Replace_HVAC_Hangar_G _Fac_1606_Drawings.pdf
PDF 6 MB Posted
- Attached to
- Replace HVAC System Hangar G Federal contract opportunity
- Solicitation number
- FA2521-15-B-0002
About this file
Attachment 2 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_of_Proposals.pdf | ||
| FA2521-15-B-0002_Solicitation_Amendment_4.pdf | ||
| Attch_7_-_Questions_and_Answers_13_Apr_15.pdf | ||
| Attch_7_-_Questions_and_Answers_9_Apr_15.pdf | ||
| FA2521-15-B-0002_Solicitation_Amendment_3.pdf | ||
| Attch_7_-_Questions_and_Answers_8_Apr_15.pdf | ||
| Attch_10_-_Drawing_Sheet_MD-102_7_Apr_15.pdf | ||
| FA2521-15-B-0002_Solicitation_Amendment_2.pdf | ||
| Attch_9__-_Drawing_Sheet_M-602_6_Apr_15.pdf | ||
| Attch_3-_DBA_WD_3_Apr_15.pdf | ||
| FA2521-15-B-0002_Solicitation_Amendment_1.pdf | ||
| Attch_8_-_Pre-Bid_Site_Visit_Record_of_Attendance_25_Mar_15.doc.pdf | ||
| Replace_HVAC_Hangar_G_Specs.pdf | ||
| Attch_3_-_DBA_WD_27_Feb_15.pdf | ||
| Attch_6_-_GPP_Certification.pdf | ||
| Attch_5_-_Haz_Waste_Form.doc | DOC document | |
| FA2521-15-B-0002.pdf | ||
| Attch_7_-_Question_Template.docx | DOCX document | |
| Attch_4_-_CECC_Form_3052.xls | XLS spreadsheet |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
A
R
O M
A N
A
R
O M
A N
V I C
I N
I T
Y
M
A P
L
O C
A T
I O
N
M
A P
N D
D R
A W
I N
G
I N
D E
X
A
R
O M
A N
D B
E H
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
C
D B
C C
A F
S
F
L
CAPE CANAVERAL AIR FORCE STATION
DBEH 13-1588
CAPE CANAVERAL, FLORIDA
LOCATION PLAN
NONE
TRUE
NORTH
01606
CCAFS
INDUSTRIAL
AREA
DESIGN HVAC, HANGAR G, FAC 1606
PROJECT LOCATION
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
G-001
VICINITY MAP, LOCATION MAP AND DRAWING INDEX
ARCHITECTURAL
A-001
ARCHITECTURAL NOTES, LEGEND AND ABBREVIATIONS
AD-101
NORTH AND SOUTH WING 1ST FLOOR CEILING PLAN - DEMOLITION
AD-102
NORTH AND SOUTH WING 2ND FLOOR CEILING PLAN - DEMOLITION
AC-101
NORTH AND SOUTH WING 1ST FLOOR CEILING PLAN - NEW
AC-102
NORTH AND SOUTH WING 2ND FLOOR CEILING PLAN - NEW
MECHANICAL
M-001
MECHANICAL LEGENDS
M-002
MECHANICAL NOTES AND ABBREVIATIONS
MD-101
MECHANICAL FIRST FLOOR PLAN - DEMO
MD-102
MECHANICAL 2ND FLOOR PLAN - DEMO
MD-103
MECHANICAL PLAN PENTHOUSE - DEMO
MC-101
MECHANICAL FIRST FLOOR PLAN - NEW
MC-102
MECHANICAL 2ND FLOOR PLAN - NEW
MC-301
ENLARGED PENTHOUSE MECHANICAL PLANS
M-501
MECHANICAL DETAILS - 1
M-502
MECHANICAL DETAILS - 2
M-601
MECHANICAL SCHEDULES
M-602
SEQUENCE OF OPERATIONS AND CONTROLS - 1
M-603
SEQUENCE OF OPERATIONS AND CONTROLS - 2
M-604
SEQUENCE OF OPERATIONS AND CONTROLS - 3
ELECTRICAL
E-001
ELECTRICAL LEGENDS
E-002
ELECTRICAL NOTES AND ABBREVIATIONS
E-003
FIRE ALARM NOTES AND LEGEND
ED-101
ELECTRICAL PLAN 1ST FLOOR - DEMO
ED-102
ELECTRICAL PLAN 2ND FLOOR- DEMO
ED-103
ELECTRICAL PLAN UPPER LEVEL- DEMO
EC-101
ELECTRICAL PLAN 1ST FLOOR - NEW
EC-102
ELECTRICAL PLAN 2ND FLOOR - NEW
EC-103
ELECTRICAL PLAN UPPER LEVEL - NEW
E-601
SINGLE LINE DIAGRAM - NEW
E-602
PANEL SCHEDULES
U S
F
T
H
C
I V
I L
G
I N
E E
R
S
Q U
A D
R O
N
S
B
U I
T
D
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
O
F
A
D
R
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
A-001
M
A
L L E
N F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
A R
C H
I T
E C
T U
R A
L
N
O T
E S
L E
G E
B
R E
V I A
T I O
N S
R
C
O N
S T
A N
T I N
I D
E
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
GENERAL REMOVAL AND INSTALLATION NOTES:
1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH PROJECT DRAWINGS AND
SPECIFICATIONS. FOR PURPOSES OF CLARIFICATION 'PROVIDE' MEANS PROVIDE AND INSTALL
U.O.N.
2. INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE OBSERVABLE IN PLACE
ELEMENTS. CONTRACTOR TO FIELD MEASURE AND VERIFY REQUIREMENTS FOR EXACT
DIMENSIONS. PRIOR TO START OF ALL WORK OPERATIONS, CONTRACTOR SHALL FIELD
VERIFY CURRENT PROJECT CONDITIONS. ALL CONSTRUCTION REQUIREMENTS SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS FOR PROPOSED WORK, PRIOR TO
START OF WORK.
4. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND
SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE ON THE PROJECT,
EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
5. ALL REFERENCES TO MANUFACTURER NAMES ARE FOR IDENTIFICATION ONLY; THE
REFERENCES ARE NOT INTENDED TO LIMIT SELECTION OF SIMILAR ITEMS FROM OTHER
MANUFACTURERS WITH APPROVAL OF CONTRACTING OFFICER.
6. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS UPON THE
INTERACTION OF VARIOUS CONNECTED COMPONENTS. PROVIDE ADEQUATE BRACING,
SHORING, AND OTHER TEMPORARY SUPPORTS AS REQUIRED TO SAFELY COMPLETE THE
WORK.
7. NOTATIONS FOR REMOVAL AND INSTALLATION REQUIREMENTS SHALL APPLY TO ALL SHEETS
IN THIS DRAWING PACKAGE.
8. WHERE REQUIRED, ALL NEW STEEL STRUCTURAL MEMBERS SHALL BE ASTM 36.
9. WHERE REQUIRED AND NOT OTHERWISE SPECIFIED, ALL WELDING SHALL BE DONE BY AWS
CERTIFIED WELDERS.
10. DISPOSAL OF ALL CONSTRUCTION DEBRIS SHALL BE AS DESCRIBED IN THE SPECIFICATIONS.
ANY UNFORESEEN CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER.
11. CONTRACTOR SHALL TAKE EXTREME CARE TO AVOID DAMAGE TO EXISTING ITEMS INTENDED
TO BE REMOVED, RE-USED, OR RECYCLED.
12. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION, WHEREVER WORK IS TO BE
PERFORMED IN FINISHED/OCCUPIED SPACES TO PREVENT DAMAGE TO ADJACENT AREAS,
EQUIPMENT, OR FURNISHINGS; TO PREVENT ACCIDENTAL INJURY TO BUILDING OCCUPANTS
AND THE PUBLIC; TO PREVENT THE SPREADING OF DUST, DIRT, DEBRIS, AND MOISTURE FROM
THE AREA WHERE WORK IS BEING PERFORMED; AND TO PREVENT DUST, DIRT, DEBRIS, AND
MOISTURE FROM GETTING ON OR IN THE BUILDING OCCUPANTS FURNISHINGS OR
EQUIPMENT. CONTRACTOR SHALL PROVIDE METHOD/CONSTRUCTION OF DUST
CONTROL/BARRIER TO CONTINUE OFF. FOR APPROVAL PRIOR TO START OF DEMO WORK.
13. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE GOVERNMENT, ANY DAMAGE DONE BY
HIMSELF OR HIS EMPLOYEES. HE SHALL ALSO BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED TO PROPERLY INSTALL HIS WORK.
14. RELOCATION OF BUILDING OCCUPANTS AND MISSION SPECIFIC ITEMS, EQUIPMENT AND
SUPPLIES SHALL BE UNDERTAKEN BY THE CONTRACTOR BUT SHALL BE COORDINATED WITH
CONTRACTING OFFICER AND WITH USER POINT OF CONTACT PRIOR TO THE START OF
DEMOLITION WORK. ALL USER RELOCATED EQUIPMENT SHALL BE MOVED PRIOR TO START
OF WORK. ALL EQUIPMENT TO REMAIN SHALL BE PROTECTED PER NOTE 17; CONTRACTOR
SHALL PROVIDE - FOR APPROVAL PRIOR TO START OF WORK A PLAN AND METHOD TO
PROTECT IN-PLACE EQUIPMENT.
15. ALL CONSTRUCTION REQUIREMENTS INCLUDING ENVIRONMENTAL ASBESTOS AND HEAVY
METAL DEMOLITION SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.
16. THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER FOR ASBESTOS AND LEAD
SURVEY REPORTS IF THE PRESENCE OF ANY LEAD, CADMIUM, CHROMIUM OR ASBESTOS
CONTAINING MATERIALS IS SUSPECTED OR DISTURBED AND NOT IDENTIFIED AS SUCH BY
THIS CONTRACT, BUT REQUIRED TO BE DISTURBED TO PERFORM CONTRACT WORK, THEN
THE CONTRACTING OFFICER SHALL BE NOTIFIED AT ONCE. UNDER NO CIRCUMSTANCES
SHALL ANY LEAD OR ASBESTOS CONTAINING MATERIALS (ACM) BE REMOVED WITHOUT THE
CONTRACT OFFICER APPROVAL. FOR REFERENCE SEE LEGEND ON COVER DRAWING G-001.
17. THE REQUIREMENTS ESTABLISHED IN THE OSHA STANDARD FOR LEAD, CADMIUM AND
CHROMIUM IN CONSTRUCTION, 29 CFR 1926.62, 29 CFR 1926.63, 29 CFR 1926.1127 AND 29
CFR1926.1126, RESPECTIVELY, MUST BE COMPLIED WITH FOR ANY CONSTRUCTION,
REFURBISHMENT, OR DEMOLITION OPERATIONS WHICH INVOLVES THE DISTURBANCE OF
COATINGS WHICH CONTAIN HAZARDOUS METALS. THE LEAD, CADMIUM AND CHROMIUM
STANDARDS ESTABLISH SPECIFIC PERSONAL PROTECTIVE EQUIPMENT TO INCLUDE
RESPIRATORY PROTECTION BASED ON THE TYPE OF WORK TO BE PERFORMED (SEE
SPECIFICATIONS FOR ADDITIONAL DATA). FOR REFERENCE SEE LEGEND ON COVER DRAWING
G-001.
18. PERSONNEL WHO UTILIZE RESPIRATORY EQUIPMENT SHALL COMPLY WITH OSHA STANDARD
29 CFR 1910.134. THE REQUIREMENTS FOR PROTECTION OF PERSONNEL DURING
DISTURBANCE OF COATINGS CONTAINING HAZARDOUS METALS APPLY WHEN THE CONTENT
HAS BEEN IDENTIFIED AS "LOW". OSHA STANDARD 29 CFR 1926.62 DOES NOT INDICATE A
LEVEL OF CONTENT LIMIT. IF LEAD IS PRESENT AT ANY LEVEL THE STANDARD SHALL BE
ADHERED. FOLLOW THE 45TH SPACE WING GUIDANCE FOR THE REMOVAL OF MATERIALS AND
COATINGS CONTAINING HEAVY METALS.
19. IF PRODUCTS ARE TO BE USED DURING THE PROJECT WHICH MAY CONTAIN HAZARDOUS
CHEMICALS, THE MATERIAL SAFETY DATA SHEET (MSDS) FOR THOSE PRODUCTS SHALL BE
SUBMITTED TO THE CAPE HYGIENE OFFICE FOR REVIEW TO DETERMINE PERSONAL
PROTECTIVE EQUIPMENT REQUIREMENT FOR PERSONNEL USING PRODUCTS ALONG WITH
CONTRACTOR'S SAFETY PLAN, PRIOR TO START OF WORK.
DISSIMILAR METALS:
CONTRACTOR SHALL PROVIDE ADEQUATE SEPARATION OF DISSIMILAR METALS BY
APPROPRIATE MEANS, SUCH AS 15# SEPARATION FELT FOR ROOFS AND ASPHALTIC
TAPE, NEOPRENE TAPE, PEEL AND STICK TAPE, OR ASPHALTIC PAINT AT OTHER
LOCATIONS AS REQUIRED.
ALL CONNECTORS, FASTENERS, BOLTS, ETC., SHALL BE SELECTED IN ORDER TO
PREVENT OR MINIMIZE ANY GALVANIC REACTION BETWEEN DISSIMILAR METALS. AND
UNLESS OTHERWISE NOTED PROVIDE 304 STAINLESS STEEL.
CONTRACTOR SHALL SEQUENCE DEMO AND NEW WORK TO FULLY COMPLETE ALL
REQUIRED CONSTRUCTION WORK. PHASED CONSTRUCTION IS ACCEPTABLE WHERE
APPROVED BY THE CONTRACTING OFFICER. CONTRACTOR SHALL PROVIDE ADEQUATE
PROTECTION OF NEW AND EXISTING ASSEMBLIES AGAINST INCLEMENT WEATHER AND
CONSTRUCTION DAMAGE.
SEQUENCING OF WORK:
ACT - ACOUSTIC CEILING TILE
AFF - ABOVE FINISHED FLOOR
ALUM - ALUMINUM
ANOD - ANODIZED
A.T. - ANTI TERRORIST
ATFP - ANTI TERRORIST FORCE
PROTECTION
BLDG - BUILDING
CID - COMPREHENSIVE INTERIOR
DESIGN
CONC - CONCRETE
CONT - CONTINUOUS
CMDR - COMMANDER'S
CMU - CONCRETE MASONRY UNIT
CPT - CARPET
CT - CERAMIC TILE
DN - DOWN
DWGS - DRAWINGS
EXIST - EXISTING
EXT - EXTERIOR
F.G. - FIBERGLASS
FIN FL - FINISH FLOOR
F.V. - FIELD VERIFY
GA - GAUGE
GALV - GALVANIZED
GRT - GROUT
GYP BD - GYPSUM WALL BOARD
GWB - GYPSUM WALL BOARD
H.M. - HOLLOW METAL
HW - HARDWARE
HDW - HARDWARE
INSUL - INSULATION
INT - INTERIOR
MAX - MAXIMUM
MFR - MANUFACTURER
MIN - MINIMUM
M.O. - MASONRY OPENING
MTL - METAL
MRGWB - MOISTURE RESIST GYPSUM
WALL BOARD
MTD - MOUNTED
NOM - NOMINAL
O.C. - ON CENTER
O.D. - OUTSIDE DIAMETER
P/PT - PAINT
P.T. - PRESSURE TREATED
PLYWD - PLYWOOD
PL - PLASTIC LAMINATE
PLST - PLASTER
PSI - POUNDS PER SQUARE INCH
PTS - POINTS
PVC - POLYVINYL CHLORIDE
REINF - REINFORCED
R.S. - RUBBER STRINGER
RTNR - RUBBER TREAD/NOSE/RISER
S.C. - SOLID CORE
SCHED - SCHEDULE
SCH - SCHEDULE
SMS - SHEET METAL SCREW
S.S. - SOLID SURFACE
ST. STL. - STAINLESS STEEL
TBB - TILE BACKER BOARD
TPD - TOILET PAPER DISPENSER
TYP - TYPICAL
U.O.N - UNLESS OTHERWISE NOTED
VWB - VINYL WALL BASE
VCT - VINYL COMPOSITION TILE
RM 123
GYP BD CEILING/SOFFIT TO BE
REMOVED
GYP BD CEILING/SOFFIT TO REMAIN
IN PLACE
EXISTING STUD WALLS TO
BE REMOVED
EXISTING DOOR TO BE REMOVED
EXISTING DOOR TO REMAIN
EXISTING CMU WALLS TO
BE REMOVED
EXISTING CMU WALLS
EXISTING STUD GYP BD WALLS
NEW STUD WALLS. ASSURE THAT
EXTERIOR WALL SURFACES ARE FLUSH
WITH ADJACENT WALLS. FINISH TO
MATCH ADJACENT SURFACES
NEW CMU INFILL
NEW DOORS
EXISTING ACOUSTIC CEILING TILE
NEW GYP BD OR DUROCK CEILING
EXTENT OF ACOUSTICAL CEILING TILE
REMOVAL, INCLUDING ANY CEILING
MOUNTED FIXTURES AND/OR EQUIPMENT
NEW ACOUSTIC CEILING TILE
WHEELCHAIR TURNAROUND
ROOM NAME/NUMBER
WALL TYPE
DOOR TYPE (ON DEMO PLAN, SYMBOL
DENOTES DOOR TO BE REINSTALLED
IN DIFFERENT LOCATION UNDER NEW
WORK. NUMBERS CORRESPOND TO
NUMBERING ON NEW DOOR
SCHEDULE)
RESTROOM ACCESSORY
AREA OF FLOOR FINISH
TO BE REMOVED
(ALL MAY NOT BE USED) FOR ADDITIONAL END ITEMS
LEGEND; REFER TO RESPECTIVE DISCIPLINE DRAWINGS
APPLICABLE CODES
WORK SHALL BE IN COMPLIANCE WITH THE FOLLOWING CODES AND THEIR
LATEST REVISION AND WITH PROJECT SPECIFICATIONS:
BUILDING CONSTRUCTION AND SAFETY NFPA 5000
LIFE SAFETY CODE NFPA 101
NATIONAL ELECTRIC CODE/INTERNATIONAL ELECTRICAL CODE
SERIES, NEC - NFPA 70
NATIONAL FIRE ALARM CODE NFPA 72
STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEM IN
OCCUPANCIES UP TO AND INCLUDING 4 STORIES IN HEIGHT, NFPA 13
STANDARD ON TYPES OF BLDG. CONSTRUCTION NFPA 2202012
INTERNATIONAL BUILDING CODE
INTERNATIONAL MECHANICAL CODE
FIRE PROTECTION ENGINEERING FOR FACILITIES UFC 3-600-012013
FORCE PROTECTION UFC 4-010-01
GENERAL BUILDING REQUIREMENTS UFC 1-200-01
INTERIOR ELECTRICAL SYSTEMS UFC 3-520-01
2003 AIR FORCE SIGN STANDARD UFC 3-120-01
20. THERE SHALL BE NO AIR EMISSIONS OF DEBRIS AND CONTRACTOR SHALL COMPLY WITH 40 CFR
763 AND 29 CFR 1910, GENERAL HEALTH AND SAFETY FOR ALL EMPLOYEES. ANY SANDBLASTING
OR NEEDLEJET OPERATIONS MUST BE APPROVED BY THE CONTRACTING OFFICER AND SHOULD
HAVE FULL CONTAINMENT.
