This document is an Asbestos Specification (Document 13 10 10) and Exhibit D from the Alameda County General Services Agency for Project #25203, the Administration Building Elevator Modernization at 1221 Oak Street, Oakland, California, under Master Contract ID #902686. The project scope includes removal and disposal of all asbestos-containing construction materials (ACCMs) necessary to facilitate the elevator modernization. Identified ACCMs include brake pads from three elevator machines (6 square feet), assumed insulation cores from elevator fire-rated doors (660 square feet), assumed insulation from electrical wiring in elevator machines (30 linear feet), joint compound in the basement freight elevator mechanical room and adjacent hallway (500 square feet), and thermal system insulation on piping in the penthouse mechanical room (80 linear feet). A pre-renovation hazardous materials survey was performed by Vista Environmental Consulting, with laboratory reports, chain of custody forms, and sample location diagrams provided in Appendix A. The contractor must submit detailed pre-work submittals, including progress schedules, worker certifications, and abatement work plans, not less than ten business days prior to mobilization. Work must comply with federal, state, and local regulations, including Bay Area Air Quality Management District requirements, Cal-OSHA standards, and EPA guidelines. Post-work submittals, including employee logs, waste manifests, air monitoring results, and incident reports, must be submitted within twenty business days following demobilization.
The contractor is solely responsible for all aspects of asbestos abatement work quality and execution and must provide comprehensive documentation of worker qualifications, including training certifications, respiratory protection training, medical examinations, and fitness determinations for tight-fitting respirator usage. The County's Industrial Hygiene Consultant will provide third-party oversight but does not supervise or assume responsibility for the contractor's work. The specification establishes stringent requirements for waste handling qualifications, disposal facility certifications, and contingency planning for emergencies. Product prohibitions are extensive and include materials containing formaldehyde, methylene chloride, isocyanates, n-hexane, ethylene glycol, and diethylene glycol dimethyl ether. The contractor must maintain negative air pressure within regulated work areas, implement comprehensive decontamination procedures, and conduct both prevalent level and aggressive clearance air monitoring using Phase Contrast Microscopy and Transmission Electron Microscopy methods. The permissible exposure limit for workers is 0.1 fibers per cubic centimeter as an eight-hour time-weighted average, with an excursion limit of 1.0 fiber per cubic centimeter over thirty minutes. Fire-rated enclosure materials and all temporary barriers must meet specified fire safety standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alameda County General Services Agency PROJECT #25203 Admin Building Elevator Modernization MASTER CONTRACT ID #902686
EXHIBIT D
EXISTING CONDITIONS REQUIREMENTS
The following items are included as part of Exhibit D:
1. Section 13 10 10 – Asbestos Specification
2. Section 13 10 20 – Lead Hazard Control Specification
Alameda County General Services Agency Project #25203 Admin Elevator Modernization Project 1221 Oak Street, Oakland
ALAMEDA COUNTY GSA-TSD ASBESTOS CONTAINING
MATERIALS SPECIFICATION
Page 1 of 37 DOCUMENT 13 10 10
DOCUMENT 13 10 10
ASBESTOS SPECIFICATION
PART 1 - GENERAL
1.1 SUMMARY
1.1.1 Scope of Work: The “Work” specified herein includes removal and disposal of all asbestos-containing construction materials (ACCMs) necessary to facilitate the elevator modernization project at the County Administration Building located at 1221 Oak Street, Oakland, California. The Asbestos Abatement Contractor (Contractor) will supply all labor, supervision, materials, equipment, tools, services, insurance and each and every item of expense necessary to perform and complete the Work. Work must be performed as specified herein and in compliance with applicable federal, state and local regulations.
A pre-renovation hazardous materials survey was performed by Vista Environmental Consulting (Vista) of Oakland, California. The laboratory reports with chain of custody forms and sample location diagrams for Vista’s survey are presented in Appendix A.
Based on Vista’s survey results, the following ACCMs summarized below are identified as present within the project work area, which may either be encountered with the possibility of disturbance or will be required to be removed to complete the work. Any ACCM not required to be removed or disturbed during the work shall be protected from impact by the Contractor. Contractor shall notify the County immediately should any ACCMs become damaged during the work.
• Brake pads associated with elevator machines #1, 2 and 3 in penthouse mechanical room (6-square feet)
• Assumed insulation cores associated with all elevator fire-rated doors (660-square feet) ***
• Assumed insulation associated with woven-type electrical wiring in elevator machines #1, 2 and 3 (30-linear feet) ***
• Joint compound applied over gypsum wallboard in the basement level freight elevator mechanical room and adjacent hallway (500-square feet)
• Thermal System Insulation (TSI) applied to piping associated with building mechanical systems in the penthouse mechanical room (80-linear feet)
Use of Vista’s survey data and the information presented above is subject to the limitations set forth in Document 00 31 19 - Existing Conditions Information. Quantities noted above are approximations only. It is the responsibility of the Contractor to field verify asbestos locations and quantities during the bid walk and/or during a subsequent site visit opportunity to be provided by the County prior to bid submission.
*** Due to inaccessibility, the presence and/or actual quantities of the following ACCMs will need to be determined during the Contractor’s work: fire door insulation and insulated electrical wiring. For bidding purposes, Contractor may use the quantities
Page 2 of 37 DOCUMENT 13 10 10 presented above for fire door insulation and insulated electrical wiring. However, the Contractor will need to provide unit costs for each of these materials as designated in Document 00 41 13 - Bid Form. Actual quantities of fire door insulation and insulated electrical wiring will be determined by the Contractor and the County’s representative during the Contractor’s work. The contract amount will be adjusted based on actual quantities observed in the field and unit prices provided by the Contractor in Document 00 41 13 - Bid Form.
