4908 - addendum 4.pdf

PDF 141 KB Posted

Attached to
Repair Tier 1-Dorm 4908 Federal contract opportunity
Solicitation number
FA3010-11-C-0000
Issued by
Department of the Air Force Air Education and Training Command

About this file

Addendum 4

View the file

Other files for this federal contract opportunity

Other files attached to Repair Tier 1-Dorm 4908, newest first.
File Type Posted
Amendment 0005.pdf PDF
11-R-0005-0004.pdf PDF
11-R-0005-0003.pdf PDF
Electrical Addenda - 4908 - May 18 —
11-R-0005-0003.pdf PDF
KAFB BLDG 4908 Addendum 2 with attachments.pdf PDF
11-R-0005-0002.pdf PDF
KAFB 4908 ADDENDA 1 11-0406.pdf PDF
Amendment 1.pdf PDF
Site Visit List.pdf PDF
FA3010-11-R-0005.pdf PDF
Performance Questionnaire.doc DOC document
4908_9 of 11.pdf PDF
4908_10 of 11.pdf PDF
MAHG 101059_4908 Project Manual.pdf PDF
4908_3 of 11.pdf PDF
4908_2 of 11.pdf PDF
General Decision Number MS162.doc DOC document
Past Performance Reference List Attach 5.rtf RTF text file
4908_7 of 11.pdf PDF
4908_8 of 11.pdf PDF
4908_1 of 11.pdf PDF
4908_11 of 11.pdf PDF
4908_5 of 11.pdf PDF
4908_4 of 11.pdf PDF
4908_6 of 11.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 4

JUNE 6, 2011

PROJECT MAHG 10-1059

REPAIR TIER 2 PERMANENT PARTY DORM PHASE 1

BUILDING 4908

KEESLER AFB, MS

NOTICE TO ALL CONTRACTORS: This addendum is effective this date. All labor, materials and proposals shall be adjusted accordingly. This addendum is hereby made a part of the project documents to the same extent as though it were originally included therein. Receipt of this addendum must be acknowledged in the space provided in the Form of Proposal.

A. REGARDING THE SPECIFICATIONS

Division 8

Section 08110

Part 2 Products

Eliminate

Paragraph 2.3 in its entirety;

Insert New Paragraph 2.3 as follows:

“Referring to New Door and Frame Schedule –

Door material types marked as “FIHM” – Flush Insulated Hollow Metal – shall meet

Curries 707 Series Door Construction standard, which is used here as a base guideline only for construction and product testing. Products by other manufacturers which meet or exceed these base standards may be submitted for approval. Minimum standards shall include but are not limited to A60 base metal rust resistance level; 14 ga. Hinge and lock channel; 16 ga. Top and bottom end channel; and 18 ga. face skins bonded to a urethane core.

Door material types marked as “FHM” – Flush Hollow Metal – shall meet Curries 707

Series Door Construction standard, which is used here as a base guideline only for construction and product testing. Products by other manufacturers which meet or exceed these base standards may be submitted for approval. Minimum standards shall include but are not limited to A60 base metal rust resistance level; 14 ga. Hinge and lock channel; 16 ga. Top and bottom end channel; and 18 ga. face skins bonded to a urethane core.

END OF ADDENDUM

File details come from the government source that posted it. Updated .