SOW_Attachment_1_-_Drawings_(adobe_version).pdf
PDF 222 KB Posted
- Attached to
- REMOVE/REPLACE CHILLER, BLDG 1270 Federal contract opportunity
- Solicitation number
- FA2517-17-Q-5016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA__4__Replace_Bldg_1270_Chiller.docx | DOCX document | |
| Q&A__3_-_Remove_Replace_Chiller_Bldg_1270.pdf | ||
| TDKA141108-SOW_FINAL.docx | DOCX document | |
| Q&A_2.docx | DOCX document | |
| Question_&_Answers_B1270.docx | DOCX document | |
| Amendment_01.docx | DOCX document | |
| SOW_Attachment_1_-_Drawing.dwg | DWG drawing | |
| Combined_Synopsis-Remove-Replace_Chiller,_Bldg_1270.pdf | ||
| SOW_Attachment_2_-_Generic_Chiller_Layout.pdf | ||
| Attachment_2_Price_Template_Remove-Replace_Chiller_Bldg_1270.xlsx | XLSX spreadsheet | |
| Attachment_1_-_Remove-Replace_Chiller,_Bldg_1270_SOW_FINAL.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHILLED WATER PIPING SCHEMATIC
NO SCALE
SUCTION DIFFUSER
STRAINER WITH
BLOWDOWN VALVE
GAUGE AND GAUGE COCK (TYP)
PUMP SKID/BASE
VIBRATION ISOLATION
CONCRETE PAD
FLEX CONNECTOR (TYP)
CHECK VALVE (TYP)
ISOLATION VALVE (TYP)
ISOLATION
VALVE (TYP)
PIPE STAND
SUPPORT
FLOOR
PS PS
AUTOMATIC
AIR VENT
(TYP)
TO SYSTEM
TS
TS
CWR/HWR
CWS/HWS
CWS/HWS
4"
4"
4"
3"
4"
CWS
CWR
NORMALLY OPEN WINTER,
CLOSED SUMMER
3" 4"
3" 4"
3"
CIRCULATING PUMP
1"
B-2
BDD
BDD
4"
NORMALLY CLOSED WINTER,
OPEN SUMMER
DEMOLISH DUAL WATER PUMPS (P1, P2, AND
P3). CONTRACTOR SHALL DEMOLISH PUMPS
ONE AT A TIME TO FACILITATE REMOVAL
WITHOUT UNDUE DOWNTIME TO FACILITY.
PROVIDE ALL ACCESSORIES AS REQUIRED AND
SHOWN.
P1
P2
P3
PIPING TO
CHILLER, CH-1
PIPING UNDER
GRADE
GENERAL NOTES:
1. THE FOLLOWING NOTES APPLY TO ALL
MECHANICAL DRAWINGS TO THE EXTENT
APPLICABLE.
2. NOT ALL DUCTWORK, OFFSETS, PIPING, EQUIPMENT
AND ACCESSORIES ARE NECESSARILY SHOWN ON
THESE DRAWINGS. REFER TO ALL OTHER PLANS,
SECTIONS, DETAILS, SCHEDULES, CONTROL
DRAWINGS AND SPECIFICATIONS FOR COMPLETE
SYSTEM REQUIREMENTS.
3. COORDINATE EXACT LOCATIONS OF ROOF, WALL,
AND FLOOR PENETRATIONS WITH GENERAL
CONTRACTOR.
4. MANY AREAS OF CONSTRUCTION WILL BE VERY
CONGESTED. INSTALLATION OF MATERIALS AND
EQUIPMENT SHALL BE COORDINATED WITH ALL
OTHER TRADES AND EXISTING CONDITIONS TO
ENSURE THAT THERE IS ADEQUATE ROOM FOR
ALL OTHER MATERIALS AND EQUIPMENT TO BE
INSTALLED UNDER THIS CONTRACT. INSTALLATION
OF MATERIALS AND EQUIPMENT WHICH DOES NOT
ALLOW FOR INSTALLATION OF REMAINING
MATERIALS AND EQUIPMENT WILL BE REMOVED
AND RELOCATED AT NO COST TO THE
GOVERNMENT.
5. COORDINATE FINAL LOCATION OF DUCTWORK,
PIPING, DIFFUSERS, EQUIPMENT, ETC. WITH ALL
OTHER TRADES AND EXISTING CONDITIONS BEFORE
FABRICATION OR INSTALLATION.
