Amendment__3.pdf
PDF 53 KB Posted
- Attached to
- Construct Variable Height Tower Federal contract opportunity
- Solicitation number
- FA2823-14-R-6024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A__2.pdf | ||
| Base_Access_Memorandum_Template.doc | DOC document | |
| Q A.pdf | ||
| Amendment_02.pdf | ||
| 07_56_10.pdf | ||
| FA2823-14-R-6024-0001.pdf | ||
| Div_14 _Sec_14_24_00.pdf | ||
| Table_of_Contens.pdf | ||
| Attachment_4_-_Contract_Bonds_Checklist.pdf | ||
| Attachment_2_-_Specifications_-_11_July_2014.pdf | ||
| Attachment_11_-_Site_Visit_Driving_Directions.pdf | ||
| Attachment_9_-_CAB_Affidavit.pdf | ||
| Attachment_5_-_Past_Performance_References_(APP_A).pdf | ||
| Attachment_8_-_Wage_Determination.pdf | ||
| Attachment_1_-_SOW_-_24_July_2014.pdf | ||
| SF_1442_-_FA2823-14-R-6024.pdf | ||
| Attachment_6_-_Past_Performance_Questionnaire_(APP_B).pdf | ||
| Attachment_3_-_Drawings_-_11_July_2014.pdf | ||
| Attachment_10-_Base_Access_Memorandum_Template.pdf | ||
| Attachment_7_-_Financial_Responsibility_Questionnaire_(APP_C).pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1TBAU4133A001 FTFA 13-3005
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Correct the Bid Guarantee from Section L to match Section I FAR clause 52.228-1 Bid Guarantee amount.
2. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Oct-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2823-14-R-6024
X 9B. DATED (SEE ITEM 11)
04-Sep-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Oct-2014
CODE
AFTC/PZIO EGLIN - FA2823
308 WEST D AVENUE, SUITE 130 (BLDG 260)
EGLIN AFB FL 32542-5418
FA2823 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA2823-14-R-6024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
The purpose of this Amendment is to:
1. Correct the Bid Guarantee from Section L to match Section I FAR clause 52.228-1 Bid Guarantee amount.
2. All other terms and conditions remain unchanged.
Section L – Instructions to Offerors
Paragraph a.- Proposal Preparation Instructions- 4. Specific Instructions for Volume I – Price Proposal iv. has been updated to reflect the following:
In accordance with block 13 of the SF 1442, a Bid Guarantee is required (See contract clause 52.228-1). The Bid Guarantee shall be 20% of the offered amount and must accompany the proposal submission.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
INSTRUCTIONS TO OFFERORS
a. PROPOSAL PREPARATION INSTRUCTIONS
1. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet the Request for Proposal (RFP) requirements, including terms and conditions, representations and certifications, and requirements as defined in the specifications and drawings. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the RFP terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Volume I - Price Proposal, Volume II - Past Performance Information, and Volume III - Past Performance References. For all volumes you must submit an original and two (2) hard paper copies and also place all Volumes on a Compact Disc (CD).
Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government intends to make an award based on the initial offers received, without discussion of such offers.
In proposal volumes, follow the quantity and page limits as follows:
Volume Copies Page Limits Volume I – Price Proposal Original + (2) copies No page limit
Financial Responsibility Original + (2) copies No page limit Questionnaires (Appendix C)
Amendments (if any) Original + (2) copies No page limit
Completed Standard Form 30
Volume II – Past Performance Information Original + (2) copies 10 pages
Volume III – Past Performance References Original + (2) copies No page limit (Appendix A)
Completed Past Performance Original + (2) copies No page limit Questionnaires (Appendix B)
NOTE 1. Provide the form at Appendix A of not more than five (5) references of the most relevant contracts performed for federal agencies and commercial customers within the last three (3) years as part of Volume III. If the Offeror is a Joint Venture or utilizing significant subcontractors, in addition to the five
(5) references for the prime, the Offeror may provide up to five (5) additional references for the Joint Venture or each significant subcontractor. In addition, the Offeror is responsible for providing the Government the completed Appendix B questionnaires provided back to the Offeror by their references as part of Volume III.
NOTE 2. Joint ventures are considered as affiliated and controlling or having the power to control each other with regard to performance of the contract.
NOTE 3. A significant subcontractor is defined as a contractor who performs 25% or more of the aggregate of the entire project.
