Attch_12_Questions_and_Answers.docx
DOCX document 3 MB Posted
- Attached to
- Demolish Heritage Launch Deactivation Delta II Complex 17 (HLDD II CX 17) Federal contract opportunity
- Solicitation number
- FA2521-16-B-0001
About this file
Attachment 12 Answers to Questions Received 1 7 pages dated 18 Jul 16
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA2521-16-B-0001
Demolish HLDD CX 17 Facilities
QUESTIONS AND ANSWERS
18 Jul 16
1. Other (Specify) _Surveys__ Question: Is there an asbestos survey available for the existing facilities on site that are scheduled to be demolished?
Answer: See asbestos survey attached below.
2. Other (Specify) _Existing Underground Infrastructure As-builts__ Question: Are there existing asbuilts that show any/all existing structures/infrastructure (piping, etc…) underground that are scheduled to be demolished?
Answer: See additional as-builts attached below.
3. RFP Section F__ Paragraph F-2___ Question: What is the estimated number of non-access days anticipated for the 600-day period of performance?
Answer: Non-access days are 120.
4. RFP Section I__ Paragraph Clauses Incorporated by Reference___ Question: Clause 52.228-1 IBR in Section I states that a Bid Guarantee is required to be furnished by the contractor at time of bid submission. The clause has two fill ins for the Contracting Officer to insert a percentage of bid price or a specific dollar amount. Please clarify the percentage of bid price or specific dollar amount that the contractor will be required to furnish for the bid guarantee?
Answer: The clause will be incorporated by full text to reflect a bid guarantee of at least 20 percent of the bid price but not to exceed $1 million, whichever is less.
5. RFP Section I__ Paragraph Clauses Incorporated by Reference___ Question: Clause 52.228-16 IBR in Section I states that Payment and Performance Bonds will be furnished by the contractor. The clause has two fill ins for the Contracting Officer to insert a percentage of contract award amount that the contractor is required to bond. Please clarify the percentage of contract award that the contractor will be required to furnish for the payment and the performance bond?
Answer: The clause will be incorporated by full text to reflect payment and performance bonds shall be 100 percent of the contract award amount.
6. RFP Section I__ Paragraph Clauses Incorporated by Reference___ Question: Clause 52.246-20 IBR in Section I states that the Contracting Officer shall give written notice of any defect or nonconformance to the contractor within a specified period of time. What is the contracting officer’s specified period of time?
Answer: The clause will be incorporated by full text to reflect the period of time to give written notice to the contractor is “within 30 days from date of acceptance by the Government.”
7. SOW/Technical Specification/Drawings paragraph/page SOW 3.G.__ Question: Paragraph 3.G. in the SOW states that Demo Location(s) may require special clearance to access. Is there any requirement for escorts at any locations included in this project and if so, will the government provide those escorts?
Answer: Special clearance not required for the demolition site. There are no requirements for escorts, therefore Government will not provide them.
8. Other (Specify) _Set-aside__ Question: Is the HUBZone required to self-perform any of this work?
Answer: Yes, as per FAR clause 52.219-3 Notice of HUBZone Set Aside or Sole Source Award incorporated into the solicitation.
9. Other (Specify) _Fencing__ Question: There is specification section related to chain link fencing but there is no mention of this scope of work in the contract documents, can you please clarify if there is any new chain link fencing to be installed and if so where?
Answer: Chain link fence will not be removed or installed for this demolition project
10. Other (Specify) _Fencing__ Question: The zip file of the building plans contained no files for building #’s 28503, 28504, 28404, 28405, 28421, 36015… will these files be available before the bid date?
Answer: The intent for the site visit was for data gathering. Additional as-builts (Attachment 13 Additional As-builts for CX-17, 199 pages) are being provided for facilities 28404 and 28503, as well as 28402. An additional site-visit will also be held to allow bidders to obtain additional
11. Other (Specify) _Surveys__ Question: Since there is no asbestos, lead or PCB survey available at bid time will the abatement of those materials if found after we test for them be handled as a change order to the base contract?
Answer: A baseline ACM survey is provided. (See answer to question #1). SOW indicates to sample and test for ACM, LBP, and PCB. If found, after testing, they may result in a change order.
12. SOW/Technical Specification/Drawings paragraph/page 02060 3.2 (L)__ Question: Spec section 02060 3.2 (L) – please explain what it means to remove concrete and pads to 72” thick?
Answer: Remove concrete up to 72" below top of concrete surface.
