This solicitation seeks proposals for the design and construction of repairs to the roof and fire suppression systems at Building 1914 on Joint Base Andrews in Maryland. Key work includes rehabilitation of the existing roof, replacement and repair of the fire suppression system, installation of mass notification and fire protection systems, renovation of restrooms for ADA compliance, replacement of exterior doors and metal panels, and refinishing of the hangar interior. Offerors should submit proposals by the specified due date to the Department of the Air Force Headquarters District Washington for consideration in awarding the contract.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN ANALYSIS

FINAL CONCEPTUAL DESIGN SUBMITTAL

Repair Roof & Fire Suppression, Hangar 1, Building 1914

Joint Base Andrews, MD Contract No. FA8903-16-D-0003 Task Order: FA8903-18-F-0015

December 11, 2019

PROJECT TEAM

Contractor GCAG/SCG JV Installation POC David Doyle, Phone #(301)981-2402

AFCEE COR Eric Staph, Phone #(210)395-9056 Preparer GCAG/SCG JV, Phone #(850)607-7328

Design Analysis Repair Roof & Fire Suppression, Hangar 1, B1914 Joint Base Andrews, MD

Page Left Intentionally Blank

TABLE OF CONTENTS

PART I DESIGN ANALYSIS

A. Architectural

1. Refinish Restrooms on West Side of Hangar

2. Replace All Exterior Doors

B. Interior Finishes C. Envelope

1. Sealants D. Roof

1. Metal Roof

2. Low Slope TPO Roof

E. Structural

1. References

2. Design Criteria

3. Summary

F. Plumbing

1. Scope of Work

2. Existing Conditions

3. Design Criteria

4. New Work

G. HVAC

1. Scope of Work

2. Existing Conditions

3. Design Criteria

4. New Work

H. Fire Protection/Life Safety

1. Building Code Analysis, Occupancy Classification

2. Compliance with UFC 3-600-01 and National Fire Codes

3. Analysis of Automatic Sprinkler Systems and Suppression Systems and Protected Areas 21

4. Fire Protection Water Supplies

5. Smoke Control Methods and Smoke Control Systems

6. Fire Alarm System and Connection to the Base Fire Alarm Reporting System

7. Mass Notification System

8. Standpipe Systems and Fire Extinguishers

9. Coordination with Security and Antiterrorism Requirements

10. Fire Protection During Construction

11. Fire Department Access

I. Electrical

1. Existing Conditions

2. Existing Conditions

3. Design Criteria

4. New Work

PART II SPECIFICATIONS

A. Division 01 B. Division 2 through 34

PART III APPENDICES

A. Advanced Final Design Submission Comments/Responses B. RFI’s C. Cost Estimate D. QC Checklist

End of Table of Contents

PART I DESIGN ANALYSIS

A. Architectural

Building 1914, Hangar 1, is located at Joint Base Andrews in Maryland. The building serves as a helicopter maintenance facility and is located within the flight line. As such, the building is a controlled/restricted area, and escort will be required for workers without appropriate clearances.

The work must be scheduled so as to minimize the impact on mission operations.

The following Unified Facilities Criteria (UFC), and other codes and standards, are referenced for the Architectural portion of this project. No waivers or exceptions are required:

UFC 1-200-01 DoD Building Code (General Building Requirements) UFC 1-200-02 High Performance and Sustainable Building Requirements UFC 3-101-01 Architecture UFC 3-110-04 Roofing Maintenance and Repair UFC 3-120-01 Design: Sign Standards UFC 3-120-10 Interior Design UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings IBC 2015 International Building Code IEBC 2015 International Existing Building Code ABA 2015 The Architectural Barriers Act Standards AFMAN 32-1084 Facility Requirements Standards

The architectural scope of work in B1914 includes supporting the work of the other disciplines, such as repair or replacement of partitions, ceilings, flooring, and other finish materials required by mechanical, electrical, or fire protection work, as well as miscellaneous finish upgrades throughout the building. Investigations of existing conditions included on-site field investigations, and examination of records and documents provided by the Government.

1. Refinish Restrooms on West Side of Hangar

The restrooms on the west side of the hangar are to be demolished and replaced. The new restrooms shall be fully ABA compliant, with fixture counts appropriate to the user population. Efficient, ABA compliant fixtures are to be used. All finish materials are to be non-porous, resistant to staining by petroleum products, and easy to maintain. In addition to replacing the existing toilet accessories in both restrooms, the following are to be provided as well:

• “Blade” type hand dryers.

• Dispensers for two types of soap dispensers: one for normal soap, and the other for “Gojo.”

• Room deodorizers.

2. Replace All Exterior Doors

All exterior doors, frames, and hardware are to be replaced in kind. This includes the doors at the mezzanine level, and man doors within the hangar doors. This does not include the hangar doors themselves.

B. Interior Finishes

Toilets: large format wall and floor tiles with epoxy grout; painted gypsum board ceilings; solid surface vanities; stainless steel toilet partitions. Tile must be non-porous and resistant to staining from petroleum-based products.

C. Envelope

In general, refer to and follow the guidance of the following Unified Facilities Criteria for this portion of the work unless otherwise indicated:

UFC 1-200-01 DoD Building Code (General Building Requirements) UFC 3-101-01 Architecture

The scope includes the installation of new PVDF finished, aluminum or galvalume-coated steel R style wall panels over existing window assemblies where they do not currently exist. Some existing window upper sections are glazed with flat metal panels that have been subsequently overlaid with face fastened metal R style panels; the lower portions have traditional glass glazing. Where noted on the drawings provide new face fastened R style panels over the existing flat metal panels. Provide flashings at terminations that appropriately waterproof and drain.

