Replace_HVAC_Hangar_G _Fac_1606_Drawings.pdf

PDF 6 MB Posted

Attached to
Replace HVAC System Hangar G Federal contract opportunity
Solicitation number
FA2521-15-B-0002
Issued by
Department of the Air Force Space Command

About this file

Attachment 2 Drawings

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-001

A

R

O M

A N

A

R

O M

A N

V I C

I N

I T

Y

M

A P

L

O C

A T

I O

N

M

A P

N D

D R

A W

I N

G

I N

D E

X

A

R

O M

A N

D B

E H

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

C

D B

C C

A F

S

F

L

CAPE CANAVERAL AIR FORCE STATION

DBEH 13-1588

CAPE CANAVERAL, FLORIDA

LOCATION PLAN

NONE

TRUE

NORTH

01606

CCAFS

INDUSTRIAL

AREA

DESIGN HVAC, HANGAR G, FAC 1606

PROJECT LOCATION

DRAWING INDEX

SHEET

NUMBER

SHEET TITLE

G-001

VICINITY MAP, LOCATION MAP AND DRAWING INDEX

ARCHITECTURAL

A-001

ARCHITECTURAL NOTES, LEGEND AND ABBREVIATIONS

AD-101

NORTH AND SOUTH WING 1ST FLOOR CEILING PLAN - DEMOLITION

AD-102

NORTH AND SOUTH WING 2ND FLOOR CEILING PLAN - DEMOLITION

AC-101

NORTH AND SOUTH WING 1ST FLOOR CEILING PLAN - NEW

AC-102

NORTH AND SOUTH WING 2ND FLOOR CEILING PLAN - NEW

MECHANICAL

M-001

MECHANICAL LEGENDS

M-002

MECHANICAL NOTES AND ABBREVIATIONS

MD-101

MECHANICAL FIRST FLOOR PLAN - DEMO

MD-102

MECHANICAL 2ND FLOOR PLAN - DEMO

MD-103

MECHANICAL PLAN PENTHOUSE - DEMO

MC-101

MECHANICAL FIRST FLOOR PLAN - NEW

MC-102

MECHANICAL 2ND FLOOR PLAN - NEW

MC-301

ENLARGED PENTHOUSE MECHANICAL PLANS

M-501

MECHANICAL DETAILS - 1

M-502

MECHANICAL DETAILS - 2

M-601

MECHANICAL SCHEDULES

M-602

SEQUENCE OF OPERATIONS AND CONTROLS - 1

M-603

SEQUENCE OF OPERATIONS AND CONTROLS - 2

M-604

SEQUENCE OF OPERATIONS AND CONTROLS - 3

ELECTRICAL

E-001

ELECTRICAL LEGENDS

E-002

ELECTRICAL NOTES AND ABBREVIATIONS

E-003

FIRE ALARM NOTES AND LEGEND

ED-101

ELECTRICAL PLAN 1ST FLOOR - DEMO

ED-102

ELECTRICAL PLAN 2ND FLOOR- DEMO

ED-103

ELECTRICAL PLAN UPPER LEVEL- DEMO

EC-101

ELECTRICAL PLAN 1ST FLOOR - NEW

EC-102

ELECTRICAL PLAN 2ND FLOOR - NEW

EC-103

ELECTRICAL PLAN UPPER LEVEL - NEW

E-601

SINGLE LINE DIAGRAM - NEW

E-602

PANEL SCHEDULES

U S

F

T

H

C

I V

I L

G

I N

E E

R

S

Q U

A D

R O

N

S

B

U I

T

D

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

O

F

A

D

R

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

A-001

M

A

L L E

N F

L A

B O

Y

R

C

O N

S T

A N

T I N

I D

E

A R

C H

I T

E C

T U

R A

L

N

O T

E S

L E

G E

B

R E

V I A

T I O

N S

R

C

O N

S T

A N

T I N

I D

E

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

GENERAL REMOVAL AND INSTALLATION NOTES:

1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH PROJECT DRAWINGS AND

SPECIFICATIONS. FOR PURPOSES OF CLARIFICATION 'PROVIDE' MEANS PROVIDE AND INSTALL

U.O.N.

2. INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE OBSERVABLE IN PLACE

ELEMENTS. CONTRACTOR TO FIELD MEASURE AND VERIFY REQUIREMENTS FOR EXACT

DIMENSIONS. PRIOR TO START OF ALL WORK OPERATIONS, CONTRACTOR SHALL FIELD

VERIFY CURRENT PROJECT CONDITIONS. ALL CONSTRUCTION REQUIREMENTS SHALL BE

COORDINATED WITH THE CONTRACTING OFFICER.

3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS FOR PROPOSED WORK, PRIOR TO

START OF WORK.

4. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND

SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE ON THE PROJECT,

EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.

5. ALL REFERENCES TO MANUFACTURER NAMES ARE FOR IDENTIFICATION ONLY; THE

REFERENCES ARE NOT INTENDED TO LIMIT SELECTION OF SIMILAR ITEMS FROM OTHER

MANUFACTURERS WITH APPROVAL OF CONTRACTING OFFICER.

6. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS UPON THE

INTERACTION OF VARIOUS CONNECTED COMPONENTS. PROVIDE ADEQUATE BRACING,

SHORING, AND OTHER TEMPORARY SUPPORTS AS REQUIRED TO SAFELY COMPLETE THE

WORK.

7. NOTATIONS FOR REMOVAL AND INSTALLATION REQUIREMENTS SHALL APPLY TO ALL SHEETS

IN THIS DRAWING PACKAGE.

8. WHERE REQUIRED, ALL NEW STEEL STRUCTURAL MEMBERS SHALL BE ASTM 36.

9. WHERE REQUIRED AND NOT OTHERWISE SPECIFIED, ALL WELDING SHALL BE DONE BY AWS

CERTIFIED WELDERS.

10. DISPOSAL OF ALL CONSTRUCTION DEBRIS SHALL BE AS DESCRIBED IN THE SPECIFICATIONS.

ANY UNFORESEEN CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE

CONTRACTING OFFICER.

11. CONTRACTOR SHALL TAKE EXTREME CARE TO AVOID DAMAGE TO EXISTING ITEMS INTENDED

TO BE REMOVED, RE-USED, OR RECYCLED.

12. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION, WHEREVER WORK IS TO BE

PERFORMED IN FINISHED/OCCUPIED SPACES TO PREVENT DAMAGE TO ADJACENT AREAS,

EQUIPMENT, OR FURNISHINGS; TO PREVENT ACCIDENTAL INJURY TO BUILDING OCCUPANTS

AND THE PUBLIC; TO PREVENT THE SPREADING OF DUST, DIRT, DEBRIS, AND MOISTURE FROM

THE AREA WHERE WORK IS BEING PERFORMED; AND TO PREVENT DUST, DIRT, DEBRIS, AND

MOISTURE FROM GETTING ON OR IN THE BUILDING OCCUPANTS FURNISHINGS OR

EQUIPMENT. CONTRACTOR SHALL PROVIDE METHOD/CONSTRUCTION OF DUST

CONTROL/BARRIER TO CONTINUE OFF. FOR APPROVAL PRIOR TO START OF DEMO WORK.

13. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE GOVERNMENT, ANY DAMAGE DONE BY

HIMSELF OR HIS EMPLOYEES. HE SHALL ALSO BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED TO PROPERLY INSTALL HIS WORK.

14. RELOCATION OF BUILDING OCCUPANTS AND MISSION SPECIFIC ITEMS, EQUIPMENT AND

SUPPLIES SHALL BE UNDERTAKEN BY THE CONTRACTOR BUT SHALL BE COORDINATED WITH

CONTRACTING OFFICER AND WITH USER POINT OF CONTACT PRIOR TO THE START OF

DEMOLITION WORK. ALL USER RELOCATED EQUIPMENT SHALL BE MOVED PRIOR TO START

OF WORK. ALL EQUIPMENT TO REMAIN SHALL BE PROTECTED PER NOTE 17; CONTRACTOR

SHALL PROVIDE - FOR APPROVAL PRIOR TO START OF WORK A PLAN AND METHOD TO

PROTECT IN-PLACE EQUIPMENT.

15. ALL CONSTRUCTION REQUIREMENTS INCLUDING ENVIRONMENTAL ASBESTOS AND HEAVY

METAL DEMOLITION SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.

16. THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER FOR ASBESTOS AND LEAD

SURVEY REPORTS IF THE PRESENCE OF ANY LEAD, CADMIUM, CHROMIUM OR ASBESTOS

CONTAINING MATERIALS IS SUSPECTED OR DISTURBED AND NOT IDENTIFIED AS SUCH BY

THIS CONTRACT, BUT REQUIRED TO BE DISTURBED TO PERFORM CONTRACT WORK, THEN

THE CONTRACTING OFFICER SHALL BE NOTIFIED AT ONCE. UNDER NO CIRCUMSTANCES

SHALL ANY LEAD OR ASBESTOS CONTAINING MATERIALS (ACM) BE REMOVED WITHOUT THE

CONTRACT OFFICER APPROVAL. FOR REFERENCE SEE LEGEND ON COVER DRAWING G-001.