1.1.2 Project IH Consultant: The County’s Industrial Hygiene Consultant (hereinafter referred to as the “Project IH Consultant”) will provide independent, third-party industrial hygiene consulting services on behalf of the County. Such services may or may not include conducting on-site work observations, materials or environmental testing, and/or consulting with the County. It is not the responsibility of the Project IH Consultant to supervise the Contractor; nor to direct the Contractor’s work effort; nor to assume the management of, or responsibility for, the Contractor’s health and/or safety practices, nor its waste management, nor its regulatory compliance. At all times, the Contractor shall be solely responsible for the quality and execution of all phases and aspects of the Work.
1.2 SUBMITTALS
1.2.1 General:
1.2.1.1 In addition to any other contractual submittals required of the Contractor, the Contractor will provide to the County the submittals described in this Specification section. Submittals will be reviewed by both the County and the Project IH Consultant for acceptability. The Project IH Consultant will either recommend submittals to the County for acceptance, or will return them to the County as deficient, with notations for correction and re-submission. The Project IH Consultant does not have authority to “approve” submittals.
1.2.1.2 Documents submitted by the Contractor in an effort to comply with the requirements of this Specification section are to be separate and distinct from any other submittals provided to comply with other Specification sections.
In attempting to satisfy the requirements of this Specification section, the Contractor must submit only those documents specifically requested to fulfill the specified requirements. Extraneous documentation will be rejected, but not returned.
1.2.2 Schedule and Format:
1.2.2.1 Delivery: Submittals listed in this section must be delivered to the County.
1.2.2.2 Quantity: Two (2) identical, legible copies of each submittal listed in this section shall be delivered in an organized fashion suitable to the County for review. One (1) copy will be conveyed by the County to the Project IH Consultant for review.
Page 3 of 37 DOCUMENT 13 10 10
1.2.2.3 Work Commencement: No portion of the Work shall be commenced by the Contractor until the submittals are reviewed and accepted by the County.
1.2.2.4 Delays: Delays to the Work resulting from the submittal of deficient or illegible documentation, or from the untimely submittal of potentially acceptable documentation, shall be the sole responsibility of the Contractor.
Except as otherwise granted by the County, no extensions will be made to the awarded contract schedule or budget to accommodate such delays.
1.2.2.5 Format: Submittals will be provided in 8-1/2" x 11" format with sections separated by numbered tabs indexed to a printed Table of Contents. Illegible submittals will be considered deficient and returned for correction.
1.2.2.6 Schedule: Submittals delivered to the County will observe and conform with the following timetable:
1.2.2.6.1 Pre-work Submittals – Not less than ten (10) business days prior to the Contractor’s mobilization onto the work site, the Contractor shall deliver legible copies of the specified documents. The Project IH Consultant will review submittals and return deficient submittals to the County within five (5) business days following their receipt by the Project IH Consultant. Deficient submittals will be corrected and resubmitted by the Contractor within five (5) business days of their return. Once accepted, the reviewed copy shall be returned to the Contractor, who shall maintain a copy of the accepted submittal at the work site.
1.2.2.6.2 Product Submittals – Not less than ten (10) business days prior to the date of intended use of the product on the work site.
1.2.2.6.3 Post-work Submittals – Except as otherwise specified herein, the Contractor shall, within twenty (20) business days following demobilization from the project site, submit 2 copies of the Post-work Submittals listed in this section. If the Project IH Consultant or the County determines that the Post-work Submittals are unacceptable, the Contractor will be required to correct the deficiencies and re-submit them for review.
1.2.3 Pre-Work Submittals:
1.2.3.1 Progress Schedule: Provide a proposed work schedule indicating the listed items.
1.2.3.1.1 Show the complete sequence of the abatement plan by activity and the sequencing of work within each building, on each floor, and for each regulated work area.
1.2.3.1.2 Show the dates for the beginning and completion of each major element (work area set-ups, gross removal, detail cleaning, Page 4 of 37 DOCUMENT 13 10 10 preliminary visual inspections, final visual inspections, tear-down, etc.) of the abatement work, including substantial completion dates for each building, on each floor, and for each regulated work area. Update as necessary.
1.2.3.1.3 Provide anticipated manpower distribution per scheduled activity and regulated work area. Distinguish between trained full-time personnel and unskilled or temporary labor. Indicate whether or not any subcontracted labor will be utilized.
1.2.3.1.4 Provide anticipated number of shifts per day and days per week, as well as specific hours for each shift. Indicate any anticipated overtime, weekend work shifts, night shifts or holiday work shifts planned. Unless otherwise directed, plan to conduct all abatement activities during routine business hours (M-F, 7:00 a.m. to 5 p.m.).
1.2.3.1.5 At a minimum, the Contractor’s Progress Schedule is to be formulated on a three-week, “look ahead” basis and updated weekly.
1.2.3.1.6 All requests for deviations from, or changes to, the initially established daily work shift hours and/or the weekly workdays shall be submitted in writing to the County and the Project IH Consultant for approval not less than 3 business days prior to the anticipated implementation of said changes. This requirement will also apply to remobilizations following periods of inactivity by the Contractor. The Contractor shall not implement any work schedule changes without the prior expressed approval of the County. The Contractor shall be responsible for its Subcontractors’ compliance with these requirements.
1.2.3.2 Notifications/Permits/Licenses:
1.2.3.2.1 Written Notice of Proposed Abatement activity (10-day prior notification) to the applicable air pollution control agency such as the Bay Area Air Quality Management District (BAAQMD).
This project involves the removal of Regulated Asbestos- Containing Materials (RACM) in quantities that exceed notifible thresholds. For floor tile and/or mastic removal operations involving the use of mechanized work methods, including motorized floor buffers, the 10-day prior notification will include appropriate notification of these planned activities, per BAAQMD advisory of June 2003.