New panel installation is to generally match existing panel overlay conditions. Some windows are already covered with R-style panels. These components will be prepared and painted with a high performance organic coating such as Kynar minimum .8 MIL dry film finish. Min 15-year warranty will be provided. New R-style panels and existing R-style panels will match in color and generally match in profile.

DB contractor is responsible for investigation and design of attachment details. It is understood the wind loads currently exerted to window will continue to do so; reference existing similar installations on the existing facility. Attachment will generally be similar to the existing R-style panels.

Refer to the drawings including photographs for additional detailed information.

1. Sealants

ASTM C920, Type S or M, Grade NS, Class 50, use NT, color as approved by Government.

Sealant shall have been tested for use with the materials on which it will be used in this project;

provide non-staining sealants. Use Butyls for concealed movement joints; for other locations high performance silicones and urethanes are acceptable.

D. Roof

In general, refer to and follow the guidance of the following Unified Facilities Criteria for this portion of the work unless otherwise indicated:

• UFC 1-200-01 DOD BUILDING CODE (GENERAL BUILDING

REQUIREMENTS)

• UFC 3-101-01 ARCHITECTURE

• UFC 3-110-03 ROOFING

• UFC 3-110-04 ROOFING MAINTENANCE AND REPAIR

Additionally, follow the recommendations of the latest additions of :

• National Roofing Contractors Association - The NRCA Roofing and Waterproofing Manual

• The Sheet Metal and Air Conditioning Contractors' National Association

(SMACNA)

1. Metal Roof

Scope includes replacement of 4 vent through roof pipe flashings; repair of flashing on the ridge section of barrel roof according to the scheme indicated on the drawings. Scope further includes repair of gutters to bring the all metal joints to watertight condition, utilizing reinforced liquid flashing.

2. Low Slope TPO Roof

DB contractor will be responsible for repair of existing expansion joints between low-slope and barrel roof areas to ensure watertight condition. Repair will include removal and reinstallation of existing splice plates in a full bed of elastomeric sealant.

To address current on-going leaks termination bars and stainless-steel counterflashing extensions will be installed at mechanical curbs on units indicated on drawings.

Remove exhaust fan and install closed cell compressible gasket between curb and unit to prevent air/water infiltration.

E. Structural

1. References

All structural work shall be completed in accordance with the following codes and standards.

a. IBC International Building Code

b. IEBC International Existing Building Code

c. ASCE 7 American Society of Civil Engineers, Minimum Design Loads for

Buildings and Other Structures

d. UFC 1-200-01 General Building Requirements

e. UFC 3-301-01 Structural Engineering

f. UFC 3-310-04 Seismic Design for Buildings

g. UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings

h. UFC 4-020-01 DoD Security Engineering Facilities Planning Manual

i. UFC 4-211-01 Aircraft Maintenance Hangars

2. Design Criteria

Dead Loads: Actual Live Loads Per UFC 3-301-01 Wind Loads Design Wind Speed 120 mph Risk Category III Exposure Classification C Seismic Ss 0.12 S1 0.05 Risk Category III Site Class (Assumed) D Ground Snow Load 35 psf Ground Frost Penetration 54 inches

3. Summary

Building 1914 is a structural steel, barrel roof aircraft hangar. The existing drawings place the date of construction about 1962. There is no anticipated structural scope for Building 1914. Any structural work will be minor and ancillary to other trades. All information provided in the Design Analysis and Specification is intended to provide design requirements for any ancillary work.

The building is an existing building located within a controlled perimeter. The building does not meet any of the triggers provided in 1-5.2 of UFC 4-010-01. Standards 10 and 12 of UFC 4-010-01 apply to all window and door replacement. Standard 18 applies to the replacement of HVAC systems.

Standard 10: Glazing in compliance with this standard is intended to minimize hazardous glazing fragments. All new exterior glazing shall comply with the requirements of Standard 10 of the UFC 4-010-01

Standard 12: Exterior doors shall into inhabited areas shall be installed to open outwards.

Glazing in exterior doors shall comply with Standard 10 of the UFC 4-010-01.

Standard 18: HVAC systems shall be installed with an emergency cutoff.

F. Plumbing

1. Scope of Work

The plumbing work for this project includes both demolition and new work:

a. Provide new plumbing system for the new layouts of restrooms Women 129 and Men

130.

2. Existing Conditions

The existing conditions for the areas of work are:

a. Women’s and Men’s Rooms (129 and 130): The existing restroom do not comply with Architectural Barrier Act (ABA).

3. Design Criteria

Design and installation will be in accordance with the International Plumbing Code (IPC), including the IPC supplemental requirements within UFC 3-420-01, Plumbing Systems, and in accordance with all Government requirements, regional, and national applicable codes, and UFC criteria effective at issue date of the RFP.

New plumbing fixtures and faucets will meet the water-efficiency requirements of UFC 3-420-01, Plumbing Systems, and UFC 1-200-02, High Performance and Sustainable Building Requirements, which requires compliance with ASHRAE 189.1, Standard for the Design of High-Performance Green Buildings, Section 6.3.2 (Building Water Use Reduction). For lavatories and handwash sinks, a maximum flow of 0.5 gpm is required.

