Furniture_.doc
DOC document 38 KB Posted
- Attached to
- SMC Furniture Federal contract opportunity
- Solicitation number
- FA254319RA007
- Issued by
- Department of the Air Force
About this file
Solicitation verbiage
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SMC_Furniture_Questions_and_Answers.pdf | ||
| Attachment_A1__Panelboard_Directory_-_LP7TS3.pdf | ||
| Attachment_A3__Panelboard_Directory__B430_-_C1.pdf | ||
| Attachment_A2__Panelboard_Directory_ITOC_-_LP2TS3.pdf | ||
| Visit_Authorization_Memo.pdf | ||
| Visit_Authorization_Memo.pdf | ||
| Attachment_B2__Building_430,_Rm_121__Drawings.pdf | ||
| Attachment_D2__Building_431_Rm_121_Drawings.pdf | ||
| Attachment_C2__Building_431,_ITOC__Drawings.pdf | ||
| Solicitation_-_FA254319RA007.pdf | ||
| PWS__Furniture_Replacement_Project.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SMC Modular Furniture Solicitation Verbiage
1. The Space & Missile System Center is looking for a commodity purchase of modular furniture to be installed in Bldg. 430/431 on Buckley Air Force Base, Colorado.
2. The government intends to award a firm fixed price contract to the responsible contractor who provides a reasonably priced, technically acceptable proposal. The offeror has to meet the requirements found in the Performance Work Statement (PWS), dated 8 February 2019.
3. The Contractor shall submit their proposals IAW the attached SF1449, FA254319RA007.
4. Only a technically acceptable offer will be considered. The Government intends to evaluate your offer and make award without discussions, however, this does not preclude the Government from having discussions if it is in the best interest of the Government. The Government will not reimburse your company for cost to provide a response to the subsequent solicitation notice.
5. This requirement does not currently have an established date for a site visit, however any contractor seeking a site visit must submit their respective requests to A1C Hunter Berry at hunter.berry@us.af.mil by NLT 06 March 2019 at 1300 (MST/MDT).
6. All Request for Information (RFI) must be submitted to A1C Hunter Berry at hunter.berry@us.af.mil by NLT 1300 (MST/MDT) on 08 March 19.
7. Submit your signed and dated offer at or before the exact specified time in the FA254319RA007 solicitation. Proposals are due NLT 12:30 PM (MST) on 15 March 2019. The Government will award a contract resulting from this solicitation to your company only if your proposal conforming to the solicitation will be advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate your offer:
BASIS OF AWARD: Lowest Priced, Technically Acceptable (LPTA) Award will be made to your company if found technically acceptable and provides a reasonably priced quote.
In order to be deemed technically acceptable, the product proposed must meet the required salient characteristics listed in the PWS, dated 8 February 2019.
IAW FAR 13.106-1—Soliciting Competition:
(a) Considerations. In soliciting competition, the contracting officer shall consider the guidance in 13.104 and the following before requesting quotations or offers:
(1)
(i) The nature of the article or service to be purchased and whether it is highly competitive and readily available in several makes or brands, or is relatively noncompetitive.
(ii) An electronic commerce method that employs widespread electronic public notice in not available; and
(iii) The urgency of the proposed purchase.
(iv) The dollar value of the proposed purchase.
(v) Past experience concerning specific dealers’ prices.
(2) When soliciting quotations or offers, the contracting officer shall notify potential quoters or offerors of the basis on which award will be made (price alone or price and other factors, e.g., past performance and quality). Contracting officers are encouraged to use best value. Solicitations are not required to state the relative importance assigned to each evaluation factor and subfactor, nor are they required to include subfactors.
The evaluation process will proceed as follows:
a) Technical Acceptability: the lowest offeror will then be ranked according to Technically Acceptable/Unacceptable based on the following technical qualifications:
i. Service(s) with description, specifications, and/or standards
ii. Technical Approach
iii. If the first lowest proposal is determined to be technically acceptable that offer represents the Best Value for the Government and the evaluation process stops at this point. Award will be made to that offeror without further consideration of any other offers. If the first lowest proposal is not deemed technically acceptable, the next lowest offer will be evaluated until an offer is deemed technically acceptable. The Government reserves the right to seek information on higher priced offerors if none of the lower priced offerors receive a Technically Acceptable rating.
KYLE M. THOMAS, TSgt, USAF
CONTRACTING OFFICER
File details come from the government source that posted it.