Appendix_C_Technical_Evaluation.pdf

PDF 96 KB Posted

Attached to
Timber Stand Improvement - Eglin AFB, FL
Solicitation number
FA2823-14-R-4031
Issued by

View the file

Other files

File Type Posted
TSI_Questions-Answers_29Aug14.pdf PDF
Appendix_A_Bid_Schedule.pdf PDF
Addendum_to_FAR_52.212-1.pdf PDF
Evaluation_-_Commercial_Items.pdf PDF
TSI_PWS-18_Aug_2014.pdf PDF
Apendix_B_Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix C Technical Evaluation

FA2823-14-R-4031 Timber Stand Improvement Eglin AFB, FL

When filled in, this document is Source Selection Sensitive

Information IAW FAR 3.104

DO NOT RETURN WITH PROPOSAL

INDIVIDUAL RATING TEAM WORKSHEET

Requirement: Sand Pine Removal Date: ___________

Solicitation Number: FA2823-14-R-4031

OFFEROR:

INITIAL EVALUATION FINAL EVALUATION

TECHNICAL ACCEPTABILITY

Acceptable Unacceptable

FACTOR 1: MANAGEMENT CAPABILITY

Subfactor (1): Provide an organization structure – chain of Acceptable Unacceptable responsibility clearly shows capability of meeting all the PWS requirements

Subfactor (2): Description of on-site organization showing Acceptable Unacceptable the capability to manage day-to-day operations.

Subfactor (3): Licensing/certification of required personnel. Acceptable Unacceptable

FACTOR 2: REQUIREMENT SPECIFIC ABILITIES

Subfactor (1): CREW MAKEUP: Number and suitability to Acceptable Unacceptable perform quality work at the required pace of production.

Subfactor (2): PPE and Safety Practices Acceptable Unacceptable

Subfactor (3): List experience with work on a military Acceptable Unacceptable reservation or area with restricted access.

Subfactor (4): Describe care of natural resources, including Acceptable Unacceptable disposal of trash/debris, and care for improve-ments.

Subfactor (5): Equipment suitability: The number, Acceptable Unacceptable maintenance, and condition of equipment needed to perform the job efficiently

Appendix C Technical Evaluation

FA2823-14-R-4031 Timber Stand Improvement Eglin AFB, FL

When filled in, this document is Source Selection Sensitive

Information IAW FAR 3.104

STRENGTHS: (If needed, Use the continuation sheet)

DEFICIENCIES: (If needed, Use the continuation sheet )

NARRATIVE (Explain how proposal exceeds or fails to meet the requirements. If exceeds, explain how it benefits the Air Force.) (If needed, use the continuation sheet)

Evaluator’s Name _______________________

Office symbol: _________________________

E-mail address: _________________________

SIGNATURE SIGNATURE (Lead Technical Evaluator)

File details come from the government source that posted it. Updated .