Text version
SECTION 23 65 00
COOLING TOWERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes factory assembled and tested, open circuit mechanical induced-draft vertical discharge cooling tower.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include rated capacities, pressure drop, performance curves with selected points indicated, furnished specialties, and accessories.
B. Shop Drawings: Complete set of manufacturer's prints of evaporative equipment assemblies, control panels, sections and elevations, and unit isolation. Include the following:
1. Assembled unit dimensions.
2. Weight and load distribution.
3. Required clearances for maintenance and operation.
4. Sizes and locations of piping and wiring connections.
5. Wiring Diagrams: For power, signal, and control wiring. Differentiate between manufacturer installed and field installed wiring.
C. Operation and Maintenance Data: Each unit to include, operation, and maintenance manual.
1.4 QUALITY ASSURANCE
A. Verification of Performance:
1. Manufacturer shall have a thermal performance testing program for water cooling towers certified by the Cooling Technology Institute (CTI) in accordance with CTI Specification Standard STD-201.
2. Unit Sound Performance ratings shall be tested and certified according to CTI ATC-128 standard. Sound ratings shall not exceed specified ratings.
B. Unit shall meet or exceed energy efficiency per ASHRAE 90.1
1.5 WARRANTY
A. Submit a written warranty executed by the manufacturer, agreeing to repair or replace components of the unit that fail in materials and workmanship within the specified warranty period.
1. Fan Motor/Drive System: Warranty Period shall be Five (5) years from date of unit shipment from Factory (fan motor(s), fan(s), bearings, mechanical support, sheaves, bushings and belt(s))
2. The entire unit shall have a comprehensive five (5) year warranty against defects in materials and workmanship from date of shipment.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide cooling towers manufactured by one of the following:
1. EVAPCO Model USS-212-136, USS-212-624
2. Pre-Bid Approved Marley/SPX
2.2 THERMAL PERFORMANCE
A. Each unit shall be capable to cool 2,640.00 GPM of water entering at 95.00ºF leaving at 85.00ºF
236550 -at a design wet bulb of 80.00ºF.
2.3 IBC COMPLIANCE
A. The unit structure shall be designed, analyzed, and constructed in accordance with the latest edition of International Building Code (IBC) Regulations for seismic loads up to 1.0 g or wind loads up to 60 psf
2.4 COMPONENTS
A. Description: Factory assembled and tested, induced draft counter flow cooling tower complete with fan, fill, louvers, accessories and rigging supports B. Materials of Construction
1. All cold water basin components including vertical supports, air inlet louver frames and panels up to rigging seam shall be constructed of Type 304 Stainless Steel.
2. Upper Casing, channels and angle supports shall be constructed of Type 304 Stainless Steel.
Fan cowl and guard shall be constructed of Type 304 Stainless Steel."Series 300" Stainless Steel will not be acceptable as equivalent to Type 304 Stainless Steel.
C. Fan(s):
1. Shall be high efficiency axial propeller type with aluminum wide chord blade construction.
Each fan shall be statically balanced and installed in a closely fitted cowl with venturi air inlet for maximum fan efficiency.
D. Drift Eliminators
1. The eliminators shall be constructed entirely of Polyvinyl Chloride (PVC) in easily handled sections. Design shall incorporate three changes in air direction and limit the water carryover to a maximum of 0.001% of the recirculating water rate.
E. Water Distribution System
1. Spray nozzles shall be precision molded ABS, large orifice spray nozzles utilizing fluidic technology for superior water distribution over the fill media and to minimize water distribution system maintenance. Spray header and branches shall be Schedule 40 Polyvinyl Chloride (PVC) for corrosion resistance with steel connection to attach external piping. Branches shall have threaded end caps to facilitate debris removal.
F. Heat Transfer Media
1. Fill media shall be constructed of Polyvinyl Chloride (PVC) of cross-fluted design and suitable for inlet water temperatures up to 130 F. The bonded block fill shall be bottom supported and suitable as an internal working platform. Fill shall be self-extinguishing, have a flame spread of 5 under A.S.T.M. designation E-84-81a, and shall be resistant to rot, decay and biological attack.
G. Air Inlet Louvers
1. The air inlet louvers shall be constructed from UV inhibited polyvinyl chloride (PVC) and incorporate a framed interlocking design that allows for easy removal of louvers for access to the entire basin area for maintenance. The louvers shall have a minimum of two changes in air direction and shall be of a non-planar design to prevent splash-out, block direct sunlight and debris from entering the basin.
H. Make up Float Valve Assembly
1. Make up float assembly shall be brass float valve with adjustable plastic float.
I. Pan Strainer
1. Pan Strainer shall be all type 304 stainless steel construction with large area removable perforated screens.
2.5 MOTORS AND DRIVES
A. General requirements for motors are specified in Division 23 Section “Motors” B. Fan Motor
1. Fan motor(s) shall be totally enclosed, ball bearing type electric motor(s) suitable for moist air service. Motor(s) are Premium Efficient, Class F insulated, 1.15 service factor design. Inverter rated per NEMA MG1 Part 31.4.4.2 and suitable for variable torque applications and constant torque speed range with properly sized and adjusted variable frequency drives.
C. Fan Drive
1. The fan drive shall be multigroove, solid back V-belt type with taper lock bushings designed for 150% of the motor nameplate horsepower. The belt material shall be neoprene reinforced with polyester cord and specifically designed for evaporative equipment service. Fan and motor sheave shall be aluminum alloy construction. Belt adjustment shall be accomplished from the exterior of the unit.
D. Vibration Switch
1. Unit shall be provided with Vibration Cutout Switch, operating on 120V feed, to protect the fan and drive assembly from damage in the event of excess vibration. Vibration switch shall be
DPDT.
2.6 MAINTENANCE ACCESS
A. Fan Section
1. Access door shall be hinged and located in the upper casing for fan drive and water distribution system access.
B. Basin Section
1. Framed removable louver panels shall be on all four sides of the unit for pan and sump access.
C. Internal Working Platform
1. Internal working platform shall provided for easy access to the fans, motor, gear drive, all mechanical equipment and complete water distribution system. The cooling tower fill shall be an acceptable means of accessing these components.
D. External Service Platform with Ladder
1. An OSHA approved external service platform shall be provided at the motor access door of the tower extending the full length of the of the access door. Each platform shall have at least a 36" walking surface. The platforms shall be galvanized steel grating, supported by galvanized steel framework attached to the tower and surrounded by a sturdy handrail, knee rail and kick plate system. Mounting channels shall be the same material as the casing section (galvanized or stainless steel). A vertical ladder shall be provided from the base of the unit to the platform.
2. Safety cage(s) shall be provided on all vertical ladder(s) and ship mounted. Safety cage(s) shall begin approximately 7-8 feet above grade.
E. Motor Davit with Base
1. Unit shall be provided with mechanical jib-boom assembly which facilitates in removal of larger fan section components. Davit arm shall be constructed of aluminum and base shall be galvanized steel.
F. Louver Access Door
1. Hinged Access Door in Louver shall be provided
2.7 ACCESSORIES
A. Basin Heater Package
1. Cold water basin shall be fitted with copper-element, electric immersion heater(s) with a separate thermostat and low water protection device. Heaters selected to maintain +40 F pan water at 0 F ambient temperature.
2. Electric immersion heater package shall include a factory-supplied NEMA 4x enclosure containing a magnetic contactor with 120V control circuit, transformer, and main power disconnect. Control package wired by others.
B. Piping Connections
1. Cold water basin shall be provided with external connections to equalize basin water levels.
SECTION 23 65 00
COOLING TOWERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes factory assembled and tested, open circuit mechanical induced-draft vertical discharge cooling tower.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include rated capacities, pressure drop, performance curves with selected points indicated, furnished specialties, and accessories.
B. Shop Drawings: Complete set of manufacturer's prints of evaporative equipment assemblies, control panels, sections and elevations, and unit isolation. Include the following:
1. Assembled unit dimensions.
2. Weight and load distribution.
3. Required clearances for maintenance and operation.
4. Sizes and locations of piping and wiring connections.
5. Wiring Diagrams: For power, signal, and control wiring. Differentiate between manufacturer installed and field installed wiring.
C. Operation and Maintenance Data: Each unit to include, operation, and maintenance manual.
1.4 QUALITY ASSURANCE
A. Verification of Performance:
1. Manufacturer shall have a thermal performance testing program for water cooling towers certified by the Cooling Technology Institute (CTI) in accordance with CTI Specification Standard STD-201.
2. Unit Sound Performance ratings shall be tested and certified according to CTI ATC-128 standard. Sound ratings shall not exceed specified ratings.
B. Unit shall meet or exceed energy efficiency per ASHRAE 90.1
1.5 WARRANTY
A. Submit a written warranty executed by the manufacturer, agreeing to repair or replace components of the unit that fail in materials and workmanship within the specified warranty period.
1. Fan Motor/Drive System: Warranty Period shall be Five (5) years from date of unit shipment from Factory (fan motor(s), fan(s), bearings, mechanical support, sheaves, bushings and belt(s))
2. The entire unit shall have a comprehensive five (5) year warranty against defects in materials and workmanship from date of shipment.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide cooling towers manufactured by one of the following:
1. EVAPCO Model USS-212-136, USS-212-624
2. Pre-Bid Approved Marley/SPX
2.2 THERMAL PERFORMANCE
A. Each unit shall be capable to cool 2,640.00 GPM of water entering at 95.00ºF leaving at 85.00ºF at a design wet bulb of 80.00ºF.
2.3 IBC COMPLIANCE
A. The unit structure shall be designed, analyzed, and constructed in accordance with the latest edition of International Building Code (IBC) Regulations for seismic loads up to 1.0 g or wind loads up to 60 psf
2.4 COMPONENTS
A. Description: Factory assembled and tested, induced draft counter flow cooling tower complete with fan, fill, louvers, accessories and rigging supports B. Materials of Construction
1. All cold water basin components including vertical supports, air inlet louver frames and panels up to rigging seam shall be constructed of Type 304 Stainless Steel.
2. Upper Casing, channels and angle supports shall be constructed of Type 304 Stainless Steel.
Fan cowl and guard shall be constructed of Type 304 Stainless Steel."Series 300" Stainless Steel will not be acceptable as equivalent to Type 304 Stainless Steel.
C. Fan(s):
1. Shall be high efficiency axial propeller type with aluminum wide chord blade construction.
Each fan shall be statically balanced and installed in a closely fitted cowl with venturi air inlet for maximum fan efficiency.
D. Drift Eliminators
1. The eliminators shall be constructed entirely of Polyvinyl Chloride (PVC) in easily handled sections. Design shall incorporate three changes in air direction and limit the water carryover to a maximum of 0.001% of the recirculating water rate.
E. Water Distribution System
1. Spray nozzles shall be precision molded ABS, large orifice spray nozzles utilizing fluidic technology for superior water distribution over the fill media and to minimize water distribution system maintenance. Spray header and branches shall be Schedule 40 Polyvinyl Chloride (PVC) for corrosion resistance with steel connection to attach external piping. Branches shall have threaded end caps to facilitate debris removal.
F. Heat Transfer Media
1. Fill media shall be constructed of Polyvinyl Chloride (PVC) of cross-fluted design and suitable for inlet water temperatures up to 130 F. The bonded block fill shall be bottom supported and suitable as an internal working platform. Fill shall be self-extinguishing, have a flame spread of 5 under A.S.T.M. designation E-84-81a, and shall be resistant to rot, decay and biological attack.
G. Air Inlet Louvers
1. The air inlet louvers shall be constructed from UV inhibited polyvinyl chloride (PVC) and incorporate a framed interlocking design that allows for easy removal of louvers for access to the entire basin area for maintenance. The louvers shall have a minimum of two changes in air direction and shall be of a non-planar design to prevent splash-out, block direct sunlight and debris from entering the basin.
H. Make up Float Valve Assembly
1. Make up float assembly shall be brass float valve with adjustable plastic float.
I. Pan Strainer
1. Pan Strainer shall be all type 304 stainless steel construction with large area removable perforated screens.
2.5 MOTORS AND DRIVES
A. General requirements for motors are specified in Division 23 Section “Motors” B. Fan Motor
1. Fan motor(s) shall be totally enclosed, ball bearing type electric motor(s) suitable for moist air service. Motor(s) are Premium Efficient, Class F insulated, 1.15 service factor design. Inverter rated per NEMA MG1 Part 31.4.4.2 and suitable for variable torque applications and constant torque speed range with properly sized and adjusted variable frequency drives.
C. Fan Drive
1. The fan drive shall be multigroove, solid back V-belt type with taper lock bushings designed for 150% of the motor nameplate horsepower. The belt material shall be neoprene reinforced with polyester cord and specifically designed for evaporative equipment service. Fan and motor sheave shall be aluminum alloy construction. Belt adjustment shall be accomplished from the exterior of the unit.
D. Vibration Switch
1. Unit shall be provided with Vibration Cutout Switch, operating on 120V feed, to protect the fan and drive assembly from damage in the event of excess vibration. Vibration switch shall be
DPDT.
2.6 MAINTENANCE ACCESS
A. Fan Section
1. Access door shall be hinged and located in the upper casing for fan drive and water distribution system access.
B. Basin Section
1. Framed removable louver panels shall be on all four sides of the unit for pan and sump access.
C. Internal Working Platform
1. Internal working platform shall provided for easy access to the fans, motor, gear drive, all mechanical equipment and complete water distribution system. The cooling tower fill shall be an acceptable means of accessing these components.
D. External Service Platform with Ladder
1. An OSHA approved external service platform shall be provided at the motor access door of the tower extending the full length of the of the access door. Each platform shall have at least a 36" walking surface. The platforms shall be galvanized steel grating, supported by galvanized steel framework attached to the tower and surrounded by a sturdy handrail, knee rail and kick plate system. Mounting channels shall be the same material as the casing section (galvanized or stainless steel). A vertical ladder shall be provided from the base of the unit to the platform.
2. Safety cage(s) shall be provided on all vertical ladder(s) and ship mounted. Safety cage(s) shall begin approximately 7-8 feet above grade.
E. Motor Davit with Base
1. Unit shall be provided with mechanical jib-boom assembly which facilitates in removal of larger fan section components. Davit arm shall be constructed of aluminum and base shall be galvanized steel.
F. Louver Access Door
1. Hinged Access Door in Louver shall be provided
2.7 ACCESSORIES
A. Basin Heater Package
1. Cold water basin shall be fitted with copper-element, electric immersion heater(s) with a separate thermostat and low water protection device. Heaters selected to maintain +40 F pan water at 0 F ambient temperature.
2. Electric immersion heater package shall include a factory-supplied NEMA 4x enclosure containing a magnetic contactor with 120V control circuit, transformer, and main power disconnect. Control package wired by others.
B. Piping Connections
1. Cold water basin shall be provided with external connections to equalize basin water levels.
| MAHG141107 Repair 4 Evaporative Cooling Towers Triangle CEP (7405) SOW |
| MAHG141107 Repair 4 Evaporative Cooling Towers Triangle CEP (7405) SOW |
| Cooling Tower Performance Specification |
Cooling Tower Performance Specification
File details come from the government source that posted it. Updated .