6. CONTRACTOR SHALL PROVIDE ALL REQUIRED
OFFSETS, TRANSITIONS, AND FITTINGS FOR
DUCTWORK AND PIPING TO COMPLETE THE
SYSTEMS.
7. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS PRIOR TO ORDERING OR FABRICATION
OF MATERIAL OR PERFORMING ANY NEW WORK.
DEVIATIONS FROM CONDITIONS SHOWN IN THESE
PLANS SHALL BE REPORTED TO THE CO/COR
IMMEDIATELY AND NO WORK SHALL BE
PERFORMED IN THIS AREA UNTIL A RESOLUTION
HAS BEEN ESTABLISHED. SITE CONDITIONS
DIFFERING FROM THOSE SHOWN ON THESE PLANS
WILL NOT GENERALLY BE CONSIDERED A BASIS
FOR CONTRACT MODIFICATIONS AS THE
CONTRACTOR SHALL TAKE INTO ACCOUNT WORST
CASE SITE CONDITIONS WHEREVER POSSIBLE.
8. DUCTWORK MAINS ARE GENERALLY INTENDED TO
RUN BELOW THE STRUCTURE WITH INDIVIDUAL
BRANCHES ROUTED UP THROUGH AND IN
BETWEEN ROOF STRUCTURE MEMBERS. DUCTWORK
MAINS ARE LAID OUT AND INTENDED TO RUN
BETWEEN LIGHT FIXTURE SPACING, NOT ABOVE
LIGHTS UNLESS NO OTHER ROUTING IS POSSIBLE.
ALL PIPING IS LAID OUT AND INTENDED TO RUN
UP THROUGH AND BETWEEN STRUCTURAL
MEMBERS AND TO STAY ABOVE DUCT ROUTING.
COORDINATE WITH EXISTING CONDITIONS.
9. ALL PENETRATIONS THROUGH FIRE/SMOKE RATED
CONSTRUCTION SHALL BE SEALED WITH A FIRE
RATED CAULK EQUAL TO OR EXCEEDING THE
CONSTRUCTION FIRE RATING.
10. COORDINATE ROUTING OF DUCTWORK AND PIPING
WITH ELECTRICAL EQUIPMENT. DO NOT ROUTE
DUCTWORK AND PIPING DIRECTLY OVER THE TOP
OF ELECTRICAL PANELBOARDS AND SWITCHBOARDS.
11. ALL PRODUCTS LISTED ON THE SCHEDULE SHEETS
ARE TO BE CONSIDERED BASIS OF DESIGN TO
ESTABLISH MINIMUM & MAXIMUM PERFORMANCE
CHARACTERISTICS. OTHER MATERIALS WILL BE
ALLOWED AS SUBSTITUTIONS PROVIDED THEY MEET
OR EXCEED ALL PERFORMANCE CHARACTERISTICS
LISTED THEREIN AND MEET OR EXCEED ALL
SPECIFICATION REQUIREMENTS.
12. ALL SCHEDULED VALUES ARE FOR 6172 FT.
ELEVATION UNLESS INDICATED OTHERWISE.
13. ALL DEVICES AND EQUIPMENT TO BE SALVAGED
OR RE-USED MUST BE CLEANED AND ALL
DAMAGED PARTS REPAIRED OR REPLACED.
14. PROVIDE PRODUCT DATA SUBMITTALS FOR ALL
EQUIPMENT ALONG WITH OPERATION AND
MAINTENANCE MANUALS. INCLUDE MANUFACTURER'S
MODEL NUMBER, SERIAL NUMBER, ELECTRICAL
CHARACTERISTICS, WEIGHT, CAPACITIES, ETC.
15. CONTRACTOR SHALL PROVIDE WORK IN PHASES
AS REQUIRED BY GOVERNMENT WHILE MINIMIZING
POTENTIAL WORK DELAYS.
16. CONTROL DEVICES SHALL COMMUNICATE OVER
BACNET COMMUNICATION PROTOCOL.
17. CONSTRUCTION DOCUMENTS CONSIST OF THESE
DRAWINGS, A SEPARATE BOOK OF SPECIFICATIONS,
AND THE STATEMENT OF WORK (SOW). THE
DRAWINGS, SPECIFICATIONS, AND STATEMENT OF
WORK (SOW) ARE COMPLEMENTARY, NONE ARE
MEANT TO STAND ALONE FOR ANY PORTION OF
THE WORK DESCRIBED HEREIN. IF ANY
DISCREPANCY EXISTS, CONTACT THE CO/COR FOR
CLARIFICATION BEFORE PROCEEDING WITH
CONSTRUCTION.