4. New Work

The new plumbing work in Building 1914 is:

a. Men’s and Women’s Rooms (129 and 130): New plumbing system layout will be provided. The faucets will be manually controlled with wrist blades and meet ABA requirements. Individual stops and grid strainers will be provided for each lavatory. Manual controlled flush valve will be provided for urinals and water closets. ABA showers will be provided with manual shower valves with thermostatic mixing valve (anti-scalding). New sanitary, vent, and domestic water piping will be provided as required to connect to the existing utilities. Existing water heater will be reused.

b. Sanitary piping along the West lean-to space was visually inspected via pipe camera. It was discovered that used toilet paper is just standing in the pipe and causing sewage back up periodically. The pipe was flushed using high pressure water to push the standing toilet paper and has alleviate the problem. In addition, the same process was done to the Women’s restroom 151 on the East lean-to space as it has also been reported that sewage back up occurs periodically. A full report for the pipe scoping/flushing will be provided in the future.

G. HVAC

1. Scope of Work

The mechanical work for this project includes both demolition and new work:

a. Add climate control and freeze protection for the foam equipment room.

b. Demolish abandoned equipment and piping in mechanical rooms.

c. Provide new exhaust system in restrooms Women 129 and Men 130.

Recommended additional mechanical work is:

a. Demolish abandoned distribution Air Handling Units (AHUs), ductwork and piping in the Hangar.

2. Existing Conditions

The fuel sources for Building 1914 are natural gas and electricity. The mechanical systems in Building 1914 are generally not included in the scope of work. The existing conditions for the areas of work are:

a. Restrooms Women 129 and Men 130: It has been reported that ventilation in the restroom is not working properly.

b. Foam Equipment Room: Currently the foam equipment room has no heat. The room does not have cooling, instead an exhaust fan provides ventilation. The existing exhaust fan will be removed.

c. Abandoned Equipment and Piping: Two Mechanical Equipment Rooms, the Foam Equipment Room and the Hangar have abandoned equipment and/or piping that will be demolished.

1) East Mechanical Room (153): Demolish the existing abandoned equipment including the steam condensate pump, the steam pressure reducing station, steam convertor, expansion tank and steam based hot water generator and the associated piping, controls and appurtenances.

2) West Utility Room (110): Demolish the existing abandoned steam equipment and the associated piping, controls and appurtenances.

3) Foam Equipment Room (112): Demolish the existing abandoned steam piping, controls and appurtenances.

4) Hangar (100): Demolish abandoned AHUs, ductwork and piping in the hangar.

Abandoned Steam Equipment and Piping

3. Design Criteria

Design and installation will be in accordance with the International Mechanical Code (IMC), including the IMC supplemental requirements within UFC 3-410-01, and UFC 3- 401-01, Mechanical Engineering, and in accordance with all Government requirements, regional, and national applicable codes, and UFC criteria effective at issue date of the

RFP.

Calculations for the HVAC system simulation including heating and cooling loads and energy use analysis will be performed with a computer simulation program that meets ANSI/ASHRAE/ACCA Standard 183, Trane TRACE. A 40-year Life Cycle Cost Analysis (LCCA) will be performed to determine the heating and cooling system for the Foam Maintenance Room in accordance with UFC 1-200-02 and using the National Institute of Standards and Technology (NIST) BLCC program.

The design parameters that will be used to determine the heating and cooling loads are provided below:

a. Outdoor Conditions: In accordance with UFC 3-410-01, outdoor conditions are base from the latest UFC 3-400-02 Engineering Weather Data:

1) Outdoor conditions for cooling are:

a) The 1.0% dry bulb (DB) and corresponding mean coincident wet bulb

(MCWB).

b) The 1.0% humidity ratio (HR) and corresponding mean coincident dry bulb (MCDB) temperature.

c) Size condensers and condensing units for 5°F above the outdoor temperature.

Condition °F DB °F WB °F DP

1.0% DB/

MCWB

91.0 74.0 66.93

1.0% HR/

MCDB

80.2 75.3 73.5

Table 1. Outdoor Conditions for Cooling Design

2) Outdoor conditions for heating are the 99% dry bulb (DB): 18.7°F.

3) Design preheat coils for an outside DB temperature of 0°F.

b. Indoor Conditions: The required conditions in UFC 3-410-01, Change 4, 01 November 2017 and used in the LCCA are:

1) Indoor conditions required for cooling and heating are:

Space Type Cooling Heating

°F DB % RH °F DB

Foam Equipment

Room

78.0 50% 68.0

Table 2. Indoor Conditions for Cooling and Heating

2) For unoccupied mode, provide the following night setback temperatures:

a) For heating, no higher than 55°F.

b) For cooling, 5°F higher than indoor cooling design conditions, but no higher than 85°F.

3) Humidification is not required.

4) Provide dehumidification by cooling the air to a dew point of 57.9°F or lower.

c. Building Envelope: The foam room in building 1914 is in a location where the adjoining rooms are currently cooled. The only heat transmission will be to the outdoors. The approximate existing envelope U-values shown below are more than current ASHRAE values:

1) Exterior Walls: U = 0.22 btuh/SF-°F

2) Roof: U = 0.14 btuh/SF-°F

d. Internal Loads: Occupancy and heat loads for calculations.

Space Type Occupants

Heat Gain/Person Sens/Latent

(btuh)

Lighting

(W/SF) *

Equipment (W)

Foam Equipment

Room none N/A 0.7 0

*LED lighting Table 3. Internal Loads

e. Occupancy Schedule: The building is occupied from 8am to 5pm. The foam equipment requires temperatures to be maintained 24 hours per day / 7 days a week.

f. Ventilation: For the foam equipment room, ASHRAE Standard 62.1, Ventilation for

Acceptable Indoor Air Quality, does not have requirements for ventilation or exhaust.

