This is a Questions and Answers (Q&A) document for a federal contract solicitation for corrosion control painting services on a CONEX container at Building 417 for the Space Force.
The work involves surface preparation and painting of a container using Sherwin-Williams Pro-Cryl primer and Sherwin-Williams Acrolon 218 HS in RAL1001 color with a satin finish. The contractor is responsible for conducting all soluble salt testing using CHLOR*TEST or approved equal, and for all paint thickness measurements in compliance with the SOW/Specs and manufacturer recommendations. Existing labels, decals, and stickers require coordination with the Government Representative to determine which items should be removed and which should remain with suitable protection; all current facility markings must be preserved or repainted as directed. The Space Force will provide a water spigot and 120v/15a electrical power on site. Proposal submissions must include drawings are not required, but submittals must comply with paragraph 3.5 of the SOW/Specs and demonstrate technical capability including product characteristics and installation services. The schedule may be submitted in MS Word, Excel, or Project format and should include specific project phases: submittal, mobilization, surface preparation, painting, and cleanup. Award decisions will be based on technical acceptability, price, and schedule, with the final selection representing best value to the Government and not necessarily the lowest priced offer. Answers to questions regarding bid bond requirements and site visit scheduling are "Pending Knowledge Build" (PKB), as is the requirement for the SF1449 form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A #2 Conex Corrosion Control, Bldg 417
Please confirm whether the existing labels, decals, and stickers on the container shall be protected and maintained, or if they may be removed and replaced during painting operations.
Answer: Per the SOW/Specs:
• Para 3.0: “Anticipated work includes but is not limited to: Removal of minor appurtenances to access concealed surfaces and reinstallation after preparation and painting.”
• Para 3.10b: “Coordinate with and obtain approval from the Government regarding which items are to be removed and which may remain in place with suitable protection.”
• Para 5.8: “Contractor shall preserve or repaint all current facility markings, as directed by the Government Representative.”
Please confirm whether the Space Force will accept soluble salt testing performed directly by the Contractor using CHLOR*TEST or approved equal, or if testing is required to be performed by an independent third party.
Answer: The contractor is responsible for conducting all soluble salt testing per the SOW/Spec.
Please confirm whether the Space Force will provide connection point, water, and electrical power.
Answer: Water spigot and 120v/15a power is available on site.
Please confirm the required final finish sheen for the coating system:
• flat, satin, semi-gloss, or gloss.
Answer: Satin
RFI #1 – Existing Labels and Stickers
RFI #2 – Soluble Salt Testing
RFI #3 – Utilities Availability
RFI #4 – Final Finish Sheen
RFI #5 – Paint Thickness Measurements
Please confirm whether the Space Force will perform paint thickness measurements (DFT/WFT) during the project. Please also confirm:
• whether measurements will be taken for each applied coat,
• the minimum required mil thickness per coat, and the total required final coating system thickness
Answer: The contractor is responsible for conducting all paint thickness measurements.
Measurements and coat thickness will comply with the SOW/Specs and paint manufacturer recommendations.
Please provide the SF1449 form referenced within the solicitation documents for proposal submission purposes, if required by the Space Force.
Answer: PKB
Please confirm the specific Sherwin Williams “Pro Industrial” finish coat product required for this project, as the Pro Industrial product line includes multiple coating systems such as:
• Waterbased Alkyd Urethane
• Acrylic
• Urethane
• DTM
• Multi-Surface
Answer: Para 4.4 is amended as follows: “Color and paint type shall be Sherwin-Williams Pro- Cryl primer and Sherwin-Williams Acrolon 218 HS, RAL1001, or approved equal.”
1. Is a bid bond required?
Answer: PKB
2. Is a site visit going to be scheduled?
Answer: PKB
3. The solicitation states in the General Information section: “The quote shall provide
RFI #6 – SF1449 Form
RFI #7 – Finish Coat Specification sufficient detailed information which demonstrates their technical capability, including product characteristics, installation services, design capability.” What design is necessary for this simple project? 35%, 65% 100% with full specs and drawings?
Answer: Drawings are not required. Submittals shall comply with paragraph 3.5 of the SOW/Specs.
4. The solicitation states in 52.212-2 “The following may be considered when evaluating offers: technical acceptability, price, and schedule. The review will result in the selection of the offer that represents the best value to the Government.
Important Note: The final selection may not be the lowest priced offer.” What kind of schedule is required? Is Microsoft Project acceptable?
Answer: MS Word, Excel or Project are acceptable. The schedule shall provide specific project details, such as submittal phase, mobilization, surface preparation, painting and cleanup.