QUESTIONS_WO__66946_Building_upgrades_B1728.pdf

PDF 50 KB Posted

Attached to
WO #66948, Building Upgrades, Repair/Remodel
Solicitation number
FA283519RA054
Issued by

View the file

Other files

File Type Posted
ADDITIONAL_QUESTIONS_AND_ANSWERS.pdf PDF
Added_1728_DRAWING.pdf PDF
Revised_Statement_of_Work_B1728.pdf PDF
Statement_of_Work_B1728.pdf PDF
Solicitation_-_FA283519RA054.pdf PDF
1728_DRAWING.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WO # 66946, QUESTIONS FOR BUILDING UPGRADES, B1728

Is there a place to store the carpet to be reused in the hallway 140 area?

A: Yes there will be a room to store the carpet

Who is your contracted fire alarm company/contact for the strobes that will be relocated?

A: We have our own alarm group, contractor to find Company to move strobes

What type of vinyl tile is specified for the breakroom and kitchen area's?

A: Armstrong or equivalent 12” x 12” 1/8”

What type of cabinets are specified, are they to be "sevear Hud use"?

A: HUD use cabinets

Is there a specified type of plumbing fixtures to be used ?

A: Commercial grade kitchen

Do we supply the plumbing fixtures or just provide the installation?

A: You supply both

What type of acoustical partition is to be installed in classroom D? A: Manually operated accordion style, soundproof, sliding door

Who is responsible for install of vending machines?

What are the power requirements?

A: Not in contract

• Where are the lay down areas located?

Ie in the building some where

A: There will be space available to store supplies Storage Unit needed to be provided by contractor at nearest exterior egress location A: If you choose to have one you can.

1. Refence Site Demolition

a. Has a site survey been conducted of the property?

A: No site survey has been done

i. If so, is their a report available?

A: NA

2. Refence Temporary Controls

a. What Type of Construction Barriers are you looking for during construction? A: ZIP walls are acceptable

b. Wood Stud/ Plywood

i. Temp Doors

c. Wood Stud/ Gypsum

i. Temp Doors

d. Metal Stud/ Plywood

i. Temp Doors

e. Metal Stud/ Gypsum

i. Temp Doors

f. Zip Wall/ 6 Mil POLY

i. Zip Doors

3. Reference Kitchen Cabinets

a. Birch

i. What style doors shaker, Raised Panel etc.. ? A: Raised Panel Doors

ii. Cabinet Finish ? A: Satin Finish

iii. Hardware Type/Finish ? A: Satin finish round pulls/silver

iv. Soft Close Doors n Drawers? A: Soft Close

4. Refence: Counter tops

a. Solid Surface

i. Type Corian, Granite etc? A: Kitchen counter to be Corian B: Hallway counter to be Laminate

ii. 4” Intergal Back Splashes? A:Yes

5. Please confirm of the doors being removed none are being replaced with new. A: Correct

6. Ref Detection n Alarm

a. Who is the manufacture of the Current Alarm System installed in the building? A:

Mircom – FX2000

b. Are the annual reports up to date? A: Yes

c. What is the model of the Arm System Currently Installed? A: Mircom – FX2000

File details come from the government source that posted it.