21. IN THE EVENT ACM IS IDENTIFIED, PREPARATION OF BUILDING SURFACES MAY CREATE
DISTURBANCES OF NON-FRIABLE ACM. CAUTION MUST BE UTILIZED DURING THE SUBJECT
PREPARATIONS TO ENSURE THAT DAMAGE/DISTURBANCE TO THE ACM DOES NOT OCCUR.
COATING OF THE SUBJECT SURFACES SHALL BE PERFORMED IN ACCORDANCE WITH THE
TRAINING AND HANDLING REQUIREMENTS OF 29 CFR 1926.1101 FOR CLASS II ASBESTOS WORK
AND AIR FORCE STANDARD SPECIFICATIONS 29 CFR 1926.58, 40 CFR 763, 40 CFR 61, SUBPART M.
AF OPLAN 19-15 FLORIDA ADMINISTRATIVE CODE CHAPTER 62-257 & FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION FORM 62-257.900(1). FDEP FORM 62-257.900(1) (NOTICE OF
DEMOLITION OR ASBESTOS RENOVATION) MUST BE FORWARDED TO FDEP AT LEAST 10 DAYS
PRIOR TO ACM REMOVAL. THE CCAFS LANDFILL OPERATOR MUST BE NOTIFIED WITHIN 24 HOURS
PRIOR TO DISPOSAL.
22. IF METALS AND/OR PCB IN PAINTED SURFACES EXIST, THERE WILL BE CONCERNS ABOUT
PARTICULATE MATTER IN RINSATE AND ABOUT LEACHABILITY AND IMPACTS TO SURROUNDING
ENVIRONMENTS. NON-LIQUID PCB MATERIAL SHOULD BE HANDLED AND TESTED IN ACCORDANCE
WITH 40 CFR 761. CONTRACTOR SHALL PROVIDE SUBMITTAL FOR ENVIRONMENTAL WORK PLAN
TO ADDRESS CONTRACTOR IDENTIFIED BEST MEANS OF PRACTICE ISSUES IN COMPLIANCE WITH
FDEP, EPA AND OSHA. ONLY THOSE PERSONNEL TRAINED IN ABATEMENT HANDLING AND
DISPOSAL MAY PERFORM WORK AND SHALL DO SO IN A MANNER THAT MINIMIZES GENERATION
OF AIR-BORNE DEBRIS. WATER, AND DEBRIS SHALL BE COLLECTED, TESTED, MANAGED AND
DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND AIR FORCE REGULATIONS.
(NOT ALL MAY BE APPLICABLE)
ARCHITECTURAL LEGEND: ABBREVIATIONS:
(ALL MAY NOT BE USED) FOR ADDITIONAL
END ITEMS ABBREVIATIONS; REFER TO
RESPECTIVE DISCIPLINE DRAWINGS
RM 121
RM 121A
RM 109
RM 105
RM 103
1MECH1
RM 105A
RM 111RM 115RM 118
12'-0"8"
8"
8"
RM 119
46'-0"
6'-7 7/8"
8"
8"
8"
17'-9 3/4"
8"
8"
8"
20'-10 1/8"
8"
20'-0" 20'-0" 19'-11" 20'-0" 11'-5 3/4" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"
19'-6 5/8"4'-8 3/8" 20'-2 1/4"
RM 124 RM 120
RM 106 RM 146
RM 104
RM 102A
RM 102
RM 116
49'-8 7/8" 46'-5 13/16"
8"
8"
8"
8"
19'-6 5/8"4'-8 3/8"
NORTH WING
SOUTH WING
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
AD-101
M
A
L L E
N F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
N O
R T
H
A
U
W
N
G
O
O R
C E
I L
I N
G
P
L A
N
D
E M
O L
I T
I O
N
R
C
O N
S T
A N
T I N
I D
E
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
L
SCALE:
NORTH WING 1ST FLOOR CEILING PLAN - DEMOLITION
1/8" = 1'-0"
T
R
U
E
N
O
R
T
H
NORTH
PLAN
EXISTING SOUTH
HIGH BAY WALL
SHOWN FOR
REFERENCE
K JK J H G F E D CD C B A
L K JK J H G F E D CD C B A
GENERAL NOTES:
1. ALL INTERIOR CLG MOUNTED ABANDONED END
ITEMS SHALL BE REMOVED THROUGHOUT ALL
AREAS OF WORK AND SHALL BE SAVED FOR
RECYCLING BY THE GENERAL CONTRACTOR,
UNLESS OTHERWISE DIRECTED BY THE
CONTRACTING OFFICER.
2. CONTRACTOR SHALL PROTECT ALL STRUCTURAL
BUILDING MEMBERS AND ALL REMAINING WALLS
AND DECK; FROM ANY DAMAGE DURING ALL
PHASES OF CONSTRUCTION.
3. UNLESS INTENDED FOR MODIFICATION BY PROJECT
CONSTRUCTION, CONTRACTOR SHALL PROTECT
ALL ADJACENT CONSTRUCTION FROM DAMAGE
DURING ALL PHASES OF CONSTRUCTION. REPLACE
ANY DAMAGED MATERIALS AND CONSTRUCTION,
AT NO ADDITIONAL COST TO THE GOVERNMENT.
4. IF THE CONTRACTOR SUSPECTS THE PRESENCE OF
HAZARDOUS MATERIALS IN AREAS OF WORK NOT
PREVIOUSLY IDENTIFIED, HE SHALL NOT DISTURB
THE SPECIFIC AREA OF WORK BUT SHALL NOTIFY
THE CONTRACTING OFFICER FOR DIRECTIONS.
5. FOR CLG MOUNTED END ITEM REMOVAL SEE
SUBSEQUENT DISCIPLINE DWGS.
FLAG NOTES - DEMOLITION WORK:
CEILING:
1. REMOVE AND DISPOSE EXISTING 2x2 LAY-IN
ACOUSTIC TILES, GRID, FASTENERS AND
ACCESSORIES THROUGHOUT AREAS OF WORK. SEE
SUBSEQUENT DRAWINGS FOR ANY ITEMS TO
REMAIN AND TO BE SUPPORTED IN-PLACE.
2. SPACE OPEN TO STRUCTURE - N.I.C.
3. EXISTING CEILING TO REMAIN - N.I.C.
4. FOR REMOVAL OF CEILING MOUNTED MECHANICAL,
ELECTRICAL AND FIRE PROTECTION END ITEMS
REFER TO SUBSEQUENT DISCIPLINE DRAWINGS.
SHOWN FOR REFERENCE.
5. EXISTING CEILING PERIMETER TRIM PIECE TO
REMAIN.
SCALE:
SOUTH WING 1ST FLOOR CEILING PLAN - DEMOLITION
1/8" = 1'-0"
EXISTING NORTH HIGH
BAY WALL SHOWN
FOR REFERENCE
EXISTING SOUTH
EXTERIOR WALL
SHOWN FOR
REFERENCE
EXISTING NORTH
EXTERIOR WALL SHOWN
FOR REFERENCE
TYP
TYP
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
TYP
EXISTING OFFICE
TOWER AND
STAIR SHOWN
FOR REFERENCE
T
R
U
E
N
O
R
T
H
NORTH
PLAN
TYPTYPTYP
TYP
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SCALE:
KEY PLAN
N.T.S.
RM 221A
RM 221B
RM 219
RM 209F RM 209E RM 209CRM 209D RM 209B
RM 209A
RM 205 RM 205B
RM 205A
2HALL1
RM 203
11'-3 1/16" 9'-3" 9'-2 3/4" 10'-2" 16'-11 3/16" 13'-10" 14'-3 1/2"
139'-2"
RM 224
RM 220A
1HALL2
RM 220B RM 220D RM 212ERM 212FRM 212E RM 212 RM 212B
RM 212C RM 204 RM 202A RM 202B
RM 212A
20'-0" 20'-0" 19'-11" 20'-0" 11'-6 5/8" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"
19'-6 5/8"4'-8 3/8" 20'-2 1/4"
10'-3 3/16"10'-0 1/2" 9'-2 1/4" 9'-5 13/16"
9'-5 15/16" 12'-10 3/16"
RM 220C
14'-11 1/8" 19'-3 7/16" 10'-6 1/8" 11'-7 3/8"
139'-2"
NORTH WING
SOUTH WING
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
AD-102
M
A
L L E
N F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
N O
R T
H
A
U
N
G
O
O R
C E
I L
I N
G
P
L A
N
D
E M
O L
I T
I O
N
R
C
O N
S T
A N
T I N
I D
E
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
SCALE:
NORTH WING 2ND FLOOR CEILING PLAN - DEMOLITION
1/8" = 1'-0"
L K JK J H G F E D CD C B A
EXISTING NORTH HIGH
BAY WALL SHOWN
FOR REFERENCE
EXISTING NORTH
EXTERIOR WALL
SHOWN FOR
REFERENCE
FLAG NOTES - DEMOLITION WORK:
CEILING:
1. REMOVE AND DISPOSE EXISTING 2x2 LAY-IN
ACOUSTIC TILES, GRID, FASTENERS AND
ACCESSORIES THROUGHOUT AREAS OF WORK.
