Solicitation Repair HVAC Systems Bldg 981 891 Patrick AFB FL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAC-101-FIRE_ALARM_FLOOR-_NEW(04022014).pdf | ||
| ATCH10_Site_Visit_Question Anwsers12Jun2014.pdf | ||
| FA252114R00230001.pdf | ||
| Pre-BidSiteVisitAttend053014.pdf | ||
| Pre-Proposal_Site_Visit_30_May_14.pdf | ||
| ATCH_3_Wage_Determination_(FL140001)_05022014.pdf | ||
| ATCH_8_Site_Visit_RulesofEngagement.pdf | ||
| ATCH_4_HazWaste_Gen..doc | DOC document | |
| ATCH_9_Site_Visit-Entry_Authority_List_(EAL)_Request.docx | DOCX document | |
| ATCH_1_Technical_Specifications.pdf | ||
| ATCH_5_Green_Procurement.pdf | ||
| ATCH_6_Cost_Worksheet.xls | XLS spreadsheet | |
| ATCH_7_Site_Visit_Question_and_Answer_Template.docx | DOCX document | |
| ATCH_2_Drawings.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F3K3DD4098A001
This acquisition is a Economically Disadvantaged Women Ow ned set-aside
NAICS: 238220 Size Standard $14M
The magnitude of this project is betw een $250,000 and $500, 000 (IAW FAR 36.204)
NOTICE TO OFFERORS: Funds are not presently available for this project. No aw ard w ill be made under this solictation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date, w ith no obligation to the offeror by the Government.
ERIC HARP 321-494-1913
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-May-2014
(RFP)
(IFB)
X
CALL:
Repair HVAC Systems, Various
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________24 Jun 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
45 CONS/LGCAA
1201 EDWARD H WHITE II ST
PATRICK AFB FL 32925-3237
FA2521
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
SXHT 11-1066
8. ADDRESS OFFER TO (If Other Than Item 7)
321-494-6193FAX:TEL: 321-494-9941 TEL: FAX:
FA2521-14-R-0023 45
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA2521-14-R-0023
Section A - Solicitation/Contract Form
SOLICITATION INFORMATION
AVAILABILITY OF FUNDING
Notice to Offeror: Funds are not presently available for this project. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after closing date.
ACQUISITION DESCRIPTION
This acquisition is a ECONOMICALLY DISADVANTAGED, WOMEN OWNED, SMALL BUSINESS
(EDWOSB) SET-ASIDE.
NAICS: 238220 Size Standard: $14M
The Magnitude of this project is between $250,000 and $500,000.
Offeror shall comply with FAR 52.222-38, Entitled “Compliance with Veteran’s Employment Reporting Requirements”. (https//Vets100.cudenver.edu)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each SXHT11-1066, Repair HVAC Systems, Variou
FFP
SXHT11-1066, Repair HVAC Systems, Various The work to be performed under this project consists of providing the labor, equipment and materials to clean the air distribution system associated with AHU-4 in facility 981 and the repair of the existing HVAC system in facility 891. Project scope includes remove and replace drop ceiling with new lay in ceiling, under deck insulation, remove and replace ductwork, installing a new 10 ton unit, redundant second 10 ton unit and the addition of insulation to underside of roof deck. All HVAC equipment shall be connected to the base EMCS control system. Facility 891 is a telecommunication facility that must remain operational throughout duration of project. Contractor is responsible for providing temporary air conditioning, the associated power and protection of all equipment within the facility.
FOB: Destination
PURCHASE REQUEST NUMBER: F3K3DD4098A001
PROJECT: SXHT 11-1066
SIGNAL CODE: A
NET AMT
SOLICITATION NOTES
B-1. CLAUSE AND PROVISIONS:
a. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and full text. Those incorporated by reference have the same force and effect as if they were given in full text.
b. Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.
c. Section K, L, and M will be physically removed from any resultant contract, but will be deemed to be incorporated, by reference, as part of the contract.
B-2. MINIMUM INSURANCE REQUIREMENT: In accordance with the requirements of FAR 52.228-5 "Insurance Work on a Government Installation", the specific types and amounts of insurance contemplated under this contract are set forth in FAR 28.306.
Section E - Inspection and Acceptance
WEEKLY PROGRESS REPORTS
For purposes of clause 52.236-15, Schedules for Construction Contracts, the contractor shall use AF IMT 3065, or equivalent, to chart actual progress and submit weekly, within one week of actual performance.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
Section F - Deliveries or Performance
NOTICE TO PROCEED
F-1. NOTICE TO PROCEED (NTP)
An NTP will be issued within thirty (30) days after contract award.
