Attach 6- Drawings MECHANICAL 8-29-19.pdf
PDF 1 MB Posted
- Attached to
- ER STARS Relocation, CCAFS, FL Federal contract opportunity
- Solicitation number
- FA252120B0005
About this file
This document outlines the requirements for a federal contract to relocate personnel offices at Cape Canaveral Air Force Station in Florida. The solicitation calls for providing labor, equipment, and materials to complete architectural, interiors, mechanical, fire protection, and electrical work in order to move offices from Facility 1704 to Facility 85 Rooms 203, 204, and 205. Drawings and specifications will dictate the work required. The Department of the Air Force Space Command is the contracting agency. The response is due by the date listed on the solicitation number FA252120B0005.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract - ER STARS 24Mar2020.pdf | ||
| Solicitation Amendment FA252120B00050002 SF 30.pdf | ||
| HVAC Schematic Pics.pdf | ||
| Solicitation Amendment FA252120B00050001.pdf | ||
| Updated WD FL20200001 (21Feb 2020).pdf | ||
| STARS MECH. RM 221 Pictures.pdf | ||
| Site Visit Q and A.pdf | ||
| Attach 2- Submittal Register.xlsx | XLSX spreadsheet | |
| Attach 9- CCAFS Stars - AV Elevations.pdf | ||
| Attach 11 - 45 SFS Badge Request Form.pdf | ||
| Attach 10- WD FL20200001 (31 Jan 2020).pdf | ||
| Attach 7- Drawings 100%.pdf | ||
| Solicitation - FA252120B0005.pdf | ||
| Attach 8 - Drawings-100% AV SYSTEM MODIFICATIONS.pdf | ||
| Attach 12 - KTR Hazardous Waste Generation Form.doc | DOC document | |
| Attach 5- Drawings FIRE ALARM 8-29-19.pdf | ||
| Attach 3- Drawings COMM 8-29-19.pdf | ||
| Attach 1-Design Specification.pdf | ||
| Attach 4- Drawings ELECTRICAL 8-29-19.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR EQUIPMENT ARE
DAMAGED IN APPEARANCE, OR BECOMES UNSERVICEABLE DUE TO CONTRACTOR
OPERATIONS, THE CONTRACTOR SHALL REPLACE WITH NEW PRODUCTS OF EQUAL
CAPACITY AND QUALITY.
2. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT DOWNS,
OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY SERVICES BEFORE
PERFORMING ANY WORK.
3. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY PARTITIONS
AND MEANS OF EGRESS RESULTING FROM DEMOLITION OPERATIONS.
4. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER ALL
DEMOLITION THAT AFFECTS OCCUPIED PORTIONS OF THE FACILITY.
5. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF PROTECTION FOR
ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL FROM THE FACILITY.
6. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN EXISTING
CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION.
7. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT AS
INDICATED. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF
GOVERNING REGULATIONS AND AS FOLLOWS:
A. HOLES IN WALLS AND FLOORS SHALL BE CUT NEATLY WITH STRAIGHT AND
PLUMB EDGES. PROCEED WITH DEMOLITION SYSTEMATICALLY; NEATLY CUT
OPENINGS AND HOLES PLUMB; AND SQUARE TRUE TO DIMENSIONS
REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE NEW
CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR
SAWING OR GRINDING. THE CONTRACTOR SHALL MINIMIZE HAMMERING AND
CHOPPING TO REDUCE DISTURBANCE TO ADJACENT SURFACES.
TEMPORARILY COVER OPENINGS.
B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED
SURFACES TO AVOID MARRING EXISTING FINISHED SURFACES.
C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL WORK
AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES,
SUCH AS DUCT INTERIORS AND PIPE INTERIORS, VERIFY CONDITIONS AND
CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OR
GRINDING OPERATIONS. MAINTAIN A FIRE WATCH AND PORTABLE FIRE-
SUPPRESSION DEVICES DURING FLAME-CUTTING OR GRINDING
OPERATIONS. CONTRACTOR SHALL OBTAIN ALL REQUIRED BURN PERMITS
BEFORE ANY OF THIS WORK IS PERFORMED.
D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES AND
GRINDING.
E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR
UNSUITABLE MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE.
F. DEMOLISHED MATERIAL AT ALL ELEVATIONS ABOVE FINISHED FLOOR SHALL
BE LOWERED TO GROUND BY METHODS SUITABLE TO AVOID FREE FALL AND
PREVENT GROUND IMPACT AND DUST GENERATION.
G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE DEMOLISHED
EQUIPMENT, DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE
LOADS ON SUPPORTING WALLS, FLOORS, ROOFS OR FRAMING.
GENERAL NOTES:
8. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.
9. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND LEGALLY
DISPOSE OF DEBRIS.
10. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST, DIRT, AND
DEBRIS CAUSED BY DEMOLITION OPERATIONS.
11. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR
APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE ADDITIONAL
REMOVALS AND REPLACEMENTS OF UNSATISFACTORY WORK.
12. CONTRACTOR TO PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED
POTENTIAL ENERGY SYTEMS INCLUDING ELECTRICAL HYRAULIC AND PNUEMATIC
INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO CONSTRUCTION.
13. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE REMAINING
OPENINGS SHALL BE PATCHED AND SEALED.
14. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING.
15. REMOVE ALL PLUMBING FIXTURE CARRIERS AND SUPPORTS SERVING DEMOLISHED
FIXTURES.
16. DOCUMENT CONDITION OF EXISTING HVAC EQUIPMENT AND ASSOCIATED
COMPONENTS PRIOR TO CONSTRUCTION. FIELD MEASURE CAPACITIES AND FLOW
RATES OF EXISTING AHU'S. REPORT DATA TO CONTRACTING OFFICER TO VERIFY
THE PERFORMANCE REQUIREMENTS CAN BE ACHIEVED.
GENERAL NOTES - RENOVATION:
1. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL, COMMUNICATION OR CLEAN
WORK AREAS.
2. ALL WORK SHALL BE IN ACCORDANCE WITH UFC 3-410-01 AND UFC 3-401-01.
3. PROVIDE AIR FOIL TURNING VANES ON ALL NEW DUCT 90 DEGREE ELBOWS.
4. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF ACTUAL
CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING
WORK.
5. WHEREVER EXISTING SYSTEMS ARE ALTERED, EXTENDED, OR PARTS THEY ARE OF
ABANDONED, MAINTAIN, IN GOOD OPERATING CONDITION, THE INTEGRITY OF THE
REMAINING SYSTEM, OR PARTS THEREOF.
6. COORDINATE ALL MECHANICAL WORK & EQUIPMENT WITH STRUCTURAL MEMBERS,
ELECTRICAL WORK AND FIXTURES, ALL OTHER TRADES AND ALL EXISTING CONDITIONS.
7. CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR REPLACEMENT OF UP TO 5% OF
THE SUPPLY AIR DUCTWORK SHOWN AND UP TO 10% OF THE SUPPLY AIR DUCTWORK
INSULATION AS NECESSARY TO REPAIR ISOLATED AREAS WHERE DUCT AND/OR
INSULATION MAY HAVE BEEN DAMAGED PRIOR TO CONTRACT. INSULATION REMOVAL
SHALL BE PERFORMED IN ACCORDANCE WITH ASBESTOS HANDLING SPECIFICATIONS.