SEE SUBSEQUENT DRAWINGS FOR ANY ITEMS TO
REMAIN AND TO BE SUPPORTED IN-PLACE.
2. SPACE OPEN TO STRUCTURE - N.I.C.
3. EXISTING CEILING TO REMAIN - N.I.C.
4. FOR REMOVAL OF CEILING MOUNTED MECHANICAL,
ELECTRICAL AND FIRE PROTECTION END ITEMS
REFER TO SUBSEQUENT DISCIPLINE DRAWINGS.
SHOWN FOR REFERENCE.
SCALE:
SOUTH WING 2ND FLOOR CEILING PLAN - DEMOLITION
1/8" = 1'-0"
EXISTING SOUTH HIGH
BAY WALL SHOWN
FOR REFERENCE
L K JK J H G F E D CD C B A
TYP
TYP
EXISTING OFFICE TOWER AND
STAIR SHOWN FOR REFERENCE
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
T
R
U
E
N
O
R
T
H
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
TYPTYP
EXISTING SOUTH
EXTERIOR WALL
SHOWN FOR RE
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SCALE:
KEY PLAN
TYP
RM 121
RM 121A
RM 109
RM 105
RM 103
1MECH1RM 105A
RM 111RM 115RM 118
12'-0"8"
8"
8"
RM 119
46'-0"
6'-7 7/8"
8"
8"
8"
17'-9 3/4"
8"
8"
8"
20'-10 1/8"
8"
20'-0"20'-0" 20'-0" 19'-11" 20'-0" 11'-6 5/8" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"
19'-6 5/8"4'-8 3/8" 20'-2 1/4"
49'-8 7/8"
46'-5 13/16"
8"
8"
8"
RM 124 RM 120
RM 106 RM 146
RM 104
RM 102A
RM 102
RM 116
8"
NORTH WING
SOUTH WING
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
AC-101
M
A
L L E
N F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
N O
R T
H
A
U
N
G
O
O R
C E
I L
I N
G
P
L A
N
N
E W
R
C
O N
S T
A N
T I N
I D
E
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
SCALE:
NORTH WING 1ST FLOOR CEILING PLAN - NEW CONSTRUCTION
1/8" = 1'-0"
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
L K JK J H G F E D CD C B A
EXISTING NORTH HIGH
BAY WALL SHOWN FOR
REFERENCE
EXISTING NORTH
EXTERIOR WALL
SHOWN FOR
REFERENCE
SCALE:
SOUTH WING 1ST FLOOR CEILING PLAN - NEW CONSTRUCTION
1/8" = 1'-0"
EXISTING SOUTH
HIGH BAY WALL
SHOWN FOR
REFERENCE
L K JK J H G F E D CD C B A
EXISTING SOUTH
EXTERIOR WALL
SHOWN FOR
REFERENCE
TYP
3 1
TYP
FLAG NOTES - NEW WORK:
CEILING:
1. PROVIDE AND INSTALL NEW 2'-0" x 2'-0" x 3/4"
NON-COMBUSTIBLE MOISTURE RESISTANT, FINE
FISSURED, SQUARE TEGULAR EDGE LAY-IN ACOUSTIC
TILES, IN 15/16" EXPOSED MEDIUM DUTY GRID; PROVIDE
FRAMING SUPPORTS AND ATTACHMENTS AS REQUIRED
FOR NEW CEILING PLAN. PER ASTM C636/C636M.
2. SPACE OPEN TO STRUCTURE - N.I.C.
3. EXISTING CEILING TO REMAIN - N.I.C.
4. PROVIDE BLOCKING AS REQUIRED; FOR ANY CEILING
MOUNTED MECHANICAL, ELECTRICAL AND COMM
FIXTURES OR END ITEMS; CONTRACTOR SHALL
COORDINATE WITH SUBSEQUENT DISCIPLINE
DRAWINGS.
5. FOR NEW CEILING MOUNTED MECHANICAL,
ELECTRICAL AND FIRE ALARM END ITEMS REFER TO
SUBSEQUENT DISCIPLINE DRAWINGS.
6. APPLY 2-FINISH COAT PAINT AT EXISTING CEILING
PERIMETER TRIM PIECE TO MATCH EXISTING COLORS.
GENERAL NOTES:
1. PROVIDE BLOCKING AT ATTACHMENT OF WALL/CLG
MOUNTED END ITEMS, INCLUDING, BUT NOT LIMITED
TO MECHANICAL, ELECTRICAL AND COMM END ITEMS,
TYP. ALL LOCATIONS. CONTRACTOR SHALL
COORDINATE WITH SUBSEQUENT DISCIPLINE DWGS
TO IDENTIFY LOCATION OF NEW WALL/CLG MOUNTED
END ITEMS.
2. PROVIDE INTUMESCENT SEALANT AND BACKER ROD
AT ALL PERIMETER THRU-WALL EQUIPMENT
PENETRATIONS.
3. CONTRACTOR SHALL VERIFY R.O. DIMENSIONS PRIOR
TO PURCHASE AND INSTALLATION OF MECHANICAL
EQUIPMENT FOR THRU-WALL PENETRATIONS, TYP.
4. WHERE EXISTING WALL FINISH IS DAMAGED DUE TO
CEILING DEMOLITION, PROVIDE NEW FINISH TO
MATCH EXISTING; FEATHER NEW FINISH INTO
EXISTING FOR CONTIGUOUS APPEARANCE, OR
RE-PAINT FROM CORNER TO CORNER AREAS THAT
CANNOT BE FEATHERED; NO SEAMS OR PATCH MARKS
SHALL BE APPARENT BETWEEN NEW AND EXISTING
CONSTRUCTION.
5. AFTER COMPLETION OF NEW WORK; CONTRACTOR
SHALL ENSURE THAT ALL NEW AND EXISTING
SURFACES ARE CLEAN.
5 3
EXISTING OFFICE TOWER AND STAIR
SHOWN FOR REFERENCE
T
R
U
E
N
O
R
T
H
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
TYP TYP TYP
TYP
TYP
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SCALE:
KEY PLAN
RM 221A
RM 221B
RM 219
RM 209F RM 209E RM 209CRM 209D RM 209B
RM 209A
RM 205 RM 205B
RM 205A
2HALL1
RM 203
11'-3 1/16" 9'-3" 9'-2 3/4" 10'-2" 16'-11 3/16" 13'-10" 14'-3 1/2"
139'-2"
RM 224
RM 220A
1HALL2
RM 220B RM 220D RM 212ERM 212FRM 212E RM 212 RM 212B
RM 212C RM 204 RM 202A RM 202B
RM 212A
20'-0" 20'-0" 19'-11" 20'-0" 11'-6 5/8" 8'-7" 8'-7 3/4" 4'-8 1/2"11'-3 1/8"
19'-6 5/8"4'-8 3/8" 20'-2 1/4"
10'-3 3/16"10'-0 1/2" 9'-2 1/4" 9'-5 13/16"
9'-5 15/16" 12'-10 3/16"
RM 220C
14'-11 1/8" 19'-3 7/16" 10'-6 1/8" 11'-7 3/8"
139'-2"
HANGER RODS
(1 MINIMUM)
AT EACH CORNER
OF LIGHT FIXTURE
LIGHT FIXTURE
WIRE HANGER AT
4'-0" O.C. MAX
CONTINUOUS
MAIN RUNNERS
ACOUSTICAL
CEILING UNITS
CROSS RUNNERS
AT FIXTURE
HANGER RODS
WIRE HANGER AT
4'-0" O.C. MAX
CONTINUOUS
MAIN RUNNERS
ACOUSTICAL
CEILING UNITS
DIFFUSER
MAIN RUNNER
AT 4'-0" O.C.
WHERE OCCURS
CROSS RUNNER
AT FIXTURE
NORTH WING
SOUTH WING
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
AC-102
M
A
L L E
N F
L A
B O
Y
R
C
O N
S T
A N
T I N
I D
E
N O
R T
H
A
U
N
G
O
O R
C E
I L
I N
G
P
L A
N
N
E W
R
C
O N
S T
A N
T I N
I D
E
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
SCALE:
NORTH WING 2ND FLOOR CEILING PLAN - NEW CONSTRUCTION
1/8" = 1'-0"
SCALE:
NORTH WING 2ND FLOOR CEILING PLAN - NEW CONSTRUCTION
1/8" = 1'-0"
L K JK J H G F E D CD C B A
EXISTING NORTH HIGH
BAY WALL SHOWN
FOR REFERENCE
EXISTING NORTH
EXTERIOR WALL
SHOWN FOR
REFERENCE
L K JK J H G F E D CD C B A
TYP
34 4
TYP
EXISTING OFFICE TOWER AND STAIR
SHOWN FOR REFERENCE
FLAG NOTES - NEW WORK:
CEILING:
1. PROVIDE AND INSTALL NEW 2'-0" x 2'-0" x 3/4"
NON-COMBUSTIBLE MOISTURE RESISTANT, FINE FISSURED,
SQUARE TEGULAR EDGE LAY-IN ACOUSTIC TILES, IN 15/16"
EXPOSED MEDIUM DUTY GRID; PROVIDE FRAMING SUPPORTS
AND ATTACHMENTS AS REQUIRED FOR NEW CEILING PLAN.