F-2. PERIOD OF PERFORMANCE: The period of performance for this project is one hundred twenty (120) calendar days including non-access/no dig days beginning at NTP.
Non-Access Period Any period of time, during normal established duty hours, that a contractor and/or its subcontractors, to include deliveries are denied access to the worksite by the appropriate government authority.
No-Dig Period Any period of time that the contractor and/or its subcontractors are not permitted to perform any modification to an existing grade or area storm drainage profile by digging, cutting an existing grade, probing, drilling, installing tie down rods, driving grounding rods, trenching and back filling and all other penetrations to subsurface area.
*Note: A no-dig day may allow the contractor access to the site, and does not necessarily preclude the contractor from performing other work. A non-access day does not allow the contractor access to the site to perform any work.
F-3. AVAILABILITY OF UTILITIES: Electric and water hook-up is available to this contractor and shall be furnished without charge. Contractor shall carefully conserve usage of these utilities.
ADC CLARIFICATION
ADC CLARIFICATION:
For Delivery purposes, ADC should read After Notice to Proceed (NTP) is issued.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 120 dys. ADC 1 45 CES/CEC - F3K3DD
1142 JUPITER ST BLDG 535
PATRICK AFB FL 32925-3237
FOB: Destination
F3K3DD
52.211-13 Time Extensions SEP 2000 52.242-14 Suspension of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days. The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section G - Contract Administration Data
CONTRACT ADMINISTRATION
G-1 CONTRACT ADMINISTRATION
1. Contract Administration: No changes, deviations, or waivers shall be effective without a modification to the contract executed by the Contracting Officer (CO) authorizing such changes, deviations, or waivers. Administration of the contract will be performed at the following address:
45 CONS/LGCA
1201 Edward H White II Street / MS 7200 Patrick AFB FL 32925
2. 45 CONS, Patrick AFB is the sole contracting office for this contract.
3. Contract Administration Offices: The designator code assigned to this contract is DO-C (IAW FAR 42.1105 Criticality Designator Code).
4. The CO is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract. Such authority remains solely with the CO. In the event the contractor effects any such change at the direction on any other person other than the CO, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
5. Any request for contract changes/modifications shall be submitted to the CO.
6. All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretations, shall be submitted to the CO.
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause-- Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Stand Alone Invoice – Construction Payment Invoice and Progress Report
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
Bldg 891 and 981 Patrick AFB, FL
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F03000 Issue By DoDAAC FA2521 Admin DoDAAC FA2521 Inspect By DoDAAC F3K3DD Ship To Code F3K3DD Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC N/A LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Contracting Officer: Benjamin.Crafton@us.af.mil Contract Specialist: Eric.Harp@us.af.mil Program Manager: Tracy.Coughlin.1@us.af.mil Energy Manager: Jerry.King.7@us.af.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
N/A
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
Section H - Special Contract Requirements
CONTRACT REQUIREMENTS
H-1 ON-BASE PERFORMANCE
1. Standard Working Hours: Contractor work hours shall be 0730 AM to 4:00 PM (0730 – 1600), Monday through Friday, excluding federal holidays. Should it become necessary for work to be accomplished during weekends and/or holidays, it will require prior approval of the Contracting Officer (CO). The contractor must submit a written request to the CO at least 5 working days in advance.
2. Progress Schedule / Progress Report: Contractor shall provide a project schedule, AF Form 3064 Contract Progress Schedule or contractor generated equivalent using the AF Form 3000 Material Submittal to the CO. The schedule shall annotate the expected delivery date of all material(s) to the project location and the intended schedule for the installation of all material(s). All tasks (milestones) shall total to 100% for the contract. Contractor shall provide a progress report that reflects 100% evaluation for the associated project schedule on AF Form 3065 Contract Progress Report or contractor generated equivalent using the AF Form 3000 Material Submittal to the Contracting Officer. The AF 3065 shall clearly show each task to be completed and shall equate to a percentage of the total contract, all tasks (milestones) shall total to 100% for the contract. Weekly submission of the AF 3065 shall be made to the CO after the issuance of NTP. Coordination through the designated Construction Contract Inspector is required prior to submission.
3. The Contractor’s performance may be interrupted from time to time because of high priority mission schedules.
For each calendar day and/or portion of a calendar day that the contractor is removed from the job site, the contract schedule will be adjusted by one (1) calendar day.
H-2 CONSTRUCTION PERMITS
1. In accordance with FAR 52.236-7 – Permits and Responsibilities, the contractor shall obtain a construction permit for any construction work on Patrick Air Force Base. An AF Form 103 – Base Civil Engineering Work Clearance Request – must be submitted with all required signatures, to the Project Manager prior to beginning of performance on the job site. No work shall begin until approval of the AF Form 103 has been granted.