8. PROVIDE ACCESS DOORS IN NEW DUCTWORK TO SERVICE DEVICES WITHIN DUCTS NOT
OTHERWISE ACCESSIBLE THROUGH GRILLES / DIFFUSERS OR OPEN DUCT.
9. PROVIDE ACCESS DOORS IN INACCESSIBLE CEILINGS TO ACCESS MECHANICAL DEVICES
ABOVE CEILINGS NOT OTHERWISE ACCESSIBLE FOR NEW WORK.
10. DUCT SHALL BE FABRICATED PER SMACNA-HVAC DUCT CONSTRUCTION STANDARDS -
METAL AND FLEXIBLE.
11. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR GAPS, FROM
COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN, OR OTHER TERMINATION AS
SHOWN ON DRAWINGS.
12. PROVIDE ALL HVAC AND PLUMBING EQUIPMENT AS PER MANUFACTURER
REQUIREMENTS AND DIVISION 23 SPECIFICATIONS.
13. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE FIELD.
14. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL
CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE APPROXIMATE AND
MUST BE FIELD VERIFIED.
15. PROVIDE NEW MANUAL AIR VENTS AT ALL NEW HIGH SYSTEM POINTS & DRAIN VALVES.
16. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH FIRE/SMOKE RATED
ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE ASSEMBLY.
17. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW
FOR TUBE/COIL REMOVAL/REINSTALLATION.
18. ALL NEW CONDENSATE DRAIN AND NEW FLOOR DRAIN PIPING SHALL HAVE A MINIMUM
SLOPE OF 1/8" PER 12" RUN.
19. ALL MECHANICAL PENETRATIONS THROUGH PRESSURE BOUNDARIES SHALL BE
CAULKED AND SEALED TO MINIMIZE LOSS OF SPACE PRESSURIZATION.
20. CLEANING: ALL EXISTING AND GRILLES AND REGISTERS SHALL BE CLEANED OF ALL
VISIBLE DIRT AND DEBRIS. SURFACE SHALL BE WIPED "VISUAL CLEAN" WITH LINT FREE
CLOTH AND ISOPROPYL ALCOHOL.
21. FIRE DAMPER SHALL BE PROVIDED AT ALL POINTS WHERE THE DUCTWORK
PENETRATES A FIRE BARRIER OF MORE THAN A ONE-HOUR RATING UNLESS OTHERWISE
INDICATED ON THE DRAWINGS.
22. ALL STEEL SHAPES (FABRICATIONS) SHALL CONFORM TO ASTM-A-3C AND ALL SHARP
EDGES SHALL BE ROUNDED. ALL BURRS SHALL BE REMOVED.
23. REFER TO DIVISION 26 SPECIFICATIONS FOR ALL BONDING AND GROUNDING
REQUIREMENTS.
24. REFER TO DIVISION 23 SPECIFICATIONS FOR ALL WELDING AND COATING
REQUIREMENTS.
25. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES NECESSARY TO
PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH THE INTENT
OF THE CONTRACT DRAWINGS. FULLY TEST, BALANCE, CLEAN, AND LEAVE SYSTEMS IN
A COMPLETE AND OPERATIONAL STATUS.
26. ALL MATERIALS SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH THE
COORDINATION OF ALL INVOLVED TRADES.
27. ALL MATERIALS AND EQUIPMENT PROVIDED SHALL BE NEW, SHALL BE U.L. LISTED WHERE
APPLICABLE, AND SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER’S
RECOMMENDATIONS WITH ADEQUATE MAINTENANCE CLEARANCES. PROVIDE
SUBMITTALS AS INDICATED ON THE SUBMITTAL SCHEDULE.
28. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT DRAWINGS ARE TO
ESTABLISH THE SPECIFIED STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED
TYPE(S), SIZE(S), AND CONFIGURATION.
29. EXCEPT WHERE INDICATED IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING,
MECHANICAL EQUIPMENT, PIPING, AND FITTINGS ARE APPROXIMATE. EXACT LOCATIONS
SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE COORDINATED WITH ALL
APPLICABLE TRADES.
30. EXTERIOR PAINT IS ASSUMED TO CONTAIN HEAVY METALS. PROPER PPE MUST BE WORN
IF ADDITIONAL OPENINGS ARE MADE INTO EXTERIOR CMU WALLS. DISPOSAL OF
HAZARDOUS WASTE SHALL BE IN ACCORDANCE WITH OSHA RULES AND REGULATIONS
AND SPECIFICATION SECTION 02 82 33.13 20.
31. HANGERS FOR ALL COPPER PIPING SHALL BE PLASTIC-COATED TYPE.
32. CONFIRM LOCATION AND ELEVATION OF ALL CROSSING LINES PRIOR TO INSTALLING ANY
PIPE. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING
OFFICER.
33. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO EXISTING CONNECTIONS
SHALL BE MADE USING THE SAME PIPE SIZE AS EXISTING (UNLESS NOTED OTHERWISE).
34. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS SHALL BE
SEALED AND THE PIPES PROTECTED ACCORDING TO THE SPECIFICATIONS.
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N O
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri to
A
C
H
I T
E
S
/8
/2
/2
:3
:0
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-001
M E
C H
A N
IC
A
L G
E N
E R
A L
N O
T E
S
D B
E H
-1
E M
-0
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U
ABBREVIATIONS:
V
VOLTS, VOLTAGE
ODP OPEN DRIP PROOF
TEFC TOTALLY ENCLOSED FAN COOLED
TOTALLY ENCLOSED AIR OVERTEAO
ELEC ELECTRIC, ELECTRICAL
SHEETSHT
OUTSIDE AIR LOUVEROAL
TRANSFER AIR GRILLETAG
FIRE ALARM CONTROL PANELFACP
FAS FIRE ALARM SYSTEM
SEC SECOND
NOT IN CONTRACTNIC
NC NOISE CRITERIA
HVAC HEATING, VENTILATION AND AIR CONDITIONING
AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME
AND AIR CONDITIONING ENGINEERS
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,
CONTRACTORS' NATIONAL ASSOCIATION
SHEET METAL AND AIR CONDITIONINGSMACNA
RH RELATIVE HUMIDITY
SEER SEASONAL ENERGY EFFICIENCY RATIO
ACCESS PANELAP
AF AIRFOIL
PRV PRESSURE REDUCING VALVE
BUILDING AUTOMATION SYSTEMBAS
BYPASSBYP
BPV BYPASS VALVE
BACKFLOW PREVENTERBFP
BTUH BRITISH THERMAL UNIT PER HOUR
DP DIFFERENTIAL PRESSURE
SUPPLY AIR TEMPERATURESAT
SS
RETURN AIR TEMPERATURERAT
OAT OUTSIDE AIR TEMPERATURE
FPS FEET PER SECOND
FCU FAN COIL UNIT
POTABLE WATERPW
TYPICALTYP
VARIABLE FREQUENCY DRIVEVFD
OUTSIDE AIR UNITOAU
RETURN REGISTERRR
EQUIPMENTEQUIP
DIFFERENTIALDIFF
MIN
HEAT EXCHANGERHX
FLOORFLR
DIRECT EXPANSIONDX
ACCESS DOORAD
BACKWARDLY INCLINEDBI
BOTTOM OF PIPEBOP
BRITISH THERMAL UNITBTU
AIR HANDLERAH
ABOVE FINISHED GRADEAFG
AIR CONDITIONERAC
AIR CONDITIONINGA/C
REF REFRIGERANT
CR CEILING REGISTER
1000 BRITISH THERMAL UNITS PER HOUR
MAKE-UP AIR UNIT
NATIONAL ELECTRIC CODE
NORMALLY OPEN
NATIONAL FIRE PROTECTION ASSOCIATION
MINIMUM CIRCUIT AMPACITY
NORMALLY CLOSED
POINT OF CONNECTION
RETURN AIR GRILLE
PRESSURE DROP
STATIC PRESSURE
REVOLUTION PER MINUTE
RATED LOAD AMPS
POUNDS PER SQUARE INCH
STAINLESS STEEL
VARIABLE AIR VOLUME
TOTAL STATIC PRESSURE
TOTAL SENSIBLE HEAT
OUTSIDE AIROA
EXHAUST FAN
EFFICIENCY
FLOOR DRAIN
FACE AREA
FLEXIBLE
FLANGE
FEET
FORWARD CURVE
ENTERING WATER TEMPERATURE
ENERGY EFFICIENCY RATIO
EXTERNAL STATIC PRESSURE
DEGREES FAHRENHEIT
GALVANIZED
HORSEPOWER
HERTZ
INCHES
GALLONS PER MINUTE
HZ
IN
HP
GALV
GPM
°F
FLEX
FLG
FT
FLD
FC
FA
EFF
ESP
EWT
EER
EF
VAV
TSTAT THERMOSTAT
ROOMRM
TSP
TSH
TEMP
STL
SP
RPM
SA
TEMPERATURE
STEEL
SUPPLY AIR
RG
RLA
PSI
RA
POC
PH
PD
OC
RETURN AIR
ON CENTER
PHASE
CAPACITY
CHILLED WATER
CONNECTION
CONTINUE
DRY BULB
DIAMETER
CENTRIFUGAL
AIR HANDLING UNIT
AUTOMATIC FLOW CONTROL VALVE
BOTTOM OF DUCT
BRAKE HORSEPOWER
CUBIC FEET PER MINUTE
DIRECT DIGITAL CONTROL
DRAWING
DOWN
DB
DDC
DIA
DWG
DN
CHW
CONT
CONN
BOD
CAP
CFM
CENTRI
AFCV
BHP
AHU
MECHANICALMECH
NFPA
NTE
NOM
NO
NEC
NC
NOT TO EXCEED
NOMINAL
MINIMUM
MAU
MCA
MBH
MAT MIXED AIR TEMPERATURE
VERTICAL DRAW THRUVDT
CW COLD WATER
EX EXISTING
SF SUPPLY FAN
W
WATT(S)
W/ WITH
LEAK DETECTION SENSOR
LEAVING AIR TEMPERATURE
LDS
LAT
PUMPED CONDENSATEPC
SCHEDULESCH
DOOR GRILLEDG
DOOR LOUVERDL
SD SUPPLY DIFFUSER
EXISTING TO REMAINETR
CHILLED WATER SUPPLY / RETURNCHWS/R
EXST EXISTING
CONTRACTOR FURNISHED,CFCI
FAN POWERED BOXFPB
HVIP HYPER VENT INTERFACE PANEL
HWS/R HEATING WATER SUPPLY / RETURN
REG REGULATION
TS TEMPERATURE SENSOR
VACUUMVAC
EYE WASH SHOWEREWS
CSD CEILING SUPPLY DIFFUSER
OD OUTER DUCT
INSIDE DIMENSIONID
CONCRETECONC
DIVISIONDIV
KILOWATTSKW
POUNDS PER SQUARE INCH GAUGEPSIG
STANDARD CUBIC FEET PER MINUTESCFM
TEMPERATURE DRYBULBTDB
SEN SENSIBLE
FEET PER MINUTEFPM
REQ REQUIRED
QUICK DISCONNECTQD
NTS NOT TO SCALE
CONTRACTOR INSTALLED
DPIT DIFFERENTIAL PRESSURE INDICATING TRANSMITTER
FIRE PROTECTIONFP
ABOVE FINISHED FLOORAFF
TEST ADJUST AND BALANCETAB
CONDENSATE DRAINCD
DAMPERDAMP
EXISTING(E)
ENERGY MANAGEMENT CONTROL SYSTEMEMCS
MAX MAXIMUM
PRESS PRESSURE
RC REHEAT COIL
V
VOLTS ALTERNATING CURRENTVAC
W
HIGH PRESSUREHP
LOW PRESSURE LP
SUMP PUMPSP
FR FILTER-REGULATOR
PNEUMATICPN
EXIST EXISTING
REVERSE OSMOSISRO
FIC FACILITY INTERFACE CABINET
ACOUSTICAL CEILING TILEACT
TRANSFER DUCTTD
TOTAL DYNAMIC HEADTDH
NPT NATIONAL PIPE THREAD
DENOTE NEW(N)
CRAC COMPUTER ROOM AIR CONDITIONER
DATA REDUCTION CENTERDRC
PERCENTPCT
REMOTE SENSORRS
PS PRESSURE SENSOR
DISCHARGE AIT TEMPERATUREDAT
ROOFTOP UNITRTU
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-002
M E
C H
A N
IC
A
L A
B B
R E
V
IA
T
IO
N S
D B
E H
-1
M -0
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U
INDICATES PIPING OR EQUIPMENT
TO BE REMOVED
DUCT TO BE DEMOLISHED
LINEWORK INDICATES
NEW PIPING OR EQUIPMENT
SYMBOL ABBR DESCRIPTION
DESCRIPTIONSYMBOL ABBR
CHILLED WATER SUPPLYCHSCHS
CHILLED WATER RETURNCHRCHR
CALIBRATED BALANCING VALVECBV
SHUTOFF VALVE (AS SPECIFIED FOR PIPING SYSTEM)
COMBINATION BALANCING/SHUTOFF VALVEBSV
BUTTERFLY VALVEBFV
PRESSURE GAUGEPG
THERMOMETERTH
PRESSURE SWITCHPR SW
Y-TYPE STRAINERSTR
FLOW MEASUREMENT STATIONFMS
3-WAY MODULATING CONTROL VALVE W/ACTUATORACV
MODULATING CONTROL VALVE W/ ACTUATORACV
TEST PLUGTP
FLOW SWITCHFL SW
UNION
CHECK VALVECKV
SOLENOID VALVE (TWO-POSITION W/ ACTUATOR)SOL VA
GLOBE VALVEGLV
BALL VALVEBV
MANUAL AIR VENT
SYMBOL ABBR DESCRIPTION
PUMP (DIAGRAM)
FLEXIBLE CONNECTOR
CAP PIPE END CAP
PIPE TURNING DOWN OR AWAY
PIPE TURNING UP OR TOWARD
PIPE TURNING DOWN OR AWAY (TEE)
PIPE CONNECTION
DIRECTION OF FLOW
LIGHT LINEWORK INDICATES
EXISTING PIPING OR EQUIPMENT
REDUCER
FLANGES
PIPE SLEEVE or ALIGNMENT GUIDES
PIPE ANCHOR
PC PC PUMPED CONDENSATE
PIPING LEGEND
AIR DISTRIBUTION LEGEND
(UNLESS NOTED OTHERWISE)
END OF DUCT WITH CAP
SQUARE TO ROUND TRANSITION
ECCENTRIC DUCT TRANSITION
RECTANGULAR DUCT SIZE IN INCHES
EXISTING DUCT
CONCENTRIC DUCT TRANSITION
BACKDRAFT DAMPER
18x12
FIRST SIZE LISTED IS SIDE SHOWN
ROUND DUCT SIZE IN INCHES18"ø
MAV
GENERAL LEGEND
DESCRIPTIONSYMBOL SYMBOL ABBR DESCRIPTION
DETAIL SYMBOL:
IDENTIFYING NUMBERA =
SHEET WHERE DETAIL IS SHOWNB =
SECTION SYMBOL:
SHEET WHERE SECTION IS SHOWN
IDENTIFYING LETTER
B
A
B
A
A
H
T
HUMIDISTAT/HUMIDITY SENSOR
(WALL MOUNTED)
(WALL MOUNTED)
H'STAT/HS
T'STAT
TITLE SYMBOL ON SHEET WHERE
SHOWN:
A = IDENTIFYING NUMBER/LETTER
SD-1
REVISION CLOUD AND
REVISION NUMBER
EQUIPMENT IDENTIFICATION
(REFER TO SCHEDULES)
CFM
CEILING SUPPLY DIFFUSER. REFER TO SUPPLY DIFFUSER SCHEDULE FOR
ADDITIONAL INFORMATION.
CEILING GRILLE (RETURN OR TRANSFER) REFER TO RETURN REGISTE SCHEDULE
FOR ADDITIONAL INFORMATION.
CEILING EXHAUST GRILLE. REFER TO DIFFUSER
AND GRILLE SCHEDULE FOR ADDITIONAL INFORMATION.
B
A
SHEET WHERE SECTION IS FROMB =
A
B
POINT OF CONNECTION
H
T
HUMIDISTAT (DUCT MOUNTED)
THERMOSTAT (DUCT MOUNTED)
AAV AUTOMATIC AIR VENT
POC
P PRESSURE SENSOR PORT
NEEDLE VALVE
R
RELOCATE
B
A
ELEVATION SYMBOL:
SHEET WHERE SECTION IS SHOWN
IDENTIFYING LETTER
B
A
SMOKE DETECTORSD
HOSE, MALE, CONNECTION
THERMOSTAT / TEMPERATURE SENSOR
POINT OF DISCONNECTION
AFCV AUTOMATIC FLOW CONTROL VALVE
TO BE DEMOLISHED AND REMOVED
PODBALANCING DAMPER
MOTORIZED (RESETABLE) FIRE DAMPER
TS REMOTE TEMPERATURE SENSOR
M
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-003
M E
C H
A N
IC
A
L L
E G
E N
D
D B
E H
-1
M -0
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U x S
A
54x20 SA x S
A
12" THROATS
x S
A
RISE 6"
T
T31
10x6 x x x x
VAV-204W
V A V-204E x x x
16x14 SA 10x14
7x14
7x14 SA
V A
V -2
W
V A
V -2
E
BOTTOM OF THESE
3 JOINTS OPEN
x
8x14 SA
7 7
FROM EXISTING AHU-3 IN MECHANICAL ROOM
TO EXISTING AHU-3 IN MECHANICAL ROOM
9 9
120x14
ITEMS TO BE DEMOLISHED
DEMOLITION LEGEND
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - SECOND FLOOR
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri s i n d ic a te d
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-101
M E
C H
A N
IC
A
L D
E M
O P
L A
N
D B
E H
-1
E M
-1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
KEYNOTES:
1. REMOVE (E) VAV BOX, CONTROL WIRING, POWER WIRING, SA DUCT, AND
ALL OTHER RELATED APPURTENANCES. VERIFY LOCATION OF (E) T'STAT &
REMOVE T'STAT. PATCH & PAINT WALL TO MATCH (E).
2. (E) VAV BOX TO REMAIN & REUSE, SHOWN FOR REFERENCE.
3. REMOVE (E) SA DUCT TO POD, PREPARE FOR RECONNECTION.
4. REMOVE (E) SA DUCT TO POD, CAP & SEAL AIRTIGHT.
5. REMOVE (E) CR.
6. REMOVE (E) T'STAT & CONTROL WIRING. PATCH & PAINT WALL TO MATCH
(E). VERIFY EXACT LOCATION IN FIELD.
7. EXISTING CEILING DIFFUSER TO REMAIN & REUSE.
8. REFER TO SHEET M-102 FOR CONTINUATION OF DUCTWORK.
9. REFER TO EXISTING DRAWINGS FOR CONTINUATION OF DUCTWORK.
0 4' 8' 12'
SCALE: 3/16"=1'-0"
PLAN NORTH
ITEMS TO BE DEMOLISHED
DEMOLITION LEGEND
STAIR 1
12x6 SA
14x10 SA
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri s i n d ic a te d
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-102
M E
C H
A N
IC
A
L D
E M
O P
L A
N
D B
E H
-1
M -1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G M
C
R R
R R
KEYNOTES:
1. REMOVE (E) SA DUCT TO POD, PREPARE FOR RECONNECTION.
2. EXISTING CEILING DIFFUSER TO REMAIN & REUSE.
3. REFER TO SHEET M-101 FOR CONTINUATION OF DUCTWORK.
4. EXISTING SIDEWALL REGISTER TO REMAIN & REUSE.
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - SECOND FLOOR CONTINUATION
0 4' 8' 12'
SCALE: 3/16"=1'-0"
T TT T
TS
TS
A B C
"x
S
A
20"x18" SA 20"x14" SA
10"ø SA
8"ø SA
"ø S
A
"ø S
A
SD-3
SD-8
SD-5
SD-11
SD-10
SD-9
SD-7
SD-2
SD-1
SD-6
SD-4
8"ø SA
8"ø S
A
10"ø SA6"ø SA
14"ø SA 18"ø SA 14"ø SA
"ø S
A
"ø
S A
10"ø SA
54"x20" SA
42"x20" SA 38"x20" SA
"x
S
A
"x
S
A
"x
S
A
8"x14" SA
"x
S A
16"x14" SA
8"ø SA 10"ø SA
RR-5
VAV
2.4
VAV
2.3
VAV
2.2
RR-8RR-7RR-6
"ø
S A
8" ø S
A
10"ø S
A
10"ø SA
8"ø SA
RR-2
RR-3 RR-4
RR-1
VAV
2.1
14 1514 15
VAV-206E
VAV-206W
16 16
PC
CHR
CHS
CHR
CHS
CHR
CHS
2" CHS & 2" CHR
VAV-2.3 VAV-2.8 VAV-2.4 VAV-2.7
200 CFM 190 CFM
ø8"
10"ø S A
VAV-2.8
D
VAV-2.7
P C
D-1
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/4
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-103
M E
C H
A N
IC
A
L F
L O
O R
P L A
N
D B
E H
-1
E M
-1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
1/4" = 1'-0"
MECHANICAL PLAN - SECOND FLOOR
KEYNOTES:
1. NEW CAP ON EXISTING DUCT. SEALED AIR TIGHT.
2. POINT OF CONNECTION, NEW 20X18 SUPPLY AIR DUCT TO EXISTING 42X20
MAIN DUCT.
3. POINT OF CONNECTION, NEW 8"∅ SUPPLY AIR DUCT TO EXISTING 10X6
DUCT. PROVIDE TRANSITION.
4. POINT OF CONNECTION, NEW 8"∅ SUPPLY AIR DUCT TO EXISTING 38X20
MAIN DUCT.
5. BALANCE EXISTING VAV 206W FOR 390 CFM.
6. 10X10 SOUND LINED Z-BOOT FOR TRANSFER AIR. FOR DETAILS SEE, SHEET
M-502 DETAIL 1.
7. VAV W/ ELECTRIC REHEAT COIL. FOR DETAILS SEE, SHEET M-502 DETAIL 4.
8. 8X8 SOUND LINED BOOT. FOR DETAILS SEE, SHEET M-501 DETAIL 2.
9. 2" CHS & 2" CHR CONNECT TO EXISTING 6" CHS & CHR INSIDE MECH ROOM
207. VERIFY EXACT LOCATION IN FIELD. PROVIDE SHUT-OFF SERVICE BALL
VALVES IN BOTH LINES IMMEDIATELY AFTER CONNECTION TO EXISTING
PIPE.
10. 1" PUMPED CONDENSATE PIPING DN, TERMINATE 1" ABOVE JANITOR FLOOR
DRAIN AND SPILL INTO FLOOR DRAIN. REFER TO SHEET M-502, DETAILS 4 & 5
FOR ROUTING DIAGRAM.
11. 28X24 SOUND LINED TRANSFER DUCT. FOR DETAILS SEE, SHEET M-502
DETAIL 1.
12. 36X24 SOUND LINED TRANSFER DUCT. FOR DETAILS SEE, SHEET M-502
DETAIL 1.
13. 24X24 SOUND LINED TRANSFER DUCT. FOR DETAILS SEE, SHEET M-502
DETAIL 1.
14. T'STAT FOR VAV BOX SERVED BY HOUSE SYSTEM. SEE PLANS FOR UNIT
DESIGNATION. FOR MOUNTING, SEE SHEET M-501, DETAIL 5.
15. T'STAT FOR VAV BOX UNDER FLOOR SERVED BY CRAC UNITS. SEE PLANS
FOR UNIT DESIGNATION. FOR MOUNTING, SEE SHEET M-501, DETAIL 5.
16. BALANCE EXISTING CEILING DIFFUSER FOR CFM SHOWN.
17. REMOTE TEMPERATURE SENSOR MOUNTED ON RETURN AIR REGISTER
FEEDING T'STAT FOR UNDER FLOOR VAV BOX SERVED BY CRAC UNITS.
02 4 8134
SCALE: 1/4"=1'-0"
CONTINUATION
ON SHEET M-104
TT T
TS
E
E
F
F
STAIR 1
ELEV
SD-12
CRAC
CRAC
12"ø SA VAV 2.5
8"ø SA
12"ø SA
16"ø SA
12"ø SA
"x
S
A
38"x20" SA1
11109
6 7
PC
CHR
CHS
PC
CHR
CHS
HI-TEMP
VAV-2.5
VAV-2.6
RR-19
RR-21
RR-22
RR-24
RR-17RR-16RR-15RR-14
RR-25
202A
MANAGERS
OFFICE (NIC)
VISITORS AREA &
CONFERENCE
ROOM (NIC)
DATA REDUCTION
CENTER 14
D
D
RR-20
VAV-2.6
RR-18
RR-23
RR-12
RR-11RR-10
RR-9
RR-13
120x14
D-2 D-3 D-4 D-5
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/4
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-104
M E
C H
A N
IC
A
L F
L O
O R
P L A
N
D B
E H
-1
M -1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
1/4" = 1'-0"
MECHANICAL PLAN - SECOND FLOOR CONTINUATION
KEYNOTES:
1. POINT OF CONNECTION, NEW 12"∅ SUPPLY AIR DUCT TO EXISTING 38X20
MAIN DUCT.
2. POINT OF CONNECTION, NEW 8"∅ SUPPLY AIR DUCT TO EXISTING
PROVIDE TRANSITION AS REQUIRED.
3. POINT OF CONNECTION, NEW 12"∅ SUPPLY AIR DUCT TO EXISTING
PROVIDE TRANSITION AS REQUIRED.
4. BALANCE EXISTING CEILING DIFFUSER FOR 165 CFM.
5. BALANCE EXISTING SIDEWALL DIFFUSER FOR 120 CFM.
6. 48X40 RA DUCT CONNECT TO CRAC UNIT AND DUCT UP THRU CEILING.
7. CRAC UNIT. FOR DETAILS SEE, SHEET M-502 DETAIL 3.
8. 2" CHS, 2" CHR, AND 1" PUMPED CONDENSATE PIPE DN BELOW FLOOR IN
SOFFIT. FOR CONTINUATION, SEE SHEET M-103.
9. JOHNSON CONTROLS BI-METAL LINE VOLTAGE T'STAT, HIGH TEMP ALARM,
WIRED TO SECURITY ALARM PANEL.
10. ALC T'STAT FOR VAV BOX SERVED BY HOUSE SYSTEM. SEE PLANS FOR
UNIT DESIGNATION.
11. ALC T'STAT FOR VAV BOX UNDER FLOOR SERVED BY CRAC UNITS. SEE
PLANS FOR UNIT DESIGNATION. USE REMOTE SENSOR MOUNTED ON
RETURN AIR REGISTER ABOVE EQUIPMENT SEE DETAIL TBD
12. NEW TRANSFER DUCT SHOWN FOR REFERENCE. FOR NOTES AND SIZE
SEE, SHEET M-502 DETAIL 1.
13. VAV W/ ELECTRIC REHEAT COIL. FOR DETAILS SEE, SHEET M-501 DETAIL 2.
14. REMOTE TEMPERATURE SENSOR MOUNTED ON RETURN AIR REGISTER
FEEDING T'STAT FOR UNDER FLOOR VAV BOX SERVED BY CRAC UNITS.
15. POINT OF CONNECTION, NEW 120" X 14" RETURN AIR DUCT TO EXISTING
120" X 14" MAIN DUCT. CONTRACTOR SHALL INSTALL (4) VERTICAL
CONTROL DAMPERS INTO NEW RETURN DUCT WITHIN ROOM 203.
CONTINUATION
ON SHEET M-103
02 4 8134
SCALE: 1/4"=1'-0"
E
E
VAV
2.8
VAV
2.7
VAV
2.6
CRAC
CRAC
101 2
4 5 11
C H
R
P C
C H
S
16"ø SA
14"ø SA
"ø S
A
"ø
S A
14"ø SA10"ø SA
"ø
S A
16"ø S A
6 12
SD-18
SD-22
SD-17
SD-21
SD-16
SD-20
SD-15
SD-19
SD-13
SD-14
SD-32
SD-31
SD-29
SD-39
SD-28
SD-30
SD-38
SD-37
SD-36
SD-45
SD-34
SD-33
D
D
SD-27
SD-26
SD-24
SD-23
SD-25
14 14
"x
" S
A
C H
R
P C
C H
S
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/4
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-105
M E
C H
A N
IC
A
L P
L A
N
R A
IS
E
D F
L O
O R
D B
E H
-1
M -1
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
1/4" = 1'-0"
PARTIAL SECOND BELOW RAISED FLOOR PLAN
KEYNOTES:
1. CRAC UNIT. FOR DETAILS SEE, SHEET M-501 DETAIL 2.
2. CRAC UNIT SECURED TO SLAB WITH SEISMIC BASE & NEOPRENE PADS.
PROVIDE 32X36 SA PLENUM DN FROM CRAC UNIT BELOW RAISED FLOOR.
3. 2" CHS/R & 1" PUMPED CONDENSATE. DRAIN PIPING UP FROM BELOW
RAISED FLOOR TO ABV CEILING. FOR CONTINUATION SEE, SHEET M-103.
4. 2" CHS/R ISOLATION BALL VALVE.
5. POC 2" CHS/R & 1" PUMPED CONDENSATE. DRAIN TO (N) CRAC UNIT. FOR
DETAILS SEE, SHEET M-501 DETAIL 2.
6. BACKDRAFT DAMPER IN SA DUCT.
7. TATE DIRECTAIRE STEEL DIRECTIONAL GRATE W/ MOUNTING HANGER &
BOLTS W/ OBD FOR BALANCING.
8. (N)18X8 SOFFIT FOR CONCEALING 2" CHS/R & 1" PUMPED CONDENSATE
PIPING & INSULATION.
9. LOCATED BENEATH RAISED FLOOR, WITH REMOVABLE PANELS FOR
ACCESS.
10. EMERSON LIQUI-TECT MODEL 410 SINGLE POINT LEAK DETECTION SENSOR
SECURED TO FLOOR & WIRED TO SECURITY CONTROL PANEL.
CONTRACTOR SHALL PROVIDE 120V/24V TRANSFORMER FOR LEAK
DETECTOR.
11. 2" CHS/R, AND 1" PUMPED CONDENSATE PIPING SHOWN AS SINGLE LINE
FOR CLARITY.
12. BALANCE FOR 900 CFM.
13. BALANCE FOR 3100 CFM.
14. TATE DIRECTAIRE STEEL DIRECTIONAL GRATE W/ MOUNTING HANGER &
BOLTS W/ OBD FOR BALANCING. COORDINATE ONE SUPPLY DIFFUSER PER
RACK.
02 4 8134
SCALE: 1/4"=1'-0"
PIPE INSULATION
INSULATION SHIELD REQUIRED
FOR
INSULATED PIPE (TOP &
BOTTOM) MIN 6" LONG
PIPE SADDLE W/ U-BOLT
(TOLCO FIG 318A OR
APPROVED EQUAL)
3"
CONCRETE FLOOR
THREADED PIPE STAND W/
WELDED BASE PLATE
(TOLCO FIG316T) SECURED
TO SLAB W/ 1/2" HILTI KWIK
BOLT
NEW PIPING WITH
INSULATION. PROVIDE
POLYISOCYANURATE
INSULATION (DOW TRYMER
1800) TO EXTEND 2" LONGER
THAN PIPE SHIELD
V
R
IE
S
3/8" HILTI KWIK BOLT TZ
WITH 3" MIN EMBEDMENT
3/8" THREADED HANGER ROD
NUT & BACKNUT
PIPE HANGER
CONDENSATE PIPING
PIPE INSULATION SHIELD
SEE MECHANICAL SPECIFICATION
MAIN SUPPLY AIR DUCT.
SEE PLAN FOR SIZES 3'-0" MAX. (TYP)
1 1/8" SHT. METAL HANGER STRAPS SECURED
FROM STRUCTURE ABV. (4) STRAPS PER
PLENUM BOX
DRAWBAND (TYP)
SECURE TO PLENUM BOX W/
LOAD RATED FASTENER.
SHEET METAL PLENUM BOX
WITH SOUND LINING (SIZE AS
REQUIRED)
PERFORATED PLATE
APPLICABLE FOR SIDE ENTRY
DUCT CONN. ONLY
SECURE C.D. TO PLENUM W/
SHT. METAL SCREWS
CEILING DIFFUSERCEILING
SUPPLY AIR DUCT
(SIDE ENTRY ALTERNATE)
FLEX. DUCT. SEE PLAN FOR SIZE
1. IF HEIGHT DOES NOT ALLOW A INTERNAL BENDING RADIUS
OF 2/3 THE DUCT DIAMETER INTO THE DIFFUSER, THE
CONTRACTOR SHALL INSTALL A SIDE ENTRY PLENUM BOX
GENERAL NOTE:
SECTION "A-A"
PIPE W/ INSULATION
SECURE ISOLATOR TO STRUCTURE W/ 1/2"∅
BOLT THRU PHILLIPS RED HEAD EXPANSION
ANCHOR LOAD RATED. 3" MIN. EMBEDMENT.
UNISTRUT ANGULAR
BRACKET (TYP)
UNISTRUT CHANNEL SWAY
BRACING (TYP)
UNISTRUT CHANNEL
INSULATION SHEILD (TYP)
1/2" NUT & BACKNUT (TYP)
1/2"∅ HANGER ROD. LOAD
RATED. LENGTH AS REQ'D
LONGITUDINAL BRACING
SIMILAR TO SWAY BRACING
FOR CONNECTION TO
CONCRETE STRUCTURE
SEE DETAIL 9 ON SHEET M-503
PC
CHWR
CHWS
ELECTRIC HEATING COIL (WHEN INCLUDED)
DUCT TRANSITION FROM VAV BOX
INTEGRAL ATTENUATOR
SINGLE DUCT VARIABLE AIR
VOLUME (V.A.V.) OR CV
TERMINAL BOX. SEE
SCHEDULE FOR SIZE.
DUCT CONNECTION
(SAME SIZE AS UNIT INLET)
MOTOR SHROUD
ACCESS DOOR
M
A X
CENTERLINE OF
THERMOSTAT
CONTROL
MOUNTING HEIGHT
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri s i n d ic a te d
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-501
M E
C H
A N
IC
A
L D
E T
A
IL
S I
D B
E H
-1
M -5
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
NTSM-501
3 TYPICAL PIPE SUPPORT DETAIL
NTSM-501
1 CONDENSATE PIPE SUPPORT DETAIL
NTSM-501
4 FLEXIBLE CONNECTION TO CD
NTSM-501
6 PIPE SUPPORT DETAIL
NTSM-501
2 VAV BOX DETAIL
NTSM-501
5 THERMOSTAT MOUNTING DETAIL
EXISTING STRUCTURE
W
M
IN
2W (MIN)
2" THICK ACOUSTIC
DUCT LINER WALL (PER PLAN)
1 1
1 1
NOTES:
1. SEAL BETWEEN TRANSFER BOOT AND WALL.
2. TRANSFER BOOTS TO BE CONSTRUCTED OF SHEET METAL:
GAUGE PER SMACNA GUIDLINES.
3. 500 F.P.M., MAX. AIRFLOW VELOCITY.
3/8" HILTI KWIK BOLT TZ
WITH 3" MINIMUM
EMBEDMENT
3/8" THREADED
HANGER ROD
ROD CONNECTIONS TO CONCRETE
3/8" HILTI KWIK BOLT TZ
WITH 3" MINIMUM EMBEDMENT
3/8" - 20 NUT AND WASHER
1-1/8" x 18 GA. HANGER STRAP
CONCRETE DECK
3/8" HILTI KWIK BOLT TZ
WITH 3" MINIMUM
EMBEDMENT
ANGLE IRON TO CONCRETE
HANGER STRAP CONNECTION TO CONCRETE
CHS
CHR
PC
2" BALL VALVE (TYP)
P/T TEST PORT (TYP)
CAP
C H
S
C H
R
P C
SOFFIT
STRAINER W/ BALL VALVE,
NIPPLE HOSE ADAPTER AND
CAP W/ CHAIN (TYP)
RAISED FLOOR
CEILING
CRAC
CRAC
1. FACTORY MOUNTED & INSTALLED CONDENSATE PUMP.
2. 1" PUMPED CONDENSATE TO FLOOR DRAIN LOCATED IN
RM 218.
3. 2" CHWS/R PIPING TO MECHANICAL RM 207.
NOTES:
1 1
1"2"
1" PUMPED CONDENSATE
2" 1"2"
1" PVC SCH 40 PIPE
AHU-3
AHU-3
AHU-3
KEYNOTES:
1. POINT OF CONNECTION FOR NEW 2" CHWS & CHWR.
CONTRACTOR SHALL VERIFY CONNECTION LOCATION IS
ADEQUATE AND ACCURATE WITH THE CONNECTION INTO THE
CHWS AND CHWR. IF DISCREPANCIES ARE FOUND,
CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD
IMMEDIATELY.
2" CHWR 2" CHWS
2" CHWR
2" CHWS
1" PUMPED CONDENSATE ROUTED FROM RM 207
ROUTE NEW 1" PUMPED
CONDENSATE TO EXISTING FLOOR
DRAIN
EXISTING
WATER HEATER
LOCATED IN
ROOM 218
REFER TO SHEET M-103 FOR CONTINUATION OF 1" PUMPED CONDENSATE
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri s i n d ic a te d
/2
/2
:3
:1
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-502
M E
C H
A N
IC
A
L D
E T
A
IL
S I I
D B
E H
-1
M -5
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
NTSM-502
1 (SL) TRANSFER DUCT DETAIL
NTSM-502
2 CONNECTION TO CONCRETE STRUCTURE
NTSM-502
4 CHW PIPING DIAGRAM
12" = 1'-0"M-502
3 AHU-3 CHWS & CHWR CONNECTION DETAIL
12" = 1'-0"M-502
5 PUMPED CONDENSATE TO FLOOR DRAIN
NTS
NTS NTS
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/2
/2
:3
:2
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-601
M E
C H
A N
IC
A
L S
C H
E D
U L
E S
D B
E H
-1
M -6
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
KEYNOTES:
1. FURNISHED W/ DISC SW, 2-WAY MODULATING CHW TCV, SEISMIC BASE
WITH NEOPRENE PADS, BACNET NTERFACE, ZONE MASTER CONTROLLER,
LEAK DETECTION WITH FIELD INSTALLED SENSORS, FACTORY MOUNTED &
INSTALLED CONDENSATE PUMP, & START UP. FIELD WIRED FOR SHUT
DOWN FROM FIRE ALARM SYSTEM FROM AREA SMOKE DETECTORS. UNITS
ARE 100% REDUNDANT AND EC MOTOR SHALL VARY AIRFLOW BASED ON
RETURN AIR TEMPERATURE.
2. FURNISH W/ MFR INSTALLED INTEGRAL ATTENUATOR.
3. FURNISH W/ MFR MOUNTED & INSTALLED TRANSFORMER.
4. PROVIDE WITH BACNET COMPATIBLE CONTROLLER, DDC, ACTUATOR &
ROOM SENSOR WITH DISPLAY. FOR WIRING DIAGRAM SEE,
5. TERMINAL BOXES RATED FOR UNDER FLOOR DISTRIBUTION.
6. TERMINAL BOXES W/ ELECTRIC REHEAT COILS.
VARIABLE AIR VOLUME TERMINAL UNIT SCHEDULE
UNIT BASIS OF DESIGN
SERVICE
AREA
INLET SIZE
(IN)
COOLING
HEATING
(CFM)
HEATER
VOLTAGE
(V) / PHASE
HEATER
CAPACITY
(kW) MCA (A)
RADIATED NC
LEVEL AT 0.5"
S.P. AT MAX RATED CFMV
STATIC PRESSURE
DROP
(IN WG)
REMARKS
(KEY NOTES)
MAX
(CFM)
MIN.
(CFM)
2.1 DAIKIN
MQTH506
2ND FLOOR
STAR OFFICE
6 100 330 100 480 / 3 0.9 1.4 25 0.09 2,3,4,6
2.2 DAIKIN
MQTH508
2ND FLOOR
STAR OFFICE
8 120 400 120 480 / 3 1.1 1.7 22 0.02 2,3,4,6
2.3 DAIKIN
MQTH514
2ND FLOOR
SUR
14 435 1455 435 480 / 3 4.1 6.2 18 0.08 2,3,4,6
2.4 DAIKIN
MQTH508
2ND FLOOR
DRC CONTROL
8 120 400 120 480 / 3 1.1 1.7 15 0.02 2,3,4,6
2.5 DAIKIN
MQTH512
2ND FLOOR
DRC
12 315 1050 315 480 / 3 3 4.5 26 0.08 2,3,4,6
2.6 DAIKIN
MQTH516
2ND FLOOR
DRC
16 930 3100 - - - - 22 0.06 2,3,4,5
2.7 DAIKIN
MQTH506
2ND FLOOR
DRC CONTROL
6 70 135 - - - - 10 0.03 2,3,4,5
2.8 DAIKIN
MQTH510
2ND FLOOR
DRC
10 230 765 - - - - 20 0.01 2,3,4,5
COMPUTER ROOM AIR CONDITIONING UNIT SCHEDULE
UNIT
MANUFACTURER &
MODEL NO.
TOTAL
COOLING
CAPACITY (BTU)
SENSIBLE COOLING
CAPACITY (BTU)
ENT AIR FAN ELECTRICAL
FILTER MERV 8 QTY -
SIZE (IN) DISPOSABLE
EVAPORATOR COIL
OPER. WT.
(LBS.) SERVICE
REMARKS
(KEY NOTES)DB (ºF) WB (ºF)
CFM STD
AIR
E.S.P. IN
W.G. QTY HP V PH HZ FLA MCA MOCP
FAE AREA
(SQ FT) GPM PD (PSI)
CRAC 1 DATA AIRE
GFCD-046
147,000 111,800 75.0 62.5 4,000 0.5 1 6.7 460 3 60 6.7 8.4 15 (1) 16x20x4 (1) 16x25x4
(1) 20x20x4 (1) 20x25x4
12.2 35 6.5 1,100 DRC/DRC
CONTROL
SUR
CRAC 2 DATA AIRE
GFCD-046
147,000 111,800 75.0 62.5 4,000 0.5 1 6.7 460 3 60 6.7 8.4 15 (1) 16x20x4 (1) 16x25x4
(1) 20x20x4 (1) 20x25x4
12.2 35 6.5 1,100 DRC/DRC
CONTROL
SUR
SUPPLY DIFFUSER SCHEDULE
UNIT TYPE NECK SIZE (IN) GRILL SIZE (IN)
BALANCE
MIN (CFM) MAX (CFM)
SD-1 CEILING 8 8 X 8 30 110
SD-2, SD-3 CEILING 8 8 X 8 40 120
SD-4, SD-5 CEILING 8 10 X 10 60 200
SD-6 CEILING 8 10 X 10 70 220
SD-7 THRU SD-10 CEILING 10 12 X 12 90 290
SD-11 CEILING 10 12 X 12 90 295
SD-12 CEILING 12 16 X 16 180 600
SD-13, SD-14 FLOOR NON-DUCTED 24 X 24 20 70
SD-15 THRU SD-22 FLOOR NON-DUCTED 24 X 24 30 100
SD-23 THRU SD-39 FLOOR NON-DUCTED 24 X 24 50 180
RETURN REGISTER SCHEDULE
UNIT QUANTITY TYPE GRILL SIZE (IN)
FLOW RANGE (CFM)
MIN MAX
RR-1 1 NON-DUCTED 8 X 8 40 110
RR-2, RR-3, RR-4, RR-5 4 NON-DUCTED 12 X 12 200 290
RR-6 THRU RR-25 20 NON-DUCTED 16 X 16 425 600
DAMPER SCHEDULE
UNIT ID BASIS OF DESIGN
SIZE W X H
(IN)
FLOW
(CFM)
STATIC PRESSURE DOP
(IN WG)
D-1 RUSKIN 20 X 18 2185 0.28
D-2 THRU D-5 RUSKIN 28 X 12 500 0.01
VAV - 206E VAV - 206W VAV - 204E VAV - 204W
OUTSIDE
AIR
NC
NO
RETURN AIR
RA_DAMP
OA_DAMP
OAT
PS
FILTER MAT
C
C
C NC
NO
CHWR
CHWS
DAT
PS
HEAT HEAT HEAT HEAT
OUTSIDE
AIR
NC
NO
RETURN AIR
RA_DAMP
OA_DAMP
OAT
PS
FILTER MAT
C
C
C NC
NO
CHWR
CHWS
DAT
PS
(E) VAV - 206E (E) VAV - 206W VAV - 2.1 VAV - 2.2 VAV - 2.3 VAV - 2.4 VAV - 2.5
HEAT HEAT HEAT HEATHEATHEATHEAT
FIRE_DAMP
FIRE_DAMP
ITEMS TO BE DEMOLISHED
DEMOLITION LEGEND
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri s i n d ic a te d
/2
/2
:3
:2
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-901
M E
C H
A N
IC
A
L D
IA
G
R A
M S
I
D B
E H
-1
M -9
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
12" = 1'-0"
EXISTING DIAGRAM - VARIABLE VOLUME AHU
12" = 1'-0"
NEW DIAGRAM - VARIABLE VOLUME AHU
NTS
NTS
NOTES:
1. REMOVE EXISTING CONTROL (POINTS)FOR VAV'S BEING DEMOLISHED.
2. PROVIDE NEW CONTROL (POINTS) FOR VAV'S BEING ADDED.
3. USE EXISTING SEQUENCE OF OPERATION INCLUDING NEW VAV'S.
VAV - 2.6 VAV - 2.7 VAV - 2.8
CRAC - 1
CRAC - 2
DAT
PS
DAT
PS
T VAV - 2.6RS
RS T
RS T
REMOTE SENSORS LOCATED ON WALL
CRAC 1 & 2 CONTROL
VAV - 2.6
VAV - 2.6
CRAC 1 & 2 CONTROL
CRAC 1 & 2 CONTROL
CRAC 1 & 2 CONTROL CRAC 1 & 2 CONTROL CRAC 1 & 2 CONTROL
ECM
ECM
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
T H
S P
A C
E W
IN
G
C C
A F
S F
L
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri
/2
/2
:3
:2
P
M
E R
S T
A R
S R
E L
O C
A T
IO
N
M-902
M E
C H
A N
IC
A
L D
IA
G
R A
M S
I I
D B
E H
-1
M -9
F A
-1
D
-0
A u g u s t
F A
F A
F A
-1 D
-0
R
S P
E E
L E
R
G C
L
IN
E
R R
R
F A
U T
H
12" = 1'-0"
CRAC UNIT VARIABLE VOLUME
NTS
SEQUENCE OF OPERATION:
CRAC UNIT
THE CRAC UNIT SHALL BE ON AT ALL TIMES WHEN ANY OF THE THE DATA RACKS
ARE POWERED ON.
THE CRAC UNIT SHALL BE OPERATED WITH A CONSTANT STATIC PREESURE NOT
TO EXCEED 1.5 INCHES W.G.
ZONE TEMPERATURE CONTROL-VAV'S
WHEN THE CRAC UNIT SHALL IS ON THE ZONE TEMPERATURE SETPOINT SHALL
BE AT THE CONFIGURED SETPOINT OR AT THE OCCUPANT-ADJUSTABLE
SETPOINT VIA THE WALL-MOUNTED THERMOSTAT.
THE CONTROLLER SHALL MODULATE THE VAV BOX DAMPER TO MAINTAIN VAV
BOX SUPPLY AIR FLOW AT SETPOINT AS MEASURED BY A MULTI-POINT FLOW
SENSING ELEMENT AT THE INLET TO THE VAV BOX. SEQUENCING SHALL BE AS
SHOWN: UPON A RISE IN ZONE TEMPERATURE ABOVE ZONE TEMPERATURE
SETPOINT, SUBJECT TO THE ZONE TEMPERATURE SETPOINT DEADBAND, THE
AIRFLOW SETPOINT SHALL BE ADJUSTED BETWEEN MINIMUM AND MAXIMUM
FLOW BASED ON THE DIFFERENCE BETWEEN ZONE TEMPERATURE AND ZONE
TEMPERATURE SETPOINT AS SHOWN. UPON A FALL IN ZONE TEMPERATURE
BELOW ZONE TEMPERATURE SETPOINT, SUBJECT TO THE DEADBAND AS SHOWN,
THE AIRFLOW SHALL BE MAINTAINED AT A FIXED AIR FLOW SETPOINT.
| Sheets |
| M-001 - MECHANICAL GENERAL NOTES |
| M-002 - MECHANICAL ABBREVIATIONS |
| M-003 - MECHANICAL LEGEND |
| M-101 - MECHANICAL DEMO PLAN - 1 |
| M-102 - MECHANICAL DEMO PLAN - 2 |
| M-103 - MECHANICAL FLOOR PLAN - 1 |
| M-104 - MECHANICAL FLOOR PLAN - 2 |
| M-105 - MECHANICAL PLAN - RAISED FLOOR |
| M-501 - MECHANICAL DETAILS I |
| M-502 - MECHANICAL DETAILS II |
| M-601 - MECHANICAL SCHEDULES |
| M-901 - MECHANICAL DIAGRAMS I |
| M-902 - MECHANICAL DIAGRAMS II |
File details come from the government source that posted it. Updated .