switch as a means to disconnect UV lighting for servicing. Contractor to also provide and install a door safety switch on the AHU compartment containing the UV lights to de-energize the UV fixture.

ADD: REMOVE AND REINSTALL:

Remove and reinstall existing duct smoke detectors.

ATTACHMENTS:

NONE

END OF ADDENDUM 2

File details come from the government source that posted it.