H-3 SALVAGE MATERIALS
1. Any materials demolished or to be removed and disposed of by the contractor shall remain the property of the Government and the contractor shall coordinate with the 45 CES Project Manager for reutilization. Any materials that cannot be reutilized or recycled shall be disposed of legally.
2. The Contractor shall recycle all construction/demolition debris to the maximum extent practicable. The contractor shall make every effort to recycle materials, such as, but not limited to concrete, bricks, asphalt, wood, and metals.
H-4 WEATHER DELAYS
1. The contractor’s progress schedule must take anticipated adverse weather delays into account in all weather-dependent activities to ensure timely completion of the job. Upon acknowledgement of Notice to Proceed (NTP) and continuing throughout the contract, the contractor will record on their Daily Report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for fifty percent or more of the contractor’s scheduled workday and must cause a delay in the work activities critical to contract completion. In order to obtain relief from contract schedule requirements, the contractor will have to demonstrate not only that the anticipated amount of weather delay was exceeded by actual weather interruption, but also that reasonable efforts were made to compensate for such excess interruptions through changes in work hours, changes in the planned sequence of work, increased concurrent activities, or other available measures.
2. In the event that all reasonable effort to complete the required performance on schedule fail and it is determined that excessive inclement weather was the cause of that failure, the contractor may request an extension of the project performance period for any weather delays suffered because of adverse weather beyond the number of days indicated on the chart. The number of workdays of delay added to the schedule shall be converted to calendar days by adding the appropriate number of weekend days associated with that number of workdays.
3. Adverse weather days will not be granted for other than normal workdays that the contractor requested to work solely for the contractor’s convenience to meet the contract performance period. Any extensions to the contract because of change orders will have the normal adverse weather days figured into the extension period.
4. Consistent with FAR 52.249-10, Default (Fixed-Price Construction), upon the written request of the contractor for an adjustment to the contract schedule made within ten (10) days from the beginning of the delay, the Contracting Officer (CO) will review the contractor's documentation of weather delays and circumstances relevant to the availability of workarounds. If the contractor requests an adjustment to the contract schedule based on the Project Manager’s review, the contractor shall notify the CO in writing and provide relevant information and recommendations regarding the request. The CO shall determine whether the request should be promptly granted, deferred pending determination of cumulative weather effects during the contract performance period, denied, or some combination thereof. The reason for any deferral or denial will be simultaneously communicated to the contractor in writing.
5. Upon any extension, the contractor shall immediately submit to the CO a revised progress schedule to meet the revised performance period.
H-5 SUBMITTALS
1. Submittals shall be submitted within 10 days of contract award. This shall include all items listed in the specifications Section 01 33 00 SUBMITTAL PROCEDURES
2. An electronic copy of the submittal and supporting documents, with a wet or digital signature, shall be submitted via e-mail to the CO. Government approval shall be annotated with a wet or digital signature.
3. Material submittals shall be submitted using AF Form 3000. The Government reserves the right to take 14 calendar days to complete the review. Any submittals that are rejected must be promptly corrected by the Contractor and resubmitted to the Contracting Officer within 10 calendar days. The Government reserves the right to take 14 calendar days to re-review any contract submittals requiring correction.
H-6 IMPLEMENTING PROCEDURES FOR THE BASE ANTI-TERRORISM PROGRAM, NON
MISSION ESSENTIAL SERVICES
1. Policy and Scope. Terrorism is criminal activity, which can occur at anytime, anywhere, and involve any person or organization. Air Force policy is to protect, to the best of its ability, U.S. Air Force (USAF) personnel, their dependents, facilities, and equipment from terrorist acts.
2. Concerned Individuals. This includes non-Air Force, and contractor organizations, and their personnel working on the installation at the time of a terrorist action, planned or actual.
3. Exercises. Based upon terrorist threat assessment guidelines, the chance of a terrorist organization committing an act of aggression on Patrick AFB (PAFB), is negligible. However, the base anti-terrorism program will be periodically exercised (tested). Air Force and non-Air Force organizations will be expected to participate in these occasional exercises (tests).
4. General Information. The AF Anti-terrorism Program is an established DoD policy to protect DoD personnel, dependents, facilities, and equipment from terrorist acts. At PAFB, this also includes non-Air Force, contractor organizations, and their personnel working on the installation. It further seeks to deter or prohibit the success of terrorist acts against the USAF community through the collection and dissemination of timely threat information, informative awareness programs, and implementation of sound defensive measures. These defensive measures are defined in four levels of force protection conditions (FPCONs). The four levels of FPCONs are ALPHA, BRAVO, CHARLIE and DELTA.
