Attach 8 - Drawings-100% AV SYSTEM MODIFICATIONS.pdf
PDF 1014 KB Posted
- Attached to
- ER STARS Relocation, CCAFS, FL Federal contract opportunity
- Solicitation number
- FA252120B0005
About this file
This package includes construction drawings and specifications for the relocation of equipment and personnel offices from Facility 1704 to Facility 85 125, Rooms 203, 204, and 205 at Cape Canaveral Air Force Station in Florida. The scope of work involves architectural, interiors, mechanical, fire protection and electrical construction services to outfit the new spaces. Drawings cover demolition plans, floor plans, reflected ceiling plans, equipment layouts, building sections, elevations, and construction details. Mechanical drawings include general notes, abbreviations, legends, demolition plans, floor plans, raised floor plans, details and schedules. Electrical drawings cover general notes, symbols, demolition plans, equipment power plans, receptacle plans, lighting plans, details, single line diagrams and panel schedules. Fire alarm and communications drawings provide general notes, demolition plans, floor plans, riser diagrams and outlet plans.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract - ER STARS 24Mar2020.pdf | ||
| Solicitation Amendment FA252120B00050002 SF 30.pdf | ||
| HVAC Schematic Pics.pdf | ||
| Solicitation Amendment FA252120B00050001.pdf | ||
| Updated WD FL20200001 (21Feb 2020).pdf | ||
| STARS MECH. RM 221 Pictures.pdf | ||
| Site Visit Q and A.pdf | ||
| Attach 10- WD FL20200001 (31 Jan 2020).pdf | ||
| Attach 7- Drawings 100%.pdf | ||
| Solicitation - FA252120B0005.pdf | ||
| Attach 12 - KTR Hazardous Waste Generation Form.doc | DOC document | |
| Attach 5- Drawings FIRE ALARM 8-29-19.pdf | ||
| Attach 3- Drawings COMM 8-29-19.pdf | ||
| Attach 1-Design Specification.pdf | ||
| Attach 4- Drawings ELECTRICAL 8-29-19.pdf | ||
| Attach 6- Drawings MECHANICAL 8-29-19.pdf | ||
| Attach 2- Submittal Register.xlsx | XLSX spreadsheet | |
| Attach 9- CCAFS Stars - AV Elevations.pdf | ||
| Attach 11 - 45 SFS Badge Request Form.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOOR PLAN LEGEND
WALLS
DOOR
REFER TO DOOR SCHEDULE
PARTITION TYPE INDICATOR
REFER TO PARTITION TYPES ON THIS SHEET
WINDOW TAG
REFER TO WINDOW TYPES
KEYNOTE
xx
NOTE: ALL ITEMS SHOWN IN THIS LEGEND MAY NOT APPLY TO THIS SHEET
B C D E
8'-11" 28'-11"
STAIR
OFFICE
205B
OFFICE
205C
OFFICE
205A
STARS USERS
ROOM
DATA REDUCTION
CONTROL
CENTER
204A
DATA REDUCTION
CENTER
205A
B
C
204A 204B
A-501
A2
FACILITY
ELECTRICAL
E
15 01
A-202
B5
A-202
B3
A-202
17'-10 5/8"
C2
E Q
E Q
E Q
E Q
E Q
E Q
E Q
OFFICE
C
A
B
7'-8"
A-202 A5B1 A-202
A1
A-202
A3
A-501
A2 Sim
A-501
A2 Sim
" 4
1'-6"
ALIGN
07 C1
D1
A-201
B1
A-201
A3
A-201
A1
A-201
C4
C3
A-202
B2
10'-0"
9'-4"
TYPE 2 FULL HEIGHT NON-RATED INTERIOR PARTITION
TYPE 3 NON-RATED INTERIOR PARTITION, GWB
TERMINATES AT 8" ABOVE CEILING TILE
PARTITION TYPES
5/8" GWB BOTH SIDES ON 3 5/8" MTL STUD
FRAMING AT 16" OC
5/8" GYP SOUND BOARD BOTH SIDES ON 6"
MTL STUD FRAMING AT 16" OC.