2. Proposal Organization: The paper files will be checked to determine the number of pages and compliance with proposal instructions. Those pages in excess of the limit of Volume II will be removed from the back and returned by the PCO to ensure they are not evaluated. The Government will not keep any pages in excess of the limit. If Evaluation Notices (EN’s) are required, page limits may be placed on any responses. Any page limits for responses to ENs will be identified in the letter forwarding the ENs to you. Excess pages submitted in response to EN’s will be removed in the same manner as above by the
PCO.
3. Format for all proposal Volumes shall be as follows:
i. Proposals shall be neat, indexed (cross-indexed as appropriate) and assembled in an orderly manner.
ii. Page Set-Up/Font Size/Lines on Page: Only 8 ½ x 11 inch, portrait format pages are acceptable for text-oriented material. Landscape (8 ½ x 11 inch) pages are permitted for charts or graphs. Foldout pages are limited to 11 x 17 inch and may be portrait or landscape (limit 5). Text shall be written in full text. Text font shall be Times New Roman (No “narrow” font versions acceptable). Font size shall be 12 point with proportional spacing permitted. Type size for figures and tables must be no smaller than 8-point with proportional spacing permitted. Text may be wrapped around figures and tables. Margins on all four (4) edges of each page shall be at least 1 inch. Include: RFP number, Volume and/or subdirectory title and page number in the margin on the upper right of all pages. Single spacing may be used for figures and tables. Company name and proprietary information notices shall be placed on top and/or bottom margins. Use single column formatting only; multi-column formatting is not allowed. Graphics are allowed in either color or black and white with an 8-point minimum on embedded text except where data is only being used as a sample and readability is not intended. Proposals shall not be supplemented by a package or supplemented by reference documents. Elaborate formats, bindings or color presentations are not desired or required.
iii. Page Definition: A page is defined as one face of a sheet of paper containing information.
iv. Page Numbering: Pages in each volume must be numbered sequentially and consecutively.
The cover page, table of contents, list(s) of tables and drawings, and blank pages are excluded from the page count.
v. Text and graphics portions of the electronic copies shall be in a format readable by Microsoft (MS) Word 2003 or higher or Adobe PDF. Data submitted in spreadsheet format shall be readable by MS Excel 2003 or higher. In case of conflict between the paper copy and the electronic copy of the proposals submitted, the paper copy shall take precedence. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government intends to make an award based on the initial offers received, without discussion of such offers.
vi. It is preferred that the volumes are not submitted in hard cover binders or spiral bound.
4. Specific Instructions for Volume I – PRICE PROPOSAL
i. Complete blocks 14 (to include CAGE Code), 15, 16, 17, 19 (if applicable), and 20A-C of the Standard Form (SF) 1442, Solicitation, Offer, and Award. An authorized official of the firm must sign and date the SF 1442 in Blocks 20A-C. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP Sections A through J. These sections constitute the model contract.
ii. Insert proposed unit prices in Section B for each Contract Line Item Number (CLIN). An Offeror’s proposed prices will be determined by multiplying the quantities identified in Section B by the proposed unit Price for each CLIN to confirm the extended amount for each. The extended amounts will be added together to determine the Offeror’s Total Evaluated Price (TEP).
iii. Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety with your Price proposal. For Sections C through I, the Offeror shall submit only those pages that require a fill-in. The Offeror’s online Representations and Certifications record must be current, accurate and complete within the System for Award Management (SAM). For additional information, reference https://www.sam.gov/portal/public/SAM/.
iv. In accordance with block 13 of the SF 1442, a Bid Guarantee is required (See contract clause 52.228-1). The Bid Guarantee shall be 20% of the offered amount and must accompany the proposal submission.
v. Submission of the financial questionnaire is required to be submitted by the Offeror on the Appendix C form(s) in regards to having, or having the ability to obtain, adequate financial resources to cover the contract. The Appendix C form shall be completed by the Offeror's main financial banking institution, and may be completed for the Offeror's suppliers and/or from other businesses having financial affairs with the Offeror. This information is to guide the Contracting Officer in determining whether or not the Offeror has the necessary financial resources to perform the contract or has the ability to obtain them prior to award in accordance with FAR 9.104-1(a).
Information submitted on Appendix C form(s) is not a technical factor and will not be evaluated.