GENERAL NOTES:
1. THE FOLLOWING NOTES APPLY TO ALL
MECHANICAL DRAWINGS TO THE EXTENT
APPLICABLE.
2. NOT ALL DUCTWORK, OFFSETS, PIPING, EQUIPMENT
AND ACCESSORIES ARE NECESSARILY SHOWN ON
THESE DRAWINGS. REFER TO ALL OTHER PLANS,
SECTIONS, DETAILS, SCHEDULES, CONTROL
DRAWINGS AND SPECIFICATIONS FOR COMPLETE
SYSTEM REQUIREMENTS.
3. COORDINATE EXACT LOCATIONS OF ROOF, WALL,
AND FLOOR PENETRATIONS WITH GENERAL
CONTRACTOR.
4. MANY AREAS OF CONSTRUCTION WILL BE VERY
CONGESTED. INSTALLATION OF MATERIALS AND
EQUIPMENT SHALL BE COORDINATED WITH ALL
OTHER TRADES AND EXISTING CONDITIONS TO
ENSURE THAT THERE IS ADEQUATE ROOM FOR
ALL OTHER MATERIALS AND EQUIPMENT TO BE
INSTALLED UNDER THIS CONTRACT. INSTALLATION
OF MATERIALS AND EQUIPMENT WHICH DOES NOT
ALLOW FOR INSTALLATION OF REMAINING
MATERIALS AND EQUIPMENT WILL BE REMOVED
AND RELOCATED AT NO COST TO THE
GOVERNMENT.
5. COORDINATE FINAL LOCATION OF DUCTWORK,
PIPING, DIFFUSERS, EQUIPMENT, ETC. WITH ALL
OTHER TRADES AND EXISTING CONDITIONS BEFORE
FABRICATION OR INSTALLATION.
6. CONTRACTOR SHALL PROVIDE ALL REQUIRED
OFFSETS, TRANSITIONS, AND FITTINGS FOR
DUCTWORK AND PIPING TO COMPLETE THE
SYSTEMS.
7. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS PRIOR TO ORDERING OR FABRICATION
OF MATERIAL OR PERFORMING ANY NEW WORK.
DEVIATIONS FROM CONDITIONS SHOWN IN THESE
PLANS SHALL BE REPORTED TO THE CO/COR
IMMEDIATELY AND NO WORK SHALL BE
PERFORMED IN THIS AREA UNTIL A RESOLUTION
HAS BEEN ESTABLISHED. SITE CONDITIONS
DIFFERING FROM THOSE SHOWN ON THESE PLANS
WILL NOT GENERALLY BE CONSIDERED A BASIS
FOR CONTRACT MODIFICATIONS AS THE
CONTRACTOR SHALL TAKE INTO ACCOUNT WORST
CASE SITE CONDITIONS WHEREVER POSSIBLE.
8. DUCTWORK MAINS ARE GENERALLY INTENDED TO
RUN BELOW THE STRUCTURE WITH INDIVIDUAL
BRANCHES ROUTED UP THROUGH AND IN
BETWEEN ROOF STRUCTURE MEMBERS. DUCTWORK
MAINS ARE LAID OUT AND INTENDED TO RUN
BETWEEN LIGHT FIXTURE SPACING, NOT ABOVE
LIGHTS UNLESS NO OTHER ROUTING IS POSSIBLE.
ALL PIPING IS LAID OUT AND INTENDED TO RUN
UP THROUGH AND BETWEEN STRUCTURAL
MEMBERS AND TO STAY ABOVE DUCT ROUTING.
COORDINATE WITH EXISTING CONDITIONS.
9. ALL PENETRATIONS THROUGH FIRE/SMOKE RATED
CONSTRUCTION SHALL BE SEALED WITH A FIRE
RATED CAULK EQUAL TO OR EXCEEDING THE
CONSTRUCTION FIRE RATING.
10. COORDINATE ROUTING OF DUCTWORK AND PIPING
WITH ELECTRICAL EQUIPMENT. DO NOT ROUTE
DUCTWORK AND PIPING DIRECTLY OVER THE TOP
OF ELECTRICAL PANELBOARDS AND SWITCHBOARDS.