1.2.3.2.2 Written Notice of Proposed Abatement activity to the Cal-OSHA Regional Office or any other agency having jurisdiction (24- Hour Temporary Worksite Notification).
Page 5 of 37 DOCUMENT 13 10 10
1.2.3.2.3 Written proof that all required permits, licenses, and registrations have been applied for and received, or are pending approval.
This shall include, but not necessarily be limited to, Contractor State Licensing Board (CSLB) Licenses, California Division of Occupational Safety and Health (DOSH) registrations, and/or as otherwise required by any federal, state, or local governments or regulatory agencies.
1.2.3.3 Worker Documentation:
1.2.3.3.1 Provide name and photo identification of each employee to be engaged in asbestos abatement work.
1.2.3.3.2 Current valid documentation from a Cal/OSHA-approved training provider indicating the most recent asbestos abatement training course and training date that each person listed in Paragraph 1.2.3.3.1. (above) has attended. Legible photocopies of recent (within the preceding 12 months) training certification cards (Laborer’s Trust Cards) will suffice, as long as both sides of the card are provided.
1.2.3.3.3 Name and social security number of the Asbestos Project Superintendent. Provide current valid documentation from a Cal/OSHA-approved training provider indicating the most recent asbestos abatement contractor/supervisor training course and training date that he/she has attended. Provide evidence indicating that he/she has a minimum of one-year on-the-job experience as an Asbestos Project Superintendent.
1.2.3.3.4 Current valid documentation indicating each worker’s most recent respiratory protection training and respirator fit testing.
Respirator fit testing documentation must contain all information required in 8 CCR §5144 (m)(2).
1.2.3.3.5 Current valid medical documentation indicating each worker’s most recent asbestos medical examination. Each such medical document must be signed by a licensed physician to be acceptable. Illegible or incomplete photocopies, or preliminary examination reports, will be rejected as deficient.
1.2.3.3.6 Current valid medical documentation indicating each worker’s medical fitness to wear a tight-fitting respirator and noting any medical limitations to such respirator usage. Each such medical determination must be signed by a licensed physician to be acceptable. Illegible or incomplete photocopies, or preliminary examination reports, will be rejected as deficient.
Page 6 of 37 DOCUMENT 13 10 10
1.2.3.3.7 Submit a completed Certificate of Asbestos Worker's Acknowledgment form (Attachment A to this Specification section) for each worker engaged in asbestos-related work.
Contractor’s employees will not be allowed to engage in asbestos-related work prior to submitting a completed Certificate of Asbestos Worker's Acknowledgment form.
1.2.3.3.8 Submit a completed Certificate of Competent Person
Acknowledgment form (Attachment B to this Specification section) for each employee engaged in asbestos-related supervisory work. Abatement Contractor’s Competent Person will not be allowed to engage in asbestos-related supervisory work prior to submitting a completed Certificate of Certificate of Competent Person Acknowledgment form.
1.2.3.4 Subcontractors: Submit qualifications and 24-hour contact information for each subcontractor to be used. This shall include two (2) legible copies of federal, state, and/or local business or operating permits, as well as State and/or EPA identification numbers for the waste transporters and disposal facilities to be used.
1.2.3.5 Abatement Work Plan: Submit a detailed work plan indicating the practices and procedures proposed for use in complying with the requirements of this specification. Include in the plan schematic drawings with depictions of the locations and general configurations of all regulated work areas. Mark-ups of current project plans will suffice to satisfy this requirement. For each regulated work area, indicate the planned locations of personal decontamination units, equipment decontamination and waste load-out chambers, exhaust air filtration units, air exhaust locations, temporary utilities locations, work area view ports and any other elements or conditions of significance to the controlled completion of the Work (e.g., location of sanitary or storm drains that will require protection). The text of the Work Plan should address the sequencing of the asbestos work; the interface of any skilled trades involved in the performance of the Work; the methods to be used to assure the safety of site workers and visitors to the site; a disposal plan including the on-site location(s) of secured waste storage areas; and a detailed description of the methods to be employed to prevent environmental impairment of the work site and its surrounding area. Expand upon the use of methods of removal to prohibit visible emissions from within the work areas, and for the packaging and transport of removed asbestos waste or debris. The plan must be reviewed and accepted by the Project IH Consultant prior to the commencement of work.
1.2.3.6 Contingency Plan: Submit a contingency plan for emergencies including, but not necessarily limited to: fire, accidents, medical emergencies, power failures, differential air pressure (“negative air”) system failures, or any other event that may require modification of decontamination methods or work area isolation procedures. Include in the plan specific procedures for work
Page 7 of 37 DOCUMENT 13 10 10 area isolation and/or decontamination. Note: Nothing in this specification should be interpreted as instructions to impede the rapid and safe exiting from the work area(s), nor to impede the provision of adequate medical attention in the event of an emergency.
Post: In a room immediately adjacent to the Personnel Decontamination Unit(s), prominently display telephone numbers, locations of and driving instructions to, emergency services including, but not necessarily limited to: fire, ambulance, physician, hospital, police, power company, telephone company, and Contractor’s job-site Superintendent.
1.2.3.7 Field Logs: Submit a sample of Daily Field Logs, Work Area Entry/Exit Logs, etc. to be used during the asbestos abatement work.
1.2.3.8 Rental Equipment: If rental equipment is to be used in conjunction with this asbestos abatement work, a written notification is to be provided to the rental company informing the company that the rented equipment will be used on an asbestos abatement project. A copy of that written notification will be submitted to the Project IH Consultant. The notification must state how the rented equipment is to be used, how it will be decontaminated following its use, and include a space for the acknowledgement of the rental company that it has been advised of the rented equipment’s intended use. The Contractor will obtain written acknowledgment from an authorized representative of the rental company and will return an original signed copy of the acknowledgment to the Project IH Consultant as documentation of compliance with this requirement. In the absence of such rentals, the Contractor will submit a signed declaration on the Contractor’s letterhead and signed by an authorized representative of the Contractor stating that no rented equipment will be used by the Contractor on this project.
