Building 1914 RFI Answers.pdf

PDF 156 KB Posted

Attached to
Repair Roof & Fire Suppression Systems Building 1914
Solicitation number
FA286020R0050
Issued by

About this file

This document contains answers to questions regarding a solicitation for the repair of roof and fire suppression systems at Building 1914, Joint Base Andrews, MD. The solicitation seeks design and construction services including rehabilitation of the existing roof, repair and replacement of the existing fire suppression system and identification and correction of deficiencies in life safety and fire protection systems. Additional work includes installation of mass notification systems, repair and replacement of electrical systems, renovation of restrooms for ADA compliance, replacement of exterior doors and panels, installation of exterior lighting and refinishing of the hangar. The document clarifies that recommended demolition of abandoned HVAC equipment is included in scope. Responses address as-built drawings, security escort requirements, and clarification that the site superintendent may also serve as quality control and safety manager. The solicitation is issued by the Department of the Air Force Headquarters District Washington.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 1914 RFI Answers:

1.) Spec Section 013526 paragraph1.6.1.1.1 allows the site safety officer to act as the CQC for the project. However Spec Section 014500 par 3.4.2 states that the CQC can have no other duties.

Please clarify whether the SSHO can also act as the safety officer or not.

Answer: 11CES reply: Yes, the site safety officer may also act as the CQC.

2.) Could you please clarify the requirement for replacement of the base Giant Voice System because language in the documentation as highlighted in yellow below makes it appear a new Wide Area Mass Notification System (WAMNS)/Giant Voice System is required? Would you please confirm if the entire base Giant Voice System is required to be replaced?

Answer: 11CES reply: The mass notification/giant voice system is for Bldg 1914 only.

3.) Section 01 10 10 - Part 1 under 1.1.1 states the main goal of the project includes the “repair and replacement of the existing fire suppression system, identification and correction of deficiencies in life safety and fire protection systems” Please confirm if it is the contractor’s responsibility to assess during the pre-bidding stage and determine the necessary measures needed to assure the fire suppression systems (HEF and sprinkler) will meet or exceed the minimum requirements of UFC 4-211-01? Answer: Yes.

4.) The documents somewhat contract in that they list specific items to repair/replace, yet further state that it is the contractor’s responsibility for a fully functional system in accordance with UFC. If additional work, such as a reconfiguration of the HEF systems to meet PAT/FAT requirements, overhead piping changes, additional HEF zones, removal of bird netting, construction of additional HEF equipment rooms within the hangar, structural upgrades should generators be required to be relocated and or added, etc… be viewed as a compensatory contract change or expected to be provided at no additional cost to the gov’t. Answer: Contract change/modification

5.) Does the D/B Request for Proposal dated March 13, 2020 supersede and/or replace the Design Analysis Final Conceptual Design Submittal dated December 11, 2019? Answer: Yes

6.) What year version of UFC 4-211-01 is applicable to this project – please note there is a contradiction between “most recent version” and UFC 4-211-01 April 13 2017)? Answer: the most recent version.

7.) Are As-built or construction drawings available of the fire alarm, fire sprinkler and suppression systems? Answer: Yes, and they will be provided.

8.) UFC 4-211-01; April 13 2017; 3-6.18 - In the event drawings of the existing fire suppression systems are not available, should the contractors include removal of bird netting in order to accurately survey pipe sizes with a high reach lift, in order to create as-built drawings for completion of the hydraulic analysis? Answer: N/A

9.) Appendix J outlines the Testing requirements of the project for the life safety systems. Based on 1 week for the PAT (from start of preparing the hangar to final foam cleanup at week’s end), allowing 14 days for the gov’t to review the PAT video and agree to perform the FAT, and then another week for the FAT, the hangar may be in a testing ready state for a minimum of 30 days.

Is it acceptable to leave the plastic draped around the hangar perimeter and other preparatory items in place during the 30 day cycle, or will it be required to remove the plastic after the PAT and then re-prepare the hangar for the FAT? Answer: It is acceptable to leave the plastic draped around the hangar perimeter and other preparatory items in place during the 30 day cycle.

10.) Preliminary design calculations show the system would not meet the fluid delivery requirements to meet the 60 second timed test of the PAT/FAT based on the 2 system configuration and 8 generators on a zone. Should the contractor’s price up additional zones, foam tanks, inductors as required for a working design/build solution or price the itemized list as provided in the documents only. Answer: price up additional zones, foam tanks, inductors as required for a working design/build solution.