13. Other (Specify) _Fuel & Gas Lines__ Question: Have the fuel & gas lines onsite been cleaned and decommissioned or are we responsible for this activity?
Answer: All fuel and gas lines have been drained.
14. Other (Specify) _Utilities__ Question: What utilities are located are located within the project limits?
Answer: All utility locates will be performed prior to NTP issuance; however, they will all (water, electrical and sewer) be within the project limits.
15. Other (Specify) _Utility disconnects__ Question: Are there any as-builts for the underground utilities located on the site that we need to disconnect?
Answer: See answer to question #2 above.
16. Other (Specify) _Disturbed areas restoration__ Question: The SOW states we must sod the disturbed areas but there’s a specification for seeding in the contract documents, can you please officially let us know which method of restoration is required?
Answer: Sod
17. Other (Specify) _Backfill stockpile__ Question: Is there a borrow pit or dirt stockpile on base that we can pull dirt from for back filling?
Answer: Our material stockpile is almost depleted. The material we have has already been committed for other projects. There are two berms located between launch pad A and B that can be used for fill. Contractor must provide soil material.
18. Other (Specify) _SWPP Requirements__ Question: What are the SWPP requirements for this project?
Answer: Review 3.3 Field Quality Control, tab 4 Water Quality, and 3.12 Digging/Excavation Requirements, tab D, in the project specifications
19. Other (Specify) _Salvage materials__ Question: Are there any items that must be salvaged for the government?
Answer: No, the contractor will take possession of all debris to include all metals.
20. Other (Specify) _Concrete repairs__ Question: The concrete designated to remain around MST 28416 is in really bad shape so will the awarded contractor be responsible for concrete repairs considering the cracks will only get worse during this demolition project?
Answer: No, the launch pad and pavement below MST 28415 is destined for future demolition under a separate project.
21. SOW/Technical Specification/Drawings paragraph/page 3 C, D__ Question: Will government conduct locates for underground utilities Answer: Yes, the Government will conduct underground utility locates.
22. SOW/Technical Specification/Drawings paragraph/page C, E__ Question: Will government provide an onsite dig pit for back fill materials or will contractor be responsible for hauling material from external location Will fill dirt be required to backfill where footings are removed? If so, Is there a spec on the fill required Answer: Contractor will be responsible for providing soil material for the project. There are two berms between launch pad A and B that can be used for fill material. Soil material is required to establish level elevation.
Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
· Soil classification, AASHTO M 145
· Moisture-density relations, AASHTO T 180, Method B or D
23. SOW/Technical Specification/Drawings paragraph/page 1, b, e__ Question: Are as-builts available?_ Answer: See answer to question #2 above.
24. SOW/Technical Specification/Drawings paragraph/page 3, a thru f__ Question: What is the thickness of all concrete and asphalt and what is the exact location for removal.
Answer: Thickness of rigid and flexible pavement is unknown. The pavement demolition boundary is located in the second page of the aerial map of the demolition site. The title of the page is DBEH 8-1618 Demolition HLDD II CX 17B Launch Pad.
25. SOW/Technical Specification/Drawings paragraph/page 3, a__ Question: Is demo licensing for over 15 stories required?
Answer: No; however, a demolition plan must be submitted to ensure safe practices will take place during demolition work.
26. SOW/Technical Specification/Drawings paragraph/page 3, a__ Question: Is there an estimated Weight for each tower?
Answer: Mobil Service Tower (MST) A (Bldg 28416) weighs approximately 800 Tons MST B (Bldg 28417) weighs approximately 980 Tons
27. Other (Specify) _Lack of survey__ Question: Will a comprehensive asbestos survey be provided prior to bid time?
Answer: No a comprehensive ACM survey will not be provided. An ACM baseline survey has been provided (See answer to question #1) to provide locations where the material is present.
28. SOW/Technical Specification/Drawings paragraph/page 02060 (3.4)__ Question: Per specification section 02060 (3.4) it states the use of explosives will not be permitted – based upon the size of the gantry’s an implosion would be the safest and most economical demolition method and has been performed on other CCAFS and NASA launch pads in the past. Can you please confirm that explosives will not be allowed on this project?
Answer: Yes. Due to the project’s location on CCAFS explosives will not be allowed.
29. Other (Specify) _Asbestos survey__ Question: Will an asbestos study be conducted to determine any asbestos material abatement requirements.