STC 45 [B.O.D. NGC 2013023]
SOUND ATTENUATION
SOUND ATTENUATION
TYPE 1 FULL HEIGHT NON-RATED INTERIOR PARTITION
5/8" GYP SOUND BOARD BOTH SIDES ON 3
5/8" MTL STUD FRAMING AT 16" OC
STC 45 [B.O.D. NGC 2013005]
SOUND ATTENUATION
TYPE 4 NON-RATED CHASE PARTITION, GWB
TERMINATES AT 8" ABOVE CEILING TILE
5/8" GYP SOUND BOARD ON ONE SIDE OVER
2 1/2" MTL STUD FRAMING
"8
TYPE 3 TYPE 2TYPE 4
STC 45
5/8" GWB ON MTL STUD
FRAMING AT 16" OC.
BASE AS SCHEDULED
CEILING AS
SCHEDULED
BASE AS SCHEDULED
CEILING AS
SCHEDULED
SOUND ATTENUATION
ACOUSTIC SEALANT
ACOUSTIC SEALANT
BASE AS SCHEDULED
CEILING AS
SCHEDULED
5/8" GWB BOTH SIDES
ON MTL STUD FRAMING
AT 16" OC
UNDERSIDE OF DECK UNDERSIDE OF DECK
UNDERSIDE OF
DECK
EXISTING RATED
PARTITION
EXISTING RAISED
FLOOR PANEL
UTILITY GROMET
EXISTING FLOOR
SLAB
MTL STUD KICKER
@ 8'-0" O.C. MAX
MTL STUD KICKER
@ 8'-0" O.C. MAX
EXISTING RAISED
FLOOR PANEL
EXISTING FLOOR
SLAB
MECH.
DUCTWORK
5/8" GYP SOUNDBOARD
BOTH SIDES ON MTL
STUD FRAMING AT 16"
OC
EXISTING RAISED
FLOOR PANEL
EXISTING FLOOR
SLAB
SOUND ATTENUATION
DEFLECTION TRACK
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N O
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri to
A
C
H
I T
E
S s i n d ic a te d
/2
/2
:5
:2
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
A-101
F L O
O R
P L A
N
D B
E H
-1
A A
-1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
D e s ig n e r
A u th o r
A p p ro v e r
C h e c k e r
GENERAL NOTES - PLAN
A THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND SHALL
VERIFY THESE DRAWINGS WITH THE EXISTING FIELD
CONDITIONS. THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER OF ANY ISSUES.
B CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND
NEW WORK. FOR ADDITIONAL GENERAL NOTES, LEGENDS,
AND SCHEDULES REFER TO SHEET G002.
C CONTRACTOR TO PROVIDE ENGINEERED SHOP DRAWINGS
AND FL PRODUCT APPROVALS FOR REVIEW BY THE DESIGN
TEAM PRIOR TO FABRICATION OF ALL ASSEMBLIES.
D COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH THE
CONTRACTING OFFICER PRIOR TO PERFORMING SHUT-DOWNS
IN UTILITY SERVICE.
E MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL
FIRE-RATED ASSEMBLIES (I.E. DOORS, GYPSUM ENCLOSURES,
SPRAYED FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW
LOCATIONS INCLUDING BUT NOT LIMITED TO STRUCTURAL
COLUMNS, BEAMS, AND FLOOR SLABS.
F ALL CONDUIT PIPING IN ELECTRICAL ROOMS TO BE
CONCEALED WITHIN THE WALL CONSTRUCTION.
G WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS,
SUCH AS LIGHTS, DUCTS, PIPING, DOWNSPOUTS, ETC. ARE
SHOWN TO PENETRATE OR CONFLICT WITH ANY BUILDING
FOOTINGS, SLABS, FLOORS, STRUCTURAL FRAMING, WALL
PARTITIONS, CEILINGS, ETC., IT IS REQUIRED THAT AN
APPROPRIATELY SIZED OPENING OR CLEARANCE BE
FURNISHED. THE CONTRACTOR SHALL COORDINATE THE
INSTALLATION OF ALL ITEMS WITH THE CONSTRUCTION
DOCUMENTS PRIOR TO THE INSTALLATION OF STRUCTURAL,
MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY
CONFLICT OR DISCREPANCY WITHIN THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE CONTRACTING
OFFICER'S ATTENTION FOR CLARIFICATION. ANY WORK
INSTALLED IN CONFLICT WITH THE ARCHITECTURAL
DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT
NO EXPENSE TO THE CONTRACTING OFFICER.
H CONTRACTOR SHALL COORDINATE WITH CONTRACTING
OFFICER CONCERNING THE PROPER REMOVAL OF ALL DEBRIS
ASSOCIATED WITH THE WORK.
I THE GENERAL CONTRACTOR SHALL MAINTAIN A CLEAN AND
ORDERLY JOBSITE, FREE OF DEBRIS AND LITTER. UPON
COMPLETION, ALL CONTRACTORS SHALL REMOVE THEIR
TRASH AND DEBRIS FROM THE PREMISES. ALL AREAS SHALL
BE BROOM CLEANED.
J ALL DIMENSIONS ARE TO FACE OF CURB, FACE OF CONCRETE
OR MASONRY, FACE OF FINISH, OR CENTERLINE OF GRID
UNLESS NOTED OTHERWISE.
K CONTRACTOR SHALL FIELD MEASURE AS REQUIRED FOR ALL
WORK RELATED TO GLAZING AND MILLWORK PRIOR TO
FABRICATION.
L CONTRACTOR SHALL ENSURE THAT ALL ENTRANCES AND
EXITS FROM THIS TENANT IMPROVEMENT SPACE MEETS
ACCESSIBLE MEANS OF EGRESS REQUIREMENTS
M CONTRACTOR SHALL COORDINATE WALL INSTALLATION WITH
EXISTING FIRE SUPPRESSION SPRINKLER HEAD LOCATION.
CONTRACTOR SHALL MAINTAIN 4" MIN. CLEARANCE FROM
CENTER OF SPRINKLER HEAD TO FACE OF WALL.
04 8 16268
SCALE: 1/8"=1'-0"
1/4" = 1'-0"A-101
B1 PARTIAL SECOND FLOOR PLAN
KEYNOTE LEGEND
01 NEW EQUIPMENT, SEE EQUIPMENT PLAN
02 PATCH EXISTING WALL TO THE SAME LEVEL OF FINISH AS
ADJACENT WALL CONSTRUCTION. MAINTAIN CONTINUITY OF
FIRE RATING.
04 NEW DOOR, FRAME AND HARDWARE
05 MODIFY FRAMES FOR NEW HW, MAINTAIN PARTITION RATING
AT OPENING
06 PRINTER BY OTHERS, PROVIDE EMERGENCY POWER
07 VERIFY PARTITION IS FULL HEIGHT [ROOF DECK TO FLOOR
SLAB] & STC 45 RATING. MODIFY AS NECESSARY.
08 VIDEO DISPLAY MONITORS, OFCI
11 PATCH AND REPAIR EXISTING WALLS AND CEILINGS IN
CORRIDOR, ELECTRICAL, MECHANICAL AND COMMS ROOM
AS NECESSARY. COORDINATE WITH ENGINEERING
DRAWINGS.