Space Type Outdoor Air Exhaust

Air, CFM CFM/Person CFM/SF Foam Equipment Room N/A N/A 0

Table 4. ASHRAE Required Ventilation

g. Moisture: A psychrometric analysis documenting that the system meets the design criteria will be provided.

4. New Work

A new climate control system will provide heating and cooling for the Foam Equipment Room. LCCA not required for process equipment rooms such as the Foam Equipment Room.

The Foam equipment room shall be conditioned with a dedicated air-cooled direct expansion (DX) ductless split heat pump system. This shall include an indoor unit, outdoor unit, associated refrigerant and condensate piping, as well as all necessary appurtenances including insulation, controls, supports, etc.

The foam suppression room HVAC system will also be used to define the foam suppression room HVAC system for Building 1915.

Controls will be the manufacturer’s standard controls, unit mounted where possible. No connection to the building or the campus control or monitoring capabilities is anticipated.

Due to the extremely limited scope of mechanical work, commissioning of the installed unit is not anticipated. Testing, adjusting and balancing (TAB) is anticipated.

The building will be occupied during construction. Equipment and piping installation will be coordinated.

Ductless Mini-Split

PTHP Unit

H. Fire Protection/Life Safety

Per UFC 3-600-01, a fire protection design analysis is required for major projects and must address the fire protection requirements of the project as required by this UFC. This design analysis summarizes fire protection features that are required versus features that are provided.

Work on this project is generally defined as ‘modification’ and ‘reconstruction’ work per UFC 3- 600-01, Chapter 34. Therefore, work must conform to the requirements for ‘new construction in UFC and NFPA 101.

Comply with UFC 3-600-01, Chapter 34, for phasing of construction and coordination of fire protection and life safety features during construction:

• Phasing of construction and demolition operations must be planned so that the integrity of fire-rated separations, smoke-tight boundaries, means of egress, exit enclosures, and vertical openings are maintained to the highest level possible.

• The phasing plan must ensure that obstruction of the means of egress is avoided or minimized.

• If exits are obstructed during construction, provide alternate means of egress and exit routes during each phase of construction and identify the alternate routes on the construction drawings as part of the phasing plan(s).

• Minimize, to the extent possible, any impairments or disruptions to active fire protection features. Delineate phasing of construction to ensure that installations of new features (or systems) or modifications to existing ones are expedited.

• Where possible, maintain existing systems in service until the replacement work has been deemed operational.

• Prior to taking any actions to impair a fire protection feature or disrupt its performance, ensure alternative procedures have been prepared and incorporated and confirm that official notification of system impairments and schedules have been given to the staff of the Facility.

References:

• International Building Code (IBC), for fire resistance requirements and area limitations as referenced by UFC 3-600-01

• NFPA 10 Standard for Portable Fire Extinguishers

• NFPA 11 Standard for Low-, Medium-, and High-Expansion Foam

• NFPA 13 Installation of Sprinkler Systems

• NFPA 70 National Electrical Code

• NFPA 72 National Fire Alarm Code

• NFPA 80 Standard for Fire Door and Other Opening Protectives

• NFPA 101 Life Safety Code, for exit facilities and means of egress as referenced by UFC 3-600-01

• UFC 3-600-01, Fire Protection Engineering For Facilities

• UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings

• UFC 4-021-01, Mass Notification Systems

• UFC 4-211-01, Aircraft Maintenance Hangars

This project scope includes the repair and modification of the Life Safety systems as follows:

• Assess the hangar to verify the deficiencies identified in the HEIR (Hangar Evaluation Installation Report) and identify life-safety and fire protection system deficiencies.

• Design corrections to life-safety and fire protection system deficiencies

• Install panic hardware on all exit doors

• Replace non-illuminated exit signs with illuminated exit signs

The Joint Base Andrews Fire Protection Standards shall be referenced in the Design\Build RFP package. The Design\Build Contractor will be required to comply with current Base Standards, to the extent they are applicable to this projects’ work scope.

1. Building Code Analysis, Occupancy Classification

Occupancy Classification \ Building Construction Type

Use Group (IBC) Existing to Remain - Business Group B.

Existing to Remain – S-1 (Aircraft Hangar Area).

Minimum Construction Type

Type II-B (Existing To Remain)

For reference, the equivalent NFPA 101 construction type for this project is Type II (000):

Exterior Bearing walls: 0-hr FRR, Interior Bearing:

0-hr FRR, Floor: 0-hr FRR, Roof: 0-hr FRR.

Fire Blocks & Draft Stops Not required in non-combustible construction (Reference IBC, Section 718)

Hazard Classification For determining automatic sprinkler densities and hose stream demands per UFC 3-600-01, NFPA 13, and as shown on drawings. Occupancy classification is considered “ordinary” as defined by NFPA 101.

Automatic Sprinklers & Other Extinguishing Equipment

Automatic Sprinklers (existing) are provided throughout the facility in accordance with UFC 3- 600-01 and NFPA 13 (See automatic suppression system section below for complete description)

Portable Fire Extinguishers No new extinguishers will be installed in the hangar bay or office areas (not required, per UFC, for a fully sprinklered facility).

Detection Alarm & Communication

Per UFC 3-600-01 and NFPA 72

Fire & Smoke Dampers NFPA 90A and UFC 3-600-01

Interior Finish Requirements

Egress Corridors Class A or Class B Interior Finish Materials, NFPA101 Section 10.2

Typical Class I or II, NFPA 101, Section 10.1

Means of Egress Separation of Means of Egress

Separation of Means of Egress as required by NFPA 101. For a new Storage\Business occupancy, fully sprinklered, corridor separation is not required.