Rather, this information is required by the FAR in order to be eligible for award and is submitted in advance to expedite the Contracting Officer's determination of Offeror responsibility prior to contract award. Please submit the advanced copy of Appendix C via email to jonathan.esquivel.2@us.af.mil and courtesy copy (CC) karen.wagner.1@us.af.mil no later than (NLT) 1600 on 24 September 2014.
vi. The Procuring Contracting Officer (PCO) has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the Contracting Officer’s opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the PCO determines that adequate price competition no longer exists; Offerors may be required to submit information to the extent necessary for the PCO to determine the reasonableness and affordability of the Price. In accordance with FAR 15.403-1(b) and 15.403-3(a), data other than cost or pricing data may be required to support price reasonableness and realism. Data shall be provided in accordance with FAR 15.403-5. If, after receipt of proposals, the PCO determines that there is insufficient information available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the Offeror shall be required to submit certified cost or pricing data. Should adequate price competition not exist after receipt of proposals, the provisions of FAR Part 15.403-4 shall apply, and the Offeror will be asked to provide certification of cost or pricing data.
5. Specific Instructions for Volume II – PAST PERFORMANCE PROPOSAL
Only information for same or similar type contracts as defined in the relevant definition in paragraph 5ii are desired. This includes Past Performance for major subcontractor who performed 25% of the aggregate of the project. Provide any information available (i.e. descriptive language, letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed projects for same or similar type contracts completed within the last three years as well as current projects nearing completion. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as extended performance periods, numerous warranty calls, etc. Provide comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions. If applicable, provide a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their Past Performance information to the prime Offeror. Past Performance regarding predecessor companies, key personnel who have recent and relevant experience, or subcontractors that will perform major or critical aspects of the requirement WILL NOT be rated as highly as Past Performance information for the principal Offeror.
RECENT AND RELEVANT INFORMATION For the purpose of this RFP, recent and relevant Past Performance is defined as:
i. RECENT – Ongoing contracts with a performance history, and contracts completed or near completion within three (3) years from the issue date of this RFP (see SF 1442, Block 3).
ii. RELEVANT – Performance of construction work which is the same or similar in scope, magnitude, trade, and complexity, as described in the RFP, including the specifications and drawings, contract type, contract environment, subcontractor interaction, and Price. Relevant contracts include experience as a prime contractor and/or Joint Ventures or Significant Subcontractor expertise in the area of construction activities with a focus on tall steel structures (tall structures are considered structures above three stories), variable height buildings, and concrete foundations that include pumping and vibration around rebar mats as well as experience with anchor bolts.
6. Specific Instructions for Volume III –PAST PERFORMANCE REFERENCES
i. Only references for same or similar type contracts are desired.
ii. The Government will evaluate the quality and extent of Offeror’s performance deemed recent and relevant to the requirements of this RFP. The Government will use information submitted by the Offeror on the Appendix A and Appendix B forms, the Past Performance Proposal, and other sources such as other federal Government offices and commercial sources, to assess performance.
The Government may also use other information available that is determined relevant to this effort, such as, but not limited to, the Construction Contractor Appraisal Support System (CCASS) or the Contractor Performance Assessment Reporting System (CPARS). Recent and relevant contracts include contracts that meet the recent and relevancy definitions detailed below.
iii. Teaming Arrangement or Joint Venture: If the Offeror intends to fulfill the requirements of this RFP in a teaming arrangement or joint venture, the Offeror must provide complete information as to the arrangement, including a list of any relevant and recent past/present performance information on previous teaming arrangements or joint ventures with the same teaming or joint venture partner. If this is a first-time joint effort, each party to the arrangement must provide a list of past and present contracts. Please reference Note 1 above for rating information.
iv. If the Offeror intends to fulfill the requirements of this RFP with a significant subcontractor, the Offeror must provide a list of any relevant and recent past/present performance information demonstrating that the significant subcontractor performed 25% or more of the relevant project.
Please reference Note 1 above for rating information.
7. Additional Instructions
i. Deviations. Deviations from these instructions will be reviewed by the Contracting Officer to ensure that no Offeror receives a competitive advantage. Deviations resulting in a competitive advantage for an Offeror will result in the proposal being determined noncompliant with the RFP requirements. Offerors unconditionally assume the risk that a clear quantitative deviation will be deemed qualitatively advantageous to the Offeror and determined noncompliant with the RFP.
ii. Disposition of Unsuccessful Proposals. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the Offeror requires otherwise, the Government will destroy extra copies of unsuccessful proposals.
iii. Proposal Delivery. Anticipate a three (3) to five (5) day lead time for Security Forces to process the documents and conduct the required background check. To get base access in time to submit proposal by due date of 6 October 2014 base access forms MUST be submitted no later than 1300 on 29 September 2014. Base passes cannot be picked up until 29 September 2014.
For base access see para 7iv. Offerors are advised that delays can be experienced entering the installation when proposals are hand carried to the base. See below instructions for specific requirements to access the installation. In addition to the specific instructions below; vehicle registration, proof of insurance and proper identification are required to enter the installation.
