Exhibit C Bid Schedule_240723 rfp.xlsx
XLSX spreadsheet 68 KB Posted
- Solicitation number
- 134.24
- Issued by
- Eagle County, Aurora City, Colorado
About this file
The file is a Bid Schedule for the Pitkin County Healthy Rivers Two Rivers Road Improvements project located in Colorado, detailing a comprehensive road and infrastructure enhancement initiative. The bid schedule outlines 16 line items covering various construction elements, including mobilization, erosion control, traffic control, removals, signage, fencing, utility services, conduit installation, road surfacing, and concrete work. Key quantities include 495 linear feet of split rail fence, 1,475 linear feet of PVC conduit, 2,943 square yards of hot mix asphalt, and 645 linear feet of concrete curb and gutter, with work focusing on road improvements to accommodate White Water Park project requirements.
The bid schedule provides a detailed breakdown of construction activities without specifying exact pricing, as the unit price and total columns are left blank for bidder completion. The project appears to be a public infrastructure improvement initiative, likely funded through county or municipal sources, with an emphasis on road reconstruction, utility upgrades, and related civil engineering work. The document is structured to allow potential contractors to submit competitive bids by filling in their proposed unit prices and calculating total project costs, with the expectation that the most economically advantageous proposal will be selected for the Two Rivers Road Shift Project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
rgt Exhibit C
ITEM# DESCRIPTION UNITS QUANTITY UNIT PRICE TOTAL
1 Mobilization & Demobilization LS 1
2 Erosion Control and Revegetation LS 1
3 Construction Traffic Control LS 1
4 Removals LS 1
5 Permanent Signage & Striping LS 1
6 Split Rail Fence LF 495
7 Water Service (85LF) EA 1
8 Sewer Service (65 LF) EA 1
9 Curb Inlet and Culvert Replacement LS 1
10 3"Sched 40 PVC conduit LF 1475
11 Conduit Installation (3 ft deep) LF 805
12 Hot Mix Asphalt (PG58-28, 5" depth) SY 2943
13 Aggregate Base Course, Class 6 (6" Depth) SY 2943
14 Concrete Curb Ramp (inc. Truncated Domes) SY 27
15 Concrete Crosswalk (8") SY 47.5
16 Concrete Curb and Gutter LF 645
TOTAL BID: $ $
| Submitted by: | |
| Company |
Address
| Submitted by: | |
| Please type or print |
Signature/Tile of Authorized Personnel
Date of Bid:
TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$ TOTAL BID:$
&"Arial,Bold"&24Bid Schedule Pitkin County Healthy Rivers Two Rivers Road Improvements&"Arial,Regular"&10
&"Arial,Bold"&24Bid Schedule
&"Arial,Bold"&12Bid Schedule Garfield County South Canyon Trail Phase 2&"Arial,Regular"&10
&12 Revised Bid Schedule Pitkin County Rio Grande Trail at Woody Creek June 3, 2013
&12Bid Schedule Pitkin County Rio Grande Trail at Woody Creek January 30, 2013
&12Bid Schedule Garfield County CR 115 Drainage Improvements
&"Arial,Bold"&12Bid Schedule Garfield County
Phase 1&"Arial,Regular"&10
Bid Schedule Pitkin County Red Moutain Road Reconstruction Revised Addendum No 03
&"Arial,Bold"&12Bid Schedule Garfield County South Canyon Trail Phase 1 to STA 250+00
&"Arial,Bold"&12Bid Schedule Garfield County
Phase 2&"Arial,Regular"&10
&12Bid Schedule Garfield County CR 115 Improvements Addendum #1 August 25, 2011
&"Arial,Bold"&24Bid Schedule
&12&P &12&D
&12&P &12&D
&P OF &N &F
&"Arial,Bold"Addendum No. 4&"Arial,Regular"
&"Arial,Bold"BD4.&P
&"Arial,Bold"BD4.&P
&"Arial,Bold"Addendum No. 4&"Arial,Regular"
&"Arial,Bold"BD4.&P
&P OF &N &F
&12&P &12&D
Sheet2
Sheet3
File details come from the government source that posted it. Updated .