Exhibit F _ Project Cost Matrix.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
[2000-27] RFQP-CM_0269-2023 Chilled Water Distribution Replacement Klaus to CoC
Solicitation number
PE-50300-RFP-2027-000000319
Issued by
Fulton County, Georgia

About this file

This is a Cost Proposal Matrix document prepared by Georgia Institute of Technology's Planning, Design & Construction unit for the Chilled Water Distribution Replacement project (Project No. 0269-2023), which involves replacing chilled water distribution infrastructure between Klaus and College of Computing buildings. The matrix serves as a guide for construction management firms to allocate costs across specified categories for their cost proposals. The document outlines a projected fee of $1,231,000 based on a $46 million Guaranteed Maximum Price (GMP), indicating this is a significant capital project at the Georgia Tech campus in Atlanta.

The cost matrix allocates expenses across six primary categories: Site Supervision & Management, Site Office Expense, Safety & Security, Cleaning, General Equipment, and Bonds & Insurance, with a seventh Miscellaneous section. Bidders are directed to populate costs in designated columns for Construction Fee, General Conditions, and Cost of Work by Others. Key line items marked for cost allocation include senior project management positions, safety engineer services ($30,000 identified for General Conditions), office equipment and supplies, traffic control, cleaning and waste management, equipment rentals, performance and payment bonds, insurance requirements, and miscellaneous project expenses. The matrix uses "X" designations to indicate where the owner expects costs to be proposed, with some items marked as "Incl." (included in other line items), "NA" (not applicable), or left blank, providing clear parameters for proposal preparation from qualified construction management firms invited to participate in this competitive selection process.

View the file

Other files

File Type Posted
Exhibit A _ Certification Form.docx DOCX document
Exhibit B _ Contractor Affidavit.docx DOCX document
Exhibit C _ CM_GC Fee Proposal.docx DOCX document
Exhibit D _ Preconstruction Cost_Expenses Bre.xlsx XLSX spreadsheet
_2000_27_ RFQP_CM Project 0269_2023 Chilled W.pdf PDF
Exhibit G _ Proposer_s Disclosure Statement.doc DOC document
Exhibit E _ General Conditions_Breakdown.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Matrix

PROJECT COST MATRIX
The spaces marked with an "X" below indicate where the Owner wishes to allocate costs for the project. Please follow this as a guide in preparing your cost proposal for the project.
Project No. 0269-2023 Chilled Water Distribution Replacement Klaus to CoC CM Svcs
Georgia Institute of Technology, Atlanta, Georgia
I. Site Supervision & Management:Construction FeeGeneral ConditionsCost of WorkBy Others
Project ExecutiveX
Corporate ExecutivesX
Legal ServicesX
Senior Project Mgr.X$0$00$0
Project Mgr.X$0$00$0
Project Supt.X$0$00$0
Asst. Project Supt.X$0$00$0
Area Supt.XNA
SecretaryX$0$00$0
Project EngineerX$0$00$0
Engineer or Eng. CompanyX$0$0
Cost ControlX$0$0
Safety EngineerX0$30,000
SchedulingX$0$00$0
PurchasingX0$0
Project AccountantXIncl.
RodmanXIncl.
$0$00$0
II. Site Office Expense:Construction FeeGeneral ConditionsCost of WorkBy Others
Job Office Trailer RentXNA
Office Jobsite Build OutX$0$00$0
Office Jobsite Set-upX$0$00$0
Temp. Const. Trailer/StorageXNA
Office FurnitureXIncl. Below
Office Machines/Equip.X$0$00$0
Copy Machines/MaintenanceXIncl. Above
Office SuppliesX$0$00$0
Janitor/San. SuppliesX$0$0
Postage & ShippingX$0$00$0
First Aid/Med. Treat.X$0$0
Telephone SystemX$0$00$0
Phone InstallationX0$0
Phone ChargesX0$0
Phone Charges-Long Dist.XBy Arch.
Radio CommunicationsX$0$00$0
Radio MaintenanceXIncl.
Computer-PCSX$0$00$0
ComputersXIncl.
SoftwareX$0$00$0
MIS ChargesX0$0
Temp. Electric-OfficeX
Security-OfficeX
Water - Field OfficeX
0$0
III. Safety & Security:Construction FeeGeneral ConditionsCost of WorkBy Others
Safety IncentivesXNA
Watchman/Guard Ser.X0$0
Traffic ControlX$0$00$0
Safety EquipmentX$0$00$0
Rainwear/Hardhats, etc.X0$0
Drug TestingX$0$00$0
Fences & GatesX0$0
Fire Protection, Extinquishers, BarrelsX0$0
Covered WalkwaysX0$0
Roadway MaintenanceX$0$0
Sidewalk BarricadesX$0$0
Safety RailingsX$0$0
Opening ClosuresX
Weather ProtectionX
Ladders & StailrsX
IV. Cleaning:Construction FeeGeneral ConditionsCost of WorkBy Others
Trash Bin Rent/HaulXIncl.
Trash Chutes/HoppersX$0$00$0
Dump Fees/HaulingX$00$0
Dust BarricadesX0$0
Daily CleaningX
Final Cleanup-BuildingX
Window/Skylight CleaningX
$00$0
V. General Equipment:Construction FeeGeneral ConditionsCost of WorkBy Others$00$0
Small Tools/ExpendablesX$0$00$0
Survey EquipmentXIncl.
Hoist/OperatorX0$0
Hoist ServiceX$0$00$0
Erect/Dismantle HoistX0$0
Temp. Elev. & OperatorX$00$0
Rapair Cab/Temp. Elev.X$00$0
Protect Perm. ElevatorX
Fuel/Oil/GreaseX
Forklift RentalX
Contractor Equipment LicenseX
Contractor Equipment PermitsX
Tower Crane ServiceX
Erect/Dismantle CraneX
Crane Rental/OperatorX
Construction EquipmentX
VI. Bonds & Insurance:Construction FeeGeneral ConditionsCost of WorkBy Others
Perform. & Payment BondsX
Workers Comp. InsuranceX
Liability InsuranceX
Fed. & State UnemploymentX
FICAX
Builders Risk InsuranceX
$1,231,000
Projected Fee (Based on $46 Million GMP)ERROR:#REF!
Builders Risk InsuranceX
VII. Miscellaneous:Construction FeeGeneral ConditionsCost of WorkBy Others
CM General Overhead CostX
CM Profit MarginX
Costs Over GMPX
Project Staff Living ExpensesX
Executive TravelX
Air FareX
Car RentalX
HotelX
MealsX
Project Staff Moving ExpensesX
Warranty WorkX
Off-Site ParkingX
Ceremony ExpenseX
Vehicle for On-Site Project ManagerX
Vehicle for On-Site SuperintendentX
Vehicle Repairs/MaintenanceX
Water - CoolersX
Water BarrelsX
Ice MachineX
Ice and/or CupsX
Temporary Toilets InstallX
Temporary ToiletsX
Cold Weather ProtectionX
Temp. Heat for Bldg.X
Job SignsX
Progress PhotosX
Extra Plans & Specs.X
Blueprint/Photostat.X
Temp. Electric -BuildingX
Building PermitX
Plan Check FeesX
Temporary RoadsX
Project TaxesX
Moving Coordination & Costs for ProjectX
Materials Incorporated Into the BuildingX
Corrective WorkX
Punchlist WorkX
Advertising for BidsX
Soils Testing & InvestigationX
Construction Materials TestingX0$0
Special InspectionsX
Water Connection FeesX
Sanitary Connection FeesX
Storm Connection FeesX
Gas Service FeesX
Power Service FeesX
Impact FeeX

&"Arial,Bold"&16&UExhibit F

Sheet2

Sheet3