F9C3B32B-C9B0-4995-94ED-D6C1CABC77D4.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Plumbing Maintenance Services UTC
- Solicitation number
- RFQ032709
- Issued by
- Franklin County, Columbus City, Ohio
About this file
This is an RFQ Work Sheet for Plumbing Maintenance Services provided by the City of Columbus, Ohio, presented as a Universal Term Contract (UTC). The City seeks proposals to provide routine maintenance, repair, and replacement of plumbing services at various City-owned, leased, or funded facilities through September 30, 2029, with an option for one additional year or portion thereof. The scope encompasses work on water, sewer, and natural gas piping systems, including fixture installation, new pipe installation, and troubleshooting and repair of existing plumbing systems at multiple facilities. The document provides eight detailed service examples with labor and parts pricing templates, including water line installation, grease trap replacement, urinal replacement, drinking fountain replacement, exterior hose bibb replacement, shower head inspection and cleaning, gas water heater replacement, and flush valve rebuilding. Each example specifies units of measure, price per unit, annual occurrences, and estimated annual costs to facilitate consistent bidding across service categories.
Bidders must be registered as City vendors and provide documentation of experience in plumbing services over the past five years, including a list of qualified personnel with requisite licenses. Bidders are required to submit proven references from at least four similar customers that demonstrate contract success in scope, complexity, and cost comparable to the UTC requirements. The pricing template indicates that contract terms and conditions are open to Co-OPP (Cooperative Purchasing Program) members. The work sheet includes a sample parts list featuring specific equipment such as an Elkay LZS8WSLK EZH2O Bottle Filling Station with Single Filtered Refrigerated Drinking Fountain, demonstrating the types of fixtures and components that may be specified in work orders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 8EC46E74-DF51-42A3-B3E5-9EC1256067EF.pdf | ||
| 16CCC8BA-20C7-4C11-814B-A01A08006207.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXAMPLE NO. 1 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Install new 30' water line. | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Hydro-Vac dig for new 4" service | HR | |||||
| Install new water line 30' from source | HR | |||||
| Pressure test line | HR | |||||
| Backfill, grade, and seed if necessary | HR | |||||
| Remove debris | HR | |||||
| Dumping Fees | HR | |||||
| Parts List | ||||||
| Piping | FT | |||||
| Shut Off Valve | EA | |||||
| Water meter | EA | |||||
| Street connection | EA | |||||
| Hydro-Vac Usage | HR | |||||
| Pipe Connectors | EA | |||||
| Gaskets | EA | |||||
| Washers | EA | |||||
| Subtotal | ||||||
| TOTAL | ||||||
| Notes: |
| EXAMPLE NO. 2 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Replace riser and grease trap. | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Pump out grease trap and remove | HR | |||||
| Excavate conc. floor 4'x 4' | HR | |||||
| Install custom riser and trap | HR | |||||
| Re-pipe inlet, outlet, and flow control | HR | |||||
| Test trap | HR | |||||
| Backfill and finish conc. Floor | HR | |||||
| Parts List | ||||||
| Grease trap | EA | |||||
| Custom 18" riser | EA | |||||
| Piping | FT | |||||
| Valves | EA | |||||
| Connectors | EA | |||||
| Dump Fees | EA | |||||
| Subtotal | ||||||
| TOTAL | ||||||
| Notes: |
| EXAMPLE NO. 3 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Replace wall hung urinal. | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Turn water valve off | HR | |||||
| Fit up urinal to wall | HR | |||||
| Install flushometer pipe | HR | |||||
| Install urinal | HR | |||||
| Turn water on & check operation | HR | |||||
| Clean up area | HR | |||||
| Parts List | ||||||
| Wall Hung urinal | EA | |||||
| Installation kit | EA | |||||
| Flushometer | EA |
| Subtotal |
| TOTAL |
| Notes: |
| EXAMPLE NO. 4 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Replace Drinking Fountain | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Turn off water | HR | |||||
| Remove existing Water cooler | HR | |||||
| Install new wall mounted Water cooler | HR | |||||
| Turn on water | HR | |||||
| Check operation | HR | |||||
| Clean up | HR | |||||
| Parts List | ||||||
| Bottle Filling Station with Single Filtered Refrigerated Drinking Fountain | EA | |||||
| In-wall mounting system | EA | |||||
| Extra filters (12 pack) | BX |
| Subtotal |
| TOTAL |
| Notes: |
| EXAMPLE NO. 5 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Replace exterior hose bibb | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Turn off water supply | HR | |||||
| Remove old hose bib | HR | |||||
| Install new hose bibb | HR | |||||
| Turn water on | HR | |||||
| Test and check for leaks | HR | |||||
| Clean up | HR | |||||
| Parts List | ||||||
| Frost Proof Silcock, Anti-Siphon, 8" | EA |
| Subtotal |
| TOTAL |
| Notes: |
| EXAMPLE NO. 6 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Inspect and clean shower spray heads | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Turn off water | HR | |||||
| Remove spray head | HR | |||||
| Check shower head | HR | |||||
| Install spray head | HR | |||||
| Turn water on | HR | |||||
| Clean up | HR | |||||
| Parts List | ||||||
| Pipe tape | Roll |
| Subtotal |
| TOTAL |
| Notes: |
| EXAMPLE NO. 7 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Replace gas water heater | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Remove existing water heater | HR | |||||
| Install new water heater | HR | |||||
| Test for leaks | HR | |||||
| Clean up | HR |
| Parts List | |
| 98 Gallon - 75,100 BTU Commercial Gas Water Heater | EA |
| Subtotal |
| TOTAL |
| Notes: |
| EXAMPLE NO. 8 | Contract terms and conditions and pricing open to Co-OPP Members? (Yes or No) | |||||
| Description of Labor - Rebuild flush valve | UOM | Number of Units | Price per Unit | Net Price | Annual Occurrences | Estimated Annual Cost |
| Mobilization | HR | |||||
| Turn off water | HR | |||||
| Remove flush valve | HR | |||||
| Rebuild valve | HR | |||||
| Reinstall valve | HR | |||||
| Turn on water | HR | |||||
| Check operation | HR | |||||
| Parts List |
| Subtotal |
| TOTAL |
| Notes: |
&"Arial,Regular"&14RFQ Work Sheet
Sheet2 Elkay LZS8WSLK EZH2O Bottle Filling Station with Single Filtered Refrigerated Drinking Fountain, 8.0 GPH, ADA, Light Gray Granite
File details come from the government source that posted it. Updated .