Answer: A baseline ACM survey was provided from our environmental contractor and is included (See answer to question #1). The SOW indicates that ACM, LBP, and PCBs must be sampled and abated.
CX 17 MV Power Distro.pdf image3.emf
CX 17 FIRE WATER.pdf
DATE:
SCALE:
UPDATED BY:
BLDG.
SHEET OF
NO.
SLC 17
NTS
1 5
FIRE WATER
AIR FORCE SPACE COMMAND
CAPE CANAVERAL, FLORIDA
CAPE CANAVERAL AIR FORCE STATION
AutoCAD SHX Text
RM 101
SCLS
1240 Sqft
Work Shop
RM 102
170 Sqft
Tool Rm
SHEET 2 5 OF
SHEET 1 3 OF
SHEET 4 OF
1289333300C
Stamp
SHEET 5 OF
1289333300C
Stamp
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17
Blank Page
DBEH_28420.pdf
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17
DBEH_28420.pdf
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17
DBEH_28420.pdf
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17
DBEH_28420.pdf
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17 image4.emf
CX 17 SANITARY SEWER.pdf
SHEET OF
NTS'
1 4
SANITARY SEWER
SHEET 2 OF
SHEET 3 OF
SHEET 4 OF
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17
DBEH_28420.pdf
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17
DBEH_28420.pdf
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17
DBEH_28420.pdf
Sheets and Views
DBEH_28420_01_FP_06-14-2010_v1.00-11 x 17 image1.emf
11) ACM Survey.pdf
Installation DBEH
AMIS Asbestos Data Archive
Building Number: 28416
DescriptionGroup Name
ACM
Code
FriableACM Present
Room Number / Name: LEVEL 7 ROOF
Quantity Units
N NRO Roofing (Other) COATING ON ROOF 80 SF
Room Number / Name: LEVEL 7 STORAGE RM
N YIF Insulation, Wall and Ceiling (Fibrous)
WALL INSULATION 84 SF
Friday, February 19, 2016 Page 1 of 1
AMIS Asbestos Sample Results Archive
Building Number: 28416
CommentsGroup Name
ACM 2
Type
Percent
Room Number / Name: LEVEL 7 ROOF
ACM Type ACM 2
Sample Number
0RO01 Roofing (Other) NAD 0CHS1080
0RO01 Roofing (Other) NAD 0CHS1081
Room Number / Name: W 1-16
0IF01 Insulation, Wall and Ceiling (Fibrous)
100% f.g.NAD 0J10400
Building Number: 28417
Room Number / Name: LEVEL 9
0VF01 Valves,Elbows,Tee's (Fiberglass)
NAD 0J5078
NAD 0J5079
NAD 0J5080
Building Number: 28414 POL BUILDING
Room Number / Name: 100
N NFE Floor Covering (Expansion joint)
BLACK 5 LF
Room Number / Name: 102
BLACK 7 LF
Room Number / Name: EAST EXTERIOR
Y NMC Miscellaneous Material (Caulk)
WHITE CAULK 16 LF
Room Number / Name: SOUTH EXTERIOR
Y NMC Miscellaneous
WHITE CAULK 38 LF
Building Number: 28423 TEST ADMIN OFFICE
Room Number / Name: EAST EXTERIOR
N NMC Miscellaneous
GRAY/WHITE CAULK 1 SF
Room Number / Name: NORTH EXTERIOR
Room Number / Name: SOUTH EXTERIOR
Room Number / Name: WEST EXTERIOR
Building Number: 28414
Room Number / Name: EAST EXTERIOR AROUND
4MC01 Miscellaneous asbestos in caulkCHRY 0J12851
3MC01 Miscellaneous asbestos in caulkCHRY 0J12852
4MC01 Miscellaneous asbestos in caulkCHRY 0J12853
Room Number / Name: ROOM 100
0FE01 Floor Covering
Observed cellulose fibers (90%).
Muffle furnaced.
NAD 0J8200
Room Number / Name: ROOM 102
ACM was observed. Point-count analysis: Trace chrysotile. ACM is
NAD 0J8201
Observed cellulose fibers (90%).
Muffle furnaced.
NAD 0J8202
Room Number / Name: SOUTH SIDE AROUND DO
3MC02 Miscellaneous asbestos in opaque caulkCHRY 0J12854 asbestos in opaque caulkCHRY 0J12855 asbestos in opaque caulkCHRY 0J12856
Building Number: 28423
Room Number / Name: EXTERIOR
0MC01 Miscellaneous
NAD 0J8583
3% cellNAD 0J8584
1% polyethyleneNAD 0J8585
Building Number: 28403 ALIGNMENT BUILDING
Room Number / Name: INTERIOR SOUTH
Y NFT Floor Covering (Tile) 9 X 9 GREEN WITH WHITE
STREAKS
180 SF
N YCT Ceiling Materials (Tile) 2 X 4 DRYWALL TILES 180 SF
Room Number / Name: NORTH
Y NFT Floor Covering (Tile) 9 X 9 GREEN WITH WHITE
450 SF
Y NFT Floor Covering (Tile) 9 X 9 BROWN 50 SF
N YCT Ceiling Materials (Tile) 2 X 4 WHITE FISSURE WITH
SMALL PINHOLE
490 SF
Building Number: 28408 ELECTRIC DISTRIBUTION BUILDING
Room Number / Name: INTERIOR
BLACK 42 LF
Building Number: 28409 CHANGE and REST HOUSE
Room Number / Name: 100-ENTRYHALL
Y NFT Floor Covering (Tile) 12 X 12 CREAM W/MAROON
44 SF
N NWD Wall Covering (Drywall)
FABRIC COVERED DRYWALL 150 SF
N NCD Ceiling Materials (Drywall/Gypsum)
WHITE 44 SF
N NCJ Ceiling Materials (Spackle/Joint
WHITE 15 SF
Room Number / Name: 101
Y NFT Floor Covering (Tile) 12" GREEN W/WHITE 70 SF
WHITE 70 SF
WHITE 23 SF
Room Number / Name: 102
WHITE 70 SF
WHITE 23 SF
Room Number / Name: 103
N YCT Ceiling Materials (Tile) 2X4 WHITE SM FISSURE
W/PINHOLE
110 SF
N YPF Pipe Insulation, Straight (Fiberglass)
3" OD SKIN OVER FIBERGLASS 10 LF
Friday, February 19, 2016 Page 1 of 2
Building Number: 28409 CHANGE and REST HOUSE
Room Number / Name: 104
Y NFT Floor Covering (Tile) 12 X 12 CREAM W/MAROON
589 SF
WHITE 589 SF
WHITE 230 SF
Friday, February 19, 2016 Page 2 of 2
Building Number: 28413 DIGS BUILDING
BLACK 60 LF
BROWN FIBROUS 40 LF
Building Number: 28502 WHITE ROOM A/C BUILDING
Room Number / Name: INTERIOR NORTH
Y NDV Duct/HVAC Materials(Vibration
BLACK-ASSUME ACM 4 SF
N YCT Ceiling Materials (Tile) 2X4 WHITE FISSURE
W/PINHOLE
252 SF
WHITE 252 SF
N NWJ Wall Covering
WHITE 84 SF
Building Number: 28403
15FT01 Floor Covering (Tile) CHRY 0170
0CT01 Ceiling Materials (Tile) 15% cellNAD 026589
0CT01 Ceiling Materials (Tile) 15% cellNAD 026590
0CT01 Ceiling Materials (Tile) 15% cellNAD 026591
Room Number / Name: NORTH ROOM
0CT02 Ceiling Materials (Tile) 20 f.g. 30 cellNAD 026592
0CT02 Ceiling Materials (Tile) 20 f.g. 30 cellNAD 026593
0CT02 Ceiling Materials (Tile) 20 f.g. 30 cellNAD 026594
5FT02 Floor Covering (Tile) asbestos in black masticCHRY 026595
0FT02 Floor Covering (Tile) NAD 026596
0FT02 Floor Covering (Tile) NAD 026597
Building Number: 28408
5% cellNAD 026999
5% cellNAD 027000
5% cellNAD 027001
Building Number: 28409
Room Number / Name: 104, 101 , 104
0CD01 Ceiling Materials
5 cellNAD 0J8067
5 cellNAD 0J8068
5 cellNAD 0J8069
Room Number / Name: CHANG RM 4
0FT02 Floor Covering (Tile) NAD 0166
10FT02 Floor Covering (Tile) CHRY 0167
Room Number / Name: CHANGE RM
0WD01 Wall Covering
NAD 0164
NAD 0165
Room Number / Name: HALLWAY
10FT01 Floor Covering (Tile) CHRY 0160
10FT01 Floor Covering (Tile) CHRY 0161
Room Number / Name: RESTRM
0PF01 Pipe Insulation, NAD 0168
Building Number: 28409
Room Number / Name: RESTRM
0PF01 Pipe Insulation, NAD 0169
Room Number / Name: RESTROOM
0CT01 Ceiling Materials (Tile) 5 f.g. 30 cellNAD 0J8070
0CT01 Ceiling Materials (Tile) 5 f.g. 30 cellNAD 0J8071
0CT01 Ceiling Materials (Tile) 5 f.g. 30 cellNAD 0J8072
Room Number / Name: RM 104, 101 ,104
0CJ01 Ceiling Materials
40 cellNAD 0J8055
40 cellNAD 0J8056
40 cellNAD 0J8057
Building Number: 28413
10 cellNAD 026996
NAD 026997
NAD 026998
0FE02 Floor Covering
98 cellNAD 026993
98 cellNAD 026994
98 cellNAD 026995
Building Number: 28502
Room Number / Name: SOUTH RM
0CT01 Ceiling Materials (Tile) FG- 45% Cellulose-50% Muffle furnaced.
NAD 0J8088
NAD 0J8089
NAD 0J8090
FG- 3% Cellulose-8%NAD 0J8091
FG- 3% Cellulose-8%NAD 0J8092
FG- 3% Cellulose-8%NAD 0J8093
0WJ01 Wall Covering
NAD 0J8094
NAD 0J8095
Cellulose- 50%NAD 0J8096
Building Number: 36004 LOCKER and STORAGE FACILITY
Room Number / Name: BREAKROOM
WHITE SPACKLE 298 SF
N NFT Floor Covering (Tile) 12" BEIGE 784 SF
N YCT Ceiling Materials (Tile) 2X4 NATURAL FISSURE W/
PINHOLES
784 SF
WHITE DRYWALL 896 SF
N NMM Miscellaneous Material (Mastic)
BASEBOARD MASTIC 112 LF
Room Number / Name: EQUIPMENT STORAGE
N NFT Floor Covering (Tile) 12" BEIGE 460 SF
Room Number / Name: LOCKER ROOM
N NFT Floor Covering (Tile) 12" BEIGE 240 SF
WHITE SPACKLE 170 SF
240 SF
WHITE DRYWALL 512 SF
BASEBOARD MASTIC 64 LF
Room Number / Name: STORAGE ROOM
WHITE DRYWALL 320 SF
Building Number: 36004 LOCKER and STORAGE FACILITY
Room Number / Name: STORAGE ROOM
BASEBOARD MASTIC 40 LF
N NFT Floor Covering (Tile) 12" BEIGE 96 SF
96 SF
WHITE SPACKLE 106 SF
Building Number: 36004
Room Number / Name: BREAKROOM
0MM01 Miscellaneous
NAD 026755
NAD 026756
NAD 026757
Room Number / Name: EQUIPMENT STORAGE
2FT02 Floor Covering (Tile) CHRY 026758
2FT02 Floor Covering (Tile) CHRY 026759
Room Number / Name: LOCKER ROOM
NAD 026749
NAD 026750
NAD 026751
NAD 026752
NAD 026753
NAD 026754
Room Number / Name: UNKNOWN
Building Number: 36004
Room Number / Name: UNKNOWN
0CT01 Ceiling Materials (Tile) NAD 0283
0CT01 Ceiling Materials (Tile) NAD 0284
0FT01 Floor Covering (Tile) NAD 0285
0FT01 Floor Covering (Tile) NAD 0286
AMIS Asbestos Report Building 28416
AMIS Asbestos Sampling Report Building 28416
AMIS Asbestos Sampling Report Building 28417
AMIS Asbestos Report Building 28414
AMIS Asbestos Report Building 28423
AMIS Asbestos Sampling Report Building 28414
AMIS Asbestos Sampling Report Building 28423
AMIS Asbestos Report Building 28403
AMIS Asbestos Report Building 28408
AMIS Asbestos Report Building 28409
AMIS Asbestos Report Building 28413
AMIS Asbestos Report Building 28502
AMIS Asbestos Sampling Report Building 28403
AMIS Asbestos Sampling Report Building 28408
AMIS Asbestos Sampling Report Building 28409
AMIS Asbestos Sampling Report Building 28413
AMIS Asbestos Sampling Report Building 28502
AMIS Asbestos Report Building 36004
AMIS Asbestos Sampling Report Building 36004 image2.emf
File details come from the government source that posted it. Updated .