Proposals must be either hand delivered or mailed to arrive at the following address by the required dates:
AFTC/PZIE
ATTN: JONATHAN J. ESQUIVEL
308 WEST D AVENUE, BUILDING 260, SUITE 130
EGLIN AFB FL 32542
Hand carried proposals must be submitted to Building 260, Room 130, Eglin AFB, FL. Please call the Contract Specialist or Contracting Officer to notify once your delivery is made. All Offerors' proposals must then be date/time stamped listed on the proposal envelope/package by the Contract Specialist or Contracting Officer. Outside the front door of the Contracting Office, Suite 130 is a table that contains all of the telephone numbers of personnel in Operational Contracting.
The envelope used in submitting your proposal must be plainly marked with the RFP number, and the date and local time set for proposal closing. NOTE) It is imperative that an Offeror intending to deliver their proposal by commercial carrier, e.g. Federal Express, DHL, UPS, etc., insure that the outer envelope of the commercial carrier’s package identifies the contents as a proposal. This outer package must clearly show the RFP number and the date and local time set for proposal closing.
iv. BASE ACCESS FOR SITE VISIT AND PROPOSAL SUBMISSION: If requesting base access, the Offeror must submit a completed Eglin AFB Form 90 (Attachment 9) and a written request, i.e. Memorandum (Template-Attachment 10) on company letterhead to the Contracting Officer (jonathan.esquivel.2@us.af.mil) and the secondary Contracting Officer (karen.d.wagner@us.af.mil) listing the following: the RFP number FA2823-14-R-6024, date of entrance, complete name and SSN/Date of Birth /Drivers License #/State of employee needing access to the base. Please note that any body modifications or tattoos must be described on the affidavit, along with the location of the body modification or tattoo. The written request must specify the individual authorized to sign for a request for base identification credentials or temporary pass. The Contracting Officer or Contract Specialist will endorse the pass request memorandum and then send it with the affidavit to Security Forces for processing.
To gain base access in time for the site visit the Offeror must submit base access forms no later than 10 September 2014, 1:00 p.m. Central Standard Time (CST) for Security Forces to process the documents and conduct the required background checks. Access on both forms should only be for Site C-86 and Eglin AFB North Gate on 16 September 2014 from 2:30-4:00 p.m.
Please do not alter the location or the date/time on the Memorandum Template (Attachment 8) for base access in order to attend the site visit; access will be limited to the aforementioned times only. *Please make sure that the above location and date/time are on the affidavit(s) submitted. When reporting to the visitor’s center to pick up the pass, the authorized individual(s) should provide a valid photo ID in order to obtain the temporary pass. Offerors are notified that they should not expect to get on base with a retired military or dependent ID card; Security Forces does not allow the use of these cards when contractors are doing business on the base.
v. Site Visit: The site visit will be held on 16 September 2014, 2:30 p.m. CST. Offerors will go to site C-86 Eglin AFB within 10 minutes of start time. Offerors will meet at the C-86 gate at 8:30 a.m. CST. Offerors will be granted access and drive through the gate, see attachment # 11 for driving directions.
vi. Electronic Reference Documents. All referenced documents for this RFP are available on the Federal Business Opportunities (FedBizOpps) website at http://www.fedbizopps.gov. Potential Offerors are encouraged to subscribe for real-time email notifications when information has been posted to the website for this RFP.
vii. Formal Communications: Offerors shall submit formal communications such as questions, requests for clarifications, and/or information concerning this RFP, in writing (email is considered the recommended method) to the following address NO LATER THAN TEN (10) CALENDAR DAYS PRIOR TO THE PROPOSAL DUE DATE to allow processing an amendment to the RFP with the Offeror’s questions and answers.
AFTC/PZIE
ATTN: JONATHAN J. ESQUIVEL
308 WEST D AVENUE, BUILDING 260, SUITE 130
EGLIN AFB FL 32542
Email: jonathan.esquivel.2@us.af.mil
8. RELATIONSHIP BETWEEN SECTION L, INSTRUCTIONS AND SECTION M, EVALUATION
Your attention is directed to the functional relationship between Section L above and Section M below of this RFP. Section L provides information for the purpose of organizing the proposal and is not intended to be all-inclusive. Section M describes evaluation factors for award, to include the evaluation procedures for responsiveness to the RFP, ranking of the Price proposal, and the assessment of Past Performance information. PROPOSALS THAT DO NOT CONTAIN THE INFORMATION REQUESTED BY SECTION L MAY BE REJECTED. Since there is a functional relationship between Section L and M the proposals must address all areas identified for both sections.
(End of Summary of Changes)