11. ALL PRODUCTS LISTED ON THE SCHEDULE SHEETS
ARE TO BE CONSIDERED BASIS OF DESIGN TO
ESTABLISH MINIMUM & MAXIMUM PERFORMANCE
CHARACTERISTICS. OTHER MATERIALS WILL BE
ALLOWED AS SUBSTITUTIONS PROVIDED THEY MEET
OR EXCEED ALL PERFORMANCE CHARACTERISTICS
LISTED THEREIN AND MEET OR EXCEED ALL
SPECIFICATION REQUIREMENTS.
12. ALL SCHEDULED VALUES ARE FOR 6172 FT.
ELEVATION UNLESS INDICATED OTHERWISE.
13. ALL DEVICES AND EQUIPMENT TO BE SALVAGED
OR RE-USED MUST BE CLEANED AND ALL
DAMAGED PARTS REPAIRED OR REPLACED.
14. PROVIDE PRODUCT DATA SUBMITTALS FOR ALL
EQUIPMENT ALONG WITH OPERATION AND
MAINTENANCE MANUALS. INCLUDE MANUFACTURER'S
MODEL NUMBER, SERIAL NUMBER, ELECTRICAL
CHARACTERISTICS, WEIGHT, CAPACITIES, ETC.
15. CONTRACTOR SHALL PROVIDE WORK IN PHASES
AS REQUIRED BY GOVERNMENT WHILE MINIMIZING
POTENTIAL WORK DELAYS.
16. CONTROL DEVICES SHALL COMMUNICATE OVER
BACNET COMMUNICATION PROTOCOL.
17. CONSTRUCTION DOCUMENTS CONSIST OF THESE
DRAWINGS, A SEPARATE BOOK OF SPECIFICATIONS,
AND THE STATEMENT OF WORK (SOW). THE
DRAWINGS, SPECIFICATIONS, AND STATEMENT OF
WORK (SOW) ARE COMPLEMENTARY, NONE ARE
MEANT TO STAND ALONE FOR ANY PORTION OF
THE WORK DESCRIBED HEREIN. IF ANY
DISCREPANCY EXISTS, CONTACT THE CO/COR FOR
CLARIFICATION BEFORE PROCEEDING WITH
CONSTRUCTION.
TONS
CAPACITY FAN
QTY HP FLA
6.61.56
LRA
RLA
50.2418.8
MAX.
FT.
WPDGPM
LWT
°F
MOTOR DATA
COMPRESSOR
QTY
1-755.9TRANE CGAM060A2**3AXB2A1CH-1
MARK EWT
54.5
°F
AIR COOLED LIQUID CHILLER SCHEDULE
REMARKS
1. CAPACITY BASED ON 6172 FT. ELEVATION, 35% PROPYLENE GLYCOL, AND 95°F AMBIENT.
2. AHRI RATED WITH CAPACITY OF MINIMUM 57.8 TONS.
3. ELECTRICAL DATA FOR EACH FAN OR COMPRESSOR.
4. UNIT SHALL HAVE TWO CIRCUITS, WITH 4 CAPACITY STEPS. CIRCUITS SHALL BE EQUALLY
SIZED.
5. 208 VOLT 3 PHASE 60 HERTZ UNIT.
6. 10.40EER FULL LOAD AND15.34EER IPLV AT AHRI CONDITIONS.
7. R-410a REFRIGERANT.
AND MODEL #
MANUFACTURER
MARK
PUMP SCHEDULE
ELEC. CHAR.REMARKS
208V/3Ø/60
MIN.
EFF.HPFT.
HD.GPM
74 125 7.5 61
SERVICE
P1,P2,P3
MFR.
WATER
CHILL/HOTBASE
MOUNTED
TYPEMODEL NO.
1,2PACO -
1. 35% PROPYLENE GLYCOL.