Illumination of Means of Egress

Illuminated emergency lighting powered through battery packs will be located as required by NFPA 101.

Marking of Means of Egress

All exits and passageways leading to an exit will have LED (Light Emitting Diode) illuminated emergency exit signs (NFPA 101 Section 7.10, and

UFC 3-600-01).

Occupant Load

Occupant Load Factor & Egress Capacity

Business – 100 sq.ft. per person Storage – 500 sq.ft. per person

Number of Means of Egress

Minimum Number of Exits

Minimum Two (2) Required (Per NFPA 101)

Actual Number of Exits Four (4) exits

Exit Configuration \ Travel Distances

Dead End Limits

NFPA 101

Business - 300 ft (sprinklered)

Common Length of Travel

Business - 100 ft (sprinklered)

Length of Travel Distance

Business - 50 ft (sprinklered)

2. Compliance with UFC 3-600-01 and National Fire Codes

As part of the design document preparation, the designer-of-record for each individual system is to ensure compliance with UFC 3-600-01 and the applicable National Fire Codes.

3. Analysis of Automatic Sprinkler Systems and Suppression Systems and Protected Areas

The building is currently equipped with a wet-pipe automatic fire sprinkler system(s) throughout and two (2) high-expansion foam water systems in the hangar bay area. This project scope includes the repair and modification of the fire suppression systems as follows:

• Assess the hangar to verify the deficiencies identified in the HEIR (Hangar

Evaluation Installation Report) and identify all life-safety and fire protection system deficiencies.

• Evaluate fire hydrant locations for compliance with UFC 4-211-01

• Add inspector’s test connection to wet-pipe sprinkler systems

• Add identification tags and data plates to risers and valves

• Demolish existing under-slab fire suppression piping and replace with above floor piping

• Add pressure relief valve device and associated drain to wet-pipe risers

• Relocate existing drain connection to a safe, acceptable, and appropriately sized discharge

• Separate the West office area wet-pipe fire sprinkler system from the foam fire suppression system. Install a new underground connection and backflow preventer from the Base water supply to supply the new west office area wet-pipe fire sprinkler system.

• Replace foam concentrate storage tanks with atmospheric foam storage tank(s) with ultrasonic level sensors. Minimum tank size shall be 500 gallons, however, actual provided tank size required shall comply with the hydraulic design requirements and foam supply duration specified in UFC 4-211-01.

• Add foam concentrate fill pump, replace foam proportioner with inductor on each foam-water riser

• Replace existing foam-water control valves with pressure regulating remote resetting flow control valves

• Install climate control and freeze protection in foam equipment room

New automatic fire sprinklers shall be of the Quick Response (QR) type. Temperature ratings shall be consistent with the environment that the head is installed, per the requirements of NFPA 13.

All fire protection devices shall be UL Listed or FM Approved for the intended use.

The final hydraulic calculations of the reconfigured fire suppression systems are to be provided with the final fire protection design documents, and approved by the project Fire Protection Engineer Designer of Record, prior to construction. The analysis is to include all pipe between the hydraulically most remote area (as defined by NFPA 13) and the fire protection water supply.

4. Fire Protection Water Supplies

The existing Base water supply serving the East Office area wet-pipe fire sprinkler system is existing and shall remain as-is.

A new connection to the Base water supply will be provided to serve the West Office area wet-pipe fire sprinkler system. The new connection will be a new 6” underground feed main with new 6” post indicator valve. Hydraulic calculations proving the adequacy of the West Office area wet-pipe fire sprinkler system shall be provided by the Design\Building Contractor and shall consider the Base water supply as the source of the fire protection hydraulic calculations. A fire hydrant flow test will be performed and included in the final Design\Build RFP package for Contractor reference. The Contractor’s Fire Protection Designer of Record will be required to perform an updated flow test for final design purposes.

The fire suppression systems serving the hangar bay consist of four (4) automatic wet pipe sprinkler systems and a high expansion foam system. Water is supplied from Pump House Building 1731, which contains three (3) 2,500 gallons per minute diesel-driven fire pumps rated for 165 psi @ 2,500 gpm. The existing fire pumps are being replaced under a separate project\contract, and it is assumed the fire pump replacement project will be finished prior to this project being completed (so that the new water supply is in place to serve this project). The water supply for the pumps is from an above-ground water storage tank. Hydraulic calculations proving the adequacy of the Hangar area fire suppression systems shall be provided by the Design\Building Contractor and shall consider the water supply originating in Building 1731 as the source of the fire protection hydraulic calculations.

5. Smoke Control Methods and Smoke Control Systems

No active smoke control systems are required as part of the work scope on this project.

6. Fire Alarm System and Connection to the Base Fire Alarm Reporting System

The existing fire alarm system in this building shall be removed in its’ entirety.

A new addressable fire alarm system with a new Mass Notification System (MNS) shall be installed. New equipment utilized to communicate with the Base central station shall be compatible with the existing Base systems. The existing Base Giant Voice Mass Notification system is a Whelen system. The existing Base Fire Alarm reporting system is a Monaco system.

The existing releasing system for the hangar area high-expansion foam system will be replaced with a new releasing system meeting the current requirements of UFC 4-211-01, “Aircraft Maintenance Hangars”.

This project scope includes the repair and modification of the fire alarm, detection, and releasing system as follows:

• Assess the hangar to verify the deficiencies identified in the HEIR (Hangar

Evaluation Installation Report) and identify all life-safety and fire protection system deficiencies.