1.2.3.9 Safety Data Sheets: Submit current Material Safety Data Sheets for each potentially hazardous material to be used on the job-site. Refer to above Section 1.2.2.6.2 – Product Submittals.
1.2.3.10 California D.O.S.H. Registration: Submit evidence of the Contractor’s registration with the Division of Occupational Safety and Health (Cal- OSHA) to conduct asbestos-related construction work, in accordance with 8
CCR §341.6.
1.2.3.11 Waste Hauling Qualifications: Submit proof of hazardous waste transporter’s registration and the vehicle operator training. Submittals shall include, but not necessarily be limited to: business name, address (mailing address and physical location), and business telephone number of the company; primary contact name and emergency contact (24-hour) telephone number;
Page 8 of 37 DOCUMENT 13 10 10 documentation of current State and/or EPA authorization to operate; and insurance coverage.
1.2.3.12 Waste Disposal Facility Qualifications: Submit documentation of the California State and/or EPA-approved waste disposal facility chosen to receive shipments of asbestos-containing waste generated during this Project.
Such information will include, but not necessarily be limited to: business name, address (mailing address and physical location), and business telephone number of the facility; primary contact name and emergency contact (24-hour) telephone number; documentation of current State and/or EPA authorization to operate; operator’s facility I. D. number; classification and/or types of waste(s) accepted; name, business address and telephone number of insurance provider; documentation of insurance type(s), coverage amounts, and any limitations on liability; and any regulatory agency information pertaining to known citations issued, notices of violations issued, corrective actions ordered, Records of Decisions rendered, or on-going environmental investigations or known liabilities.
1.2.4 POST-WORK SUBMITTALS:
1.2.4.1 General: In accordance with the requirements of the above Section 1.2.2.6.3 - Post-Work Submittals, submit the following documentation:
1.2.4.1.1 Copies of employee and visitor Work Area Entry/Exit Logs and Daily Field Logs/Reports.
1.2.4.1.2 Waste manifests, certified weight tickets, and landfill receipts.
1.2.4.1.3 Results of all Contractor’s personal exposure air monitoring.
1.2.4.1.4 Manometer print-outs attached to 81/2" x 11" paper. Each page should indicate the dates, times, and work area containment to which the Manometer print-out applies. Print-out pages should be arranged in ascending chronological order.
1.2.4.1.5 Incident reports describing any events such as injuries, accidents, emergencies, or loss of differential air pressure and the actions taken in response.
1.3 QUALITY REQUIREMENTS
1.3.1 Reference Standards:
1.3.1.1 Regulations: Applicable regulations pertaining to this asbestos abatement work include, but are not necessarily limited to, the following:
1.3.1.1.1 Bay Area Air Quality Management District (BAAQMD) - Regulation 11 Hazardous Pollutants Rule 2, dated October 7, 1998 or more recent.
Page 9 of 37 DOCUMENT 13 10 10
1.3.1.1.2 California Division of Occupational Safety and Health (Cal- OSHA) – Construction Safety Orders - Asbestos, Title 8, California Code of Regulations section 1529, et. seq. (8 CCR §1529).
1.3.1.1.3 California Health and Safety Code Section 25163, et. seq.
(Transportation of Hazardous Waste).
1.3.1.1.4 Title 22, California Code of Regulations, Section 66261.24 et.
seq. (Characteristics of Hazardous Waste – Toxicity).
1.3.1.1.5 Title 22, California Code of Regulations, Section
66268.7(a)(11).
1.3.1.1.6 Title 22, California Code of Regulations, Section 66268.114 et.
seq. (Treatment Standard for Asbestos-Containing Waste).
1.3.1.1.7 California Labor Code sections 6501.5 (Employer Registration);
and 6501.9 (Determining the Presence of Asbestos Prior to Contracting for Work).
1.3.1.1.8 California Safe Drinking Water and Toxic Enforcement Act of 1986 (Prop. 65).
1.3.1.1.9 Title 29, Code of Federal Regulations, Parts 1910 and 1926.1101.
1.3.1.1.10 Title 40, Code of Federal Regulations, Part 61, Subpart M, National Emission Standards for Hazardous Air Pollutants (NESHAP). U.S. Environmental Protection Agency (U.S. EPA).
1.3.1.1.11 Title 49, Code of Federal Regulations, Part 172, U.S.
Department of Transportation.
1.3.1.1.12 All other applicable Federal, State, and/or Local regulations, codes, and ordinances.
1.3.1.2 Standards: Applicable industry standards pertaining to asbestos abatement work include, but are not limited to, the following:
1.3.1.2.1 American National Standard Institute (ANSI) Publications:
Z9.2 Fundamentals Governing The Design and Operation of Local Exhaust Systems; and
Z88.2 Practices for Respiratory Protection.
Page 10 of 37 DOCUMENT 13 10 10
1.3.1.2.2 U. S. Environmental Protection Agency (EPA): Publication No.
560/5-85-024 Guidance for Controlling Asbestos-Containing Materials in Buildings, June, 1985
1.3.1.2.3 American Society for Testing Materials (ASTM) Publications:
E1368-14 Standard Practice for Visual Inspection of Asbestos Abatement Projects; and
E1542-20b (2020) Standard Terminology Relating to Occupational Health and Safety; and
E84-20 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials.
1.3.1.2.4 National Institute of Occupational Safety and Health (NIOSH) Publications:
Manual of Analytical Methods:
Method 7400 Asbestos and Other Fibers by PCM; and
Method 7402 Asbestos Fibers by TEM.