5. FPCON Definitions and Defense Measures.
The terrorism FPCONs listed below describes progressive levels of defensive security measures in response to a terrorist threat to PAFB.
5.1 ALPHA. A general threat of possible terrorist activity against personnel and facilities exists, the nature and extent of which are unpredictable. Circumstances do not justify full implementation of FPCON BRAVO measures, but certain measures from higher FPCONs may be necessary based on intelligence reports, or as a deterrent.
5.1.1 Brief all contractor personnel of current FPCON. Secure unused buildings, rooms, and storage areas under contractor’s control. Make periodic checks of parking areas under contractor’s control for unknown or suspicious vehicles. Identify all unknown or suspicious persons in facilities and work areas to the law enforcement agency.
5.2 BRAVO. An increased and more predictable threat of terrorist activity exists.
5.2.1 Continue all actions required by FPCON ALPHA. Move vehicles and objects such as crates, trash containers at least 10 meters (33 feet) from buildings and 25 meters (82 feet) from certain critical buildings, especially those of a sensitive nature. Remind drivers to lock parked vehicles, and check inside or outside of vehicles for suspicious packages that could be explosive or of similar harmful nature prior to operation. Notify the law enforcement agency at 911 if any suspicious items are found.
5.3 CHARLIE. An incident occurs, or intelligence is received that indicates imminent terrorist acts against personnel and facilities.
5.3.1 Continue all actions required by the previous FPCONs. Notify the law enforcement agency at 911 if any suspicious activity is observed.
5.4 DELTA. A terrorist attack occurred or intelligence indicates that terrorist action against a specific location or person is likely. Normally, this FPCON is a local condition.
5.4.1 Continue all actions required by the previous FPCONs. All non-essential contractor personnel will be removed from base. Discontinue all travel outdoors to prevent exposure to the terrorist threat.
5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel Security Program Management.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
2. CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS - ADDITIONAL REQUIREMENTS
This Special Contract Requirement, Contractor Access to Air Force Installations, by adding the following additional requirements:
(a) Contractors must have an approved request letter on file at Security Forces with employees name and the required data.
(b) Subcontracts: The contractor shall include this Special Contract Requirement in subcontracts of any tier.
(c) Unescorted Access to Installations:
(1) To request access to Patrick AFB, prior to their proposed business or contract requirements, all contractor personnel shall provide a current completed “45th Security Forces Pass & Registration Badging Request Form”.
(2) To request access to Cape Canaveral AFS, prior to their proposed business or contract requirements, all contractor personnel shall provide a current completed “CCAFS Badging Request Form”.
(3) Contractor personnel must complete and sign the applicable form cited above before the required background check (see d. and e. below) can be performed.
(d) All personnel entering Patrick AFB and Cape Canaveral AFS must provide two forms of identification (one must be a photo ID) as required by AFI 10-245, and have a background check.
(1) For unescorted entry into non-restricted areas of the installations, personnel must obtain, from AF security personnel, favorable National Criminal Information Center (NCIC) check, and have complete social security employment verifications prior to being issued badges (to include temporary passes.
(2) Prior to being issued restricted area badges for unescorted entry into restricted areas of the installations, U.S. citizens working as contractor employees must obtain a favorable National Agency Check (NAC).
(3) All required information shall be provided to support background checks, and citizenship verification (i.e., birth certificate, passport, voter registration card, resident alien card, or certificate of naturalization).
(e) Escorted Access-Temporary Passes: Personnel may receive a temporary pass, Air Force Form 75/Visitor and Vehicle Pass, for no more than 30 total days in one 365 day period. This pass is issued without a criminal background check, but requires a Wants & Warrants check. Persons with temporary passes receive escorted access rights only, i. e.; they must be escorted at all times by an escort official. Escorted personnel must be with their escort official (the escort official must be in plain view) at all times while on the installation.
(f) Personnel Background Checks
(1) The 45th Security Forces will conduct the background check at no cost to the applicant. Refusal to submit to the background check will result in denial of access. Applicants shall be denied installation access based on an arrest record including, but not limited to the following crimes:
(i) Murder
(ii) Manslaughter
(iii) Rape
(iv) Aggravated Assault
(v) Burglary
(vi) Arson
(vii) Other forms of Sexual Assaults (lewd, malicious acts to a child, etc.)
(viii) Any other felony
(ix) Outstanding warrants
(x) Misdemeanor convictions less that 5-year involving moral turpitude offenses (theft, worthless checks, etc.)