11.) Can the contractor’s be provided a base fire line plan showing the underground pipe sizes and routing of the underground fire mains from the pump house to the hangar? Please provide appropriate C Factors to be used for existing underground piping and type of underground piping materials? Answer: West Side Deluge system design information will be provided.

12.) The flow data provided is for the base municipal water supply and not reflective of the fire pump system which will serve the fire protection systems in the hangar bay. Can the base provide an expected base of riser supply that can be used for system calculations? Answer:

West Side Deluge system design information will be provided.

13.) Will the gov’t require the DOR to obtain a base of riser flow test from the sprinkler contractor from inside the building to validate the assumptions made in the underground piping arrangement, in the event items 7 and 8 cannot be provided above? Answer: Don’t you mean 9 and 10? If so, N/A.

14.) Other than of domestic origin, will any type of schedule 40 piping be required? Answer: Yes, as long as it meets applicable UFC’s.

15.) Section 01 10 10 / 13.4 Constraints - Is it the gov’ts intent to compensate the contractors for any proposed changes from the concept criteria required to meet section 01 10 10 / 13.2.1?

Answer: Contracting to reply.

16.) Will it be a requirement of this contract to replace any sprinklers within the facility? Answer: As needed.

17.) Will it be the contractor’s responsibility to inspect, clean and flush strainers within the generators? Answer: Yes, please plan on flushing existing strainers at the generators prior to preliminary system testing.

18.) The documents state flushing of the HEF system is required. Will the rinsate need to be treated as hazardous material and disposed of as such? Answer: Treating flushing water as a hazardous material is not required.

19.) Will items deemed not of domestic origin and or not listed for fire protection use be the contractor’s responsibility to identify and include in the project pricing? Answer: No. That can be a change order.

20.) It was stated during the walkthrough that the current fire protection upgrade on the fire pumps has been on hold for the past 6 months. Will that project be completed prior to needing fire water for hydrostatic testing or flushing? If not, will alternate means of water supply be the responsibility of the contractor? For PAT/FAT testing? Answer: That project will be completed prior to needing fire water for hydrostatic testing or flushing. An alternate means of water supply would not be the responsibility of the contractor.

21.) Will pads be required for the foam tanks? Answer: That is for the contractor’s engineer to decide (compliance with UFC is minimum requirements).

22.) If a full design build solution is required for the project pricing for bid day, will it be possible to have the hangars made available for an extended period of at least 4 hours such that contractors can make assessments of the equipment and arrangement of components for proper evaluation. Answer: Yes.

23.) Please provide the appropriate wage determination? Answer: Wage Determination has been addded

24.) Section 01 10 10 / 13.2.28 - In keeping with the design build aspect of the project, will the contractors be responsible for coordinating the existing generator locations with the silhouettes of the aircraft during the design build plan submittal process? Answer: No.

25.) When will the contractor’s obtain a plan view of the silhouettes? Answer: No.

26.) Can the gov’t provide a plan view of both the aircraft silhouettes and the locations of the existing foam generators? Answer: Approximate locations for the existing foam generators are shown on the concept plans (for reference).

27.) UFC 4-211-01; April 13 2017; 3-6.4.1.3 - In order to assure the coverage of the silhouettes in 60 seconds for the PAT/FAT – are the contractors responsible for fire pump start with a remote start signal from the Fire Alarm Control Unit? If so, how is this to be achieved and can the statement of work be modified to include the means/methods. Answer: Automatic remote fire pump starting with a remote start signal is not currently anticipated under this projects scope.

If during preliminary system testing lag in fire pump starting causes significant delay in system operation, the concern will be revisited. The contractor shall include reasonable lag time in the system calculations for receipt of signal and the local releasing\control unit and start of system flow (per UFC).

28.) UFC 4-211-01; April 13 2017; 3-6.5.1 - Due to the distance of the fire pumps to the hangar, will it be required for the contractor’s to provide the manufacturer’s calculations for verification of sizing of the surge arrestors? Answer: Yes.

29.) Should the contractor’s price surge arrestors as noted in statement of work, or include allowances for larger surge arrestors based on the outcome of a manufacturer’s calculations as noted in #24. Answer: Don’t you mean #26? If so, include allowances for larger surge arrestors based on the outcome of a manufacturer’s calculations.

30.) UFC 4-211-01; April 13 2017; 3-6.5.3 - Will the contractor’s be required to install an indicating isolation valve on each riser surge arrestor, currently not installed? If required to be electrically supervised please add this to the Fire Alarm statement of work. Answer: Yes. Please provide a isolation valve to serve each surge arrestor and provide monitoring of the isolation valve on the fire alarm system.