PER ASTM C636/C636M.
2. SPACE OPEN TO STRUCTURE - N.I.C.
3. EXISTING CEILING TO REMAIN - N.I.C.
4. PROVIDE BLOCKING AS REQUIRED; FOR ANY CEILING
MOUNTED MECHANICAL, ELECTRICAL AND COMM FIXTURES
OR END ITEMS; CONTRACTOR SHALL COORDINATE WITH
SUBSEQUENT DISCIPLINE DRAWINGS.
5. FOR NEW CEILING MOUNTED MECHANICAL, ELECTRICAL AND
FIRE ALARM END ITEMS REFER TO SUBSEQUENT DISCIPLINE
DRAWINGS.
TYP
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
SCALE:
TYP LIGHT INSTALLATION DETAIL
N.T.S.
SCALE:
TYP DIFFUSER INSTALLATION DETAIL
N.T.S.
T
R
U
E
N
O
R
T
H
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
EXISTING SOUTH HIGH
BAY WALL SHOWN
FOR REFERENCE
EXISTING SOUTH
EXTERIOR WALL
SHOWN FOR RE
TYP
TYP TYP
SCALE:
KEY PLAN
N.T.S.
T
R
U
E
N
O
R
T
H
NORTH
PLAN
TYP
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
M-001
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
G
E N
D S
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
-EXISTING FIRE DAMPER TO REMOVED
M
FM
-MANUAL BALANCING DAMPER
-AIR FLOW MEASURING STATION
-MOTOR OPERATED CONTROL DAMPER (MOD)
-FLEXIBLE CONNECTION
-ACCESS DOORS, VERTICAL OR HORIZONTAL
-DOOR GRILLE
-UNDERCUT DOOR
-SPIN-IN TAKE-OFF
-RECTANGLE-TO-ROUND TAKE-OFF
DNUP
-TRANSITION, SQUARE TO ROUND
UP
DOWN
-CEILING EXHAUST
-CEILING RETURN
-STANDARD BRANCH TAKE-OFF
-RADIUS ELBOW
-TRANSITION, ECCENTRIC
-FLEXIBLE DUCT
-CHANGE OF ELEVATION
-DUCT ELBOW, NEGATIVE PRESSURE, RETURN
-DUCT ELBOW, EXHAUST
-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY)
-TRANSITION, CONCENTRIC
-SQUARE THROAT TEE
-RADIUS TEE
-ROUND DIFFUSER
-DOUBLE WALL (K27) LINED DUCTWORK
-EXISTING TO BE REMOVED
M-1
-TEMPERATURE SENSOR
-MOTORIZED CONTROL DAMPER
-HUMIDISTAT/HUMIDITY SENSOR
-THERMOSTAT/TEMPERATURE SENSOR
-REVISION REFERENCE
-PRESSURE SENSOR
-DUCT SMOKE DETECTOR
-CONNECT TO EXISTING
-DEMOLISH TO POINT INDICATED
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
-45° PIPE RISE (R) / DROP (D)
-CONDENSATE SUPPLY
-VALVE ON RISER
-CAP
-CONNECTION, BOTTOM
-CONNECTION, TOP
-COUPLING
-ELBOW, 90°
-ELBOW, 45°
-ELBOW, TURNED DOWN
-ELBOW, TURNED UP
-TEE, OUTLET DOWN
-TEE, OUTLET UP
D
D
CR
-CONDENSATE RETURN
-P-TRAP
EQUIP
-RELIEF VALVE
HVAC SYMBOL LEGEND
-BACKDRAFT DAMPER
-PIPE ANCHORS
-CONCENTRIC REDUCER
-ECCENTRIC REDUCER
-FLOW DIRECTION
-SHEET NOTE CALLOUT
-SHEET NOTE CALLOUT
-FLAG NOTE CALLOUT
-CEILING MOUNTED ACCESS DOOR
-RECTANGULAR DUCT SECTION UP, EXHAUST
SYMBOL DESCRIPTIONSYMBOL DESCRIPTION
HVAC PIPING SYMBOL LEGEND
SYMBOL DESCRIPTION
-EXHAUST DUCT UP THROUGH SLAB WITH
FAN ON ROOF ABOVE
-EXHAUST FAN ON ROOF WITH DUCT
DOWN THROUGH ROOF
-CEILING DIFFUSER, ROUND NECK (CEILING
DIFFUSERS ARE 4-WAY THROW U.O.N.)
-CEILING DIFFUSER, RECTANGULAR OR
SQUARE NECK (CEILING DIFFUSERS ARE
4-WAY THROW UNO)
-SUPPLY REGISTER OR GRILLE (VERTICAL
MOUNT, SIDEWALL)
-RETURN/EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
-DETAIL REFERENCE: TOP - DETAIL#
BOTTOM - DRAWING# SHOWN ON
-FIRE DAMPER (WITH ACCESS PANEL)
-RECTANGULAR DUCT SECTION UP,
NEGATIVE PRESSURE, RETURN
-RECTANGULAR DUCT SECTION UP, POSITIVE
PRESSURE, SUPPLY OR OUTSIDE AIR
-DUCT ELBOW UP THROUGH ROOF OR SLAB
ABOVE
-NEW DUCTWORK, FIRST DIMENSION IS
SIDE SHOWN
-SQUARE THROAT ELBOW
WITH TURNING VANES
-RECTANGULAR/ROUND BRANCH TAKE-OFF
OR ROUND/ROUND BRANCH TAKE-OFF
TS
TOR
M
-MOTOR SENSOR
CS
-EXISTING DUCTWORK TO REMAIN
-VARIABLE AIR VOLUME TERMINAL UNIT
12x10
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
M-002
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
T
B
R E
V I A
T I O
N S
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS
TERMINAL NUMBER
TERMINAL UNIT TYPE
VAV - VARIABLE TERMINAL
UNIT
VAV-1
DDC -DIRECT DIGITAL CONTROLS
SP -STATIC PRESSURE
P
-CHANGE IN PRESSURE
CV -CONSTANT AIR VOLUME
RS/L -REFRIGERANT SUCTION &
-OUTSIDE AIR LOUVEROAL
-VARIABLE AIR VOLUMEVAV
-SUPPLY AIRSA
-REHEAT COILRHC
-REVOLUTIONS PER MINUTERPM
-RETURN AIRRA
-POLYVINYL CHLORIDE PIPEPVC
-PSI GAUGEPSIG
-POUNDS PER SQUARE INCHPSI
-PRESSURE REDUCING VALVEPRV
-OUTSIDE AIROA
-NORMALLY OPENNO
-NORMALLY CLOSEDNC
-LEAVING WATER TEMPERATURELWT
-LEAVING AIR TEMPERATURELAT
-GALLONS PER MINUTEGPM
-FEET PER MINUTE
-FIRE DAMPER
-ENTERING WATER TEMPERATURE
-ENTERING AIR TEMPERATURE
-DOWN
-CONDENSING UNIT
-CUBIC FEET PER MINUTE
-CHANGE IN TEMPERATURE
-COOLING TOWER
-CEILING DIFFUSER
-BRITISH THERMAL UNIT
-BRAKE HORSEPOWER
-BOTTOM OF PIPE
-ACCESS PANEL
-ABOVE FINISHED FLOOR
FPM
FD
EWT
EAT
DN
CU
CFM
T
CT
CD
BTU
BOP
BHP
AP
AFF
-AIR HANDLING UNITAHU
MBH -THOUSAND BTUs PER HOUR
AFD -ADJUSTABLE FREQUENCY DRIVE
ESP -EXTERNAL STATIC PRESSURE
KW -KILOWATT
MOCP -MAXIMUM OVER
UNO
TSP -TOTAL STATIC PRESSURE
-VOLTS/PHASEV/PH
VFD -VARIABLE FREQUENCY DRIVE
-UNLESS NOTED OTHERWISE
FLA -FULL LOAD AMPS
AHU NUMBER
-AIR HANDLING UNIT
-AIR DISTRIBUTION DEVICE
200A
CFM
TYPE
AHU-1
HVAC ABBREVIATIONS
HVAC EQUIPMENT TAGS
MOD -MOTOR OPERATED CONTROL
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
CURRENT PROTECTION
DAMPER (MOD)
MCA -MINIMUM CIRCUIT AMPS
LIQUID LINES
GENERAL NOTES
2. ALL HOLES CAUSED BY REMOVAL OF DUCTWORK, CONTROLS, CONTROL WIRING, PIPING, AND ASSOCIATED MATERIALS
SHALL BE PATCHED WITH LIKE MATERIAL TO SURROUNDINGS UNLESS OTHERWISE SPECIFIED BY CONTRACTING OFFICER, SPECIFICATIONS OR ARCHITECT. THESE PATCHES SHALL BE THEN PAINTED TO MATCH SURROUNDING AREA.
3. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL
EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
4. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE
WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING
DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.
5. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION
STANDARD.
6. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.
7. PROVIDE SINGLE WALL AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
8. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.
9. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH CEILING AND EXISTING EQUIPMENT OF ALL TRADES.
10. LOCATE THERMOSTATS 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER
EQUIPMENT, FURNITURE, AND DOOR SWINGS.
11. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL
SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
12. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
13. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT
BLACK.
14. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
15. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO
SUIT EQUIPMENT FURNISHED.
16. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR
MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
17. ALL DUCTWORK IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO
ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
18. PROVIDE MANUAL BALANCING DAMPERS AT EVERY BRANCH CONNECTION WHETHER INDICATED ON THE DRAWINGS OR
NOT. MARK DAMPER POSITION AND CIRCUIT SETTER ONCE FINAL ADJUSTMENTS ARE MADE
19. VERIFY FINISH WITH CONTRACTING OFFICER PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND
OTHER AIR DISTRIBUTION DEVICES.
20. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN AND AIR HANDLING UNIT.
21. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.
22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND
FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10'-0" CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE
LOCATIONS.
24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.
25. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE OF
EQUIPMENT CONNECTION TO THE NEAREST PLUMBING DRAIN.
26. ALL MECHANICAL WORK INVOLVING ROOF PENETRATIONS SHALL BE COORDINATED WITH THE ROOFING CONTRACTOR TO
MAINTAIN ROOFING WARRANTY.
27. ALL WALL LOUVER DUCTWORK CONNECTIONS SHALL BE SLOPED TOWARDS THE DRAIN OF THE LOUVER.
28. THE NEW DDS SYSTEM SHALL BE IN FULL COMPLIANCE WITH ALL BASE STANDARDS. ALL MECHANICAL EQUIPMENT WITHIN
THE SCOPE OF THIS PROJECT SHALL SHOW FULL COMUNICATION WITH BASE FRONT END VIA FULLY PROGRAMMED
TRIDUM JACE 200.
29. ALL VAV LOCATIONS AND NUMBERS SHALL BE PROPERLY IDENTIFIED VIA LABELS AT CEILING LOCATION BELOW
VAV. CONTROLLING THERMOSTAT SHALL ALSO BE CLEARLY IDENTIFIED AS TO WHICH VAV THEY CONTROL.
DG -DOOR GRILLE
CU NUMBER
-CONDENSING UNIT
CU-1
AC-1
(EXIST)
CU-1
(EXIST)
30x20
22x20
17x20
13x20
10x2010"Ø
10"Ø
(TYP 6
PLACES)
8x12
12x16
18x16
20x16 20x22
EF
(EXIST. TO REMAIN)
AC-3
(EXIST)
CU-3
(EXIST)
EF
(EXIST. TO
REMAIN)
OA LOUVER
(EXIST. TO
REMAIN)
30x20
26x20
20x20
14x20
12x20
Ø
Ø
Ø
12x12 12x22
16x22
19x22 20x22
Ø
Ø
Ø
6"Ø
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
MD-101
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
R
O
A
N
D
E M
O
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
SCALE:
MECHANICAL PLAN - 1ST FLOOR - SOUTH WING - DEMOLITION
1/8" = 1'-0"
GENERAL NOTES:
1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL
CONTRACTOR TO PROVIDE FOR APPROVAL
COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION
AND INSTALLATION. COORDINATING WITH ALL TRADES
AND EXISTING SITE CONDITIONS I.E. MECHANICAL,
STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL
CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING
CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL
ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY
OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING
DUCT FABRICATION OR FIELD MODIFICATIONS TO
ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO
20% IN OVERAGE IN MATERIAL.
2. PROJECT SCOPE IS THE DEMOLISHING OF THE EXISTING
MECHANICAL SYSTEM. TO INCLUDE BUT NOT LIMITED TO
ALL EXISTING AHU'S, CONDENSING UNITS, WITH
ASSOCIATED AIR DISTRIBUTION, SUPPORTS,
CONDUCTOR, CONDUIT, AND CONTROLS AS INDICATED
ON PLANS.
3. ALL EXISTING DUCTWORK TO REMAIN SHALL BE CLEANED
PRIOR TO INSTALLATION OF NEW EQUIPMENT. SEE
SPECIFICATIONS FOR SPECIFIC REQUIREMENTS.
NORTH
PLAN
T
R
U
E
N
O
R
T
H
SCALE:
MECHANICAL PLAN - 1ST FLOOR - NORTH WING - DEMOLITION
1/8" = 1'-0"
DEMOLISH ALL EXISTING AHU'S TO INCLUDE ALL PIPING,
SUPPORTS, CONTROLS, CONDUITS, CONDUCTOR, AND
CONDENSATE PIPING. DEMOLISH SUPPLY AND RETURN
DUCTWORK TO POINT INDICATED ON PLAN AND PREPARE
FOR NEW CONNECTION.
DEMOLISH EXISTING CONDENSING UNITS TO INCLUDE PIPING,
INSULATION, SUPPORTS, WIRING, CONDUIT AND CONTROLS.
DEMOLISH ALL EXISTING REFRIGERANT LINES AND
ASSOCIATED CONTROLS, SUPPORTS, AND INSULATION.
EXISTING RESTROOM EXHAUST TO REMAIN, SHOWN FOR
INFORMATION COORDINATION ONLY.
EXISTING SUPPLY AND RETURN DUCTWORK TO REMAIN.
DEMOLISH ALL EXISTING WALL LOUVERS AND REPAIR
OPENING. COORDINATE ALL LOCATIONS WITH
ARCHITECTURAL PLANS.
DEMOLISH ALL EXISTING HVAC CONTROLS WIRING, CONDUIT,
AND DEVICES.
DEMOLISH EXISTING CEILING MOUNTED SUPPLY AND RETURN
AIR DIFFUSERS. PRESERVE CONNECTING DUCTWORK FOR
NEW DIFFUSER CONNECTIONS.
DEMOLISH EXISTING SUPPLY DUCTWORK TO POINT
INDICATED ON PLAN.
NORTH
PLAN
T
R
U
E
N
O
R
T
H
(TYP)
(TYP)
(TYP)
(TYP)(TYP)
(TYP)
DEMO FLAG NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
KEY PLAN
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NTS
NORTH WING
SOUTH WING
L K JK J H G F E D CD C B A
L K JK J H G F E D CD C B A
23x38 SA UP TO AC-2
ROOF (EXIST)
38x2435x2435x23 35x22
35x2135x2033x2032x20
22x16 27x20 30x20
54x30 RA
GRILLE
DG (TYP)
24x6
11x12
14x12
16x12
24x12 24x14 24x18 24x20 24x22 24x6
22x24 SA UP
TO AC-4 (EXIST)
38x30 RA
GRILLE
DG (TYP)
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
O
A
N
D
E M
O
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
SCALE:
MECHANICAL PLAN - 2ND FLOOR - SOUTH WING - DEMOLITION
1/8" = 1'-0"
SCALE:
MECHANICAL PLAN - 2ND FLOOR - NORTH WING - DEMOLITION
1/8" = 1'-0"
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
T
R
U
E
N
O
R
T
H
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
MD-102
GENERAL NOTES:
1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL
CONTRACTOR TO PROVIDE FOR APPROVAL
COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION
AND INSTALLATION. COORDINATING WITH ALL TRADES
AND EXISTING SITE CONDITIONS I.E. MECHANICAL,
STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL
CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING
CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL
ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY
OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING
DUCT FABRICATION OR FIELD MODIFICATIONS TO
ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO
20% IN OVERAGE IN MATERIAL.
2. PROJECT SCOPE IS THE DEMOLISHING OF THE ENTIRE
MECHANICAL SYSTEM SERVING THE SECOND FLOOR. TO
INCLUDE BUT NOT LIMITED TO ALL EXISTING AHU'S,
CONDENSING UNITS, WITH ASSOCIATED AIR
DISTRIBUTION, SUPPORTS, CONDUCTOR, CONDUIT, AND
CONTROLS.
EXISTING RESTROOM EXHAUST TO REMAIN, SHOWN FOR
INFORMATION COORDINATION ONLY.
DEMOLISH ALL AIR DISTRIBUTION TO INCLUDE DUCTWORK,
INSULATION, SUPPORTS, DIFFUSERS, TRANSFER GRILLES,
DAMPERS, AND CONTROLS BACK TO AIR HANDLER WITHIN
PENTHOUSE ON ROOF.
DEMO FLAG NOTES:
1.
2.
KEY PLAN
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NTS
NORTH WING
SOUTH WING
L K JK J H G F E D CD C B A
L K JK J H G F E D CD C B A
CONDENSING UNIT
CU-2 (EXIST)
AC-2
(EXIST)
23x38 SA DN TO 2ND
FLR (EXIST)
P
R
CONDENSING UNIT
CU-4 (EXIST)
AC-4
(EXIST)
22x24 SA DN TO 2ND
FLR (EXIST)
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
A
N
P
E N
T H
O U
E M
O
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
SCALE:
MECHANICAL PLAN - PENTHOUSE - SOUTH WING - DEMOLITION
1/8" = 1'-0"
SCALE:
MECHANICAL PLAN - PENTHOUSE - NORTH WING - DEMOLITION
1/8" = 1'-0"
GENERAL NOTES:
1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL
CONTRACTOR TO PROVIDE FOR APPROVAL
COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION
AND INSTALLATION. COORDINATING WITH ALL TRADES
AND EXISTING SITE CONDITIONS I.E. MECHANICAL,
STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL
CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING
CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL
ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY
OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING
DUCT FABRICATION OR FIELD MODIFICATIONS TO
ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO
20% IN OVERAGE IN MATERIAL.
2. PROJECT SCOPE IS THE DEMOLISHING OF THE ENTIRE
MECHANICAL SYSTEM. TO INCLUDE BUT NOT LIMITED TO
ALL EXISTING AHU'S, CONDENSING UNITS, CHILLERS,
WITH ASSOCIATED AIR DISTRIBUTION, SUPPORTS,
CONDUCTOR, CONDUIT, AND CONTROLS.