13 STATIC DISSIPATIVE CARPET TILE, MATCH EXISTING, PLACE
TRANSITION BELOW DOOR IN CLOSED POSITION
15 ALIGN EQUIPMENT W/ RAISED FLOOR TILES WHERE
POSSIBLE. CONTRACTOR SHALL FIELD VERIFY FLOOR TILE
LOCATION AND FULLY COORDINATE W/ EQUIPMENT FOR
LOCATION. MINIMIZE CUTTING OF TILES. USE MFR'S DETAILS
FOR BRIDGING, TRIM, ETC AS NECESSARY TO CONFORM W/
PLAN
PLAN NORTH
jrb30077 Callout Add Metal Backing for AV Walls to match dimensions shown on AV Elevations jrb30077 Callout Add Metal Backing for AV Walls to match dimensions shown on AV Elevations
TS
B C D E
101 102 103 104 105
112113114116117
M
IN
MIN
3'-0"
/8
4'-6 1/4"
4'-5"
4'-3 7/16"4'-6 1/4"5'-6 3/16"
4'-5 1/2"
ALIGN
ALIGN
ALIGN
3'-11 11/16"
ALIGN
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/4
/2
/2
:5
:2
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
A-103
E Q
U
IP
M E
N T
P L A
N
D B
E H
-1
A I
A -1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
D e s ig n e r
A u th o r
A p p ro v e r
C h e c k e r
1/4" = 1'-0"A-103
C1 SECOND FLOOR EQUIPMENT PLAN
02 4 8134
SCALE: 1/4"=1'-0"
EQUIPMENT SCHEDULE
EQUIP
NO. EQUIPMENT REMARKS FURNISH INSTALL
15 10-TONS CRAC UNIT UNIT MOUNTED ON STEEL SUPPORT. CONTRACTOR CONTRACTOR
16 10-TONS CRAC UNIT UNIT MOUNTED ON STEEL SUPPORT. CONTRACTOR CONTRACTOR
17 SINGLE STATIC UNINTERRUPTED POWER SUPPLY UNIT BATTERY PACK COMPONENT MOUNTED ON STEEL SUPPORT. CONTRACTOR CONTRACTOR
20 STARS USER ROOM CONSOLE-1 OWNER'S VENDOR SHALL PROVIDE DIMENSIONS TO CONTRACTOR.
CONTRACTOR TO PROVIDE ROUGH-INS AND CUTOUTS.
VENDOR VENDOR
21 STARS USER ROOM CONSOLE-2 OWNER'S VENDOR SHALL PROVIDE DIMENSIONS TO CONTRACTOR.
CONTRACTOR TO PROVIDE ROUGH-INS AND CUTOUTS.
VENDOR VENDOR
22 DRC CONTROL ROOM CONSOLE OWNER'S VENDOR SHALL PROVIDE DIMENSIONS TO CONTRACTOR.
CONTRACTOR TO PROVIDE ROUGH-INS AND CUTOUTS.
VENDOR VENDOR
23 DISPLAY VIDEO WALL OWNER'S VENDOR SHALL PROVIDE DIMENSIONS TO CONTRACTOR.
CONTRACTOR TO PROVIDE ROUGH-INS AND CUTOUTS.
VENDOR VENDOR
101 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
102 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
103 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
104 MOVABLE RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
105 MOVABLE RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
106 EIS RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
107 EIS RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
108 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
109 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
110 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
111 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
112 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
113 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
114 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
116 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
117 RACK MOUNT EQUIPMENT CABINET OWNER CONTRACTOR
PLAN NORTH
jrb30077 Callout See AV Elevations for additional layout information
MIN 16 GA, 6" MTL STUD,
SPACE 16" OC
FASTENER
MIN 16 GA, 6"
UNPUNCHED MTL STUD,
EXTEND FULL LENGTH
OF SIGN OR
ARCHITECTURAL
ELEMENT. PLACE STUD
AT EA END.
COORDINATE LOCATION
OF BACKING W/
EQUIPMENT PLAN
SHADE HOUSING
ROLLER TUBE SHADE
ASSEMBLY ( MANUAL)
ROLLER SHADE SYSTEM
EXISTING WALL
SILL BEYOND
EXISTING
STOREFRONT
ACOUSTIC JOINT
FILLER
DOUBLE MTL STUD
AT END OF PARTITION
ANODIZED ALUM
END CAP, MATCH
STOREFRONT
SOUND ATTENUATING
WALL CLOSURE [B.O.D.