• Add blue rotating beacons, with signage, to indicate foam activation.

• Replace Fire Alarm Control Unit (FACU) and Releasing Service Fire Alarm

Control Unit (RSFACU) for hangar-specific fire alarm detection/response and high-expansion foam release.

• Replace foam system control panel.

• Conduct an engineering evaluation to verify and move detectors to the correct height.

• Replace existing flame detectors with multi-spectrum IR3 flame detectors. Adjust height as required.

• Replace manual foam discharge stations that have a key-reset.

• Replace signage at manual foam discharge stations and mount the stations directly to the signs.

• Add manual foam stop/abort stations adjacent to manual foam discharge stations.

• Add manual foam stop/abort stations adjacent to manual foam discharge stations.

• Install new mass notification voice system.

All software, software locks, special tools and other proprietary equipment required to maintain, add devices to or delete devices from the system or test the system will be required to be furnished to the Government prior to final inspections of the system.

All new fire alarm and mass notification system wire shall be located in dedicated conduit.

All visual notification devices will be synchronized as per ABA requirements. Audible notification will be performed with the speakers that are integrated into the fire alarm visual notification device. This audible notification device shall provide a clear audible alarm followed by clear audible instructions.

Upon detection of any fire alarm system alarm or trouble, the fire alarm panel connected to the fire alarm transmitter will transmit the indicated system signal to the local authorities having jurisdiction.

If the MNS is activated during fire alarm activation, all fire alarm notifications will be disabled and replaced by the MNS alarm notification as required.

The run time of the fire alarm system, mass notification system, and the fire alarm transmitter, on batteries is designed to perform for 60 minutes of alarm, with a standby of 48 hours after loss of primary power.

7. Mass Notification System

There is no existing Mass Notification System in this facility.

The building will receive a new mass notification system that will be integrated with the new addressable fire alarm system. The system shall consist of a Mass Notification Control Panel(s), Audio Booster Panel(s), NAC Booster Panel(s), and Local Operator Consoles. The MNS notification devices include speakers, strobes, and outdoor speakers located near the main exits. The system status of the mass notification system will be monitored by fire alarm system.

If a trouble is indicated within the mass notification system, the fire alarm system will indicate a trouble message, and transmit trouble signals to the local authority having jurisdiction via the Base reporting system. The fire alarm system shall automatically reset once the trouble signal has been restored.

The mass notification system is activated by contact closure message activation.

a. Activation via the fire alarm system will respond with an audible voice evacuation message, with visual notification using clear strobes.

b. Activation by means of local operator console shall correspond with pre-selected events specified as per project requirements.

c. Each remote local operator console can also provide live audible messages via a dedicated push to talk microphone located inside the local operator console.

The mass notification system activation can trigger a specific type of notification based upon message button selected. The list below is in the order of signal priority. Event messages may be customized at the main mass notification panel.

Priority 1. Local Live Voice.

Priority 2. Command Post Live Voice.

Priority 3. Bomb Threat.

Priority 4. Intruder.

Priority 5. Shelter In-Place.

Priority 6. Weather.

Priority 7. FIRE.

Priority 8. Carbon Monoxide (CO) Detection. (if applicable) Priority 9. All Clear.

Priority 10. TEST.

Visual notification is dependent upon event programming and UFC requirements for Air Force facilities. Both “Fire” & “Mass Notification” signal will utilize a clear white strobe. The strobe will be labeled “Alert”, per current UFC 3-600-01.

New HVAC system shut-down switches will be provided at the new Local Operating Console locations, per UFC 4-010-01.

Local Operating Consoles (LOC’s) will be provide for user input per UFC 4-021-01. The proposed location and quantity of LOC’s shall be shown on the design documents for AHJ review.

8. Standpipe Systems and Fire Extinguishers

Considering the height and size of the building, a standpipe system (NFPA 14) is not required.

Per UFC 3-600-01, new portable fire extinguishers will not be required on this project due to the building being fully sprinklered and being provided with a fire alarm system.

9. Coordination with Security and Antiterrorism Requirements

Each system (including architectural, mechanical, electrical, plumbing, fire protection, etc.) shall be coordinated with the anti-terrorism requirements and recommendations of UFC 4-010-01. It will be the responsibility of the designer-of-record for each system to incorporate antiterrorism requirements.

Security features that interface with means of egress components (i.e. exit doors) of the building shall meet the requirements of NFPA 101. Egress access shall be available to all occupants of the building while occupied.

10. Fire Protection During Construction

Construction activities shall consider and incorporate the recommendations of NFPA 241

- “Standard for Safeguarding Construction, Alteration, and Demolition Operations”.

The existing fire alarm shall be maintained in service, to the extent possible, during renovation activities. If fire protection systems are removed from service a Fire Watch shall be provided by the Contractor.

Base fire department Hot Work permit requirements shall be obtained prior to any Hot Work activities. A Hot Work permit is required for any temporary operation involving open flames or producing heat and/or sparks. This includes, but is not limited to: Brazing, Grinding, Soldering, Thawing Pipe, Torch Applied Roofing and Welding.

11. Fire Department Access

Fire Department vehicular access routes serving this building\site are existing to remain as-is.

The existing building access key box (i.e. knox-box), for emergency responder use, shall remain as-is.

I. Electrical

1. Existing Conditions

The electrical work for this project includes both demolition and new work:

a. Replace electrical receptacle(s), conduit(s), conduit seal(s), and wiring in hangar located between the floor and 18” AFF to be compliant with NEC 513, Class I, Division II.

b. Replace electrical distribution panel enclosures(s) located in hangar with NEMA 4, 4X, 6, or 6P rated enclosures, specifically for exposure to hose down spray.

c. Provide LED lighting rated for wet location on North and South hangar door alcoves with motion sensor controls.

d. Provide electrical connection for Fire Alarm/Suppression panels, blue strobes, and other miscellaneous fire suppression equipment.

e. Provide lighting, receptacles, and electrical connections to support bathroom renovations.

f. Remove electrical connections associated with abandoned mechanical equipment.

g. Replace all exit signs and provide additional exits signs for all paths of egress, which includes replacing non-illumination exit signs with illuminated exit signs.

h. Replace exterior lighting at egress doors with emergency battery backup lighting as required by the UFC and NFPA.

i. Replace all existing Federal Pacific Electric (FPE) panels located throughout the hangar and mechanical rooms.

j. Replace emergency lighting in the office area and provide additional emergency lighting where necessary per UFC and NFPA.

k. Replace lighting and controls in Mech. Equip. Room 153, and Utility Room 110

l. Provide a complete Lightning Protection System to include strike termination devices, conductors, ground terminals, interconnecting conductors, surge suppression devices, and other connectors and fittings.

m. Perform megger test on the existing grounding electrode system. Provide additional ground rods as required to achieve a maximum resistance to ground of 25 Ohms.

n. Provide a complete and functional Public Address system with coverage throughout facility.

2. Existing Conditions

The existing conditions for the areas of work are:

a. Corridor 134, 135, & 136: In general, the exit signs are in poor condition and are not located such that all paths of egress are covered. The emergency lighting in this area is in poor condition or not working and does not provide enough emergency lighting coverage per UFC and NFPA.

b. Hangar Alcoves 100: The existing lighting in these areas is not functioning.

c. Hangar 100: Exit signs leading out of the hangar area are not present. Emergency lighting was not observed, however the existing lighting in the hangars may be provided with integral emergency ballasts. In general, the electrical panels are not provided with the correct NEMA rated enclosures. Many of these panels are also FPE manufactured panels which are recommended to be replaced. There are minimal locations where electrical devices are not compliant with NEC Art. 513 Class I, Division II.

d. East Mechanical Room 153: Except for the transformer and enclosed circuit breaker, all electrical devices in this room are FPE panels. Lighting in this room is not operational. There are no emergency lighting fixtures located in this room.

e. Corridor 170, 171, & 172: The exit signs are in good condition and do not need to be replaced. All paths of egress are shown by the exit signs. Emergency lighting was not noticed in corridor 170 & 171, however the existing lighting in the corridor may be provided with integral emergency ballasts.

f. Break Room 154: Exit sign is in poor condition.

g. Hangar 1914 exterior: Existing lighting around the perimeter is minimal except by the hangar doors. In general, there is (1) light fixture located above each of the exterior egress doors. These fixtures are in poor condition. No indication if these fixtures are for general perimeter lighting or if they are exterior emergency lighting.

h. Site: Existing drawings indicate there is an existing grounding electrode system for the hangar.

j. Estimated load summary: The hangar is equipped with an 800A, 480/277V, 3-phase, 4-wire service entrance rated switchboard. The estimated hangar load is 532 KW.

3. Design Criteria

Design and installation will be in accordance with the National Electric Code (NEC), the National Fire Protection Association (NFPA), and UFC criteria, specifically UFC 3-520- 01, UFC 3-530-01, UFC 3-575-01, and UFC 4-211-01 effective at issue date of the RFP.

Due to the occupancy of Hangar 1914, NEC article 513 classifies the hangar area of Hangar B1914 up to 18” above finished floor (A.F.F.) as Class I Division II. The electrical devices located within this Class I Division II location shall be explosion proof type with gasketed seals. Receptacles located within the hangar area but outside of the Class I Division II location shall be GFCI type and provided with a weatherproof box to protect against the ingress of water. The permitted conduit in the Class I Division II area is rigid metal conduit (RMC) or intermediate metal conduit (IMC) with listed fittings.

Conduits within the hangar area but located outside of the Class I Div. II are permitted to be type EMT or MC cable. Conductors shall be type THHN/THWN. The panel enclosures within the hangar shall be NEMA 4, 4x, 6, or 6P to protect against the ingress of water, specifically hose directed water. Disconnect switches located within the hangar area shall also be NEMA 4, 4x, 6, or 6P. Disconnect switches located on the exterior of the buildings shall be NEMA 3R. Disconnect switches located in the miscellaneous mechanical rooms shall be NEMA 1. Junction boxes in the hangar shall have gasketed seals to prevent against the ingress of water.

The lighting fixtures in the hangar alcoves shall be rated for wet location and be IP 66 rated. The light fixtures shall be controlled by occupancy sensors located within the alcoves and at the entrance to the alcoves and shall meet IES illumination standards for the specified area. Select lighting type through life cycle cost analysis. Reference UFC 1- 200-02 Section 2-3 and 4-2.2.2.2. Exit signs located in the hangar area shall be exit sign/emergency lighting unit combination type fixtures, internally illuminated with an IP66 rating. Exit signs located in the administrative areas at the exterior egress doors shall be exit sign/emergency lighting unit combination type fixtures, internally illuminated, with a polycarbonate housing. All other exit signs shall be single or double face, internally illuminated with a polycarbonate housing. Emergency lighting units located in the administrative areas shall be UL 924 listed with 90-minute battery life.

Any conduit penetrations into the hangar shall be fire stopped.