2. PROVIDE WITH SUCTION DIFFUSER. REFER TO PROJECT SPECIFICATIONS.
RPM
°F
TEMP
PSIG
PRESSURE
44/180
CWR/HWR
CWS/HWS
CWS/HWS
4"
4"
4"
3"
4"
CWS
CWR
NORMALLY OPEN WINTER,
CLOSED SUMMER
3" 4"
3" 4"
3"
CIRCULATING PUMP
1"
B-2
BDD
BDD
4"
NORMALLY CLOSED WINTER,
OPEN SUMMER
PIPING TO
CHILLER, CH-1
PIPING UNDER
GRADE
P1
P2
P3
L L
CH-1
4" CHILLED WATER PIPING
(HEAT TRACE AND
INSULATED WITH METAL
JACKET)
PROVIDE NEW PIPING AND ACCESSORIES
TO INCLUDE, BUT NOT BE LIMITED TO,
STRAINER, VIBRATION ISOLATORS,
MECHANICAL GAUGES, BALANCING VALVE,
BYPASS VALVE, P-T PORTS, ETC
4" CHILLED WATER PIPING
(HEAT TRACE AND
INSULATED WITH METAL
JACKET)
MAINTAIN MANUFACTURERS CLEARANCES AS A
MINIMUM
SUCTION DIFFUSER
STRAINER WITH
BLOWDOWN VALVE
GAUGE AND GAUGE COCK (TYP)
PUMP SKID/BASE
VIBRATION ISOLATION
CONCRETE PAD
FLEX CONNECTOR (TYP)
CHECK VALVE (TYP)
ISOLATION VALVE (TYP)
ISOLATION
VALVE (TYP)
PIPE STAND
SUPPORT
FLOOR
PS PS
AUTOMATIC
AIR VENT
(TYP)
TO SYSTEM
TS
TS
GENERAL NOTES:
1. THE FOLLOWING NOTES APPLY TO ALL
MECHANICAL DRAWINGS TO THE EXTENT
APPLICABLE.
2. NOT ALL DUCTWORK, OFFSETS, PIPING, EQUIPMENT
AND ACCESSORIES ARE NECESSARILY SHOWN ON
THESE DRAWINGS. REFER TO ALL OTHER PLANS,
SECTIONS, DETAILS, SCHEDULES, CONTROL
DRAWINGS AND SPECIFICATIONS FOR COMPLETE
SYSTEM REQUIREMENTS.
3. COORDINATE EXACT LOCATIONS OF ROOF, WALL,
AND FLOOR PENETRATIONS WITH GENERAL
CONTRACTOR.
4. MANY AREAS OF CONSTRUCTION WILL BE VERY
CONGESTED. INSTALLATION OF MATERIALS AND
EQUIPMENT SHALL BE COORDINATED WITH ALL
OTHER TRADES AND EXISTING CONDITIONS TO
ENSURE THAT THERE IS ADEQUATE ROOM FOR
ALL OTHER MATERIALS AND EQUIPMENT TO BE
INSTALLED UNDER THIS CONTRACT. INSTALLATION
OF MATERIALS AND EQUIPMENT WHICH DOES NOT
ALLOW FOR INSTALLATION OF REMAINING
MATERIALS AND EQUIPMENT WILL BE REMOVED
AND RELOCATED AT NO COST TO THE
GOVERNMENT.
5. COORDINATE FINAL LOCATION OF DUCTWORK,
PIPING, DIFFUSERS, EQUIPMENT, ETC. WITH ALL
OTHER TRADES AND EXISTING CONDITIONS BEFORE
FABRICATION OR INSTALLATION.
6. CONTRACTOR SHALL PROVIDE ALL REQUIRED
OFFSETS, TRANSITIONS, AND FITTINGS FOR
DUCTWORK AND PIPING TO COMPLETE THE
SYSTEMS.
7. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS PRIOR TO ORDERING OR FABRICATION
OF MATERIAL OR PERFORMING ANY NEW WORK.
DEVIATIONS FROM CONDITIONS SHOWN IN THESE
PLANS SHALL BE REPORTED TO THE CO/COR
IMMEDIATELY AND NO WORK SHALL BE
PERFORMED IN THIS AREA UNTIL A RESOLUTION
HAS BEEN ESTABLISHED. SITE CONDITIONS
DIFFERING FROM THOSE SHOWN ON THESE PLANS
WILL NOT GENERALLY BE CONSIDERED A BASIS
FOR CONTRACT MODIFICATIONS AS THE
CONTRACTOR SHALL TAKE INTO ACCOUNT WORST
CASE SITE CONDITIONS WHEREVER POSSIBLE.
