SSPARS_Draft_RFP_and_Industry_Day_Comments-_ROUND_3.pdf

PDF 74 KB Posted

Attached to
Solid State Phased Array Radar System (SSPARS) Federal contract opportunity
Solicitation number
FA2517-15-R-8001
Issued by
Department of the Air Force Space Command

About this file

This sources sought notice seeks potential sources to provide operations and maintenance support for five geographically separated radar sites that comprise the Solid State Phased Array Radar System. Services required include 24/7 radar and communications system maintenance and support. Interested parties are requested to respond to attached market research questions by July 15, 2015. An industry day is planned for the fourth quarter of fiscal year 2016 at Peterson Air Force Base to provide additional information to interested parties. The North American Industry Classification Systems code for this requirement is 517919. The current contract is fixed price incentive with some cost reimbursable logistics items. The incumbent contractor and contract period of performance were not specified. A draft request for proposal will be released in the future with an updated performance work statement.

SSPARS Draft RFP and Industry Day Comments Round 3

View the file

Other files for this federal contract opportunity

Other files attached to Solid State Phased Array Radar System (SSPARS), newest first.
File Type Posted
2._Attch_2,_Contractor_Assessment_and_Performance_Reporting_(CAsPR)_Matrix.xlsx XLSX spreadsheet
12._Attch_12,_Questions_and_Answers.pdf PDF
11._Attch_11,_CLIN_Schedule_Worksheet.xlsx XLSX spreadsheet
5._Attch_5,_Cape_Cod_CBA_1_Oct_2016_-_30_Sep_2019.pdf PDF
1._Attch_1,_Performance_Work_Statement.docx DOCX document
6._Attch_6,_Clear_CBA_(FJCC)_1_Oct_2015_-_30_Sep_2019.pdf PDF
9._Attch_9,_Scheduled_Government_Furnished_Property.pdf PDF
1._Attch_1,_Performance_Work_Statement.docx DOCX document
5._Attch_5,_Cape_Cod_CBA_1_Oct_2016_-_30_Sep_2019.pdf PDF
8._Attch_8,_Quality_Assurance_Surveillance_Plan.docx DOCX document
7._Attch_7,_Clear_CBA_(IBT)_1_Oct_2016_-_30_Sep_2019.pdf PDF
6._Attch_6,_Clear_CBA_(FJCC)_1_Oct_2015_-_30_Sep_2019_(2).pdf PDF
3._Attch_3,_DD_Form_254.pdf PDF
10._Attch_10,_Staffing_Matrix.xlsx XLSX spreadsheet
11._Attch_11,_CLIN_Schedule_Worksheet.xlsx XLSX spreadsheet
1._Attch,_Performance_Work_Statement.docx DOCX document
11._Attch_11,_CLIN_Schedule_Worksheet.xlsx XLSX spreadsheet
4._Attch_4,_Beale_CBA_1_Oct_2015_-_30_Sep_2019.pdf PDF
10._Attch_10,_Staffing_Matrix.xlsx XLSX spreadsheet
9._Attch_9,_Schedule_Government_Furnished_Property.pdf PDF
7._Attch_7,Clear_CBA_(IBT)_1_Oct_2016_-_30_Sep_2019.pdf PDF
15._Attch_15,_Site_Visit_7_SWS_VAR_Form.doc DOC document
17._Attch_17,_Site_Visit_REAL_ID_Act_Primer.pdf PDF
OCI_Mitigation_Plan_REMINDER.pdf PDF
12._Attch_12_Site_Visit_Schedule.doc DOC document
9._Attch_9,_Schedule_Government_Furnished_Property.pdf PDF
0._DRAFT_Request_For_Proposal_FA2517-15-R-8001.pdf PDF
2._Attch_2,_Contractor_Assessment_and_Performance_Reporting_(CAsPR)_Matrix.xlsx XLSX spreadsheet
6._Attch_6,_Clear_CBA_(FJCC)_1_Oct_2015_-_Sep_2019.pdf PDF
17._Attch_17,_Site_Visit_REAL_ID_Act_Primer.pdf PDF
3._Attch_3,_DD_Form_254.pdf PDF
13._Attch_13,_Site_Visit_Base_Maps.pdf PDF
7._Attch_7,_Clear_CBA_(IBT)_1_Oct_2016_-_30_Sep_2019.pdf PDF
5._Attch_5,_Cape_Cod_CBA_1_Oct_2016_-_30_Sep_2019.pdf PDF
15._Attch_15,_Site_Visit_7_SWS_VAR_Form.doc DOC document
Updated_Draft_PWS_SSPARS_1_Dec_16.docx DOCX document
SSPARS_Draft_RFP_and_Industry_Day_Comments_-_ROUND_2.pdf PDF
SSPARS_Industry_Day_Attendees.pdf PDF
SSPARS_Draft_RFP_and_Industry_Day_Comments_-_ROUND_1.pdf PDF
Attch_2_DRAFT_Contractor_Assessment_and_Performance_Reporting_(CAsPR)_Matrix.xlsx XLSX spreadsheet
CORRECTED_Notice_of_Industry_Day.pdf PDF
DD2345.pdf PDF
DD2345_Requirements_and_Instructions.pdf PDF
FAQ_and_Answers_for_Form_DD2345.pdf PDF
Notice_of_Industry_Day.pdf PDF
Attch_1_-_Agenda.pdf PDF
FA2517-15-R-8001_Synopsis.docx DOCX document
RFI_3_Attch_1_LoS_Rule_2014-29753.pdf PDF
RFI_3_LoS _Prof_Emp.pdf PDF
RFI__1_General_Questions.docx DOCX document
Show all 50