4. New Work

The existing non-explosion proof receptacles and wiring devices located in the Class I Division II area, (0” – 18” above finished floor), in the hangar shall be relocated to 24” above finished floor which is outside of the Class I Division II area. This matches with the rest of the wiring devices inside of the hangar. Except for power panels LP1, LP-2, LP3, and LP4, all existing power panels located in the hangar area will have the existing panel enclosures removed and NEMA 4, 4x, 6, or 6P rated enclosures will be provided.

The following power panels are the existing FPE panels located in the hangar area as well as Mechanical Equipment room 153: Panel L7(OLD)-208/120V 100amp 3-phase 4 wire, Panel P4-208/120V 600amp 3-phase 4 wire, Panel E2-208/120V 100amp 3-phase 4 wire, Panel L9-208/120V 100amp 3-phase 4 wire, Panel L8- 208/120V 100amp 3-phase 4 wire, Panel MP, Panel PL1, Panel L2-208/120V 225amp 3-phase 4 wire, Panel P3- 208/120V 400amp 3-phase 4 wire, and Panel L1-208/120V 225amp 3-phase 4 wire. We recommend removing and replace these power panels with like-in-kind Siemens, Eaton, Square D or equal manufacture panel boards.

Provide a lighting fixture with an IP66 rating in each the hangar alcoves. These lights should be controlled via occupancy sensors located inside each of the alcoves to detect someone standing/walking in the alcoves as well as an occupancy sensor located at the entrance to each alcove to detect someone entering the space. Provide recessed LED lighting bathrooms and surface mounted LED linear lighting in mechanical and utility rooms. Lighting controls in these areas shall comply with UFC 3-530-01 and consist on occupancy sensors with manual override switches. Existing combination exit sign/emergency lighting units, exit signs, and emergency lighting units shall be removed in the administrative areas of Building 1914. Provide new exit signs and emergency lighting units to cover all emergency paths of egress per the NFPA.

Provide a complete Lightning Protection System to include strike termination devices, conductors, ground terminals, interconnecting conductors, surge suppression devices, and other connectors and fittings. Lightning Protection System to tie into the existing grounding electrode systems at the hangar.

Perform a megger test on the existing grounding electrode system to confirm the maximum resistance to ground does not exceed 25 Ohms. Provide additional ground rods as required to achieve 25 Ohm resistance. Grounding shall comply with NEC and UFC requirement.

PART II SPECIFICATIONS

Technical Specifications have not been provided.

A. Division 01

01 10 00 DESIGN REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

B. Division 2 through 34

02 41 00 DEMOLITION AND DECONSTRUCTION

02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING

MATERIALS

02 83 13.00.20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING

PCBs AND MERCURY

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS

(PCBs)

04 20 00 UNIT MASONRY

05 05 23 WELDING, STRUCTURAL

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

06 10 00 ROUGH CARPENTRY

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

07 01 50.71 REHABILITATION OF METAL ROOFING (See special section attached and modify to conform to requirements indicated)

07 11 13 BITUMINOUS DAMPPROOFING

07 19 00 WATER REPELLENTS

07 21 13 BOARD AND BLOCK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 61 15.00 20 ALUMINUM STANDING SEAM METAL ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

08 11 13 STEEL DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANEL

08 71 00 DOOR HARDWARE

08 91 00 METAL WALL AND DOOR LOUVERS

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

12 48 13 ENTRANCE FLOOR MATS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 20.00 20 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS

22 00 00 PLUMBING, GENERAL PURPOSE

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

28 10 05 ELECTRONIC SECURITY SYSTEMS

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

31 00 00 EARTHWORK

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERS

PART III APPENDICES

APPENDIX A – Advanced Final Design Submission Comments/Responses

Project Title: Repair Roof & Fire Suppression Hangar 1, B1914;

Project Number: AJXF 16-1563

Contract Number: FA8903-15-D-0003-0004 Document Date: 29-Mar-19

Project Manager: Eric Staph Review Date:

Design Phase: Advanced Final Concept Design

Project Information:

1. The Government's review or acceptance does not relieve the contractor of his responsibility to provide a safe, functional project in accordance with the terms of the contract.

2. The Contractor shall respond to each comment with a response that clearly indicates what action will be taken. Comments that, in the Contractor's opinion, require effort outside the scope of the contract shall be clearly indicated as such by the Contractor.

3. Variations from contract requirements require both Designer of Record (DOR) and Government approval and will be considered where advantageous to Government.

Design Phase: Advanced Final Concept Design Date: 0-Jan-00 Project #: AJXF 16-1563 Contract #: FA8903-15-D-0003-0004

ITEM NO. REVIEWER DOC REFERENCE COMMENT RESPONDEE RESPONSE BACK CHECK

GENERAL Advanced Final

David Doyle, JBA 11CES

2019_0329 Design Analysis B1914

Please correct: outdated, unanswered versions of the RFI's, for all 3 buildings are in "Appendix B – RFIs, 3.

Unanswered". Many have been answered. Please update "Appendix B – RFIs, 2. Answered" as well.

GENERAL Intermediate

David Doyle, 11CES

All 3 design analyses G-001: typo in the title.

David Moran Concur. Will correct..

GENERAL Preliminary 01 M. Orozco Prelim Design Analysis Discipline specific QC checklists is missing (SOW

4.2 & 6.2.1) David Moran Concur. Will provide. Open: 20190226 B.

Kohpay QC Checklists are still missing from submittal

02 M. Orozco Prelim Design Analysis Cost estimate, although included, is not in CSI format

(SOW 6.4.3)

David Moran Concur. Will provide in the proper format in future…