31.) UFC 4-211-01; April 13 2017; 3-6.8.1 - Will the contractors be required to install labeling on existing piping? Answer: No. Labeling on existing piping is not required. Labeling is required on new piping installed in accordance with UFC 4-211-01; April 13 2017; 3-6.8.1.

32.) UFC 4-211-01; April 13 2017; 3-6.15.3 – Will contractor’s be responsible to install automatic air vents at wet system high points? Answer: No. Automatic air vent installation is not required on this project.

33.) UFC 4-211-01; April 13 2017; 3-6.17.1 - Please confirm that the rotary sweep of the helicopters will be considered part of the silhouette for performance testing. Answer: N/A, see answers to #22 and #23.

34.) Restroom Fixture Counts / Part I.A.1, Page 5 Question:

A. Restroom fixture counts are noted as follows: “. . . with fixture counts appropriate to the user population”. Please define the “user population”.

B. If the “user population” driven fixture counts exceed the available space in the existing restrooms when factoring in the ABA required clearances, is the intent for the restrooms to be expanded or to stay the current size?

Answer: All of this information is included in the RFP, specifically the toilet room layouts in the drawings. The description referenced in the question is from the Design Analysis.

35.) Reference: Frames, Doors and Hardware / Part I.A.2, Page 6 Question: SOW notes to replace doors, frames and hardware “in kind”. Please provide specifications for the desired hollow metal doors, frames and hardware

Answer: See RFP, Section 01 10 10, para’s 7.2.3 Exterior Doors, 7.3.5 Interior Doors and Frames, and 7.4 DOOR HARDWARE – GENERAL REQUIREMENTS. In the future, please search the RFP and Design Analysis.

36.) Reference: Remove and Repaint Existing R-Style Panels / Part I.C Question: SOW notes that the existing R style panels that are in place are to be removed and “repainted” with Kynar. This is impossible as Kynar is a baked-on finish. Please specify alternate method for repainting existing R style panels.

Answer: Attached is a cut sheet for Air Dry Fluoropolymer Coating system, for touch up and field painting a Kynar panel. KYNAR makes a similar air dry system.

37.) Reference: Provide Complete and functional Public Address System / Page 27 Part I. 1.

N Question:

A. Are we to enhance the existing system or replace the existing system?

B. Are we to provide exterior speakers?

Answer: Replace the existing system. There are two different systems currently in place only one works. PA system speakers may be reused if compatible in the office areas on both sides of the building. There are no PA system speakers on the main hangar floor and would need new speakers installed. There will be no exterior speakers to install.

38.) Reference: Existing Fire Protection Systems – As-Built Drawings & Record Submittals Question:

A. Please provide as-built drawings for the existing fire protection system.

B. If as-built drawings are not available, then original shop drawings will suffice. We will also need all FP calculations and FP product submittals from original installation.

Answer: FP As-builts and calculations will be provided.

39.) Reference: Building Automation System / Controls Contractor Question: Please provide the company name, contact person, and phone number for the Building Automation Systems (BAS)/Controls Contractor currently providing service and/or maintenance for the existing building and temperature controls systems in Building 1914.

Answer: Siemens, John Yingling, 301-440-1605, john.yingling@siemens.com

40.) Reference: Badging/ID’s for Construction Personnel Question: Please summarize and clarify the badging/ID requirements for construction personnel.

Answer: Short term passes are good for up to 30 days; long term passes are good for up to 1 year.

41.) Reference: Security Escorts

Question: Will security escorts be required for this project? If yes, is the Owner going to provide escorts at no cost to the General Contractor?

Answer: Yes.

42.) Reference: CAD and Word Files for Contractor’s Use Question: Please advise if the Owner will provide CAD files (drawings) and Word files (specifications) for the Contractor’s use in generating the required Design Documents.

Answer: Yes, those that are available.

43.) Reference: Site Superintendent – Quality Control and Site Safety

Question: Will the Contractor’s Site Superintendent be allowed to also perform the roles of Quality Control Manager (QCM) and Site Safety and Health Officer (SSHO)? If not, please specify the On-Site Personnel requirements.

Answer: Yes.

44.) Reference: Request to Submit Additional RFIs Question: Due to the one-day period (Monday, 10/12/2020; also a federal holiday) between the issuance of Drawings and Specifications and the due date for submission of RFIs/Questions, please consider allowing additional RFIs/Questions to be submitted for this project.

Answer: Done.

45.) RFP states under HVAC SOW: “Recommended additional mechanical work is:

a. Demolish abandoned distribution Air Handling Units (AHUs), ductwork and piping in the Hangar.”

1.) Please clarify if this is to be included in the contract?

Answer: Yes, it is to be included in the contract.