8. DUCTWORK MAINS ARE GENERALLY INTENDED TO
RUN BELOW THE STRUCTURE WITH INDIVIDUAL
BRANCHES ROUTED UP THROUGH AND IN
BETWEEN ROOF STRUCTURE MEMBERS. DUCTWORK
MAINS ARE LAID OUT AND INTENDED TO RUN
BETWEEN LIGHT FIXTURE SPACING, NOT ABOVE
LIGHTS UNLESS NO OTHER ROUTING IS POSSIBLE.
ALL PIPING IS LAID OUT AND INTENDED TO RUN
UP THROUGH AND BETWEEN STRUCTURAL
MEMBERS AND TO STAY ABOVE DUCT ROUTING.
COORDINATE WITH EXISTING CONDITIONS.
9. ALL PENETRATIONS THROUGH FIRE/SMOKE RATED
CONSTRUCTION SHALL BE SEALED WITH A FIRE
RATED CAULK EQUAL TO OR EXCEEDING THE
CONSTRUCTION FIRE RATING.
10. COORDINATE ROUTING OF DUCTWORK AND PIPING
WITH ELECTRICAL EQUIPMENT. DO NOT ROUTE
DUCTWORK AND PIPING DIRECTLY OVER THE TOP
OF ELECTRICAL PANELBOARDS AND SWITCHBOARDS.
11. ALL PRODUCTS LISTED ON THE SCHEDULE SHEETS
ARE TO BE CONSIDERED BASIS OF DESIGN TO
ESTABLISH MINIMUM & MAXIMUM PERFORMANCE
CHARACTERISTICS. OTHER MATERIALS WILL BE
ALLOWED AS SUBSTITUTIONS PROVIDED THEY MEET
OR EXCEED ALL PERFORMANCE CHARACTERISTICS
LISTED THEREIN AND MEET OR EXCEED ALL
SPECIFICATION REQUIREMENTS.
12. ALL SCHEDULED VALUES ARE FOR 6172 FT.
ELEVATION UNLESS INDICATED OTHERWISE.
13. ALL DEVICES AND EQUIPMENT TO BE SALVAGED
OR RE-USED MUST BE CLEANED AND ALL
DAMAGED PARTS REPAIRED OR REPLACED.
14. PROVIDE PRODUCT DATA SUBMITTALS FOR ALL
EQUIPMENT ALONG WITH OPERATION AND
MAINTENANCE MANUALS. INCLUDE MANUFACTURER'S
MODEL NUMBER, SERIAL NUMBER, ELECTRICAL
CHARACTERISTICS, WEIGHT, CAPACITIES, ETC.
15. CONTRACTOR SHALL PROVIDE WORK IN PHASES
AS REQUIRED BY GOVERNMENT WHILE MINIMIZING
POTENTIAL WORK DELAYS.
16. CONTROL DEVICES SHALL COMMUNICATE OVER
BACNET COMMUNICATION PROTOCOL.
17. CONSTRUCTION DOCUMENTS CONSIST OF THESE
DRAWINGS, A SEPARATE BOOK OF SPECIFICATIONS,
AND THE STATEMENT OF WORK (SOW). THE
DRAWINGS, SPECIFICATIONS, AND STATEMENT OF
WORK (SOW) ARE COMPLEMENTARY, NONE ARE
MEANT TO STAND ALONE FOR ANY PORTION OF
THE WORK DESCRIBED HEREIN. IF ANY
DISCREPANCY EXISTS, CONTACT THE CO/COR FOR
CLARIFICATION BEFORE PROCEEDING WITH
CONSTRUCTION.
D
ES
C R
IP
TI
O N
M A R K
D A
TE
SI
ZE
D A
TE
A N
SI
D
M
A R
R
EP
A
IR
C
H
IL
LE
R B
W O R K P
LA
N
M101
TD
K A st S pa ce W in g
P et er so n
A ir F or ce B as e
C ol or ad o Sp ri ng s, C
O
C
ES
C
EN
M
PROFESSIONAL SEAL
EN
SS
RE
D
AP
PDAN ER
G
EN
S R
T
HT
DEMOLITION MECHANICAL ROOM
SCALE: N.T.S.M101
1 NEW WORK MECHANICAL ROOM
SCALE: N.T.S.M101
DEMOLITION MECHANICAL YARD
SCALE: N.T.S.M101
2 NEW WORK MECHANICAL YARD
SCALE: N.T.S.M101
TYPICAL PUMP DETAIL
SCALE: N.T.S.M101
| Model |
| Layout1 |
File details come from the government source that posted it. Updated .