1.3.1.2.5 Underwriters Laboratories, Inc. (UL) Publication:
UL 586, Edition 9 High Efficiency, Particulate, Air Filter Units
1.3.1.3 Applicability. The most current version of each document will apply. Where conflicts among these regulations or standards exist, the more stringent requirement or interpretation will apply.
1.3.2 Definitions: In addition to definitions provided elsewhere in these specifications, the following definitions shall apply:
1.3.2.1 Abatement: The procedure to control fiber release from asbestos-containing building materials. Activities include removal, encapsulation, and enclosure.
1.3.2.2 Adequately Wet: A term defined in 40 CFR 61, Subpart M and EPA 340/1- 90-019 that means to sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions are observed to be coming from ACM or ACCM, then that material has not been adequately wetted. The absence of visible emissions, however, is not sufficient evidence of being adequately wetted.
1.3.2.3 Aggressive Clearance: Final clearance air monitoring of a regulated asbestos work area which utilizes leaf blowers, fans, and similar tools to “aggressively” disturb and entrain any settled residual asbestos fibers for the purpose of capturing them during sampling.
Page 11 of 37 DOCUMENT 13 10 10
1.3.2.4 Air Lock: A system for permitting ingress and egress with minimum air movement between a contaminated area and an uncontaminated area.
1.3.2.5 Air Monitoring: The process of measuring the fiber content of a specific volume of air in a stated period of time.
1.3.2.6 Amended Water: Water to which a surfactant has been added.
1.3.2.7 Asbestos: The general name given to a group of fibrous mineral forms including chrysotile, crocidolite, amosite, tremolite anthophyllite, and actinolite and any of these minerals that have been chemically treated or altered.
1.3.2.8 Asbestos-Containing Hazardous Waste: Any material that contains more than one percent asbestos and is in a friable, finely divided, or powered state.
Alternatively, any mixture of material(s) which contains (i.e. is contaminated with) equal to, or greater than, one percent friable asbestos is also asbestos-containing hazardous waste.
1.3.2.9 Asbestos-Containing Material: any material containing more than one percent (1%) asbestos.
1.3.2.10 Asbestos-Containing Construction Material: any manufactured construction material which contains more than one tenth of 1 percent (0.1%) asbestos by weight.
1.3.2.11 Asbestos Abatement Contractor: The contractor or subcontractor designated in the contract documents as being responsible to the County for the control or abatement of asbestos-containing or asbestos-contaminated materials.
1.3.2.12 Asbestos Permissible Exposure Limit (PEL): The Contractor will assure that no employee is exposed to an airborne concentration of asbestos of greater than 0.1 fibers per cubic centimeter (f/cc) as based on an 8-hour time-weighted average (TWA).
1.3.2.13 Authorized Visitor: The County or designated representative, the Project IH Consultant, the Project IH Consultant’s inspector or representative, or any representative of a federal, state, county, city, or local agency having legal or regulatory jurisdiction over the project while acting in an official capacity.
Any person whose name appears upon an approved authorized visitor's list.
1.3.2.14 Background Monitoring: See “Prevalent Level Monitoring.”
1.3.2.15 Class I Asbestos Work: Activities involving the removal of thermal system insulation (TSI) and surfacing ACM and PACM. For the purposes of this specification, asbestos-containing resilient sheet flooring (“linoleum”) will also be removed as “Class I Asbestos Work.”
Page 12 of 37 DOCUMENT 13 10 10
1.3.2.16 Class II Asbestos Work: Activities involving the removal of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard or joint compound, floor tile, roofing materials, sidings and construction mastics.
1.3.2.17 Clean Room: An uncontaminated area or room which is part of the worker decontamination enclosure with provisions for storage of worker's street clothes and protective equipment.
1.3.2.18 Competent Person: In addition to the definition in Title 8 CCR 1529 (b), one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, as specified in 29 CFR §1926.32 (f): in addition, for Class I and Class II work, one who is specially trained in a training course which meets the criteria of EPA’s Model Accreditation Plan (40 CFR §763) for supervisor, or its equivalent and, for Class II and Class IV work, one who is trained in a manner consistent with EPA requirements for training of local education agency maintenance and custodial staff as set forth at 40 CFR §763.92 (a)(2).
1.3.2.19 County: The County of Alameda and its designated representative(s).
1.3.2.20 Critical Barrier: One or more layers of plastic sealed over an opening into a work area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a work area from migrating to an adjacent area.
1.3.2.21 Curtained Doorway: A device to allow ingress and egress from one room to another while permitting minimal air movement between the rooms, typically constructed by placing two overlapping sheets of plastic over an existing or temporarily framed doorway, securing the vertical edge of one sheet along one vertical side of the doorway, and securing the vertical edge of the other sheet along the opposite vertical side of the doorway.
1.3.2.22 Decontamination Enclosure System: A series of connected rooms, with curtained doorways between any two adjacent rooms, for the decontamination of workers and of materials and equipment. A decontamination enclosure system always contains at least one airlock.
1.3.2.23 Differential Air Pressure Equipment: A portable local exhaust fan or “unit” equipped with HEPA filtration and capable of maintaining a constant, negative air pressure differential within the regulated work area by providing a low velocity air flow into contaminated areas from adjacent uncontaminated areas and exhausting filtered air outside the work area (preferably to the outdoor air).
1.3.2.24 Disturbance: Activities that disrupt the matrix of ACM/ACCM or PACM, crumble or pulverize ACM/ACCM or PACM, or generate visible debris from ACM/ACCM or PACM. This term includes activities that disrupt the matrix
Page 13 of 37 DOCUMENT 13 10 10 of ACM/ACCM or PACM, render ACM/ACCM or PACM friable, or generate visible debris. Disturbance includes cutting away small amounts of ACM/ACCM and PACM, no greater than the amount which can be contained in one standard sized glove bag or waste bag in order to access a building component. In no event shall the amount of ACM/ACCM or PACM so disturbed exceed that which can be contained in one glove bag or waste bag which shall not exceed 60 inches in length and width.
1.3.2.25 DOP Testing: The challenge testing of HEPA-filtered equipment, using appropriate aerosols. A 0.3 µm dioctylphthalate aerosol was formerly used in challenging the efficiency of HEPA-filtered equipment. Although dioctylphthalate compounds are now suspected human carcinogens, the phrase “DOP testing” is still current vernacular for the process of challenge testing the efficiency of HEPA-filtered equipment.
1.3.2.26 Encapsulant: A liquid material which can be applied to asbestos-containing materials and which prevents the possible release of asbestos fibers from the material either by creating a membrane over the surface (bridging encapsulant) or by penetrating into the material and binding its components together (penetrating encapsulant). A sealant.
1.3.2.27 Encapsulation: All herein specified procedures necessary to apply an encapsulant to asbestos-containing building materials to control the possible release of asbestos fibers into the air.
1.3.2.28 Enclosure: All herein specified procedures necessary to completely enclose asbestos-containing material behind airtight, impermeable, permanent barriers.
1.3.2.29 Equipment Decontamination Enclosure: That portion of a decontamination enclosure system designed for controlled transfer of materials and equipment, typically consisting of a washroom and a holding area.
1.3.2.30 Equipment Room: A contaminated area or room which is part of the worker decontamination enclosure with provisions for storage of contaminated clothing and equipment.
1.3.2.31 Excursion Limit: The Contractor will assure that no employee is exposed to an airborne concentration of asbestos of greater than 1.0 fiber per cubic centimeters (f/cc) as an average over a sampling period of thirty minutes.
1.3.2.32 Fixed Object: A unit of equipment or furniture in the work area which cannot be removed from the work area.
1.3.2.33 Friable: Material(s) that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. Material that has been rendered to a finely divided or powered state will also be considered to be “friable.”
Page 14 of 37 DOCUMENT 13 10 10
1.3.2.34 Glovebag: Not more than a 60 x 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which material and tools may be handled.
1.3.2.35 Glovebag Technique: A method with limited applications for removing small amounts of friable asbestos-containing material from HVAC ducts, short pipe runs, valves, joints, elbows, and other non-planer surfaces in an otherwise non-enclosed work area. The glovebag assembly is a manufactured or pre-fabricated device consisting of a glovebag (typically constructed of 6-mil transparent regulate plastic), two inward projecting long sleeve rubber gloves, one inward projecting sleeve, an internal tool pouch, and an attached, labeled receptacle for asbestos waste. The glovebag is constructed and should be installed in such a manner that it will surround the ACCM or ACM to be removed and will contain all asbestos fibers released during the removal process. All workers who are permitted to use the glovebag technique must be trained, experienced, and skilled in this method.
Limitations on, and requirements pertaining to glovebag work, as set forth in 8 CCR §1529 et. seq., will be observed and complied with during this Work.
The number of contiguous glove-bags that may be used within a regulated work area will be at the discretion of the Project IH Consultant.
1.3.2.36 Holding Area: A chamber in the equipment decontamination enclosure located between the washroom and an uncontaminated area. The holding area comprises an airlock.
1.3.2.37 HEPA Filter: A High-Efficiency Particulate Air (HEPA) filter capable of trapping and retaining 99.97 percent of particles (asbestos fibers) greater than 0.3 micrometers in mass median aerodynamic equivalent diameter.
1.3.2.38 HEPA Vacuum Equipment: Vacuuming equipment manufactured with a HEPA filter system.
1.3.2.39 Leak Tight: Solids, liquids or dusts cannot escape or spill out.
1.3.2.40 Log Book: A notebook or other book containing essential project data and daily project information and a daily project diary. This book shall be kept up to date and on the project site at all times.
1.3.2.41 Movable Object: A unit of equipment or furniture in the work area which can be removed from the work area.
1.3.2.42 SDS: Safety Data Sheet.
1.3.2.43 Negative Initial Exposure Assessment: A demonstration by the employer, which complies with the criteria in paragraph (f)(2)(C) of 8 CCR §1529, that employee exposure during an operation is expected to be consistently below the PEL and Excursion Limit.
Page 15 of 37 DOCUMENT 13 10 10
1.3.2.44 NIOSH: National Institute of Occupational Safety and Health.
1.3.2.45 Phase Contrast Microscopy (PCM): NIOSH Method 7400 using “A” counting rules.
1.3.2.46 Plasticize: To cover floors, walls, ceilings or other surfaces with plastic sheeting as specified herein.
1.3.2.47 Presumed Asbestos Containing Material (PACM): Thermal system insulation and surfacing material found in buildings constructed no later than 1980. The designation of a material as “PACM” may be rebutted pursuant to 8 CCR §1529 (k)(5).
1.3.2.48 Prevalent Level Monitoring: Air sampling conducted for the purposes of evaluating existing ambient airborne fiber concentrations prior to starting abatement activities.
1.3.2.49 Regulated Area: An area established by the employer to demarcate areas where Class I, II and/or III asbestos work is conducted, and/or any adjoining area where debris and waste from such asbestos work may accumulate; a work area within which airborne concentrations of asbestos exceed, or where there is a reasonable expectation they may exceed, the permissible exposure limit. Requirements for regulated areas are set out in paragraph (e) of 8 CCR §1529.
1.3.2.50 Removal: All herein specified procedures necessary to remove asbestos-containing materials from the designated areas in an appropriate manner and to dispose of these materials at an acceptable site.
1.3.2.51 Shower Room: A room between the clean room and the equipment room in the worker decontamination enclosure with hot and cold or warm running water and suitably arranged for complete showering during decontamination.
1.3.2.52 Small-Scale, Short Duration Work: For the purposes of this Specification, asbestos abatement work that meets the Cal-OSHA definition of Class III asbestos work and that can be completed in no more than 4 hours by no more than 2 workers.
1.3.2.53 Surfacing Material: Material that is sprayed, troweled-on or otherwise applied to surfaces (such as acoustical plaster on ceilings or walls and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, and other purposes).
1.3.2.54 Surfactant: A chemical wetting agent added to water to improve penetration.
1.3.2.55 Thermal System Insulation (TSI): ACM or ACCM applied to pipes, fittings, boilers, breaching, tanks, ducts or other structural components to prevent heat loss or gain.
Page 16 of 37 DOCUMENT 13 10 10
1.3.2.56 Time Weighted Average (TWA): The TWA is an 8-hour time weighted average of the airborne concentration of fibers (longer than 5 micrometers) per cubic centimeter of air (f/cc) which represents the employee’s 8-hour workday exposure as determined by the formula:
8-hour TWA = (C1T1+C2T2+CnTn) 480 minutes where “C” is the contaminant concentration measured in units of f/cc and “T” the measurement time period in units of minutes.
1.3.2.57 Transmission Electron Microscopy (TEM): A method of analyzing air samples for asbestos fibers using a transmission electron microscope and associated instrumentation.
1.3.2.58 Visible Emissions: Any emissions containing particulate asbestos material that are visually detectable without the aid of instruments. This does not include condensed uncombined water vapor.
1.3.2.59 Washroom: A room between the work area and the holding area in the equipment decontamination enclosure system. The washroom comprises an airlock.
1.3.2.60 Wet Cleaning: The process of eliminating asbestos contamination from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with amended water, and disposing of these cleaning tools as asbestos-contaminated waste.
1.3.2.61 Work Area: Designated rooms, spaces, or areas of the project in which asbestos abatement actions are to be undertaken or which may become contaminated as a result of such abatement actions. A contained work area is a work area which has been sealed, plasticized, and equipped with a decontamination enclosure system. A non-contained work area is an isolated or controlled-access work area which has not been plasticized nor equipped with a decontamination enclosure system.
1.3.2.62 Worker Decontamination Enclosure System: That portion of a decontamination enclosure system designed for controlled passage of workers, and other personnel and authorized visitors, typically consisting of a clean room, a shower room, and an equipment room separated by air locks.
PART 2 - PRODUCTS
2.1 MATERIALS
2.1.1 Product Prohibitions: The following products or product constituents are prohibited from use during asbestos abatement activities:
Page 17 of 37 DOCUMENT 13 10 10
2.1.1.1 Any product for which a Safety Data Sheet is available from the manufacturer and has yet to be submitted.
2.1.1.2 Any product for which a less hazardous substitute product is readily available, provided that the substitute product possesses similar performance characteristics.
2.1.1.3 Any product containing any concentration of diethylene glycol dimethyl ether; ethylene glycol monoethyl ether; or ethylene glycol mono methyl ether (skin TLV 5 ppm; CAS 109-86-4). These constituents cause reproductive damage and blood cell damage.
2.1.1.4 Any product containing any concentration of ethylene glycol (1,2 Ethanediol glycol; TLV = 50 ppm). This chemical causes kidney damage if ingested.
2.1.1.5 Any product containing any concentration of formaldehyde, a suspect carcinogen.
2.1.1.6 Any product containing any concentration of methylene chloride, a suspect carcinogen.
2.1.1.7 Any product containing any concentration of n-hexane. This chemical causes peripheral nerve damage (potential ingredient in spray adhesive).
2.1.1.8 Any product containing any concentration of isocyanates. An allergic sensitizer, this group of chemicals typically has no warning properties (potential ingredient in spray foams and some epoxies).
2.1.1.9 Non-fire rated visquene and/or non-fire rated lumber are prohibited from use.
2.1.1.10 Solvents with a flash point <140o F are prohibited from use.
2.1.2 Equipment Prohibitions: The following equipment is prohibited from use during asbestos abatement activities:
2.1.2.1 Fasteners: High velocity powder-actuated fasteners are prohibited from use without the expressed written permission of the County.
2.1.2.2 Torches: Open flame torches are prohibited from use for asbestos abatement purposes.
2.1.2.3 Compressed Air: Air compressors, leaf blowers or similar forced-air equipment is prohibited from use for asbestos abatement purposes.
2.1.2.4 Lamps: Sodium or mercury vapor (metal halide) lamps are prohibited from use.
2.1.2.5 Ladders: Wooden or metal ladders are prohibited from use.
Page 18 of 37 DOCUMENT 13 10 10
2.1.2.6 Engines: Internal combustion engines shall not be permitted for operation indoors without the expressed written permission of the County in consultation with the Project IH Consultant.
2.1.2.7 Grounded Electrical Equipment: Electrical equipment manufactured with internal grounding or grounded wiring shall not be used if the grounding has been removed, tampered with, or otherwise altered.
2.1.2.8 HEPA-Filtered Vacuum Cleaners Without Certification of Efficiency Challenge Testing: Vacuums without certification of on-site testing for efficiency (“DOP testing”) shall not be allowed for use outside of a negative differential pressure enclosure (“containment”).
2.1.3 Material Requirements:
2.1.3.1 Sealants: Sealants used will have a flame spread, smoke and fuel contribution of zero, and will be ASTM and UL rated for 3 hours for standard method fire test for fire stop systems.
2.1.3.2 Lock-down Encapsulants: Lock-down encapsulants used will be compatible with substrate to which they will be applied, as well as with adhesives or other finish materials which may be applied over such encapsulants.
2.1.3.3 Polyethylene Sheeting: Polyethylene sheeting used will be in compliance with NFPA Standard 701 fire testing, with flame spread < 5 and smoke development rating of < 70 when tested by ASTM E-84. Minimal thickness will be 6 mil.
2.1.3.4 Spray Poly: Spray poly as a liquid must be non-flammable (no flash point), vapor free, and not noxious; when dry, poly must be Class A rated, with flame spread <20, have a fuel contribution of zero, and smoke development of < 110 by ASTM method E-84.
2.1.3.5 Waste Containers: Waste containers (bags, drums, bins, etc.) must be suitable for loading, temporary storage, transit, and unloading of asbestos waste without rupture, or otherwise causing asbestos exposure to persons nor releases to the atmosphere. Use of rigid primary containers (bins, boxes, drums, etc.) is preferred and recommended. Where rigid primary containers are used, they shall be lined with a secondary leak tight barrier of poly sheeting or poly bags of minimal thickness of 6 mil. All containers used for disposal of asbestos-containing waste shall be labeled in general accordance with applicable regulations, and in specific with the requirements of 8 CCR §1529(k)(8) and BAAQMD Regulation 11, Rule 2. See section 3.2.3.2 of this Specification section for additional details.
2.1.3.6 Adhesives: Adhesives, whether tape or aerosol liquid, shall be capable of securely bonding plastic to plastic, or plastic to substrate. The bonding strength and resulting seal of the material used must not be compromised by
Page 19 of 37 DOCUMENT 13 10 10 mist or water, encapsulating agent or any other product or process used in the regulated work area.
2.1.3.7 Warning Signs and Labels: Warning signs and labels will be used in compliance with applicable federal, state, and local regulations. Signs must be lettered in the language(s) necessary to communicate the specific hazard warning(s) to workers or visitors reasonably expected to be at the job site.
2.1.4 Equipment Requirements:
2.1.4.1 General: It is the responsibility of the Contractor to utilize tools and equipment that have been thoroughly and adequately decontaminated prior to their delivery to this project site. All equipment brought onto this project work site will be subject to inspection by the County and/or the Project IH Consultant. Visible evidence of suspected equipment contamination will be sufficient to cause the equipment to be rejected from mobilization onto the project work site. All costs resulting from the need to decontaminate any part of the worksite contaminated by the Contractor’s use of inadequately decontaminated equipment will be borne by the Contractor.
2.1.4.2 Differential Air Pressure Equipment: Differential air pressure equipment (also known as “exhaust fan units” or “negative air machines”) shall be equipped with HEPA filtration. All differential air pressure equipment will be in well-maintained condition and will comply with ANSI/AIHA Standard Z9.2 for performance. Differential air pressure equipment will arrive on-site with the intake and exhaust openings sealed. Each unit must be efficiency-challenged (“DOP tested”) on-site, in the presence of the Project IH Consultant and prior to use, so as to ensure a minimum 99.97% filtering efficiency of aerosol particulates of 0.3 microns in size. DOP testing shall be performed by a professional third-party testing firm not otherwise financially affiliated with the Contractor. Each unit used on this project must have a certification label affixed to it attesting to its most recent successful testing. Upon arriving on-site, each unit must be visibly clean and free of apparent or suspected asbestos contamination, as judged by the Project IH Consultant. If, in the opinion of the Project IH Consultant, the differential air pressure units are judged to be in need of cleaning, maintenance, or in any other way fail to meet typical industry standards, the unit(s) may not be placed into operation on this project. If secured, negative air machines may be stacked, but no more than two high without the prior approval of the Project IH Consultant, and in no event will negative air machines be allowed to be inverted for the purpose of stacking.
2.1.4.3 HEPA-filtered Vacuum Cleaners: HEPA-filtered vacuum cleaners will be in well-maintained condition and must be visibly clean and free of apparent or suspected contamination, as judged by the Project IH Consultant. Each unit must arrive on-site sealed and empty of any debris. Each unit must be DOP tested on-site, within containment, before it can be used outside of a regulated work area. DOP testing will be performed by a professional third-
Page 20 of 37 DOCUMENT 13 10 10 party firm not otherwise financially affiliated with the Contractor. Each unit used on this project must have a certification label affixed to it attesting to its most recent successful testing. If, in the opinion of the Project IH Consultant, the HEPA-filtered vacuum cleaners are judged to be in need of cleaning, maintenance, or in any other way fail to meet typical industry standards, the vacuum cleaners may not be placed into operation on this project. Care will be exercised by the Contractor to prevent commingling of asbestos and lead waste. Separate vacuums will be used for each type of waste clean-up.
2.1.4.4 Lights and Electrical Cords: Electrical lights and equipment utilizing electrical power cords will be in well-maintained condition and will be visibly clean and free of apparent contamination, as judged by the Project IH Consultant. All lighting and electrical equipment must be water resistant.
Work lighting must have protective covers over the light source. Grounded electrical equipment will be used with grounded electrical supply and outlets.
Where such equipment will be used in the near vicinity of water, ground fault circuit interruption (GFCI) protection shall be used in the wiring circuit at the first feasible point closest to the source of power.
2.1.4.5 Personnel Decontamination Facilities: At a minimum, a 3-chamber personnel decontamination (decon) unit with functioning shower will be constructed and used whenever Class I work is being conducted. A decon unit with shower will be constructed contiguous with each Class I regulated work area.
Use of a remote shower for Class I work may be allowed where a contiguous shower is infeasible, as judged by the Project IH Consultant. A curtained doorway (see Section 1.3 C above) will be constructed to separate individual chambers within a personnel decon unit, as well as at ingress and egress points. The decon units shall be constructed in a manner so as to be free of physical hazards (e.g., jagged metal or exposed wood surfaces). To the extent feasible, a personnel decon unit must not be used for waste load-out.
2.1.4.6 Personnel Decontamination Facilities (Class II): At a minimum, a 2-chamber personnel decontamination (decon) with separate clean room and equipment room will be…