Revised_Statement_of_Work_B1728.pdf
PDF 148 KB Posted
- Attached to
- WO #66948, Building Upgrades, Repair/Remodel
- Solicitation number
- FA283519RA054
About this file
Revised Statement of Work dated 14 August 2019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDITIONAL_QUESTIONS_AND_ANSWERS.pdf | ||
| Added_1728_DRAWING.pdf | ||
| QUESTIONS_WO__66946_Building_upgrades_B1728.pdf | ||
| Statement_of_Work_B1728.pdf | ||
| Solicitation_-_FA283519RA054.pdf | ||
| 1728_DRAWING.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Repair/Remodel Education Center
Location Building: 1728
By: Mike Schubmehl
WORK ORDER NUMBER: 66946
DATED: 25 March 2019
Revised: 14 August 2019
1. GENERAL INFORMATION:
This project is intended to repair/remodel the education center in accordance with all applicable
National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of
Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB for the purpose of entry or egress is prohibited. The use of an alternative means of entry/egress
(i.e. appropriate portable ladder/personnel lowering device) is authorized.
2. SCOPE: Renovate Building 1728
Part 1: Hallway 140
Remove 11’ of countertop
Remove 11’ of base cabinets
Patch existing wall
Prime and paint walls using 2 coats Navajo white, latex, egg shell finish
Install 11’ of upper wall birch cabinets/raised panel/ HUD/ Soft close doors and drawers
Round silver satin finish pulls
Install fillers as needed
Install 4’ of birch cabinets/raised panel/ HUD/ Soft close doors and drawers/Round silver satin finish pulls
Install 4’ of Formica style countertop on new base cabinets (Color TBD)
Install new toe kick around new cabinets to match cabinets
Install new LED light fixture under cabinet in hallway 140
Install 1 duplex outlet and comm. port at work surface counter
Install 1 duplex outlet and comm. port on wall to accommodate printer and shredder
Install provided carpet tiles as needed around new base cabinets
Part 2
Remove 6’ kitchen counter and sink
Remove 6’ of kitchen cabinets and kitchen upper cabinets
Remove all kitchen plumbing fixtures and hardware (Commercial Grade Chrome)
Remove all vinyl flooring and carpet in kitchen room 126 and room 127
Save carpet tiles for reused in hallway 140 area, around new cabinets
Remove 3 doors and frames in kitchen
Remove door and frame in room 127
Remove 12’ X 8’ of wall that separates kitchen and room 127 for new breakroom/kitchen area
Remove 4 X 8’ of wall that separates kitchen and storage room 126
Remove 6’ X 8’ wall that separates room 124 and 123
Remove fire alarms strobes and horn from hallway save to relocate
Reconnect horn/strobe on opposite wall
Remove 16’ X 8’ of wall that separates hallway and room 124 for new vending area
Remove vinyl flooring in room 124
All new walls to be 5/8” drywall with level four finish
Install 3’ X 8’ of new wall where door was removed between kitchen and room 127
Install 3’ X 8’ of new wall in hallway where door to kitchen was removed
Install 6’ X 8” of new wall in room 124
Prime and paint walls in new vending area and new kitchen/breakroom area using 1 coat of primer and 2 coats of Navajo White latex egg shell finish
Install approximately 42’ soffit where walls removed
Prime and paint soffit to match existing finish
All trim to match existing finishes
Patch and level floor
Install vinyl composition 12”x12” 1/8” thick (Armstrong or approved equal) in new breakroom/kitchen area (Color TBD)
Install approximately 100 sq. ft. of vinyl composition tile 12”x12” 1/8” thick (Armstrong or approved equal) in new vending area (Color TBD)
Install approximately 200 sq. ft. of vinyl composition tile 12”x12” 1/8” thick (Armstrong or approved equal)in new kitchen/breakroom area (Color TBD)
Install new rubber black transition strips where existing carpet meets new VCT flooring
Install approximately 100 linear feet of cove base to match existing
Re-route hot/cold water supply and drain to opposite floor/wall in kitchen
Install 6’ of birch cabinets in kitchen /raised panel/ HUD/ Soft close doors and drawers
Round silver satin finish pulls
Install new toe kick around new base cabinet in kitchen
Install approximately 6’ of solid surface countertop (Corian)with backsplash on top of base cabinet
Properly caulk and seal countertop where it meets the wall (Color TBD)
Install stainless steel sink in countertop
Install all new necessary plumbing fixtures and hardware (Commercial Grade Chrome)
Install 6’ of wall mounted above countertop birch cabinets/raised panel/ HUD/Soft close doors and drawers Round silver satin finish pulls
Install new GFI duplex outlet at kitchen countertop
Install duplex outlet to the right of kitchen cabinets
Install 4 duplex outlets in vending area 1 on each side wall and 2 on back wall evenly spaced
Install 20’8” x 7’ X 9’ acoustic partition in classroom D on existing ceiling mounted track
All removed items will be disposed of properly
Contractor to dispose of all construction debris properly (demo and created) off of
Hanscom AFB
3. GENERAL REQUIREMENTS:
Work includes, but is not limited to the following:
a. Provide resolutions of any technical problems that arise during the construction.
b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.
c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.
d. The Contractor is solely responsible for compliance with the Occupational Safety and
Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.
e. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form
f. Provide three (3) copies of O & M manuals and warranty letter
g. Period of Performance 60 days after award of contract
4. ADMINISTRATION:
Points of Contact (POC):
POC: Mike Schubmehl Phone Number. (781) 225-2958
Alternate POC: Roland Hartz Phone Number. (781) 225-5924