17. THE REQUIREMENTS ESTABLISHED IN THE OSHA STANDARD FOR LEAD, CADMIUM AND

CHROMIUM IN CONSTRUCTION, 29 CFR 1926.62, 29 CFR 1926.63, 29 CFR 1926.1127 AND 29

CFR1926.1126, RESPECTIVELY, MUST BE COMPLIED WITH FOR ANY CONSTRUCTION,

REFURBISHMENT, OR DEMOLITION OPERATIONS WHICH INVOLVES THE DISTURBANCE OF

COATINGS WHICH CONTAIN HAZARDOUS METALS. THE LEAD, CADMIUM AND CHROMIUM

STANDARDS ESTABLISH SPECIFIC PERSONAL PROTECTIVE EQUIPMENT TO INCLUDE

RESPIRATORY PROTECTION BASED ON THE TYPE OF WORK TO BE PERFORMED (SEE

SPECIFICATIONS FOR ADDITIONAL DATA). FOR REFERENCE SEE LEGEND ON COVER DRAWING

G-001.

18. PERSONNEL WHO UTILIZE RESPIRATORY EQUIPMENT SHALL COMPLY WITH OSHA STANDARD

29 CFR 1910.134. THE REQUIREMENTS FOR PROTECTION OF PERSONNEL DURING

DISTURBANCE OF COATINGS CONTAINING HAZARDOUS METALS APPLY WHEN THE CONTENT

HAS BEEN IDENTIFIED AS "LOW". OSHA STANDARD 29 CFR 1926.62 DOES NOT INDICATE A

LEVEL OF CONTENT LIMIT. IF LEAD IS PRESENT AT ANY LEVEL THE STANDARD SHALL BE

ADHERED. FOLLOW THE 45TH SPACE WING GUIDANCE FOR THE REMOVAL OF MATERIALS AND

COATINGS CONTAINING HEAVY METALS.

19. IF PRODUCTS ARE TO BE USED DURING THE PROJECT WHICH MAY CONTAIN HAZARDOUS

CHEMICALS, THE MATERIAL SAFETY DATA SHEET (MSDS) FOR THOSE PRODUCTS SHALL BE

SUBMITTED TO THE CAPE HYGIENE OFFICE FOR REVIEW TO DETERMINE PERSONAL

PROTECTIVE EQUIPMENT REQUIREMENT FOR PERSONNEL USING PRODUCTS ALONG WITH

CONTRACTOR'S SAFETY PLAN, PRIOR TO START OF WORK.

DISSIMILAR METALS:

CONTRACTOR SHALL PROVIDE ADEQUATE SEPARATION OF DISSIMILAR METALS BY

APPROPRIATE MEANS, SUCH AS 15# SEPARATION FELT FOR ROOFS AND ASPHALTIC

TAPE, NEOPRENE TAPE, PEEL AND STICK TAPE, OR ASPHALTIC PAINT AT OTHER

LOCATIONS AS REQUIRED.

ALL CONNECTORS, FASTENERS, BOLTS, ETC., SHALL BE SELECTED IN ORDER TO

PREVENT OR MINIMIZE ANY GALVANIC REACTION BETWEEN DISSIMILAR METALS. AND

UNLESS OTHERWISE NOTED PROVIDE 304 STAINLESS STEEL.

CONTRACTOR SHALL SEQUENCE DEMO AND NEW WORK TO FULLY COMPLETE ALL

REQUIRED CONSTRUCTION WORK. PHASED CONSTRUCTION IS ACCEPTABLE WHERE

APPROVED BY THE CONTRACTING OFFICER. CONTRACTOR SHALL PROVIDE ADEQUATE

PROTECTION OF NEW AND EXISTING ASSEMBLIES AGAINST INCLEMENT WEATHER AND

CONSTRUCTION DAMAGE.

SEQUENCING OF WORK:

ACT - ACOUSTIC CEILING TILE

AFF - ABOVE FINISHED FLOOR

ALUM - ALUMINUM

ANOD - ANODIZED

A.T. - ANTI TERRORIST

ATFP - ANTI TERRORIST FORCE

PROTECTION

BLDG - BUILDING

CID - COMPREHENSIVE INTERIOR

DESIGN

CONC - CONCRETE

CONT - CONTINUOUS

CMDR - COMMANDER'S

CMU - CONCRETE MASONRY UNIT

CPT - CARPET

CT - CERAMIC TILE

DN - DOWN

DWGS - DRAWINGS

EXIST - EXISTING

EXT - EXTERIOR

F.G. - FIBERGLASS

FIN FL - FINISH FLOOR

F.V. - FIELD VERIFY

GA - GAUGE

GALV - GALVANIZED

GRT - GROUT

GYP BD - GYPSUM WALL BOARD

GWB - GYPSUM WALL BOARD

H.M. - HOLLOW METAL

HW - HARDWARE

HDW - HARDWARE

INSUL - INSULATION

INT - INTERIOR

MAX - MAXIMUM

MFR - MANUFACTURER

MIN - MINIMUM

M.O. - MASONRY OPENING

MTL - METAL

MRGWB - MOISTURE RESIST GYPSUM

WALL BOARD

MTD - MOUNTED

NOM - NOMINAL

O.C. - ON CENTER

O.D. - OUTSIDE DIAMETER

P/PT - PAINT

P.T. - PRESSURE TREATED

PLYWD - PLYWOOD

PL - PLASTIC LAMINATE

PLST - PLASTER

PSI - POUNDS PER SQUARE INCH

PTS - POINTS

PVC - POLYVINYL CHLORIDE

REINF - REINFORCED

R.S. - RUBBER STRINGER

RTNR - RUBBER TREAD/NOSE/RISER

S.C. - SOLID CORE

SCHED - SCHEDULE

SCH - SCHEDULE

SMS - SHEET METAL SCREW

S.S. - SOLID SURFACE

ST. STL. - STAINLESS STEEL

TBB - TILE BACKER BOARD

TPD - TOILET PAPER DISPENSER

TYP - TYPICAL

U.O.N - UNLESS OTHERWISE NOTED

VWB - VINYL WALL BASE

VCT - VINYL COMPOSITION TILE

RM 123

GYP BD CEILING/SOFFIT TO BE

REMOVED

GYP BD CEILING/SOFFIT TO REMAIN

IN PLACE

EXISTING STUD WALLS TO

BE REMOVED

EXISTING DOOR TO BE REMOVED

EXISTING DOOR TO REMAIN

EXISTING CMU WALLS TO

BE REMOVED

EXISTING CMU WALLS

EXISTING STUD GYP BD WALLS

NEW STUD WALLS. ASSURE THAT

EXTERIOR WALL SURFACES ARE FLUSH

WITH ADJACENT WALLS. FINISH TO

MATCH ADJACENT SURFACES

NEW CMU INFILL

NEW DOORS

EXISTING ACOUSTIC CEILING TILE

NEW GYP BD OR DUROCK CEILING

EXTENT OF ACOUSTICAL CEILING TILE

REMOVAL, INCLUDING ANY CEILING

MOUNTED FIXTURES AND/OR EQUIPMENT

NEW ACOUSTIC CEILING TILE

WHEELCHAIR TURNAROUND

ROOM NAME/NUMBER

WALL TYPE

DOOR TYPE (ON DEMO PLAN, SYMBOL

DENOTES DOOR TO BE REINSTALLED

IN DIFFERENT LOCATION UNDER NEW

WORK. NUMBERS CORRESPOND TO

NUMBERING ON NEW DOOR

SCHEDULE)

RESTROOM ACCESSORY

AREA OF FLOOR FINISH

TO BE REMOVED

(ALL MAY NOT BE USED) FOR ADDITIONAL END ITEMS

LEGEND; REFER TO RESPECTIVE DISCIPLINE DRAWINGS

APPLICABLE CODES

WORK SHALL BE IN COMPLIANCE WITH THE FOLLOWING CODES AND THEIR

LATEST REVISION AND WITH PROJECT SPECIFICATIONS:

BUILDING CONSTRUCTION AND SAFETY NFPA 5000

LIFE SAFETY CODE NFPA 101

NATIONAL ELECTRIC CODE/INTERNATIONAL ELECTRICAL CODE

SERIES, NEC - NFPA 70

NATIONAL FIRE ALARM CODE NFPA 72

STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEM IN

OCCUPANCIES UP TO AND INCLUDING 4 STORIES IN HEIGHT, NFPA 13

STANDARD ON TYPES OF BLDG. CONSTRUCTION NFPA 2202012

INTERNATIONAL BUILDING CODE

INTERNATIONAL MECHANICAL CODE

FIRE PROTECTION ENGINEERING FOR FACILITIES UFC 3-600-012013

FORCE PROTECTION UFC 4-010-01

GENERAL BUILDING REQUIREMENTS UFC 1-200-01

INTERIOR ELECTRICAL SYSTEMS UFC 3-520-01

2003 AIR FORCE SIGN STANDARD UFC 3-120-01

20. THERE SHALL BE NO AIR EMISSIONS OF DEBRIS AND CONTRACTOR SHALL COMPLY WITH 40 CFR

763 AND 29 CFR 1910, GENERAL HEALTH AND SAFETY FOR ALL EMPLOYEES. ANY SANDBLASTING

OR NEEDLEJET OPERATIONS MUST BE APPROVED BY THE CONTRACTING OFFICER AND SHOULD

HAVE FULL CONTAINMENT.

21. IN THE EVENT ACM IS IDENTIFIED, PREPARATION OF BUILDING SURFACES MAY CREATE

DISTURBANCES OF NON-FRIABLE ACM. CAUTION MUST BE UTILIZED DURING THE SUBJECT

PREPARATIONS TO ENSURE THAT DAMAGE/DISTURBANCE TO THE ACM DOES NOT OCCUR.