Solid State Phased Array Radar System (SSPARS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2517-15-R-8001 SSPARS Draft RFP and Industry Day

Questions and Answers Round 3

Question

Draft

PWS/RFP

Para #

QUESTION ANSWER

Draft RFP

Section L-5

D.1.

(page 110)

Why are offerors not required to address their proposed approach to many sections of the Performance Work Statement (PWS), such critical items as: handling classified materials, environmental and air quality programs, water programs, asbestos control, ionizing and non-ionizing radiation devices, medical services and drinking water quality. These are of significant importance and require a thorough understanding in order to protect the environment, the local community as well as the military and contractor personnel at each location.

All paragraphs of the PWS are necessary and required for the success of the mission. However, not all PWS requirements have to be evaluated or will provide discrimination among the offerors. Based on the

Government's acquisition risk analysis, the Government determined this is sufficient information to be able to differentiate among offerors or mitigate the identified risks

Draft RFP

Section L-5

D.1.a.

(page 110)

Why is the Mission System Maintenance Plan, the most important

Subfactor being evaluated as Pass/Fail? Using this evaluation criteria the government losses the advantage of selecting a contractor with distinguishing capability and advantages above a marginal but

“acceptable” bid.

In order to help eliminate confusion, the evaluation criteria will be revised. There will now be three factors: Factor 1 -

Management, Factor 2 - Mission Maintenance, and Factor

3 - Cost/Price. Factor 1 will have four subfactors, rated most to least important: Program Management, Knowledge

Capture and Retention, Resource Management, and Small

Business Participation. Each subfactor under Factor 1 will receive a color rating. Factor 2 will be rated on an

"acceptable/unacceptable" basis. An offeror must receive a rating of "acceptable" on Factor 2 to be eligible for award.

Factor 3 will be evaluated for reasonableness and balance.

Factors 1 and 2, when combined, will be significantly more important than price.

Draft RFP

Section M-3

B.3.

(page 115)

Why is Past Performance not formally evaluated per FAR 15.304? By not evaluating contractor Past Performance for relevancy and recency the next SSPARS contractor will likely have no large Weapons System O&M experience.

Past performance will not be an evaluation factor because through market research the Government has determined it will not be a meaningful discriminator for this acquisition.

Market research has revealed that the majority of interested parties for SSPARS are large businesses with extensive experience in this type of work. The Government fully expects that, through offerors' differing technical approaches, the Government will be able to select a proposal that meets or exceeds the PWS requirements and is low-risk, thus representing the best value to the

Government and taxpayers. Past performance is reviewed by the CO when determining an offeror is responsible IAW

FAR 9.104.

FA2517-15-R-8001 SSPARS Draft RFP and Industry Day

Questions and Answers Round 3

Question

Draft

PWS/RFP

Para #

QUESTION ANSWER

Draft RFP

Section M-3

C.3.

(page 119)

Why does the evaluation criteria not include price realism? While the contract is FFP and all the financial risk in selecting an unrealistically low bid is thought to be on the contractor. This thinking has proven problematic in many acquisitions where the final contract outcome is termination either by a T4C, T4D or not exercising the next option period.

In each of these cases the mission is significantly impacted, a tremendous amount of time is spent by the contractor, Government

Contracting Officer along with the technical Government customers to unwind the contract and then the procurement must be redone.

FAR guidance and GAO case precedent are clear in this regard. Price realism is not to be done on competitive FFP contracts except in "exceptional cases," for "fixed-price-type" contracts, such as when new requirements may not be fully understood by competing offerors, or performance requires meaningful numbers of "professional employees."

The SSPARS requirement is not such an "exceptional case," and FAR clause 52.222-46 will not be included in the RFP since there aren't meaningful numbers of professional employees; as such price realism will not be conducted. Per the DoD Source Selection Procedures, risk of unsuccessful performance will be addressed through the combined Technical/Risk Evaluation, which considers aspects such as potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, and/or the likelihood of unsuccessful contract performance.

Industry Day

Briefing

Slides

(slides 54-60)

When will the Government decide whether or not it will move forward with the "property consideration" approach?

The Government has determined this is not a viable approach and will not move forward with it. There will still be certain property that is issued as "Government-

Furnished Property." As for the "other" property at the sites, the contractor will not be required to propose consideration, nor will the contractor take title of it.

Instead, the property will be available at the sites for contractor use. As the property is consumed or wears out, if that same type of property is still required for contract performance, the contractor will be responsible for replacement at contractor expense.