Q&A__3_-_Remove_Replace_Chiller_Bldg_1270.pdf

PDF 71 KB Posted

Attached to
REMOVE/REPLACE CHILLER, BLDG 1270 Federal contract opportunity
Solicitation number
FA2517-17-Q-5016
Issued by
Department of the Air Force Space Command

About this file

Q&A # 3 (Re-try)

View the file

Other files for this federal contract opportunity

Other files attached to REMOVE/REPLACE CHILLER, BLDG 1270, newest first.
File Type Posted
QA__4__Replace_Bldg_1270_Chiller.docx DOCX document
TDKA141108-SOW_FINAL.docx DOCX document
Q&A_2.docx DOCX document
Question_&_Answers_B1270.docx DOCX document
SOW_Attachment_1_-_Drawings_(adobe_version).pdf PDF
Amendment_01.docx DOCX document
SOW_Attachment_1_-_Drawing.dwg DWG drawing
Combined_Synopsis-Remove-Replace_Chiller,_Bldg_1270.pdf PDF
SOW_Attachment_2_-_Generic_Chiller_Layout.pdf PDF
Attachment_2_Price_Template_Remove-Replace_Chiller_Bldg_1270.xlsx XLSX spreadsheet
Attachment_1_-_Remove-Replace_Chiller,_Bldg_1270_SOW_FINAL.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Remove and Replace Chiller at Bldg. 1270

FA2517-17-Q-5016

Questions

Question 1: Are covers, cover letters, and table of contents excluded from the 4 page limit for the Technical Proposal?

Answer 1: No.

Question 2: What is existing power provided to chiller along with breaker/panel size?

Answer 2: Existing electrical breaker is 400 A, 240 V.

Question 3: What are the training requirements, if any?

Answer 3: Training shall be provided by the manufacturer’s representative and should be approximately 2 hours.

Question 4: What is the Government schedule of work with the onset of warm weather and the lead time of the ordering of the chiller?

Answer 4: The installation of the pumps and accessories, SOW para 2.3, can be installed anytime during the performance period. Of the three dual service pumps, two pumps shall be functioning at all times.

The installation of the chiller which will include cooling system downtime should be after 4 September 2017 to minimize impact to dorm occupants. As specified in SOW para 3.9, the schedule shall be coordinated with the Facility Manager and Contracting Officer a minimum of 14 days in advance of work.

Question 5: Will government provide temporary chiller during work time? What is the plan or requirements for temp chilled water, if any?

Answer 5: See answer 4 above.

Question 6: Will there be another site visit offered?

Answer 6: No

Question 7: At the site visit, it was stated that Davis Bacon (DB) construction wages and Service Contract Act (SCA) wages were not applicable however in Amendment 03 – Q&A #1 it states that SCA wages were applicable. Please clarify.

Answer 7: Since this is a commodity (chiller) with incidental install (service), DB wages and SCA wages are NOT applicable. You must pay your employees Colorado minimum wage.

Question 8: The Statement of Work states the chiller needs to be TRANE or equivalent however Johnson Controls only works with York. Please clarify.

Answer 8: BACNet communication, which is a requirement in para 2.2 of SOW, is a universal HVAC protocol on multiple equipment vendors (Trane, York, etc.). However, the whole building is not being converted to BACNet communication protocol. We are requiring the BACNet card for future capability and for current project sequence, a proportional reset of chilled water with a 4-20 ma or 0-10 VDC signal to chiller in addition to start/stop control of chiller.

Question 9: SOW dated 24 Mar 2017, paragraph 3.3, calls for new units to tested after completion of work for full operation. Please clarify the intent/extent of required testing for the new chiller and JCI controls systems.

Answer 9: The new equipment needs to be run through the sequence of operation including using Energy Management Control System (EMCS) to enable the unit, activating the stages of cooling and shutting down unit.

Question 10: SOW dated 24 Mar 2017, paragraph 3.8 states warranty shall include less than 24 hour response from the manufacturer. Please clarify the period of time for this requirement - 1 year or 5 years.

Answer 10: Revised PWS dated 10 May 2017 has changed verbiage for PWS paragraph 3.8. See attached revised PWS.

Question 11: Solicitation documents include 21 CES Design Guide: Are there any additional specifications applicable to this project? If so, please list those documents.

Answer 11: No.