COATING OF THE SUBJECT SURFACES SHALL BE PERFORMED IN ACCORDANCE WITH THE

TRAINING AND HANDLING REQUIREMENTS OF 29 CFR 1926.1101 FOR CLASS II ASBESTOS WORK

AND AIR FORCE STANDARD SPECIFICATIONS 29 CFR 1926.58, 40 CFR 763, 40 CFR 61, SUBPART M.

AF OPLAN 19-15 FLORIDA ADMINISTRATIVE CODE CHAPTER 62-257 & FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION FORM 62-257.900(1). FDEP FORM 62-257.900(1) (NOTICE OF

DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED TO FDEP AT LEAST 10 DAYS

PRIOR TO ACM REMOVAL. THE CCAFS LANDFILL OPERATOR MUST BE NOTIFIED WITHIN 24 HOURS

PRIOR TO DISPOSAL.

22. IF METALS AND/OR PCB IN PAINTED SURFACES EXIST, THERE WILL BE CONCERNS ABOUT

PARTICULATE MATTER IN RINSATE AND ABOUT LEACHABILITY AND IMPACTS TO SURROUNDING

ENVIRONMENTS. NON-LIQUID PCB MATERIAL SHOULD BE HANDLED AND TESTED IN ACCORDANCE

WITH 40 CFR 761. CONTRACTOR SHALL PROVIDE SUBMITTAL FOR ENVIRONMENTAL WORK PLAN

TO ADDRESS CONTRACTOR IDENTIFIED BEST MEANS OF PRACTICE ISSUES IN COMPLIANCE WITH

FDEP, EPA AND OSHA. ONLY THOSE PERSONNEL TRAINED IN ABATEMENT HANDLING AND

DISPOSAL MAY PERFORM WORK AND SHALL DO SO IN A MANNER THAT MINIMIZES GENERATION

OF AIR-BORNE DEBRIS. WATER, AND DEBRIS SHALL BE COLLECTED, TESTED, MANAGED AND

DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND AIR FORCE REGULATIONS.

(NOT ALL MAY BE APPLICABLE)

ARCHITECTURAL LEGEND: ABBREVIATIONS:

(ALL MAY NOT BE USED) FOR ADDITIONAL

END ITEMS ABBREVIATIONS; REFER TO

RESPECTIVE DISCIPLINE DRAWINGS

RM 121

RM 121A

RM 109

RM 105

RM 103

1MECH1

RM 105A

RM 111RM 115RM 118

12'-0"8"

8"

8"

RM 119

46'-0"

6'-7 7/8"

8"

8"

8"

17'-9 3/4"

8"

8"

8"

20'-10 1/8"

8"

20'-0" 20'-0" 19'-11" 20'-0" 11'-5 3/4" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"

19'-6 5/8"4'-8 3/8" 20'-2 1/4"

RM 124 RM 120

RM 106 RM 146

RM 104

RM 102A

RM 102

RM 116

49'-8 7/8" 46'-5 13/16"

8"

8"

8"

8"

19'-6 5/8"4'-8 3/8"

NORTH WING

SOUTH WING

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

AD-101

M

A

L L E

N F

L A

B O

Y

R

C

O N

S T

A N

T I N

I D

E

N O

R T

H

A

U

W

N

G

O

O R

C E

I L

I N

G

P

L A

N

D

E M

O L

I T

I O

N

R

C

O N

S T

A N

T I N

I D

E

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

L

SCALE:

NORTH WING 1ST FLOOR CEILING PLAN - DEMOLITION

1/8" = 1'-0"

T

R

U

E

N

O

R

T

H

NORTH

PLAN

EXISTING SOUTH

HIGH BAY WALL

SHOWN FOR

REFERENCE

K JK J H G F E D CD C B A

L K JK J H G F E D CD C B A

GENERAL NOTES:

1. ALL INTERIOR CLG MOUNTED ABANDONED END

ITEMS SHALL BE REMOVED THROUGHOUT ALL

AREAS OF WORK AND SHALL BE SAVED FOR

RECYCLING BY THE GENERAL CONTRACTOR,

UNLESS OTHERWISE DIRECTED BY THE

CONTRACTING OFFICER.

2. CONTRACTOR SHALL PROTECT ALL STRUCTURAL

BUILDING MEMBERS AND ALL REMAINING WALLS

AND DECK; FROM ANY DAMAGE DURING ALL

PHASES OF CONSTRUCTION.

3. UNLESS INTENDED FOR MODIFICATION BY PROJECT

CONSTRUCTION, CONTRACTOR SHALL PROTECT

ALL ADJACENT CONSTRUCTION FROM DAMAGE

DURING ALL PHASES OF CONSTRUCTION. REPLACE

ANY DAMAGED MATERIALS AND CONSTRUCTION,

AT NO ADDITIONAL COST TO THE GOVERNMENT.

4. IF THE CONTRACTOR SUSPECTS THE PRESENCE OF

HAZARDOUS MATERIALS IN AREAS OF WORK NOT

PREVIOUSLY IDENTIFIED, HE SHALL NOT DISTURB

THE SPECIFIC AREA OF WORK BUT SHALL NOTIFY

THE CONTRACTING OFFICER FOR DIRECTIONS.

5. FOR CLG MOUNTED END ITEM REMOVAL SEE

SUBSEQUENT DISCIPLINE DWGS.

FLAG NOTES - DEMOLITION WORK:

CEILING:

1. REMOVE AND DISPOSE EXISTING 2x2 LAY-IN

ACOUSTIC TILES, GRID, FASTENERS AND

ACCESSORIES THROUGHOUT AREAS OF WORK. SEE

SUBSEQUENT DRAWINGS FOR ANY ITEMS TO

REMAIN AND TO BE SUPPORTED IN-PLACE.

2. SPACE OPEN TO STRUCTURE - N.I.C.

3. EXISTING CEILING TO REMAIN - N.I.C.

4. FOR REMOVAL OF CEILING MOUNTED MECHANICAL,

ELECTRICAL AND FIRE PROTECTION END ITEMS

REFER TO SUBSEQUENT DISCIPLINE DRAWINGS.

SHOWN FOR REFERENCE.

5. EXISTING CEILING PERIMETER TRIM PIECE TO

REMAIN.

SCALE:

SOUTH WING 1ST FLOOR CEILING PLAN - DEMOLITION

1/8" = 1'-0"

EXISTING NORTH HIGH

BAY WALL SHOWN

FOR REFERENCE

EXISTING SOUTH

EXTERIOR WALL

SHOWN FOR

REFERENCE

EXISTING NORTH

EXTERIOR WALL SHOWN

FOR REFERENCE

TYP

TYP

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

TYP

EXISTING OFFICE

TOWER AND

STAIR SHOWN

FOR REFERENCE

T

R

U

E

N

O

R

T

H

NORTH

PLAN

TYPTYPTYP

TYP

T

R

U

E

N

O

R

T

H

NORTH

PLAN

SCALE:

KEY PLAN

N.T.S.

RM 221A

RM 221B

RM 219

RM 209F RM 209E RM 209CRM 209D RM 209B

RM 209A

RM 205 RM 205B

RM 205A

2HALL1

RM 203

11'-3 1/16" 9'-3" 9'-2 3/4" 10'-2" 16'-11 3/16" 13'-10" 14'-3 1/2"

139'-2"

RM 224

RM 220A

1HALL2

RM 220B RM 220D RM 212ERM 212FRM 212E RM 212 RM 212B

RM 212C RM 204 RM 202A RM 202B

RM 212A

20'-0" 20'-0" 19'-11" 20'-0" 11'-6 5/8" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"

19'-6 5/8"4'-8 3/8" 20'-2 1/4"

10'-3 3/16"10'-0 1/2" 9'-2 1/4" 9'-5 13/16"

9'-5 15/16" 12'-10 3/16"

RM 220C

14'-11 1/8" 19'-3 7/16" 10'-6 1/8" 11'-7 3/8"

139'-2"

NORTH WING

SOUTH WING

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

AD-102

M

A

L L E

N F

L A

B O

Y

R

C

O N

S T

A N

T I N

I D

E

N O

R T

H

A

U

N

G

O

O R

C E

I L

I N

G

P

L A

N

D

E M

O L

I T

I O

N

R

C

O N

S T

A N

T I N

I D

E

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

SCALE:

NORTH WING 2ND FLOOR CEILING PLAN - DEMOLITION

1/8" = 1'-0"

L K JK J H G F E D CD C B A

EXISTING NORTH HIGH

BAY WALL SHOWN

FOR REFERENCE

EXISTING NORTH

EXTERIOR WALL

SHOWN FOR

REFERENCE

FLAG NOTES - DEMOLITION WORK:

CEILING:

1. REMOVE AND DISPOSE EXISTING 2x2 LAY-IN

ACOUSTIC TILES, GRID, FASTENERS AND

ACCESSORIES THROUGHOUT AREAS OF WORK.

SEE SUBSEQUENT DRAWINGS FOR ANY ITEMS TO

REMAIN AND TO BE SUPPORTED IN-PLACE.

2. SPACE OPEN TO STRUCTURE - N.I.C.

3. EXISTING CEILING TO REMAIN - N.I.C.

4. FOR REMOVAL OF CEILING MOUNTED MECHANICAL,

ELECTRICAL AND FIRE PROTECTION END ITEMS

REFER TO SUBSEQUENT DISCIPLINE DRAWINGS.

SHOWN FOR REFERENCE.

