Appendix_C_Technical_Evaluation.pdf
PDF 96 KB Posted
- Attached to
- Timber Stand Improvement - Eglin AFB, FL
- Solicitation number
- FA2823-14-R-4031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TSI_Questions-Answers_29Aug14.pdf | ||
| Appendix_A_Bid_Schedule.pdf | ||
| Addendum_to_FAR_52.212-1.pdf | ||
| Evaluation_-_Commercial_Items.pdf | ||
| TSI_PWS-18_Aug_2014.pdf | ||
| Apendix_B_Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C Technical Evaluation
FA2823-14-R-4031 Timber Stand Improvement Eglin AFB, FL
When filled in, this document is Source Selection Sensitive
Information IAW FAR 3.104
DO NOT RETURN WITH PROPOSAL
INDIVIDUAL RATING TEAM WORKSHEET
Requirement: Sand Pine Removal Date: ___________
Solicitation Number: FA2823-14-R-4031
OFFEROR:
INITIAL EVALUATION FINAL EVALUATION
TECHNICAL ACCEPTABILITY
Acceptable Unacceptable
FACTOR 1: MANAGEMENT CAPABILITY
Subfactor (1): Provide an organization structure – chain of Acceptable Unacceptable responsibility clearly shows capability of meeting all the PWS requirements
Subfactor (2): Description of on-site organization showing Acceptable Unacceptable the capability to manage day-to-day operations.
Subfactor (3): Licensing/certification of required personnel. Acceptable Unacceptable
FACTOR 2: REQUIREMENT SPECIFIC ABILITIES
Subfactor (1): CREW MAKEUP: Number and suitability to Acceptable Unacceptable perform quality work at the required pace of production.
Subfactor (2): PPE and Safety Practices Acceptable Unacceptable
Subfactor (3): List experience with work on a military Acceptable Unacceptable reservation or area with restricted access.
Subfactor (4): Describe care of natural resources, including Acceptable Unacceptable disposal of trash/debris, and care for improve-ments.
Subfactor (5): Equipment suitability: The number, Acceptable Unacceptable maintenance, and condition of equipment needed to perform the job efficiently
Appendix C Technical Evaluation
FA2823-14-R-4031 Timber Stand Improvement Eglin AFB, FL
When filled in, this document is Source Selection Sensitive
Information IAW FAR 3.104
STRENGTHS: (If needed, Use the continuation sheet)
DEFICIENCIES: (If needed, Use the continuation sheet )
NARRATIVE (Explain how proposal exceeds or fails to meet the requirements. If exceeds, explain how it benefits the Air Force.) (If needed, use the continuation sheet)
Evaluator’s Name _______________________
Office symbol: _________________________
E-mail address: _________________________
SIGNATURE SIGNATURE (Lead Technical Evaluator)
File details come from the government source that posted it. Updated .