MULL IT OVER]
SUSPENDED ACOUSTICAL
CEILING
SUSPENSION CEILING WALL
ANGLE
WALL AS SCHEDULED
PATCH AND REPAIR EXISTING
RAISED FLOOR SYSTEM AS
NECESSARY, PROVIDE NEW
FLOOR COVERING
STRUCTURAL FLOOR
MONITOR BACKING WHERE
REQUIRED
FASTEN CONT CHANNEL
TO CONC FLOOR OVER
(2) CONT BEADS OF
SEALANT
ACOUSTIC SEALANT
CONT DEFLECTION TRACK
FASTENED TO STRUCTURE
ABOVE
FASTEN GYP BOARD TO
LOWER DEEP LEG TRACK
ONLY TO ALLOW FOR SLIP
CONNECTION
A-501
C2
A-501
C2
BASE AS SCHEDULED
ALUMINUM
STOREFRONT SYSTEM
BATT INSULATION
WALL AS SCHEDULED
BLOCKING
ROLLER TUBE AND SHADE
ASSEMBLY (MANUAL)
METAL THRESHOLD W/
GASKET ON UNDERSIDE
SEALANT BED
FINISH AS SCHEDULED ON
EXISTING RAISED FLOOR
SYSTEM
FIRE CAULK [ACOUSTIC
SEALANT FOR INTERIOR
SOUND PARTITIONS]
GYP WALL BOARD ON MTL
STUD FRAMING. SEE PLAN.
BATT INSULATION
DOOR AS SCHEDULED
/2
M
A X
DOOR FRAME BEYOND
EXISTING SLAB
FIRE CAULK [ACOUSTIC
SEALANT FOR INTERIOR
SOUND PARTITIONS]
METAL THRESHOLD W/
GASKET IN SEALANT BED.
ACOUSTIC SEALANT
FINISH AS SCHEDULED ON
EXISTING RAISED FLOOR
SYSTEM
ACOUSTIC SEALANT
WALL AS SCHEDULED
BATT INSULATION
DOOR AS SCHEDULED
DOOR FRAME BEYOND
EXISTING SLAB
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri s i n d ic a te d
/2
/2
:5
:4
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
A-501
D E
T A
IL
S
D B
E H
-1
A -5
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
D e s ig n e r
A u th o r
A p p ro v e r
C h e c k e r
1 1/2" = 1'-0"A-501
C2 BACKING DETAIL
1 1/2" = 1'-0"A-501
C4 DOUBLE ROLL-UP SHADES
3" = 1'-0"A-501
A2
WALL TO MULLION
CONNECTION DTL
1 1/2" = 1'-0"A-501
A1 WALL SECTION
1 1/2" = 1'-0"A-501
C3 HEADER DETAIL
3" = 1'-0"A-501
A3 SILL DETAIL - RATED / ACOUSTIC PARTITION
3" = 1'-0"A-501
A5 TYPICAL SILL DETAIL
jrb30077 Cloud+ jrb30077 Cloud+ Use full metal backing at dimension shown in AV Elevations.
A
B
B
C
C
D
D
E
E
F
F
STAIR 1
ELEV
2RP3
2PP1
EPO EQUIPMENT
2UPS3
2RP2
2LP1
2PP2
2RP1
2SWB1
(2UPS3)-(2) (2RP2)-(8)
(2UPS3)-(4)
(2UPS3)-(6) (2RP2)-(6) (2UPS3)-(17)
(2UPS3)-(20)
(2RP2)-(2)
(2UPS3)-(7) (2UPS3)-(8)
(2UPS3)-(9) (2UPS3)-(10)
(2UPS3)-(11) (2UPS3)-(12)
(2UPS3)-(13) (2UPS3)-(14)
(2UPS3)-(19)
(2UPS3)-(22) (2UPS3)-(21)
(2UPS3)-(15)
(2UPS3)-(16)
(2RP2)-(10)
(2RP2)-(14)
(2RP2)-(12)
(2UPS3)-(18)
(2RP2)-(4)
G
(2UPS3)-(1,3,5)
OFFICE
205B
OFFICE
205C
OFFICE
205A
STARS USERS ROOM
DATA REDUCTION
CONTROL CENTER
204A
DATA REDUCTION
CENTER
OFFICE
FACILITY ELECTRICAL
JAN.
