Attch_18_-_Preaward_Survey.pdf

PDF 637 KB Posted

Attached to
MODELING, SIMULATION, AND ANALYSIS (MS&A) FOR SPACE AND CYBERSPACE CAPABILITIES Federal contract opportunity
Solicitation number
FA2517-17-R-7003
Issued by
Department of the Air Force Space Command

About this file

MSCC Preaward Survey (Draft). Attachments failed to upload using Internet Explorer. Attemping to load attachments in Google Crome.

View the file

Other files for this federal contract opportunity

Other files attached to MODELING, SIMULATION, AND ANALYSIS (MS&A) FOR SPACE AND CYBERSPACE CAPABILITIES, newest first.
File Type Posted
Attch_1.1.1_-_DIDs_to_MSCC_CDRLs_and_List_of_Publications.pdf PDF
Attch_10__-_Position_Description.docx DOCX document
Attch_8_-_Team_Composition_Matrix.docx DOCX document
Attch_13_-_Consent_Letter.docx DOCX document
Attch_16_-_AF-DoD_Policy_Directives.pdf PDF
Attch_1.1_-_CRDLs_to_MSCC_PWS.pdf PDF
Attch_15_-_Preaward_Survey.pdf PDF
Attch_14_-_Pre-Priced_Labor_Rates.xlsx XLSX spreadsheet
Attch_12_-_Past_Performance_Questionnaire_(PPQ).docx DOCX document
Attch_18_-_Offeror_Compensation_Evaluation.xlsx XLSX spreadsheet
Attch_11_-_Task_Order_(TO)_Template.docx DOCX document
Attch_7__-_Staffing_Matrix_template.docx DOCX document
MSCC_QAs_dtd_27_Apr17.pdf PDF
MSCC_RFP_FA2517-17-R-7003_DRAFT_25APR17.pdf PDF
IDIQ_CDRL_A099_(dd1423-1)_-_Technical_and_Management_Work_Plan_-_1_Feb_17.pdf PDF
A034_DID_(DI-IPSC-81440A)_-_3_Feb_17.pdf PDF
IDIQ_CDRL_A008_(dd1423-1)_-_Contractor's_Configuration_Mgmt_Plan_-_1_Feb_17.pdf PDF
MSCC_DIDs_Document_for_CDRLs.pdf PDF
Attch_13_-_Consent_Letter.docx DOCX document
Attch_1a_-_TO_0001_-_PWS_-_Contract-TO_Management__Phase-In_PWS_24Apr17.pdf PDF
Attch_9_-_Relevancy_Matrix.doc DOC document
2._DD2345_form.pdf PDF
A041_DID_(DI-IPSC-81633)_-_3_Feb_17.pdf PDF
A099_DID_(DI-MGMT-81117)_-_3_Feb_17.pdf PDF
Attch_1c_-_TO_0003-_Sample_Technical_PWS_24Apr17.pdf PDF
A045_DID_(DI-AVCS-80700)_-_3_Feb_17.pdf PDF
Attch_19_-_Solicitation_Cross_Reference_Matrix.docx DOCX document
A031_DID_(DI-IPSC-81437A)_-_3_Feb_17.pdf PDF
A032_DID_(DI-IPSC-81438A)_-_3_Feb_17.pdf PDF
Attch_1b_-_TO_0002_-_PWS_-_AVAC-24Apr17.pdf PDF
Attch_2_-_MSCC_DD254_-_Gov't_to_Prime_MSSC_(IDIQ)_Contractor_(Original_Unsigned)_-_1_Mar_17.pdf PDF
IDIQ_CDRL_A038_(dd1423-1)_-_Software_Center_Operator_Manual_(SCOM)_-_1_Feb_17.pdf PDF
IDIQ_CDRL_A100_(dd1423-1)_-_Technical_Report-Study_Services_-_1_Feb_17.pdf PDF
IDIQ_CDRL_A036_(dd1423-1)_-_Software_Version_Description_(SVD)_-_1_Feb_17.pdf PDF
1.__FAQ_and_Answers,_DD2345_form.pdf PDF
A019_DID_(DI-IPSC-80590B)_-_3_Feb_17.pdf PDF
Attch_15_-_Cost_Template.xlsx XLSX spreadsheet
A048_DID_(DI-MGMT-80227)_-_3_Feb_17.pdf PDF
Attch_8_-_Team_Composition_Matrix.docx DOCX document
Attch_1_-_MSCC_PWS_-_4_Feb_17.docx DOCX document
Attch_10_-_Relevancy_Matrix.doc DOC document
Attch_16_-_Cost_Template.xlsx XLSX spreadsheet
Attch_5__Past_Performance_Information_Tool.accdb —
Attch_19_-_AF-DoD_Policy_Directives.pdf PDF
Attch_2a_-_MSCC_DD254_Continue_Pgs_-_1_Feb_17.pdf PDF
Attch_2_-_MSCC_DD254_-_Gov't_to_Prime_MSSC_(IDIQ)_Contractor_(Original_Unsigned)_-_1_Mar_17.pdf PDF
Attch_12_-_TO_Template.docx DOCX document
Attch_15_-_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
FA2517-17-R-7003_MSCC_DRAFT_RFP.docx DOCX document
Attch_4__-_Pre-Bid_Pre-Proposal_Conference_Questionnaire_Form.docx DOCX document
Show all 50

MODELING, SIMULATION, AND ANALYSIS (MS&A) FOR SPACE AND CYBERSPACE CAPABILITIES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREAWARD SURVEY OF PROSPECTIVE

CONTRACTOR

ACCOUNTING SYSTEM

SERIAL NO. (For surveying activity use) OMB Control Number: 9000-0011 Expiration Date: 1/31/2017

PROSPECTIVE CONTRACTOR

Public reporting for this collection of information is estimated to average 24 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Regulatory Secretariat (MVCB), Office of Acquisition Policy, GSA, 1800 F Street, NW, Washington, DC 20405.

SECTION I - RECOMMENDATION

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

YES NO (Explain in 2. NARRATIVE)

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE)

2. NARRATIVE (Clarification of deficiencies, and other pertinent comments,. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

3. SURVEY

MADE BY

a. SIGNATURE AND OFFICE (Include, typed or printed name) b. TELEPHONE NO.

(include area code)

c. DATE SIGNED

4. SURVEY

REVIEWING

OFFICIAL

a. SIGNATURE AND OFFICE (Include typed or printed name) b. TELEPHONE NO.

(include area code)

c. DATE REVIEWED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA FAR (48 CFR) 53.209 -1(f)

ATTACHMENT 18

DRAFT

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE) YES NO

NOT

APPLIC-

CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED

ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?

(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

DRAFT

SECTION I - RECOMMENDATION
SECTION II - EVALUATION CHECKLIST
5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? (If not, describe in Section I Narrative which portions are

File details come from the government source that posted it. Updated .