(xi) FBI Terrorist Watch List
(2) Individuals who do not meet the criteria for unescorted base access may still be granted escorted access on a case-by-case basis. The determination will be made based on the results of the background investigation, totality of the criminal record and the types of crime reported.
(3) Individuals may appeal denial of escorted/unescorted installation access through the Security Forces. It shall be the responsibility of the applicant who is denied access to submit supporting documents such as court, police or arrest records, evidence of community involvement, letters of recommendation to the denial authority for reconsideration.
(4) For the purposes of this policy, convictions are considered to include the following: Guilty verdicts or a Nolo Contendere plea, disposition of cases resulting in deferred adjudication or pretrial diversion and expunged offenses resulting in convictions of crimes enumerated in subparagraph (e)(1) above.
(5) Contractors should allow 14 days for background checks to be finalized. The contractor should provide the required form (see c. above) for each of its personnel to the government 14 days before the contract start date whenever possible. Background checks cannot be performed from only a list of names.
(g) The Government will not be held responsible for contractual impacts or delays caused by the contractor’s failure to take prompt action in providing the required information and documentation to obtain access to Patrick AFB and Cape Canaveral AFS.
Section I - Contract Clauses
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees APR 1984 52.203-7 Anti-Kickback Procedures OCT 2010 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
SEP 2013
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUL 2013
52.204-13 System for Award Management Maintenance JUL 2013 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.216-4 Economic Price Adjustment-Labor and Material JAN 1997 52.216-25 Contract Definitization OCT 2010 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns JUL 2013 52.219-14 Limitations On Subcontracting NOV 2011 52.219-29 Notice of Set-Aside for Economically Disadvantaged
Women-Owned Small Business Concerns
JUL 2013
52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-6 Davis Bacon Act JUL 2005 52.222-7 Withholding of Funds FEB 1988 52.222-8 Payrolls and Basic Records JUN 2010 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) JUL 2005 52.222-12 Contract Termination-Debarment FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for
Construction
FEB 1999
52.222-35 Equal Opportunity for Veterans SEP 2010 52.222-36 Affirmative Action For Workers With Disabilities OCT 2010 52.222-37 Employment Reports on Veterans SEP 2010
52.222-40 Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons FEB 2009 52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-6 Drug-Free Workplace MAY 2001 52.223-9 Estimate of Percentage of Recovered Material Content for
EPA-Designated Items
MAY 2008
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.224-1 Privacy Act Notification APR 1984 52.224-2 Privacy Act APR 1984 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.228-1 Bid Guarantee SEP 1996 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995 52.228-14 Irrevocable Letter of Credit DEC 1999 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-17 Interest OCT 2010 52.232-23 Assignment Of Claims JAN 1986 52.232-27 Prompt Payment for Construction Contracts JUL 2013 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes JUL 2002 52.233-1 Alt I Disputes (Jul 2002) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items DEC 2013 52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A MAR 2014 252.204-7007 Alternate A, Annual Representations and Certifications MAY 2013 252.204-7012 Safeguarding of unclassified controlled technical information NOV 2013 252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
MAR 2014
252.223-7002 Safety Precautions For Ammunition And Explosives MAY 1994 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 2012
252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7016 Restriction On Acquisition Of Ball and Roller Bearings JUN 2011 252.225-7021 Trade Agreements OCT 2013 252.225-7036 Buy American--Free Trade Agreement--Balance of Payments
Program
DEC 2012
252.225-7048 Export-Controlled Items JUN 2013 252.232-7004 DOD Progress Payment Rates OCT 2001 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012
52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (SEP 2010)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
Project Drawings & Technical Specifications under SXHT 11-1066
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by 45th Civil Engineering Squadron personnel.
(b) Weather conditions Reference 45th Weather Squadron Websiteat http://www.patrick.af.mil/index.asp.
(c) Transportation facilities: None
(d) N/A
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR - http://farsite.hill.af.mil/vffara.htm
DFARS - http://farsite.hill.af.mil/vfdfara.htm
AFFARS - http://farsite.hill.af.mil/vfaffara.htm
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any DFARS (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.223-7001 HAZARD WARNING LABELS (DEC 1991)
(a) "Hazardous material," as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.
(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labeling requirements of one of the following statutes:
(1) Federal Insecticide, Fungicide and Rodenticide Act;
(2) Federal Food, Drug and Cosmetics Act;
(3) Consumer Product Safety Act;
(4) Federal Hazardous Substances Act; or
(5) Federal Alcohol Administration Act.
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labeled in accordance with one of the Acts in paragraphs (b)(1) through
(5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL (If None, Insert "None.") ACT
(d) The apparently successful Offeror…