SCALE:

SOUTH WING 2ND FLOOR CEILING PLAN - DEMOLITION

1/8" = 1'-0"

EXISTING SOUTH HIGH

BAY WALL SHOWN

FOR REFERENCE

L K JK J H G F E D CD C B A

TYP

TYP

EXISTING OFFICE TOWER AND

STAIR SHOWN FOR REFERENCE

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

T

R

U

E

N

O

R

T

H

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

TYPTYP

EXISTING SOUTH

EXTERIOR WALL

SHOWN FOR RE

T

R

U

E

N

O

R

T

H

NORTH

PLAN

SCALE:

KEY PLAN

TYP

RM 121

RM 121A

RM 109

RM 105

RM 103

1MECH1RM 105A

RM 111RM 115RM 118

12'-0"8"

8"

8"

RM 119

46'-0"

6'-7 7/8"

8"

8"

8"

17'-9 3/4"

8"

8"

8"

20'-10 1/8"

8"

20'-0"20'-0" 20'-0" 19'-11" 20'-0" 11'-6 5/8" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"

19'-6 5/8"4'-8 3/8" 20'-2 1/4"

49'-8 7/8"

46'-5 13/16"

8"

8"

8"

RM 124 RM 120

RM 106 RM 146

RM 104

RM 102A

RM 102

RM 116

8"

NORTH WING

SOUTH WING

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

AC-101

M

A

L L E

N F

L A

B O

Y

R

C

O N

S T

A N

T I N

I D

E

N O

R T

H

A

U

N

G

O

O R

C E

I L

I N

G

P

L A

N

N

E W

R

C

O N

S T

A N

T I N

I D

E

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

SCALE:

NORTH WING 1ST FLOOR CEILING PLAN - NEW CONSTRUCTION

1/8" = 1'-0"

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

L K JK J H G F E D CD C B A

EXISTING NORTH HIGH

BAY WALL SHOWN FOR

REFERENCE

EXISTING NORTH

EXTERIOR WALL

SHOWN FOR

REFERENCE

SCALE:

SOUTH WING 1ST FLOOR CEILING PLAN - NEW CONSTRUCTION

1/8" = 1'-0"

EXISTING SOUTH

HIGH BAY WALL

SHOWN FOR

REFERENCE

L K JK J H G F E D CD C B A

EXISTING SOUTH

EXTERIOR WALL

SHOWN FOR

REFERENCE

TYP

3 1

TYP

FLAG NOTES - NEW WORK:

CEILING:

1. PROVIDE AND INSTALL NEW 2'-0" x 2'-0" x 3/4"

NON-COMBUSTIBLE MOISTURE RESISTANT, FINE

FISSURED, SQUARE TEGULAR EDGE LAY-IN ACOUSTIC

TILES, IN 15/16" EXPOSED MEDIUM DUTY GRID; PROVIDE

FRAMING SUPPORTS AND ATTACHMENTS AS REQUIRED

FOR NEW CEILING PLAN. PER ASTM C636/C636M.

2. SPACE OPEN TO STRUCTURE - N.I.C.

3. EXISTING CEILING TO REMAIN - N.I.C.

4. PROVIDE BLOCKING AS REQUIRED; FOR ANY CEILING

MOUNTED MECHANICAL, ELECTRICAL AND COMM

FIXTURES OR END ITEMS; CONTRACTOR SHALL

COORDINATE WITH SUBSEQUENT DISCIPLINE

DRAWINGS.

5. FOR NEW CEILING MOUNTED MECHANICAL,

ELECTRICAL AND FIRE ALARM END ITEMS REFER TO

SUBSEQUENT DISCIPLINE DRAWINGS.

6. APPLY 2-FINISH COAT PAINT AT EXISTING CEILING

PERIMETER TRIM PIECE TO MATCH EXISTING COLORS.

GENERAL NOTES:

1. PROVIDE BLOCKING AT ATTACHMENT OF WALL/CLG

MOUNTED END ITEMS, INCLUDING, BUT NOT LIMITED

TO MECHANICAL, ELECTRICAL AND COMM END ITEMS,

TYP. ALL LOCATIONS. CONTRACTOR SHALL

COORDINATE WITH SUBSEQUENT DISCIPLINE DWGS

TO IDENTIFY LOCATION OF NEW WALL/CLG MOUNTED

END ITEMS.

2. PROVIDE INTUMESCENT SEALANT AND BACKER ROD

AT ALL PERIMETER THRU-WALL EQUIPMENT

PENETRATIONS.

3. CONTRACTOR SHALL VERIFY R.O. DIMENSIONS PRIOR

TO PURCHASE AND INSTALLATION OF MECHANICAL

EQUIPMENT FOR THRU-WALL PENETRATIONS, TYP.

4. WHERE EXISTING WALL FINISH IS DAMAGED DUE TO

CEILING DEMOLITION, PROVIDE NEW FINISH TO

MATCH EXISTING; FEATHER NEW FINISH INTO

EXISTING FOR CONTIGUOUS APPEARANCE, OR

RE-PAINT FROM CORNER TO CORNER AREAS THAT

CANNOT BE FEATHERED; NO SEAMS OR PATCH MARKS

SHALL BE APPARENT BETWEEN NEW AND EXISTING

CONSTRUCTION.

5. AFTER COMPLETION OF NEW WORK; CONTRACTOR

SHALL ENSURE THAT ALL NEW AND EXISTING

SURFACES ARE CLEAN.

5 3

EXISTING OFFICE TOWER AND STAIR

SHOWN FOR REFERENCE

T

R

U

E

N

O

R

T

H

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

TYP TYP TYP

TYP

TYP

T

R

U

E

N

O

R

T

H

NORTH

PLAN

SCALE:

KEY PLAN

RM 221A

RM 221B

RM 219

RM 209F RM 209E RM 209CRM 209D RM 209B

RM 209A

RM 205 RM 205B

RM 205A

2HALL1

RM 203

11'-3 1/16" 9'-3" 9'-2 3/4" 10'-2" 16'-11 3/16" 13'-10" 14'-3 1/2"

139'-2"

RM 224

RM 220A

1HALL2

RM 220B RM 220D RM 212ERM 212FRM 212E RM 212 RM 212B

RM 212C RM 204 RM 202A RM 202B

RM 212A

20'-0" 20'-0" 19'-11" 20'-0" 11'-6 5/8" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"

19'-6 5/8"4'-8 3/8" 20'-2 1/4"

10'-3 3/16"10'-0 1/2" 9'-2 1/4" 9'-5 13/16"

9'-5 15/16" 12'-10 3/16"

RM 220C

14'-11 1/8" 19'-3 7/16" 10'-6 1/8" 11'-7 3/8"

139'-2"

HANGER RODS

(1 MINIMUM)

AT EACH CORNER

OF LIGHT FIXTURE

LIGHT FIXTURE

WIRE HANGER AT

4'-0" O.C. MAX

CONTINUOUS

MAIN RUNNERS

ACOUSTICAL

CEILING UNITS

CROSS RUNNERS

AT FIXTURE

HANGER RODS

WIRE HANGER AT

4'-0" O.C. MAX

CONTINUOUS

MAIN RUNNERS

ACOUSTICAL

CEILING UNITS

DIFFUSER

MAIN RUNNER

AT 4'-0" O.C.

WHERE OCCURS

CROSS RUNNER

AT FIXTURE

NORTH WING

SOUTH WING

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

AC-102

M

A

L L E

N F

L A

B O

Y

R

C

O N

S T

A N

T I N

I D

E

N O

R T

H

A

U

N

G

O

O R

C E

I L

I N

G

P

L A

N

N

E W

R

C

O N

S T

A N

T I N

I D

E

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

SCALE:

NORTH WING 2ND FLOOR CEILING PLAN - NEW CONSTRUCTION

1/8" = 1'-0"

SCALE:

NORTH WING 2ND FLOOR CEILING PLAN - NEW CONSTRUCTION

1/8" = 1'-0"

L K JK J H G F E D CD C B A

EXISTING NORTH HIGH

BAY WALL SHOWN

FOR REFERENCE

EXISTING NORTH

EXTERIOR WALL

SHOWN FOR

REFERENCE

L K JK J H G F E D CD C B A

TYP

34 4

TYP

EXISTING OFFICE TOWER AND STAIR

SHOWN FOR REFERENCE

FLAG NOTES - NEW WORK:

CEILING:

1. PROVIDE AND INSTALL NEW 2'-0" x 2'-0" x 3/4"

NON-COMBUSTIBLE MOISTURE RESISTANT, FINE FISSURED,

SQUARE TEGULAR EDGE LAY-IN ACOUSTIC TILES, IN 15/16"

EXPOSED MEDIUM DUTY GRID; PROVIDE FRAMING SUPPORTS

AND ATTACHMENTS AS REQUIRED FOR NEW CEILING PLAN.

PER ASTM C636/C636M.

2. SPACE OPEN TO STRUCTURE - N.I.C.

3. EXISTING CEILING TO REMAIN - N.I.C.

4. PROVIDE BLOCKING AS REQUIRED; FOR ANY CEILING

MOUNTED MECHANICAL, ELECTRICAL AND COMM FIXTURES

OR END ITEMS; CONTRACTOR SHALL COORDINATE WITH

SUBSEQUENT DISCIPLINE DRAWINGS.

5. FOR NEW CEILING MOUNTED MECHANICAL, ELECTRICAL AND

FIRE ALARM END ITEMS REFER TO SUBSEQUENT DISCIPLINE

DRAWINGS.

TYP

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

SCALE:

TYP LIGHT INSTALLATION DETAIL

N.T.S.

SCALE:

TYP DIFFUSER INSTALLATION DETAIL

N.T.S.

T

R

U

E

N

O

R

T

H

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

EXISTING SOUTH HIGH

BAY WALL SHOWN

FOR REFERENCE

EXISTING SOUTH

EXTERIOR WALL

SHOWN FOR RE

TYP

TYP TYP

SCALE:

KEY PLAN

N.T.S.

T

R

U

E

N

O

R

T

H

NORTH

PLAN

TYP

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

M-001

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

G

E N

D S

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

-EXISTING FIRE DAMPER TO REMOVED

M

FM

-MANUAL BALANCING DAMPER

-AIR FLOW MEASURING STATION

-MOTOR OPERATED CONTROL DAMPER (MOD)

-FLEXIBLE CONNECTION

-ACCESS DOORS, VERTICAL OR HORIZONTAL

-DOOR GRILLE

-UNDERCUT DOOR

-SPIN-IN TAKE-OFF

-RECTANGLE-TO-ROUND TAKE-OFF

DNUP

-TRANSITION, SQUARE TO ROUND

UP

DOWN

-CEILING EXHAUST

-CEILING RETURN

-STANDARD BRANCH TAKE-OFF

-RADIUS ELBOW

-TRANSITION, ECCENTRIC

-FLEXIBLE DUCT

-CHANGE OF ELEVATION

-DUCT ELBOW, NEGATIVE PRESSURE, RETURN

-DUCT ELBOW, EXHAUST

-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY)

-TRANSITION, CONCENTRIC

-SQUARE THROAT TEE

-RADIUS TEE

-ROUND DIFFUSER

-DOUBLE WALL (K27) LINED DUCTWORK

-EXISTING TO BE REMOVED

M-1

-TEMPERATURE SENSOR

-MOTORIZED CONTROL DAMPER

-HUMIDISTAT/HUMIDITY SENSOR

-THERMOSTAT/TEMPERATURE SENSOR

-REVISION REFERENCE

-PRESSURE SENSOR

-DUCT SMOKE DETECTOR

-CONNECT TO EXISTING

-DEMOLISH TO POINT INDICATED

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT

-45° PIPE RISE (R) / DROP (D)

-CONDENSATE SUPPLY

-VALVE ON RISER

-CAP

-CONNECTION, BOTTOM

-CONNECTION, TOP

-COUPLING

-ELBOW, 90°

-ELBOW, 45°

-ELBOW, TURNED DOWN

-ELBOW, TURNED UP

-TEE, OUTLET DOWN

-TEE, OUTLET UP

D

D

CR

-CONDENSATE RETURN

-P-TRAP

EQUIP

-RELIEF VALVE

HVAC SYMBOL LEGEND

-BACKDRAFT DAMPER

-PIPE ANCHORS

-CONCENTRIC REDUCER

-ECCENTRIC REDUCER

-FLOW DIRECTION

-SHEET NOTE CALLOUT

-SHEET NOTE CALLOUT

-FLAG NOTE CALLOUT

-CEILING MOUNTED ACCESS DOOR

-RECTANGULAR DUCT SECTION UP, EXHAUST

SYMBOL DESCRIPTIONSYMBOL DESCRIPTION

HVAC PIPING SYMBOL LEGEND

SYMBOL DESCRIPTION

-EXHAUST DUCT UP THROUGH SLAB WITH

FAN ON ROOF ABOVE

-EXHAUST FAN ON ROOF WITH DUCT

DOWN THROUGH ROOF

-CEILING DIFFUSER, ROUND NECK (CEILING

DIFFUSERS ARE 4-WAY THROW U.O.N.)

-CEILING DIFFUSER, RECTANGULAR OR

SQUARE NECK (CEILING DIFFUSERS ARE

4-WAY THROW UNO)

-SUPPLY REGISTER OR GRILLE (VERTICAL

MOUNT, SIDEWALL)

-RETURN/EXHAUST REGISTER OR GRILLE

(VERTICAL MOUNT, SIDEWALL)

-DETAIL REFERENCE: TOP - DETAIL#

BOTTOM - DRAWING# SHOWN ON

-FIRE DAMPER (WITH ACCESS PANEL)

-RECTANGULAR DUCT SECTION UP,

NEGATIVE PRESSURE, RETURN

-RECTANGULAR DUCT SECTION UP, POSITIVE

PRESSURE, SUPPLY OR OUTSIDE AIR

-DUCT ELBOW UP THROUGH ROOF OR SLAB

ABOVE

-NEW DUCTWORK, FIRST DIMENSION IS

SIDE SHOWN

-SQUARE THROAT ELBOW

WITH TURNING VANES

-RECTANGULAR/ROUND BRANCH TAKE-OFF

OR ROUND/ROUND BRANCH TAKE-OFF

TS

TOR

M

-MOTOR SENSOR

CS

-EXISTING DUCTWORK TO REMAIN

-VARIABLE AIR VOLUME TERMINAL UNIT

12x10

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

M-002

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

T

B

R E

V I A

T I O

N S

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS

TERMINAL NUMBER

TERMINAL UNIT TYPE

VAV - VARIABLE TERMINAL

UNIT

VAV-1

DDC -DIRECT DIGITAL CONTROLS

SP -STATIC PRESSURE

P

-CHANGE IN PRESSURE

CV -CONSTANT AIR VOLUME

RS/L -REFRIGERANT SUCTION &

-OUTSIDE AIR LOUVEROAL

-VARIABLE AIR VOLUMEVAV

-SUPPLY AIRSA

-REHEAT COILRHC

-REVOLUTIONS PER MINUTERPM

-RETURN AIRRA

-POLYVINYL CHLORIDE PIPEPVC

-PSI GAUGEPSIG

-POUNDS PER SQUARE INCHPSI

-PRESSURE REDUCING VALVEPRV

-OUTSIDE AIROA

-NORMALLY OPENNO

-NORMALLY CLOSEDNC

-LEAVING WATER TEMPERATURELWT

-LEAVING AIR TEMPERATURELAT

-GALLONS PER MINUTEGPM

-FEET PER MINUTE

-FIRE DAMPER

-ENTERING WATER TEMPERATURE

-ENTERING AIR TEMPERATURE

-DOWN

-CONDENSING UNIT

-CUBIC FEET PER MINUTE

-CHANGE IN TEMPERATURE

-COOLING TOWER

-CEILING DIFFUSER

-BRITISH THERMAL UNIT

-BRAKE HORSEPOWER

-BOTTOM OF PIPE

-ACCESS PANEL

-ABOVE FINISHED FLOOR

FPM

FD

EWT

EAT

DN

CU

CFM

T

CT

CD

BTU

BOP

BHP

AP

AFF

-AIR HANDLING UNITAHU

MBH -THOUSAND BTUs PER HOUR

AFD -ADJUSTABLE FREQUENCY DRIVE

ESP -EXTERNAL STATIC PRESSURE

KW -KILOWATT

MOCP -MAXIMUM OVER

UNO

TSP -TOTAL STATIC PRESSURE

-VOLTS/PHASEV/PH

VFD -VARIABLE FREQUENCY DRIVE

-UNLESS NOTED OTHERWISE

FLA -FULL LOAD AMPS

AHU NUMBER

-AIR HANDLING UNIT

-AIR DISTRIBUTION DEVICE

200A

CFM

TYPE

AHU-1

HVAC ABBREVIATIONS

HVAC EQUIPMENT TAGS

MOD -MOTOR OPERATED CONTROL

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

CURRENT PROTECTION

DAMPER (MOD)

MCA -MINIMUM CIRCUIT AMPS

LIQUID LINES

GENERAL NOTES

2. ALL HOLES CAUSED BY REMOVAL OF DUCTWORK, CONTROLS, CONTROL WIRING, PIPING, AND ASSOCIATED MATERIALS

SHALL BE PATCHED WITH LIKE MATERIAL TO SURROUNDINGS UNLESS OTHERWISE SPECIFIED BY CONTRACTING OFFICER, SPECIFICATIONS OR ARCHITECT. THESE PATCHES SHALL BE THEN PAINTED TO MATCH SURROUNDING AREA.

3. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL

EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

4. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE

WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING

DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.

5. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION

STANDARD.

6. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.

7. PROVIDE SINGLE WALL AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.

8. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.

9. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH CEILING AND EXISTING EQUIPMENT OF ALL TRADES.

10. LOCATE THERMOSTATS 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER

EQUIPMENT, FURNITURE, AND DOOR SWINGS.

11. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL

SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.

12. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.

13. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT

BLACK.

14. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.

15. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO

SUIT EQUIPMENT FURNISHED.

16. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR

MAINTENANCE OF ALL MECHANICAL EQUIPMENT.

17. ALL DUCTWORK IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO

ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

18. PROVIDE MANUAL BALANCING DAMPERS AT EVERY BRANCH CONNECTION WHETHER INDICATED ON THE DRAWINGS OR

NOT. MARK DAMPER POSITION AND CIRCUIT SETTER ONCE FINAL ADJUSTMENTS ARE MADE

19. VERIFY FINISH WITH CONTRACTING OFFICER PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND

OTHER AIR DISTRIBUTION DEVICES.

20. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN AND AIR HANDLING UNIT.

21. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.

22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND

FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10'-0" CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE

LOCATIONS.

24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.

25. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE OF

EQUIPMENT CONNECTION TO THE NEAREST PLUMBING DRAIN.

26. ALL MECHANICAL WORK INVOLVING ROOF PENETRATIONS SHALL BE COORDINATED WITH THE ROOFING CONTRACTOR TO

MAINTAIN ROOFING WARRANTY.

27. ALL WALL LOUVER DUCTWORK CONNECTIONS SHALL BE SLOPED TOWARDS THE DRAIN OF THE LOUVER.

28. THE NEW DDS SYSTEM SHALL BE IN FULL COMPLIANCE WITH ALL BASE STANDARDS. ALL MECHANICAL EQUIPMENT WITHIN

THE SCOPE OF THIS PROJECT SHALL SHOW FULL COMUNICATION WITH BASE FRONT END VIA FULLY PROGRAMMED

TRIDUM JACE 200.

29. ALL VAV LOCATIONS AND NUMBERS SHALL BE PROPERLY IDENTIFIED VIA LABELS AT CEILING LOCATION BELOW

VAV. CONTROLLING THERMOSTAT SHALL ALSO BE CLEARLY IDENTIFIED AS TO WHICH VAV THEY CONTROL.

DG -DOOR GRILLE

CU NUMBER

-CONDENSING UNIT

CU-1

AC-1

(EXIST)

CU-1

(EXIST)

30x20

22x20

17x20

13x20

10x2010"Ø

10"Ø

(TYP 6

PLACES)

8x12

12x16

18x16

20x16 20x22

EF

(EXIST. TO REMAIN)

AC-3

(EXIST)

CU-3

(EXIST)

EF

(EXIST. TO

REMAIN)

OA LOUVER

(EXIST. TO

REMAIN)

30x20

26x20

20x20

14x20

12x20

Ø

Ø

Ø

12x12 12x22

16x22

19x22 20x22

Ø

Ø

Ø

6"Ø

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

MD-101

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

R

O

A

N

D

E M

O

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

SCALE:

MECHANICAL PLAN - 1ST FLOOR - SOUTH WING - DEMOLITION

1/8" = 1'-0"

GENERAL NOTES:

1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL

CONTRACTOR TO PROVIDE FOR APPROVAL

COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION

AND INSTALLATION. COORDINATING WITH ALL TRADES

AND EXISTING SITE CONDITIONS I.E. MECHANICAL,

STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL

CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING

CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL

ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY

OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING

DUCT FABRICATION OR FIELD MODIFICATIONS TO

ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO

20% IN OVERAGE IN MATERIAL.

2. PROJECT SCOPE IS THE DEMOLISHING OF THE EXISTING

MECHANICAL SYSTEM. TO INCLUDE BUT NOT LIMITED TO

ALL EXISTING AHU'S, CONDENSING UNITS, WITH

ASSOCIATED AIR DISTRIBUTION, SUPPORTS,

CONDUCTOR, CONDUIT, AND CONTROLS AS INDICATED

ON PLANS.

3. ALL EXISTING DUCTWORK TO REMAIN SHALL BE CLEANED

PRIOR TO INSTALLATION OF NEW EQUIPMENT. SEE

SPECIFICATIONS FOR SPECIFIC REQUIREMENTS.

NORTH

PLAN

T

R

U

E

N

O

R

T

H

SCALE:

MECHANICAL PLAN - 1ST FLOOR - NORTH WING - DEMOLITION

1/8" = 1'-0"

DEMOLISH ALL EXISTING AHU'S TO INCLUDE ALL PIPING,

SUPPORTS, CONTROLS, CONDUITS, CONDUCTOR, AND

CONDENSATE PIPING. DEMOLISH SUPPLY AND RETURN

DUCTWORK TO POINT INDICATED ON PLAN AND PREPARE

FOR NEW CONNECTION.

DEMOLISH EXISTING CONDENSING UNITS TO INCLUDE PIPING,

INSULATION, SUPPORTS, WIRING, CONDUIT AND CONTROLS.

DEMOLISH ALL EXISTING REFRIGERANT LINES AND

ASSOCIATED CONTROLS, SUPPORTS, AND INSULATION.

EXISTING RESTROOM EXHAUST TO REMAIN, SHOWN FOR

INFORMATION COORDINATION ONLY.

EXISTING SUPPLY AND RETURN DUCTWORK TO REMAIN.

DEMOLISH ALL EXISTING WALL LOUVERS AND REPAIR

OPENING. COORDINATE ALL LOCATIONS WITH

ARCHITECTURAL PLANS.

DEMOLISH ALL EXISTING HVAC CONTROLS WIRING, CONDUIT,

AND DEVICES.

DEMOLISH EXISTING CEILING MOUNTED SUPPLY AND RETURN

AIR DIFFUSERS. PRESERVE CONNECTING DUCTWORK FOR

NEW DIFFUSER CONNECTIONS.

DEMOLISH EXISTING SUPPLY DUCTWORK TO POINT

INDICATED ON PLAN.

NORTH

PLAN

T

R

U

E

N

O

R

T

H

(TYP)

(TYP)

(TYP)

(TYP)(TYP)

(TYP)

DEMO FLAG NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

KEY PLAN

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NTS

NORTH WING

SOUTH WING

L K JK J H G F E D CD C B A

L K JK J H G F E D CD C B A

23x38 SA UP TO AC-2

ROOF (EXIST)

38x2435x2435x23 35x22

35x2135x2033x2032x20

22x16 27x20 30x20

54x30 RA

GRILLE

DG (TYP)

24x6

11x12

14x12

16x12

24x12 24x14 24x18 24x20 24x22 24x6

22x24 SA UP

TO AC-4 (EXIST)

38x30 RA

GRILLE

DG (TYP)

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

O

A

N

D

E M

O

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

SCALE:

MECHANICAL PLAN - 2ND FLOOR - SOUTH WING - DEMOLITION

1/8" = 1'-0"

SCALE:

MECHANICAL PLAN - 2ND FLOOR - NORTH WING - DEMOLITION

1/8" = 1'-0"

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

T

R

U

E

N

O

R

T

H

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

MD-102

GENERAL NOTES:

1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL

CONTRACTOR TO PROVIDE FOR APPROVAL

COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION

AND INSTALLATION. COORDINATING WITH ALL TRADES

AND EXISTING SITE CONDITIONS I.E. MECHANICAL,

STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL

CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING

CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL

ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY

OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING

DUCT FABRICATION OR FIELD MODIFICATIONS TO

ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO

20% IN OVERAGE IN MATERIAL.

2. PROJECT SCOPE IS THE DEMOLISHING OF THE ENTIRE

MECHANICAL SYSTEM SERVING THE SECOND FLOOR. TO

INCLUDE BUT NOT LIMITED TO ALL EXISTING AHU'S,

CONDENSING UNITS, WITH ASSOCIATED AIR

DISTRIBUTION, SUPPORTS, CONDUCTOR, CONDUIT, AND

CONTROLS.

EXISTING RESTROOM EXHAUST TO REMAIN, SHOWN FOR

INFORMATION COORDINATION ONLY.

DEMOLISH ALL AIR DISTRIBUTION TO INCLUDE DUCTWORK,

INSULATION, SUPPORTS, DIFFUSERS, TRANSFER GRILLES,

DAMPERS, AND CONTROLS BACK TO AIR HANDLER WITHIN

PENTHOUSE ON ROOF.

DEMO FLAG NOTES:

1.

2.

KEY PLAN

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NTS

NORTH WING

SOUTH WING

L K JK J H G F E D CD C B A

L K JK J H G F E D CD C B A

CONDENSING UNIT

CU-2 (EXIST)

AC-2

(EXIST)

23x38 SA DN TO 2ND

FLR (EXIST)

P

R

CONDENSING UNIT

CU-4 (EXIST)

AC-4

(EXIST)

22x24 SA DN TO 2ND

FLR (EXIST)

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

A

N

P

E N

T H

O U

E M

O

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

SCALE:

MECHANICAL PLAN - PENTHOUSE - SOUTH WING - DEMOLITION

1/8" = 1'-0"

SCALE:

MECHANICAL PLAN - PENTHOUSE - NORTH WING - DEMOLITION

1/8" = 1'-0"

GENERAL NOTES:

1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL

CONTRACTOR TO PROVIDE FOR APPROVAL

COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION

AND INSTALLATION. COORDINATING WITH ALL TRADES

AND EXISTING SITE CONDITIONS I.E. MECHANICAL,

STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL

CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING

CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL

ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY

OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING

DUCT FABRICATION OR FIELD MODIFICATIONS TO

ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO

20% IN OVERAGE IN MATERIAL.

2. PROJECT SCOPE IS THE DEMOLISHING OF THE ENTIRE

MECHANICAL SYSTEM. TO INCLUDE BUT NOT LIMITED TO

ALL EXISTING AHU'S, CONDENSING UNITS, CHILLERS,

WITH ASSOCIATED AIR DISTRIBUTION, SUPPORTS,

CONDUCTOR, CONDUIT, AND CONTROLS.

DEMO FLAG NOTES:

1. DEMOLISH ALL EXISTING AHU'S TO INCLUDE ALL

DUCTWORK, PIPING, SUPPORTS, CONTROLS, CONDUITS,

AND CONDUCTOR.

2. DEMOLISH EXISTING CONDENSING UNITS TO INCLUDE

PIPING, INSULATION, WIRING, CONDUIT AND CONTROLS.

AND EXISTING STRUCTURAL STAND..

