STATEMENT OF WORK
For
Repair/Remodel Education Center Location Building: 1728
By: Mike Schubmehl
WORK ORDER NUMBER: 656946
DATED: 25 March 2019
1. GENERAL INFORMATION:
This project is intended to repair/remodel the education center in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB for the purpose of entry or egress is prohibited. The use of an alternative means of entry/egress (i.e. appropriate portable ladder/personnel lowering device) is authorized.
2. SCOPE: Renovate Building 1728
• Part 1: Hallway 140
• Remove 11’ of countertop
• Remove 11’ of base cabinets
• Patch existing wall
• Prime and paint walls using 2 coats Navajo white, latex, egg shell finish
• Install 11’ of upper wall birch cabinets
• Install fillers as needed
• Install 4’ of birch cabinets
• Install 4’ of Formica style countertop on new base cabinets (Color TBD)
• Install new toe kick around new cabinets to match cabinets
• Install new LED light fixture under cabinet in hallway 140
• Install 1 duplex outlet and comm. port at work surface counter
• Install 1 duplex outlet and comm. port on wall to accommodate printer and shredder
• Install provided carpet tiles as needed around new base cabinets
• Part 2
• Remove 6’ kitchen counter and sink
• Remove 6’ of kitchen cabinets and kitchen upper cabinets
• Remove all kitchen plumbing fixtures and hardware
• Remove all vinyl flooring and carpet in kitchen room 126 and room 127
• Save carpet tiles for reused in hallway 140 area, around new cabinets
• Remove 3 doors and frames in kitchen
• Remove door and frame in room 127
• Remove 12’ X 8’ of wall that separates kitchen and room 127 for new breakroom/kitchen area
• Remove 4 X 8’ of wall that separates kitchen and storage room 126
• Remove 6’ X 8’ wall that separates room 124 and 123
• Remove fire alarms strobes and horn from hallway
• Reconnect horn/strobe on opposite wall
• Remove 16’ X 8’ of wall that separates hallway and room 124 for new vending area
• Remove vinyl flooring in room 124
• All new walls to be 5/8” drywall with level four finish
• Install 3’ X 8’ of new wall where door was removed between kitchen and room 127
• Install 3’ X 8’ of new wall in hallway where door to kitchen was removed
• Install 6’ X 8” of new wall in room 124
• Prime and paint walls in new vending area and new kitchen/breakroom area using 1 coat of primer and 2 coats of Navajo White latex egg shell finish
• Install approximately 42’ soffit where walls removed
• Prime and paint soffit to match existing finish
• All trim to match existing finishes
• Patch and level floor
• Install vinyl composition in new breakroom/kitchen area (Color TBD)
• Install approximately 100 sq. ft. of vinyl composition tile in new vending area (Color TBD)
• Install approximately 200 sq. ft. of vinyl composition tile in new kitchen/breakroom area
(Color TBD)
• Install new rubber transition strips where existing carpet meets new VCT flooring
• Install approximately 100 linear feet of core base to match existing
• Re-route hot/cold water supply and drain to opposite floor/wall in kitchen
• Install 6’ of birch cabinets in kitchen
• Install new toe kick around new base cabinet in kitchen
• Install approximately 6’ of solid surface countertop with backsplash on top of base cabinet
• Properly caulk and seal countertop where it meets the wall (Color TBD)
• Install stainless steel sink in countertop
• Install all new necessary plumbing fixtures and hardware
• Install 6’ of wall mounted above countertop birch cabinets
• Install new GFI duplex outlet at kitchen countertop
• Install duplex outlet to the right of kitchen cabinets
• Install 4 duplex outlets in vending area 1 on each side wall and 2 on back wall evenly spaced
• Install 20’8” x 7’ X 9’ acoustic partition in classroom D on existing ceiling mounted track
• All removed items will be disposed of properly
3. GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form
f. Provide three (3) copies of O & M manuals and warranty letter
g. Period of Performance 60 days after award of contract
4. ADMINISTRATION:
Points of Contact (POC):
POC: Mike Schubmehl Phone Number. (781) 225-2958 Alternate POC: Roland Hartz Phone Number. (781) 225-5924