Exhibit C _ CM_GC Fee Proposal.docx

DOCX document 15 KB Posted

Attached to
[2000-27] RFQP-CM_0269-2023 Chilled Water Distribution Replacement Klaus to CoC
Solicitation number
PE-50300-RFP-2027-000000319
Issued by
Fulton County, Georgia

About this file

This is a CM/GC Fee Proposal document submitted by a Construction Manager/General Contractor to the Georgia Institute of Technology for Project No. 0269-2023 Chilled Water Distribution Replacement Klaus to College of Computing, located in Atlanta, Georgia. The proposal is part of a two-step procurement process in which qualified firms submit statements of qualifications followed by fee proposals and interviews. The project involves construction management and general contracting services for chilled water distribution replacement work on the Georgia Tech campus.

The fee proposal establishes compensation through two primary components: a preconstruction fee representing gross profit for preconstruction consulting services and a construction fee representing gross profit for construction services. Additionally, the CM/GC identifies maximum preconstruction costs and expenses and maximum construction overhead costs as separate line items, with all amounts to be filled in by the bidding firm. The document specifies that these fees and costs are fixed amounts providing full compensation for the CM/GC's services, contingent upon performance of all contract document requirements within established timeframes. The proposal structure allows for detailed cost breakdowns by site if applicable to multi-site projects, with separate attachments referenced for preconstruction and construction overhead cost detail.

View the file

Other files

File Type Posted
Exhibit A _ Certification Form.docx DOCX document
Exhibit B _ Contractor Affidavit.docx DOCX document
Exhibit D _ Preconstruction Cost_Expenses Bre.xlsx XLSX spreadsheet
_2000_27_ RFQP_CM Project 0269_2023 Chilled W.pdf PDF
Exhibit G _ Proposer_s Disclosure Statement.doc DOC document
Exhibit F _ Project Cost Matrix.xlsx XLSX spreadsheet
Exhibit E _ General Conditions_Breakdown.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C

Project No. 0269-2023 Chilled Water Distribution Replacement Klaus to CoC CM Svcs, Georgia Institute of Technology, Atlanta, Georgia

CM/GC FEE PROPOSAL

1. CM/GC’S FEE:

Basis of Fee. The CM/GC’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the CM/GC as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the CM/GC performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.

A. PRECONSTRUCTION FEE:

Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by CM/GC as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to CM/GC a Preconstruction Fee:

TOTAL

Pre-Construction Fee (fixed fee)

B. CONSTRUCTION FEE:

Construction Fee. Representing the gross profit for the construction services provided by CM/GC as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to CM/GC a Construction Fee.

TOTAL

Construction Fee (fixed fee)

2. CM/GC’S PRECONSTRUCTION COSTS AND CONSTRUCTION OVERHEAD COSTS:

The CM/GC’s Overhead Costs. The maximum amount for the CM/GC’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .

AMOUNT

A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)

B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)

Total Maximum Overhead Cost (Sum of A & B)

CM/GC Name

By:_________________________________________________________ Signature of CM/GC Officer

Title of CM/GC Officer