COMMUNICATIONS
MECHANICAL
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/8
/2
/2
:1
:5
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
E-103
E L
E C
T R
IC
A
L R
E C
E P
T A
C L
E P
L A
N
D B
E H
-1
E E
-1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
M G
O N
Z A
L E
Z
V
B A
D G
E T
T
A p p ro v e r
B
K O
L A
K
1/8" = 1'-0"
ELECTRICAL RECEPTACLE PLAN - SECOND FLOOR
GENERAL NOTES:
1. REFER TO PARTIAL SINGLE-LINE DIAGRAM ON SHEET E-601 FOR
EQUIPMENT, CONDUCTOR AND CONDUIT INFORMATION.
2. REFER TO PANEL SCHEDULES ON SHEET E-701 FOR CIRCUIT BREAKER,
BRANCH CONDUCTOR AND CONDUIT INFORMATION.
3. ENSURE ALL CONDUITS LEAVING SECURED ROOMS 203 AND 204 AREA ARE
SEALED WITH 3 FEET OF LEAVING THE SPACE.
4. REFER TO POWER/LIGHTING LEGEND ON SHEET E-001 FOR RECEPTACLE
MOUNTING TYPES.
5. LOCATIONS FOR DRC AND SUR WORKSTATION CIRCUITS 2UPS-7 THROUGH
2UPS-16 ARE NOTIONAL, FINAL LOCATION TO BE DETERMINED BASED ON
FINAL FURNITURE PLAN. COORDINATE FINAL LOCATION WITH CONTRACTING
OFFICER.
PLAN NORTH
04 8 16268
SCALE: 1/8"=1'-0"
KEY NOTES:
1. MOUNT FIRST AND SECOND ROW OF VIDEO WALL RECEPTACLES 65 AND 92
INCHES AFF RESPECTIVELY, MEASURED FROM CENTER OF RECEPTACLE
BOX.
jrb30077 Cloud+ jrb30077 Cloud+ Change from (8) quad outlets to (10) duplex outlets behind monitors. Locate outlets based on AV Elevation Drawing.
jrb30077 Cloud+ jrb30077 Cloud+ Change from (1) quad outlet to (1) duplex outlet behind monitors. Locate outlets based on AV Elevation Drawing.
V
T V
T V
T V
T V
T V
T V
T V
T V
T V
C
T V
T V S
S
S
S
A
A
B
B
C
C
D
D
E
E
F
F
STAIR 1
VIDEO WALL 2
OFFICE
205B
OFFICE
205C
OFFICE
205A
STARS USERS ROOM
DATA REDUCTION
CONTROL CENTER
204A
DATA REDUCTION
CENTER
OFFICE
FACILITY ELECTRICAL
JAN.
COMMUNICATIONS
STAIR 1
ELEV
MECHANICAL
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/8
/2
/2
:1
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
T-103
C O
M M
U N
IC
A
T
IO
N S
O U
T L
E T
P L A
N
D B
E H
-1
E T
-1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
M G
O N
Z A
L E
Z
V
B A
D G
E T
T
A p p ro v e r
B
K O
L A
K
KEY NOTES:
1. MOUNT FIRST AND SECOND ROW OF VIDEO WALL OUTLETS 65 AND 92
INCHES AFF RESPECTIVELY, MEASURED FROM CENTER OF OUTLET BOX.
2. INSTALL QTY 3, 1-1/2 INCH CONDUITS FROM ABOVE REFLECTED CEILING TO
CABLE TRAY UNDER RAISED FLOOR FOR FUTURE USE.
GENERAL NOTES:
1. INSTALL TEL/DATA, AUDIO VISUAL AND SPEAKER OUTLETS IN LOCATIONS
SHOWN. INSTALL 1 INCH CONDUIT FROM EACH WALL OR CEILING MOUNTED
BOX TO CABLE TRAY UNDER RAISED FLOOR. COMMUNICATION CABLING TO
BE INSTALLED BY OTHERS.
2. COORDINATE MOUNTING HEIGHT OF ALL WALL MOUNTED OUTLETS WITH
CONTRACTING OFFICER UNLESS OTHERWISE NOTED.
1/8" = 1'-0"
COMMUNICATIONS OUTLET PLAN - SECOND FLOOR
PLAN NORTH
04 8 16268
SCALE: 1/8"=1'-0"
jrb30077 Cloud+ jrb30077 Cloud+ Remove box for TV jrb30077 Cloud+ jrb30077 Cloud+ Remove box for TV jrb30077 Cloud+ jrb30077 Cloud+
1. Remove network drops from monitor wall
2. Back boxes in video wall should be double gang.
3. Conduit from underfloor cable tray to back boxes should be 2-inch diameter
4. In lieu of (8) back boxes show, a total of (10) back boxes should be installed.
5. Refer to AV Elevation drawing
| Sheets |
| G-001 - COVER SHEET |
| G-002 - SHEET INDEX |
| G-003 - PROJECT DATA |
| A-001 - LIFE SAFETY PLAN |
| A-002 - REFERENCE PLAN |
| AD-101 - DEMOLITION FLOOR PLAN |
| A-101 - FLOOR PLAN |
| A-102 - REFLECTED CEILING PLAN |
| A-103 - EQUIPMENT PLAN |
| A-201 - BUILDING SECTIONS |
| A-202 - PARTIAL ELEVATIONS |
| A-501 - DETAILS |
| A-601 - OPENING SCHEDULES AND DETAILS |
| A-701 - FINISH PLAN |
| M-001 MECHANICAL GENERAL NOTES |
| M-002 MECHANICAL ABBREVIATIONS |
| M-003 MECHANICAL LEGEND |
| M-101 MECHANICAL DEMO PLAN - 1 |
| M-102 MECHANICAL DEMO PLAN - 2 |
| M-103 MECHANICAL FLOOR PLAN -1 |
| M-104 MECHANICAL FLOOR PLAN -2 |
| M-105 MECHANICAL PLAN - RAISED FLOOR |
| M-501 MECHANICAL DETAILS I |
| M-502 MECHANICAL DETAILS II |
| M-601 MECHANICAL SCHEDULES |
| M-901 MECHANICAL DIAGRAMS I |
| M-902 MECHANICAL DIAGRAMS II |
| E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS |
| E-101 ELECTRICAL DEMO PLAN |
| E-102 EQUIPMENT POWER PLAN |
| E-103 ELECTRICAL RECEPTACLE PLAN |
| E-104 LIGHTING PLAN |
| E-501 ELECTRICAL DETAILS |
| E-601 SINGLE LINE DIAGRAM |
| E-701 PANEL SCHEDULES |
| FA-001 FIRE ALARM GENERAL NOTES, SYMBOLS AND ABBREVIATIONS |
| FA-101 FIRE ALARM DEMO PLAN |
| FA-102 FIRE ALARM FLOOR PLAN |
| FA-601 FIRE ALARM RISER DIAGRAM |
| T-001 COMM GENERAL NOTES, SYMBOLS AND ABBREVIATIONS |
| T-101 COMM DEMO PLAN |
| T-102 CABLE TRAY PLAN |
| T-103 COMMUNICATIONS OUTLET PLAN |
| T-104 COMMUNICATION CEILING PLAN |
File details come from the government source that posted it. Updated .