Tab_04_FTFA131096_SOW_Appendix_3.pdf
PDF 1 MB Posted
- Attached to
- CTG Modular Facilities Federal contract opportunity
- Solicitation number
- FA282318R4014
About this file
Appendix 3 Conceptual Design
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_8.4_Eglin_Architectural_Compatibility_Plan_2012_1.pdf | ||
| Site_Visit_Questions_10.02.18_RJC.pdf | ||
| Appendix_8.5_Eglin_FA_MNS.pdf | ||
| FTFA13-1096_-_SOW_-_Addenda_1_10.4.18.pdf | ||
| Appendix_8.7_Eglin_Design_Manual.pdf | ||
| Appendix_8.6_Eglin_Cable_Guide.pdf | ||
| Site_Visit_Sign-In_Sheet.pdf | ||
| Solicitation_Questions_-_Answered_RJC_9.25.18.docx | DOCX document | |
| FTFA_13-1096_Past_Performance_Information.pdf | ||
| Attach_D_-_Eglin_Specific_Contract_Language.pdf | ||
| FTFA_13-1096_SSP_1_Financial_Responsibility_Questionnaire.pdf | ||
| Wage_Determination.pdf | ||
| 50_Divisions_Cost_Estimate_w_Instructions.xls | XLS spreadsheet | |
| EAFB_Form_90_(2016).pdf | ||
| FTFA13-1096_-_SOW_-_8.17.18.pdf | ||
| FTFA_13-1096_Past_Performance_Questionnaire.pdf | ||
| FA282318R4014_CTG_Temp_Facility.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 8: Appendixes 190 | P a g e
APPENDIX 3 – CONCEPTUAL DESIGN – REFERENCE ONLY
NORTH
VICINITY PLAN
SCALE: N.T.S.
CBPO 210
CHOCTAWHATCHEE AVENUE
FL
O
R
ID
A
"B" AVENUE
"C" AVENUE
"D" AVENUE
S E
C O
N D
S
TR
E E
T
FO
U
R
TH
S
TR
E E
T
EGLIN
B
OULE
VARD
SIXTH STREET
SEVENTH STREET
EIGHTH STREET
DAYTONA R
OAD HY
M
ES
R
OA
D
OCA
LA
R
OAD
W
AC
ISSA R
O
AD
FI
FT
H S
TR
E
E T
TH
IR
D S
TR
E
E T
DADE RD.
VAN MATRE AVENUE
A V
E
GEORGIA AVENUE
CHAPEL - 1
35 36 37 38
27 28 29
32 33
12 6
17 2
228 230
303 373 375 38
11 21
A
PRIMES
PHOTO LAB
272SECURITY
POLICE
72 71
CONF
CEN
TELE.
BLDG.
CREDIT
UNIO
N
NCO C
LU
B
TOWER
A/C
WASH
BASE
SUPPLY
Section 8: Appendixes Page 191
SS
W
W
W
W
W
W
W
W
W
W
W
W
OHE
UCOM
UCOM
UCOM
PMT
PIV
F/H
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
UCOM
G
SS
SS
SS
SS
SS
SS
SS
OHE
OHE
OHE
OHE
OHE
OHE
OHE
G
G
G
G
G
G
G
G
UCOM
UCOM
UCOM
UCOM
UCOM
NORTH
SITE/UTILITY PLAN
COMM MANHOLE
PMT
PAD MOUNTED TRANSFORMER
OHE OVERHEAD ELECTRIC
W WATER LINE
UCOM UNDERGROUND COMMUNICATIONS
SD STORM DRAIN
Section 8: Appendixes Page 192
FLOOR PLAN
Section 8: Appendixes Page 193
NORTH ELEVATION
SOUTH ELEVATION
EAST ELEVATION
WEST ELEVATION
Section 8: Appendixes Page 194
FURNITURE PLAN
Section 8: Appendixes Page 195
| FTFA 13-1096_Plan Set 7.2.18.pdf |
| Swingspace Trailer Layout V4-G-100 |
| Swingspace Trailer Layout V4-C-101 |
| Swingspace Trailer Layout V4-A-101 |
| Swingspace Trailer Layout V4-A-201 |
| Swingspace Trailer Layout V4-I-101 |
File details come from the government source that posted it.