DEMO FLAG NOTES:
1. DEMOLISH ALL EXISTING AHU'S TO INCLUDE ALL
DUCTWORK, PIPING, SUPPORTS, CONTROLS, CONDUITS,
AND CONDUCTOR.
2. DEMOLISH EXISTING CONDENSING UNITS TO INCLUDE
PIPING, INSULATION, WIRING, CONDUIT AND CONTROLS.
AND EXISTING STRUCTURAL STAND..
3. DEMOLISH ALL EXISTING REFRIGERANT LINES AND
ASSOCIATED CONTROLS, SUPPORTS, AND INSULATION. IF
PIPING IS BELOW GRADE, CAPPING BELOW GRADE AND
FINISHING VOID TO MATCH SURROUNDING AREAS IS AN
ACCEPTABLE SUBSTITUTION.
4. DEMOLISH ALL EXISTING HVAC CONTROLS WIRING,
CONDUIT, AND DEVICES.
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
T
R
U
E
N
O
R
T
H
MD-103
KEY PLAN
NORTH
PLAN
T
R
U
E
N
O
R
T
H
NTS
NORTH WING
SOUTH WING
L K JK J H G F E D CD C B A
L K JK J H G F E D CD C B A
AHU-1N
CU-1N
150A
30x20
22x20
17x20
13x20
10x2010"Ø
10"Ø
(TYP 6
PLACES)
8x12
12x16
18x16
20x16 20x22
150A
150A
150A
150A
150A
150A
150A
150A
150A 150A
150A
150A
150A
150A
150A
150A
150A
150A
150A
500B
500B
500B 500B
500B 500B x
T
AHU-1N
CU-1N
150A
30x20
22x20
17x20
13x20
10x2010"Ø
10"Ø
(TYP 6
PLACES)
8x12
12x16
18x16
20x16 20x22
150A
150A
150A
150A
150A
150A
150A
150A
150A 150A
150A
150A
150A
150A
150A
150A
150A
150A
150A
500B
500B
500B 500B
500B 500B x
T
RM 124
RM 120
RM 116
RM 106
RM 146
RM 104
RM 102A
RM 102
AHU-1S
CU-1S
30x20
26x20
20x20
Ø
Ø
Ø
12x12 12x22
19x22 20x22
Ø
Ø
Ø
200A
200A
200A
200A
200A
200A 200A
200A
200A
200A
75A 100A 100A
150A 150A
150A
150A
300B300B
250A
250A
200B
500B
800B
400B
400B
400B x x x
75B
T
AHU-1S
CU-1S
30x20
26x20
20x20
Ø
Ø
Ø
12x12 12x22
19x22 20x22
Ø
Ø
Ø
200A
200A
200A
200A
200A
200A 200A
200A
200A
200A
75A 100A 100A
150A 150A
150A
150A
300B300B
250A
250A
200B
500B
800B
400B
400B
400B x x x
75B
T
RM 121
RM 121A
RM 119
RM 118
RM 115
RM 111
RM 109
RM 105A
RM 105
RM 103
1MECH1
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
MC-101
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
R
O
A
N
N
E W
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
SCALE:
MECHANICAL PLAN - 1ST FLOOR - SOUTH WING - NEW
1/8" = 1'-0"
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SCALE:
MECHANICAL PLAN - 1ST FLOOR - NORTH WING - NEW
1/8" = 1'-0"
T
R
U
E
N
O
R
T
H
NORTH
PLAN
GENERAL NOTES:
1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL
CONTRACTOR TO PROVIDE FOR APPROVAL
COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION
AND INSTALLATION. COORDINATING WITH ALL TRADES
AND EXISTING SITE CONDITIONS I.E. MECHANICAL,
STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL
CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING
CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL
ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY
OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING
DUCT FABRICATION OR FIELD MODIFICATIONS TO
ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO
20% IN OVERAGE IN MATERIAL.
PROVIDE AND INSTALL NEW HORIZONTAL AHU SUSPENDED
FROM STRUCTURE ABOVE USING SPRING ISOLATION. SUPPRT
UNIT PER MANUFACTURER INSTALLATION INSTRUCTIONS.
CONNECT TO EXISTING SUPPLY AND RETURN DUCTWORK AS
INDICATED ON PLAN.
PROVIDE AND INSTALL NEW SUPPLY AND RETURN
DIFFUSERS, AND GRILLES. CONNECT TO EXISTING
DUCTWORK. MODIFY AND / OR EXTEND AS REQUIRED WITH
NEW FLEX FOR A COMPLETE INSTALLATION.
CONNECT NEW SUPPLY AND RETURN AIR DUCTWORK TO
EXISTING SUPPLY AND RETURN MAIN AT THIS LOCATION.
8x6 OUTSIDE AIR DUCTWORK WITH MOTOR OPERATED
DAMPER. ROUTE TO BACK SIDE OF EXISTING WALL MOUNTED
LOUVER.
PROVIDE AND INSTALL REFRIGERANT LINES. ROUTE UP WALL
AND INTO BUILDING TIGHT TO STRUCTURE AND DOWN TO
AHU. INSTALL STAINLESS STEEL JACKETING ON ALL
EXTERIOR PIPING. COVER EXTERIOR PIPING WITH STAINLESS
STEEL CHASE AND PAINT TO MATCH BUILDING EXTERIOR.
PROVIDE AND INSTALL NEW CONDENSING UNIT ON EXISTING
CONCRETE PAD.
FLAG NOTES:
1.
2.
3.
4.
5.
6.
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
KEY PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
NTS
NORTH WING
SOUTH WING
L K JK J H G F E D CD C B A
L K JK J H G F E D CD C B A
26x16 SA UP TO AHU-2N
VAV-2N.1
VAV-2N.2
VAV-2N.3
VAV-2N.4
VAV-2N.5
VAV-2N.7
VAV-2N.9
T
TT
T
T
T
VAV-2N.6
VAV-2N.8
T
T
36x16 RA UP TO AHU-2N
225A
225A
250A
100A
200A 200A
200A200A
350A
300A225A
225A
225A
225A
225A
200A
200A
100A 100A
300A
300A
A
225A x x x x x
Ø x
Ø x
6x10
225B x
6x10 x x
Ø
6x10 10x12
18x12
12x12
6x10
20x12 x
22x14 24x16
400B
450B
225B
225B 225B
300B
350B
200B
250B
350B x
8x8 x
20x12 x x
20x14 20x16 x x
24x16 x
800B
30x16 x
34x16 x
10x8 x
EXIST. EF EXIST. EF
T
900B
12"Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
RM 224
RM 220A
1HALL2
RM 220B
RM 220C RM 220D
RM 212E
RM 212F
RM 212E
RM 212
RM 212B
RM 212C
RM 204
RM 202A
RM 202B
RM 212A
VAV-2S.2
VAV-2S.4
VAV-2S.6
T
T
TT
26x16 SA UP TO AHU-2S
T
VAV-2S.1
6x10
350B
350A x x x
10x10
6x10
Ø x
Ø
200A 200A
150A
150A x
6x10
VAV-2S.3
200A
A
275A275A
300A
12x12
6x10
100A
100A
300A 300A 300A
VAV-2S.5
VAV-2S.7
VAV-2S.8
22x16 20x1418x12
10x12
100A 100A
200A
300A
B 200
300B
8x8
200A
200A
200A
200A
800B x
900B
36x16 RA UP
TO AHU-2S
300B x
275B 275B
275B
12x20 x x
18x12 x
8x12
6x12 x
900B
200B
350A
200B x
22x14
350B
22x16 x
24x16 26x16
8x8
34x16
T
T
200B
T
Ø
Ø
Ø
Ø
Ø
Ø
Ø
8"Ø
RM 221A
RM 221B
RM 219
RM 209F
RM 209E
RM 209C
RM 209D
RM 209B RM 209A RM 205
RM 205B
RM 203
RM 205A
2HALL1
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
O
A
N
N
E W
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
24'16'6' 2'4' 0' 8'
GRAPHIC SCALE 1/8" = 1'-0"
SCALE:
MECHANICAL PLAN - 2ND FLOOR - SOUTH WING - NEW
1/8" = 1'-0"
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SCALE:
MECHANICAL PLAN - 2ND FLOOR - NORTH WING - NEW
1/8" = 1'-0"
GENERAL NOTES:
1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL
CONTRACTOR TO PROVIDE FOR APPROVAL
COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION
AND INSTALLATION. COORDINATING WITH ALL TRADES
AND EXISTING SITE CONDITIONS I.E. MECHANICAL,
STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL
CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING
CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL
ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY
OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING
DUCT FABRICATION OR FIELD MODIFICATIONS TO
ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO
20% IN OVERAGE IN MATERIAL.
T
R
U
E
N
O
R
T
H
NORTH
PLAN
MC-102
ROUTE NEW SUPPLY AND RETURN AIR DUCTWORK UP TO
NEW AIR HANDLER MOUNTED IN PENTHOUSE ON ROOF.
FLAG NOTES:
1.