3. DEMOLISH ALL EXISTING REFRIGERANT LINES AND

ASSOCIATED CONTROLS, SUPPORTS, AND INSULATION. IF

PIPING IS BELOW GRADE, CAPPING BELOW GRADE AND

FINISHING VOID TO MATCH SURROUNDING AREAS IS AN

ACCEPTABLE SUBSTITUTION.

4. DEMOLISH ALL EXISTING HVAC CONTROLS WIRING,

CONDUIT, AND DEVICES.

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

T

R

U

E

N

O

R

T

H

MD-103

KEY PLAN

NORTH

PLAN

T

R

U

E

N

O

R

T

H

NTS

NORTH WING

SOUTH WING

L K JK J H G F E D CD C B A

L K JK J H G F E D CD C B A

AHU-1N

CU-1N

150A

30x20

22x20

17x20

13x20

10x2010"Ø

10"Ø

(TYP 6

PLACES)

8x12

12x16

18x16

20x16 20x22

150A

150A

150A

150A

150A

150A

150A

150A

150A 150A

150A

150A

150A

150A

150A

150A

150A

150A

150A

500B

500B

500B 500B

500B 500B x

T

AHU-1N

CU-1N

150A

30x20

22x20

17x20

13x20

10x2010"Ø

10"Ø

(TYP 6

PLACES)

8x12

12x16

18x16

20x16 20x22

150A

150A

150A

150A

150A

150A

150A

150A

150A 150A

150A

150A

150A

150A

150A

150A

150A

150A

150A

500B

500B

500B 500B

500B 500B x

T

RM 124

RM 120

RM 116

RM 106

RM 146

RM 104

RM 102A

RM 102

AHU-1S

CU-1S

30x20

26x20

20x20

Ø

Ø

Ø

12x12 12x22

19x22 20x22

Ø

Ø

Ø

200A

200A

200A

200A

200A

200A 200A

200A

200A

200A

75A 100A 100A

150A 150A

150A

150A

300B300B

250A

250A

200B

500B

800B

400B

400B

400B x x x

75B

T

AHU-1S

CU-1S

30x20

26x20

20x20

Ø

Ø

Ø

12x12 12x22

19x22 20x22

Ø

Ø

Ø

200A

200A

200A

200A

200A

200A 200A

200A

200A

200A

75A 100A 100A

150A 150A

150A

150A

300B300B

250A

250A

200B

500B

800B

400B

400B

400B x x x

75B

T

RM 121

RM 121A

RM 119

RM 118

RM 115

RM 111

RM 109

RM 105A

RM 105

RM 103

1MECH1

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

MC-101

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

R

O

A

N

N

E W

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

SCALE:

MECHANICAL PLAN - 1ST FLOOR - SOUTH WING - NEW

1/8" = 1'-0"

T

R

U

E

N

O

R

T

H

NORTH

PLAN

SCALE:

MECHANICAL PLAN - 1ST FLOOR - NORTH WING - NEW

1/8" = 1'-0"

T

R

U

E

N

O

R

T

H

NORTH

PLAN

GENERAL NOTES:

1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL

CONTRACTOR TO PROVIDE FOR APPROVAL

COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION

AND INSTALLATION. COORDINATING WITH ALL TRADES

AND EXISTING SITE CONDITIONS I.E. MECHANICAL,

STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL

CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING

CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL

ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY

OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING

DUCT FABRICATION OR FIELD MODIFICATIONS TO

ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO

20% IN OVERAGE IN MATERIAL.

PROVIDE AND INSTALL NEW HORIZONTAL AHU SUSPENDED

FROM STRUCTURE ABOVE USING SPRING ISOLATION. SUPPRT

UNIT PER MANUFACTURER INSTALLATION INSTRUCTIONS.

CONNECT TO EXISTING SUPPLY AND RETURN DUCTWORK AS

INDICATED ON PLAN.

PROVIDE AND INSTALL NEW SUPPLY AND RETURN

DIFFUSERS, AND GRILLES. CONNECT TO EXISTING

DUCTWORK. MODIFY AND / OR EXTEND AS REQUIRED WITH

NEW FLEX FOR A COMPLETE INSTALLATION.

CONNECT NEW SUPPLY AND RETURN AIR DUCTWORK TO

EXISTING SUPPLY AND RETURN MAIN AT THIS LOCATION.

8x6 OUTSIDE AIR DUCTWORK WITH MOTOR OPERATED

DAMPER. ROUTE TO BACK SIDE OF EXISTING WALL MOUNTED

LOUVER.

PROVIDE AND INSTALL REFRIGERANT LINES. ROUTE UP WALL

AND INTO BUILDING TIGHT TO STRUCTURE AND DOWN TO

AHU. INSTALL STAINLESS STEEL JACKETING ON ALL

EXTERIOR PIPING. COVER EXTERIOR PIPING WITH STAINLESS

STEEL CHASE AND PAINT TO MATCH BUILDING EXTERIOR.

PROVIDE AND INSTALL NEW CONDENSING UNIT ON EXISTING

CONCRETE PAD.

FLAG NOTES:

1.

2.

3.

4.

5.

6.

(TYP.)

(TYP.)

(TYP.)

(TYP.)

(TYP.)

KEY PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

NTS

NORTH WING

SOUTH WING

L K JK J H G F E D CD C B A

L K JK J H G F E D CD C B A

26x16 SA UP TO AHU-2N

VAV-2N.1

VAV-2N.2

VAV-2N.3

VAV-2N.4

VAV-2N.5

VAV-2N.7

VAV-2N.9

T

TT

T

T

T

VAV-2N.6

VAV-2N.8

T

T

36x16 RA UP TO AHU-2N

225A

225A

250A

100A

200A 200A

200A200A

350A

300A225A

225A

225A

225A

225A

200A

200A

100A 100A

300A

300A

A

225A x x x x x

Ø x

Ø x

6x10

225B x

6x10 x x

Ø

6x10 10x12

18x12

12x12

6x10

20x12 x

22x14 24x16

400B

450B

225B

225B 225B

300B

350B

200B

250B

350B x

8x8 x

20x12 x x

20x14 20x16 x x

24x16 x

800B

30x16 x

34x16 x

10x8 x

EXIST. EF EXIST. EF

T

900B

12"Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

RM 224

RM 220A

1HALL2

RM 220B

RM 220C RM 220D

RM 212E

RM 212F

RM 212E

RM 212

RM 212B

RM 212C

RM 204

RM 202A

RM 202B

RM 212A

VAV-2S.2

VAV-2S.4

VAV-2S.6

T

T

TT

26x16 SA UP TO AHU-2S

T

VAV-2S.1

6x10

350B

350A x x x

10x10

6x10

Ø x

Ø

200A 200A

150A

150A x

6x10

VAV-2S.3

200A

A

275A275A

300A

12x12

6x10

100A

100A

300A 300A 300A

VAV-2S.5

VAV-2S.7

VAV-2S.8

22x16 20x1418x12

10x12

100A 100A

200A

300A

B 200

300B

8x8

200A

200A

200A

200A

800B x

900B

36x16 RA UP

TO AHU-2S

300B x

275B 275B

275B

12x20 x x

18x12 x

8x12

6x12 x

900B

200B

350A

200B x

22x14

350B

22x16 x

24x16 26x16

8x8

34x16

T

T

200B

T

Ø

Ø

Ø

Ø

Ø

Ø

Ø

8"Ø

RM 221A

RM 221B

RM 219

RM 209F

RM 209E

RM 209C

RM 209D

RM 209B RM 209A RM 205

RM 205B

RM 203

RM 205A

2HALL1

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

O

A

N

N

E W

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

24'16'6' 2'4' 0' 8'

GRAPHIC SCALE 1/8" = 1'-0"

SCALE:

MECHANICAL PLAN - 2ND FLOOR - SOUTH WING - NEW

1/8" = 1'-0"

T

R

U

E

N

O

R

T

H

NORTH

PLAN

SCALE:

MECHANICAL PLAN - 2ND FLOOR - NORTH WING - NEW

1/8" = 1'-0"

GENERAL NOTES:

1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL

CONTRACTOR TO PROVIDE FOR APPROVAL

COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION

AND INSTALLATION. COORDINATING WITH ALL TRADES

AND EXISTING SITE CONDITIONS I.E. MECHANICAL,

STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL

CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING

CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL

ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY

OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING

DUCT FABRICATION OR FIELD MODIFICATIONS TO

ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO

20% IN OVERAGE IN MATERIAL.

T

R

U

E

N

O

R

T

H

NORTH

PLAN

MC-102

ROUTE NEW SUPPLY AND RETURN AIR DUCTWORK UP TO

NEW AIR HANDLER MOUNTED IN PENTHOUSE ON ROOF.

FLAG NOTES:

1.

KEY PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

NTS

NORTH WING

SOUTH WING

L K JK J H G F E D CD C B A

L K JK J H G F E D CD C B A

P

R

U S

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

G

M

E D

I N

A

C

H

U D

S O

N

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

GENERAL NOTES:

1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL

CONTRACTOR TO PROVIDE FOR APPROVAL

COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION

AND INSTALLATION. COORDINATING WITH ALL TRADES

AND EXISTING SITE CONDITIONS I.E. MECHANICAL,

STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL

CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING

CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL

ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY

OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING

DUCT FABRICATION OR FIELD MODIFICATIONS TO

ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO

20% IN OVERAGE IN MATERIAL.

2. ROOFING WORK TO BE PERFORMED UNDER THIS

CONTRACT FOR EQUIPMENT THE SUPPORT CURBS SHALL

BE PERFORMED BY LICENSED ROOFING CONTRACTOR

AND CARRY SAME WARRANTY AS EXISTING ROOF.

T

R

U

E

N

O

R

T

H

NORTH

PLAN

SCALE:

ENLARGED MECHANICAL PLAN - NORTH WING - PENTHOUSE - NEW

1/8" = 1'-0"

MC-301

SCALE:

ENLARGED MECHANICAL PLAN - SOUTH WING - PENTHOUSE - NEW

1/8" = 1'-0"

MC-301

8'6'4'2'2' 1' 0'

GRAPHIC SCALE 3/8" = 1'-0"

T

R

U

E

N

O

R

T

H

NORTH

PLAN

CU-2N

AHU-2N

26x16 SA DOWN

TO 2ND FLR

26x16 SA DOWN

TO 2ND FLR

AHU-2S

CU-2S

MC-301

E N

L A

R G

N

T H

O U

M

C

H A

N I C

A L

P L

A N

S

36x16 RA DOWN

TO 2ND FLR

36x16 RA DOWN

TO 2ND FLR

PROVIDE AND INSTALL NEW AHU ON EXISTING CONCRETE

PAD WITH HOUSE SPRING ISOLATORS.

PROVIDE AND INSTALL NEW CONDENSING UNIT TO BE

MOUNTED ON NEW PREFABIRCATED EQUIPMENT SUPPORT

CURB WITH STAINLESS STEEL CAPS. CONTRACTOR TO VERFY

ROOFING MATERIAL AND PROVIDE WITH CANT AS REQUIRED.

SECURE UNIT TO CURB SUPPORTS WITH MOUNTING BOLTS

AND STAINLESS STEEL TIE DOWNS.

PROVIDE AND INSTALL REFRIGERANT LINES. ROUTE UP WALL

AND INTO PENTHOUSE TIGH TO STRUCTURE AND DOWN TO

AHU. INSTALL STAINLESS STEEL JACKETING ON ALL

EXTERIOR PIPING. COVER EXTERIOR PIPING WITH STAINLESS

STEEL CHASE AND PAINT TO MATCH PENTHOUSE EXTERIOR.

ROUTE NEW SUPPLY AND RETURN AIR DUCTWORK DOWN

EXISTING CHASE TO SECOND FLOOR. SUPPORT DUCTWORK

AT OPENING.

PROVIDE NEW 12X8 OA INTAKE LOUVER, RUSKIN MODEL

EME520MD WITH INSECT SCREEN.

FLAG NOTES:

1.

2.

3.

4.

5.

8x8 OA

8x8 OA

MD

MD

KEY PLAN

T

R

U

E

N

O

R

T

H

NORTH

PLAN

NTS

NORTH WING

SOUTH WING

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T o t a l

I n t e g r a t e d

E n t e r p r i s e s

A

B

2 3

C

1 2 3

4 5

4 5

C

D

A

B

D

M-501

G

M

E D

I N

A

C

H

U D

S O

N

M E

C H

A N

I C

T

A I L

S

C

H

U D

S O

N

D B

G

B

E A

R D

D E

S I G

N

H

V A

C

H

A N

G A

R

G

F

D B

C C

A F

S

F

L

S

U

P

P

Y

O

W

R

E

T

U

O

W

RECTANGULAR DUCT

2" INSULATION

ROUND DUCT

NOTES:

1. ON DUCTS 24" AND LARGER, SECURE INSULATION WITH WELDED STICK-PINS 18" O.C. PLUS ADHESIVE ON THE BOTTOM OF DUCT.

2. CUT INSULATION TO PROPER LENGTHS TO AVOID COMPRESSION OF INSULATION.

3. TAPE ALL JOINTS WITH FASON (SMACNA) ALUMINUM REINFORCED PRESSURE SENSITIVE TAPE. COAT ALL EDGES, SEAMS AND JOINTS

WITH INSUL-COUSTIC PRODUCT "SURE-COAT" M1-110 WHITE" FIRE RESISTANT MASTIC.

4. SEAL ALL SEAMS AND JOINTS WITH HARDCAST TAPE FR#1502.

5. INSULATION TO BE FIBER GLASS WITH FOIL FACE.

DUCT

VAPOR

BARRIER

TAPE

DUCT

VAPOR BARRIER TAPE

WOOD STUD CONSTRUCTION OPENING TO

BE LINED WITH FIRE RESISTIVE MATERIAL

OF RATING EQUAL TO THAT ON WALL

SPACE AT CORNERS 1/8"

METAL STUD CONSTRUCTION

EXTERNAL THERMAL INSULATION

COMPRESS INSULATION

AGAINST PARTITION

CAULK BEAD AROUND EDGE

BETWEEN DUCT AND WALL

OVERLAP OF OPENING. MAX. SPACE

INSULATION COMPRESSED TO

MAX. OF 1/8". MAX. 1/4" SPACE

BETWEEN DUCTS AND WALL

METAL DUCT

CAULK BEAD AROUND EDGE

BETWEEN DUCT AND WALL

FIRE RESISTIVE

MATERIAL (TYP)

45 DEGREE BOOT

TAP, TYPICAL

MANUAL BALANCING

DAMPER, TYPICAL

RADIUS ELBOWS MAY

BE USED IN LIEU OF

SQUARE ELBOWS

DOUBLE NUTS AND WASHERS

BOTH SIDES OF ANGLE (TYP)

STRUCTURAL JOIST

1/2" BOLT AND NUT

WITH 2 1/2" WASHER

1/2" THREADED ROD (TYP)

1 1/4 x 1 1/4 x 3/16

ANGLE IRON SUPPORTS

STEEL HANGERS,

SUPPORT FROM STRUCTURE

SHEET METAL MAIN

SUPPLY TRUNK

TYPICAL TRANSITION

MAX. 15° ANGLE

VOLUME DAMPER WITH

LOCKING DEVICE

SHEET METAL

BRANCH DUCT

STRUCTURAL CHANNEL

45° ENTRY BRANCH FITTING

2" INSULATION

TURNING VANES

SIDE VIEW TRAPEZE HANGER FOR UP TO

1000 LB. UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER-TYPE 1

ADJUSTABLE CLEVIS HANGER-TYPE 43

PROVIDE INSULATION

SHIELD AND INSERT FOR

ALL PIPING (8" MIN)

1/2" DIA. HANGER RODS WITH

36" MAX. SPACING ON EACH CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

1 5/8" 12 GAUGE CHANNEL

OR 2"x2"x1/4" ANGLE

BAND

M

A X

PITCH DOWN

TOWARD DRAIN

CLEANOUT

OPEN DRAIN

DRAIN PAN

CLEANOUT

DRAIN LINE SHALL BE AT LEAST

THE SAME SIZE AS THE NIPPLE

ON THE DRAIN PAN, BUT NO

LESS THAN 1 1/4" OR AS

INDICATED ON THE DRAWINGS

D

M

G

P

D

M I N

D E

P T

H

O

F

S

E A

L

A O

R

A

N

D L

I N

G

U N

I T

S

SCALE:

CONDENSATE TRAP PIPING DETAIL

NONE

M-501

(DUCTS LOCATED WITHIN THE BUILDING ONLY)

SCALE:

(NOT APPLICABLE TO FIRE-RATED WALLS)

NONE

M-501

DUCT PENETRATION THROUGH WALL

SCALE:

INTERIOR DUCT INSULATION DETAIL

NONE

M-501

SCALE:

DUCT HANGER DETAIL

NONE

M-501

SCALE:

PIPE SUPPORT DETAIL

NONE

M-501

SCALE:

TYPICAL LOW PRESSURE DUCTWORK

NONE

M-501

SCALE:

BRANCH DUCT TAKEOFF DETAIL

NONE

M-501

AIR FLOW

AIR FLOW

HANGER BRACKET

VAV

UNIT

36" CLEAR

NOTES:

1. MANUFACTURER OF TERMINAL UNIT SHALL PROVIDE CONTROL

ON LEFT OR RIGHT SIDE AS REQUIRED BY FIELD CONDITIONS.

2. ARRANGE ACCESS TO PERMIT EASY FIELD BALANCE AND

MAINTENANCE OF TERMINAL UNIT.

3. COORDINATE LOCATION OF VAV BOXES WITH LIGHTING FIXTURES

TO ASSURE PROPER ACCESS.

STRAIGHT DUCT

LENGTH MINIMUM

2'-0". DUCT SIZE

TRANSITION TO

MATCH INLET SIZE

OF VAV BOX

CONTROL

BOX

FASTEN AND SEAL

CONNECTION

SUPPORTING

CHANNEL

42" CLEAR

HEATER

CONTROL BOX

2'-0" STRAIGHT

DUCT

SCALE:

TYPICAL VAV INSTALLATION DETAIL

NONE

M-501

NOTE: FOR SLEEVE INSTALLATION, COORDINATE WITH

ARCHITECTURAL DRAWINGS.

T

H

C

I V

G

I N

E E

R

S

Q U

A D

R O

N

I

T

E

D E

L I V

E R

Y

N

O

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

R E

V I E

W E

D

B

Y

D A

T E

C O

N T

R A

F

A

D

E I S

R A

N G

E

A

R C

H I T

E C

T E

N G

I N

E E

R

I N

S P

E C

T I O

N

S

E R

V I C

E S

F A

D

O n e i d a

T…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .