KAFB 4908 ADDENDA 1 11-0406.pdf

PDF 18 KB Posted

Attached to
Repair Tier 1-Dorm 4908 Federal contract opportunity
Solicitation number
FA3010-11-C-0000
Issued by
Department of the Air Force Air Education and Training Command

About this file

Addendum 1

View the file

Other files for this federal contract opportunity

Other files attached to Repair Tier 1-Dorm 4908, newest first.
File Type Posted
4908 - addendum 4.pdf PDF
Amendment 0005.pdf PDF
11-R-0005-0004.pdf PDF
11-R-0005-0003.pdf PDF
Electrical Addenda - 4908 - May 18 —
11-R-0005-0003.pdf PDF
KAFB BLDG 4908 Addendum 2 with attachments.pdf PDF
11-R-0005-0002.pdf PDF
Amendment 1.pdf PDF
Site Visit List.pdf PDF
4908_3 of 11.pdf PDF
4908_2 of 11.pdf PDF
General Decision Number MS162.doc DOC document
FA3010-11-R-0005.pdf PDF
Performance Questionnaire.doc DOC document
4908_9 of 11.pdf PDF
4908_10 of 11.pdf PDF
MAHG 101059_4908 Project Manual.pdf PDF
Past Performance Reference List Attach 5.rtf RTF text file
4908_7 of 11.pdf PDF
4908_8 of 11.pdf PDF
4908_1 of 11.pdf PDF
4908_11 of 11.pdf PDF
4908_5 of 11.pdf PDF
4908_4 of 11.pdf PDF
4908_6 of 11.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDADDENDADDENDADDENDUMUMUMUM 1111

APRIL 6, 2011APRIL 6, 2011APRIL 6, 2011APRIL 6, 2011

PROJECT MAHG101059PROJECT MAHG101059PROJECT MAHG101059PROJECT MAHG101059

REPAIR REPAIR REPAIR REPAIR BUILDING 4908BUILDING 4908BUILDING 4908BUILDING 4908

KEESLER AFB, MSKEESLER AFB, MSKEESLER AFB, MSKEESLER AFB, MS

NOTICE TO ALL CONTRACTORSNOTICE TO ALL CONTRACTORSNOTICE TO ALL CONTRACTORSNOTICE TO ALL CONTRACTORS: This addendum is effective this date. All labor, materials and proposals shall be adjusted accordingly. This addendum is hereby made a part of the project documents to the same extent as though it were originally included therein. Receipt of this Addendum must be acknowledged in the space provided in the Form of Proposal.

AAAA.... REGREGREGREGARDING THEARDING THEARDING THEARDING THE DRAWINGSDRAWINGSDRAWINGSDRAWINGS::::

1. Sheet Sheet Sheet Sheet A1.6A1.6A1.6A1.6, New Door and Frame Schedule , New Door and Frame Schedule , New Door and Frame Schedule , New Door and Frame Schedule ---- All FlooAll FlooAll FlooAll Floors:rs:rs:rs:

a. Under frame details delete all references to head details 1, 2 and 3; jamb details 4, 5 and

6; sill details 7 and 8.

2. Sheet A1.14Sheet A1.14Sheet A1.14Sheet A1.14, Opening Elevations and Details:, Opening Elevations and Details:, Opening Elevations and Details:, Opening Elevations and Details:

a. 1/A1.14, Opening Elevations, Opening Mark “A”: Change the following:

“New Hollow Metal Frame, New Insulated Hollow Metal Door and Insulated Impact Side Lite”

To

“Existing Hollow Metal Frame to Remain With New Insulated Hollow Metal Door. Existing Aluminum Side Lite Window to Remain. Existing Transom to Remain”.

b. 1/A1.14, Opening Elevations, Opening Mark “B”: Change the following:

“New Hollow Metal Frame, New Insulated Hollow Metal Door and Insulated Impact Side Lite”

To

“Existing Hollow Metal Frame to Remain With New Insulated Hollow Metal Door. Existing Aluminum Side Lite Window to Remain. Existing Transom to Remain”.

c. Delete Opening Details 1 through 8 from Opening Elevations “A”.

d. Delete Opening Details 1 through 8 from Opening Elevations “B”.

BBBB.... REGARDING THE REGARDING THE REGARDING THE REGARDING THE SPECIFICATIONSSPECIFICATIONSSPECIFICATIONSSPECIFICATIONS::::

1. Section 08100 Section 08100 Section 08100 Section 08100 ---- Steel Frames:Steel Frames:Steel Frames:Steel Frames:

a. Remove Section 1.5 in its entirety.

C.C.C.C. CLARIFICATIONS:CLARIFICATIONS:CLARIFICATIONS:CLARIFICATIONS:

1. Opening Elevation “A” and “B” are typical for all dorm rooms except dorm rooms 233, 234,235, 236, 333, 334, 335 and 336. These dorm rooms do not have the aluminum side lite. The change made in this addendum under “Regarding the Drawings” is intended to keep the existing hollow metal door frame and the existing aluminum double hung side lite. The existing hollow metal frame shall be striped, primed and painted per specifications. Existing caulk and sealant shall be inspected and any loose material shall be removed and replaced with new caulk and sealant painted to match adjacent wall. The existing aluminum side lite has no work required. The existing transom infill to remain, stripped, primed and painted.

2. Door/Frame/Hardware General Note: Before proceeding at the submittal phase, verify existing conditions at each door opening as is necessary in order to ensure that the best products and materials are provided and installed, and meet specifications. Conditions which shall be determined and verified include but are not limited to the following: wall thickness at each opening requiring a new frame; the dimensions and hardware preparations on those existing frames which are to remain, in order to ensure that new doors fit correctly and that the hardware aligns and functions properly.

Perform work as necessary to correct deficiencies in existing conditions.

END OF ADDENDUEND OF ADDENDUEND OF ADDENDUEND OF ADDENDUMMMM 1111