KEY PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
NTS
NORTH WING
SOUTH WING
L K JK J H G F E D CD C B A
L K JK J H G F E D CD C B A
P
R
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G
M
E D
I N
A
C
H
U D
S O
N
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
GENERAL NOTES:
1. DRAWINGS ARE FOR DESIGN INTENT ONLY. MECHANICAL
CONTRACTOR TO PROVIDE FOR APPROVAL
COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION
AND INSTALLATION. COORDINATING WITH ALL TRADES
AND EXISTING SITE CONDITIONS I.E. MECHANICAL,
STRUCTURE, ELECTRICAL AND CIVIL. SHEET METAL
CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING
CONDITIONS ABOVE CEILING AND WITHIN MECHANICAL
ROOMS. CONTRACTOR IS RESPONSIBLE FOR ANY
OFFSETS, TRANSITIONS AND FITTINGS REQUIRED DURING
DUCT FABRICATION OR FIELD MODIFICATIONS TO
ACCOMMODATE EXISTING CONDITIONS ON SITE AT UP TO
20% IN OVERAGE IN MATERIAL.
2. ROOFING WORK TO BE PERFORMED UNDER THIS
CONTRACT FOR EQUIPMENT THE SUPPORT CURBS SHALL
BE PERFORMED BY LICENSED ROOFING CONTRACTOR
AND CARRY SAME WARRANTY AS EXISTING ROOF.
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SCALE:
ENLARGED MECHANICAL PLAN - NORTH WING - PENTHOUSE - NEW
1/8" = 1'-0"
MC-301
SCALE:
ENLARGED MECHANICAL PLAN - SOUTH WING - PENTHOUSE - NEW
1/8" = 1'-0"
MC-301
8'6'4'2'2' 1' 0'
GRAPHIC SCALE 3/8" = 1'-0"
T
R
U
E
N
O
R
T
H
NORTH
PLAN
CU-2N
AHU-2N
26x16 SA DOWN
TO 2ND FLR
26x16 SA DOWN
TO 2ND FLR
AHU-2S
CU-2S
MC-301
E N
L A
R G
N
T H
O U
M
C
H A
N I C
A L
P L
A N
S
36x16 RA DOWN
TO 2ND FLR
36x16 RA DOWN
TO 2ND FLR
PROVIDE AND INSTALL NEW AHU ON EXISTING CONCRETE
PAD WITH HOUSE SPRING ISOLATORS.
PROVIDE AND INSTALL NEW CONDENSING UNIT TO BE
MOUNTED ON NEW PREFABIRCATED EQUIPMENT SUPPORT
CURB WITH STAINLESS STEEL CAPS. CONTRACTOR TO VERFY
ROOFING MATERIAL AND PROVIDE WITH CANT AS REQUIRED.
SECURE UNIT TO CURB SUPPORTS WITH MOUNTING BOLTS
AND STAINLESS STEEL TIE DOWNS.
PROVIDE AND INSTALL REFRIGERANT LINES. ROUTE UP WALL
AND INTO PENTHOUSE TIGH TO STRUCTURE AND DOWN TO
AHU. INSTALL STAINLESS STEEL JACKETING ON ALL
EXTERIOR PIPING. COVER EXTERIOR PIPING WITH STAINLESS
STEEL CHASE AND PAINT TO MATCH PENTHOUSE EXTERIOR.
ROUTE NEW SUPPLY AND RETURN AIR DUCTWORK DOWN
EXISTING CHASE TO SECOND FLOOR. SUPPORT DUCTWORK
AT OPENING.
PROVIDE NEW 12X8 OA INTAKE LOUVER, RUSKIN MODEL
EME520MD WITH INSECT SCREEN.
FLAG NOTES:
1.
2.
3.
4.
5.
8x8 OA
8x8 OA
MD
MD
KEY PLAN
T
R
U
E
N
O
R
T
H
NORTH
PLAN
NTS
NORTH WING
SOUTH WING
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
M-501
G
M
E D
I N
A
C
H
U D
S O
N
M E
C H
A N
I C
T
A I L
S
C
H
U D
S O
N
D B
G
B
E A
R D
D E
S I G
N
H
V A
C
H
A N
G A
R
G
F
D B
C C
A F
S
F
L
S
U
P
P
Y
O
W
R
E
T
U
O
W
RECTANGULAR DUCT
2" INSULATION
ROUND DUCT
NOTES:
1. ON DUCTS 24" AND LARGER, SECURE INSULATION WITH WELDED STICK-PINS 18" O.C. PLUS ADHESIVE ON THE BOTTOM OF DUCT.
2. CUT INSULATION TO PROPER LENGTHS TO AVOID COMPRESSION OF INSULATION.
3. TAPE ALL JOINTS WITH FASON (SMACNA) ALUMINUM REINFORCED PRESSURE SENSITIVE TAPE. COAT ALL EDGES, SEAMS AND JOINTS
WITH INSUL-COUSTIC PRODUCT "SURE-COAT" M1-110 WHITE" FIRE RESISTANT MASTIC.
4. SEAL ALL SEAMS AND JOINTS WITH HARDCAST TAPE FR#1502.
5. INSULATION TO BE FIBER GLASS WITH FOIL FACE.
DUCT
VAPOR
BARRIER
TAPE
DUCT
VAPOR BARRIER TAPE
WOOD STUD CONSTRUCTION OPENING TO
BE LINED WITH FIRE RESISTIVE MATERIAL
OF RATING EQUAL TO THAT ON WALL
SPACE AT CORNERS 1/8"
METAL STUD CONSTRUCTION
EXTERNAL THERMAL INSULATION
COMPRESS INSULATION
AGAINST PARTITION
CAULK BEAD AROUND EDGE
BETWEEN DUCT AND WALL
OVERLAP OF OPENING. MAX. SPACE
INSULATION COMPRESSED TO
MAX. OF 1/8". MAX. 1/4" SPACE
BETWEEN DUCTS AND WALL
METAL DUCT
CAULK BEAD AROUND EDGE
BETWEEN DUCT AND WALL
FIRE RESISTIVE
MATERIAL (TYP)
45 DEGREE BOOT
TAP, TYPICAL
MANUAL BALANCING
DAMPER, TYPICAL
RADIUS ELBOWS MAY
BE USED IN LIEU OF
SQUARE ELBOWS
DOUBLE NUTS AND WASHERS
BOTH SIDES OF ANGLE (TYP)
STRUCTURAL JOIST
1/2" BOLT AND NUT
WITH 2 1/2" WASHER
1/2" THREADED ROD (TYP)
1 1/4 x 1 1/4 x 3/16
ANGLE IRON SUPPORTS
STEEL HANGERS,
SUPPORT FROM STRUCTURE
SHEET METAL MAIN
SUPPLY TRUNK
TYPICAL TRANSITION
MAX. 15° ANGLE
VOLUME DAMPER WITH
LOCKING DEVICE
SHEET METAL
BRANCH DUCT
STRUCTURAL CHANNEL
45° ENTRY BRANCH FITTING
2" INSULATION
TURNING VANES
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER-TYPE 1
ADJUSTABLE CLEVIS HANGER-TYPE 43
PROVIDE INSULATION
SHIELD AND INSERT FOR
ALL PIPING (8" MIN)
1/2" DIA. HANGER RODS WITH
36" MAX. SPACING ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
1 5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
BAND
M
A X
PITCH DOWN
TOWARD DRAIN
CLEANOUT
OPEN DRAIN
DRAIN PAN
CLEANOUT
DRAIN LINE SHALL BE AT LEAST
THE SAME SIZE AS THE NIPPLE
ON THE DRAIN PAN, BUT NO
LESS THAN 1 1/4" OR AS
INDICATED ON THE DRAWINGS
D
M
G
P
D
M I N
D E
P T
H
O
F
S
E A
L
A O
R
A
N
D L
I N
G
U N
I T
S
SCALE:
CONDENSATE TRAP PIPING DETAIL
NONE
M-501
(DUCTS LOCATED WITHIN THE BUILDING ONLY)
SCALE:
(NOT APPLICABLE TO FIRE-RATED WALLS)
NONE
M-501
DUCT PENETRATION THROUGH WALL
SCALE:
INTERIOR DUCT INSULATION DETAIL
NONE
M-501
SCALE:
DUCT HANGER DETAIL
NONE
M-501
SCALE:
PIPE SUPPORT DETAIL
NONE
M-501
SCALE:
TYPICAL LOW PRESSURE DUCTWORK
NONE
M-501
SCALE:
BRANCH DUCT TAKEOFF DETAIL
NONE
M-501
AIR FLOW
AIR FLOW
HANGER BRACKET
VAV
UNIT
36" CLEAR
NOTES:
1. MANUFACTURER OF TERMINAL UNIT SHALL PROVIDE CONTROL
ON LEFT OR RIGHT SIDE AS REQUIRED BY FIELD CONDITIONS.
2. ARRANGE ACCESS TO PERMIT EASY FIELD BALANCE AND
MAINTENANCE OF TERMINAL UNIT.
3. COORDINATE LOCATION OF VAV BOXES WITH LIGHTING FIXTURES
TO ASSURE PROPER ACCESS.
STRAIGHT DUCT
LENGTH MINIMUM
2'-0". DUCT SIZE
TRANSITION TO
MATCH INLET SIZE
OF VAV BOX
CONTROL
BOX
FASTEN AND SEAL
CONNECTION
SUPPORTING
CHANNEL
42" CLEAR
HEATER
CONTROL BOX
2'-0" STRAIGHT
DUCT
SCALE:
TYPICAL VAV INSTALLATION DETAIL
NONE
M-501
NOTE: FOR SLEEVE INSTALLATION, COORDINATE WITH
ARCHITECTURAL DRAWINGS.
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .