Exhibit D 01025 Measurement and Payment_240723 (1).pdf
PDF 95 KB Posted
- Solicitation number
- 134.24
- Issued by
- Eagle County, Aurora City, Colorado
About this file
The document is Exhibit D, Section 01025 for Measurement and Payment, associated with the Two Rivers Road Shift Project for Pitkin County, Colorado. This section outlines the detailed payment procedures and bid items for a construction project, specifically describing 16 distinct bid items ranging from mobilization and demobilization to specific infrastructure installations like water and sewer services, conduit installation, asphalt and concrete work, and erosion control. Each bid item includes a description, specific inclusions/exclusions, payment basis (typically per lump sum, linear foot, or square yard), and references to the Town of Basalt Public Works Manual for technical specifications.
The payment terms emphasize that progress payments will be based on the Engineer's assessment of completed work and stored materials, following an approved Schedule of Values. The document provides flexible pricing mechanisms, including provisions for potential unit price renegotiations if actual field measurements differ from estimated quantities by more than 50%. The mobilization bid item, for instance, allows for 75% payment on initial requests with the remaining 25% paid on the final request. The contract also specifies that lump sum prices are intended to cover all materials, equipment, labor, and associated costs for completing each specified work component, with an understanding that bid quantities are estimates and contractors should independently verify actual requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01025 - 1
SECTION 1025
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 SUMMARY
This section describes the procedure for Application for Payment by the Contractor.
This section establishes the basis of payment, application format, application content and application review process required by the Owner before they will process the application for actual payment.
1.02 FORMAT AND DATA REQUIRED
A. Submit Applications for Payment and all other required forms and information to the Engineer.
B. Provide itemized data on continuation sheets.
C. Format, schedules, line items, and values: Those of the approved Schedule of Values.
1.03 PREPARATION OF APPLICATION FOR EACH PROGRESS PAYMENT
A. Prepare Application for Payment and all other required information to Engineer in accordance with terms and schedule established in the Agreement Between Owner and Contractor, or as otherwise negotiated between Owner and Contractor.
B. Application Form
1. Required information completed, including that for Change Orders executed prior to the date of submittal of application.
2. Summary of dollar values to agree with the respective totals indicated on the continuation sheets.
C. Continuation Sheets
1. Total list of all scheduled component items of Work, with item number and the scheduled dollar value for each item.
2. Dollar value in each column for each scheduled line item when work has been performed.
3. Each Change Order executed prior to the date of submission shall be listed at the end of the continuation sheets.
4. List by Change Order number and description as for an original component item of work.
D. Contractor shall execute certification with the signature of a responsible officer of the Contractor's firm.
Exhibit D
01025 - 2
1.04 SUBSTANTIATING DATA FOR PROGRESS PAYMENTS
A. When Owner or Engineer requires substantiating data, Contractor shall submit suitable information with a cover letter identifying:
1. Project name and number.
2. Application number and date.
3. Detailed list of enclosures.
B. Submit one (1) copy of data and cover letter for each copy of application.
1.05 SCHEDULE OF VALUES
A. Where payment is to be based on unit bid prices, correlate Schedule of Values with bid items.
B. Where payment is to be based on fixed price, correlate Schedule of Values with divisions and sections of specifications, unless otherwise approved by the Engineer.
C. On Bid items to be paid as lump sum that may extend beyond a single pay estimate, a schedule of values shall be submitted to Owner a minimum of 10 days prior to Work on that item. Adequate detail shall be given to allow a value to be placed on Work completed during any given pay estimate. Where payment is to be based on unit Bid prices, correlate schedule of values with divisions and sections of Specifications, unless otherwise approved by the Engineer. If separate payment is to be requested for materials suitably stored but not installed, paid invoices for the item shall be submitted.
D. The Schedule of Values line item for mobilization shall be paid for as a lump sum and shall include all fixed costs for the Work; by way of example, mobilization and de-mobilization, bond and insurance costs, etc. The first partial pay request shall include not more than 75% of this Bid amount; 25% of this Bid amount shall be paid on the final pay request.
1.06 PREPARATION OF APPLICATION FOR FINAL PAYMENT
A. Contractor shall complete Application form as specified for progress payments.
1.07 SUBMITTAL PROCEDURE
A. Submit Application for Payment and all required information to Engineer for review in accordance with the established schedule. Application and all related forms shall be properly executed by signature of a responsible officer of the Contractor's firm.
B. Engineer to review and verify Application for Payment within established schedule.
Contractor shall make corrections noted by Engineer and re-submit three copies of Application to Engineer.
C. When Engineer finds the Application complete and correct, Engineer will transmit two copies of the complete Application packet to Owner for processing.
01025 - 3
1.08 BASIS OF PAYMENT
Progress payments will be made on the basis of Engineer’s opinion of completed work of individual project components, plus suitably stored materials on-hand, per the approved Schedule of Values and in accordance with the terms of the Agreement
A. LUMP SUM PRICES
1. Where lump sum prices are given for a described portion of the work, that price shall cover all materials, equipment and labor necessary to acquire, deliver, store and install that portion of the work, complete and in place, as shown and indicated in the drawings and as described in the Project Manual.
2. Quantities given in the bid form are estimates for the purpose of evaluating bids.
Consequently, some differences may arise in actual and bid quantities.
3. Quantities given for lump sum items, including earthwork, are estimates only.
The Contractor should satisfy himself as to the actual quantities required to complete the work described in the plans and these specifications. Unit costs for earthwork will not be employed to determine payment.
B. UNIT PRICE BID ITEMS
1. Payment for work included in unit price bid items shall be based on the completed value of each unit in such quantity actually installed as measured and determined by the Engineer unless the approved Schedule of Values provides sufficient detail for measurement and payment of partial progress of work.
2. Unit pricing shall include all materials, equipment and labor necessary to complete the bid item as shown and indicated in the project documents.
3. Quantities given in the bid form are estimates for the purpose of evaluating bids.
Consequently, some differences may arise in actual and bid quantities.
4. Contractor or Owner may request re-negotiation of Unit Price for an item if the actual field measured work done for that item differs from the estimated quantity by more than 50% under the following terms:
a. Contractor shall not make any claim for damages for any work item for which the actual field measurement does not differ from the estimated quantity by more than 50%, higher or lower.
b. Re-negotiated Unit Prices shall be based on actual costs to Contractor for the specific work item plus a reasonable allowance for overhead and profit.
c. Re-negotiating the Unit Price shall not increase or decrease the Unit Price by more than 10 percent.
d. Contractor shall submit to Owner satisfactory data substantiating the actual costs and overhead rate to perform the Work covered by the Unit Price being re-negotiated.
5. No payment will be made if the entire bid item is unused.
1.09 BID ITEMS
A. Bid Item #1 – Mobilization & Demobilization
1. Description
a. This line item is for the costs associated with mobilizing and demobilizing from the project site.
b. Item shall also include any item that is required for the project but does not have a specific bid item.
01025 - 4
2. Specific inclusions, exclusions, or special considerations
a. Includes contractor overhead, profit, insurance, bonding etc.
b. Includes temporary facilities, office trailer, bathroom, etc.
3. Payment Basis
a. Lump Sum
B. Bid Item #2 – Erosion Control and Revegetation
1. Description
a. This line item is for the installation and maintenance of erosion control as defined on the contract documents.
2. Specific inclusions, exclusions, or special considerations
a. This line item shall include all labor, materials and equipment involved with the installation and maintenance of erosion control measures.
b. Includes revegetation of all disturbed areas.
3. Payment Basis
a. Lump Sum
C. Bid Item #3 – Construction Traffic Control
1. Description
a. This line item is for the costs associated with providing construction traffic control throughout duration the project.
2. Specific inclusions, exclusions, or special considerations
a. Includes all overhead, labor, materials, equipment, and other associated costs for the construction traffic control for the project.
b. Includes all temporary construction phasing devices, signage, striping
(placement and removal), maintenance, inspection, traffic control supervisor, submittal of MHT’s, and other associated items.
3. Payment Basis
a. Lump Sum
D. Bid Item # 4 – Removals
1. Description
a. This line item is for the removals required for the project as shown in the contract documents.
2. Specific inclusions, exclusions, or special considerations
a. Includes all pavement markings, asphalt, asphalt milling, curb inlet, culvert, concrete, fence, landscape, signage, manhole or water valve adjustments, and all other associated items shown on the plans.
3. Payment Basis
a. Per Lump Sum
E. Bid Item #5 – Permanent Signage and Striping
1. Description
a. This line item is for the permanent signage and striping as defined on the contract documents.
2. Specific inclusions, exclusions, or special considerations
a. Includes all pavement markings (epoxy and thermoplastic), signage, reset signage, and all other associated items shown on the plans.
a. Lump Sum
01025 - 5
F. Bid Item #6 – Split Rail (Wood) Fence
1. Description
a. This item is for the installation of a new split rail fence adjacent to shifted roadway.
2. Specific inclusions or special considerations
a. Includes all overhead, labor, materials, equipment, and other associated costs for installation of new split rail fence.
b. Includes connection to existing wood fence as needed.
3. Payment Basis
a. Per Lineal Foot.
4. Estimated Quantity
a. Per Bid Schedule
G. Bid Item #7 – Water Service
1. Description
a. This line item is for the installation of a new water service line for the future restroom.
2. Specific inclusions, exclusions, or special considerations
a. This line item shall include all labor, materials and equipment involved with the procurement and installation of the ¾ inch type K water service.
b. Includes curb stop and all other associated items shown on the plans.
c. Includes pressure testing and disinfection as required by Town of Basalt.
3. Payment Basis
a. Per Each
4. Estimated Quantity
a. Per Bid Schedule
H. Bid Item #8 – Sewer Service
1. Description
a. This line item is for the new sewer service for the future restroom.
2. Specific inclusions, exclusions, or special considerations
a. Includes all overhead, labor, materials, equipment, and other associated costs for the procurement and installation of the 4-inch SDR 35 sewer service.
b. Includes cleanout and all other associated items shown on the plans.
c. Includes pressure testing as required by Town of Basalt.
3. Payment Basis
a. Per Each
4. Estimated Quantity Per Bid Schedule
I. Bid Item #9 – Curb Inlet and Culvert Replacement
1. Description
a. This line item is for the Installation of a new curb inlet and 24” ADS N12 culvert as shown in the contract documents.
2. Specific inclusions, exclusions, or special considerations
a. Includes all overhead, labor, materials, equipment, and other associated costs for the installation of a new curb inlet, concrete structure, new 24-inch smooth wall ADS N12 culvert, Steel Flared End Section, connections to existing and all other associated items shown on the plans.
01025 - 6
a. Per Lump Sum
J. Bid Item #10 – 3” Sched 40 PVC Conduit
1. Description
a. This line item is for the procurement of Sched 40 PVC conduit as defined on the contract documents.
2. Specific inclusions, exclusions, or special considerations
a. Includes all empty conduits shown on the plans and all other associated items necessary for the work.
3. Payment Basis
a. Per Lineal Foot.
4. Estimated Quantity
a. Per Bid Schedule
K. Bid Item #11 – Conduit Installation (3 ft Depth)
1. Description
a. This line item is for the trenching, bedding, backfill, and installation of 3-inch empty conduits as defined on the contract documents and per Town of Basalt Public Works Manual.
2. Specific inclusions, exclusions, or special considerations
a. Includes conduit across Two Rivers Road to future restroom for electric, under concrete sidewalk for irrigation, and along the length of new curb and gutter for future fiber and electric, and all other associated items shown on the plans.
3. Payment Basis
a. Per Lineal Foot.
4. Estimated Quantity
a. Per Bid Schedule
L. Bid Item #12 – Hot Mix Asphalt (PG 58-28)
1. Description
a. This item is for the installation of the new hot mix asphalt pavement as defined on the contract documents and per Town of Basalt Public Works Manual.
2. Specific inclusions or special considerations
a. Includes all overhead, labor, materials, equipment, and other associated costs for installation of the new hot mix asphalt.
b. Includes reshaping and compaction of road base as needed, proof roll, and asphalt density testing by contractor.
3. Payment Basis
a. Per Square Yard
4. Estimated Quantity
a. Per Bid Schedule
M. Bid Item #13 – Aggregate Base Course Class 6
1. Description
a. This item is for the installation of the new ABC Class 6 as defined on the contract documents and per Town of Basalt Public Works Manual.
2. Specific inclusions or special considerations
01025 - 7
a. Includes all overhead, labor, materials, equipment, compaction at optimum moisture, and other associated costs for installation of the new ABC Class 6.
b. Includes scarification, reshaping, and compaction at optimum moisture of existing subgrade as required by the plans.
c. Includes proof roll
d. Includes density testing by contractor.
3. Payment Basis
a. Per Square Yard
4. Estimated Quantity
a. Per Bid Schedule
N. Bid Item #14 – Concrete Curb Ramp
1. Description
a. This item is for the installation of the Concrete Curb Ramp as defined on the contract documents and per Town of Basalt Public Works Manual.
Specific inclusions or special considerations
b. Includes all materials, equipment, compaction at optimum moisture, and other associated costs for installation of the new Concrete Curb Ramp.
c. Includes scarification, reshaping, compaction at optimum moisture of existing subgrade as required by the plans, ABC Class 6, and iron truncated domes.
d. Includes concrete testing by contractor.
2. Payment Basis
a. Per Square Yard
3. Estimated Quantity
a. Per Bid Schedule
O. Bid Item #15 – Concrete Crosswalk
1. Description
a. This item is for the installation of a new raised concrete crosswalk near Station 4+15 as defined on the contract documents and per Town of Basalt Public Works Manual.
2. Specific inclusions or special considerations
a. Includes all materials (inc. ABC CL6) and other associated costs for installation of the new concrete crosswalk and all other associated items shown on the plans.
b. Includes concrete testing by contractor.
3. Payment Basis
a. Per Square Yard
4. Estimated Quantity
a. Per Bid Schedule
P. Bid Item #16 – Concrete Curb and Gutter
1. Description
a. This item is for the installation of a new Concrete Curb and Gutter as defined on the contract documents and per Town of Basalt Public Works Manual.
2. Specific inclusions or special considerations
01025 - 8
a. Includes all materials (inc. ABC CL6) and other associated costs for installation of the curb and gutter and all other associated items shown on the plans.
b. Includes concrete testing by contractor.
3. Payment Basis
a. Per Lineal Foot
4. Estimated Quantity
a. Per Bid Schedule
END OF SECTION