EXHIBIT A - SCOPE OF SERVICES.pdf

PDF 439 KB Posted

Attached to
ADAS Calibration and Wheel Alignment System
Solicitation number
OP143228
Issued by
California

About this file

This Scope of Services document outlines specifications for the Los Angeles County Metropolitan Transportation Authority (LACMTA) Invitation for Bid (IFB) No. OP143228 for the purchase of one new ADAS Calibration and Wheel Alignment System. The equipment must be delivered within 150 days from the contract effective date and must arrive at the designated location (Division 10 - Non-Revenue Maintenance Operation, 742 North Mission Road, Los Angeles, CA 90033) between Monday and Friday, 7:30 a.m. to 1:00 p.m. The contractor must notify LACMTA personnel two working days prior to delivery to allow for pre-delivery factory inspections and pre-acceptance. Delivery must be made via truck equipped with a lift gate, with the equipment fully charged or fueled upon arrival.

The equipment must be new, factory model year at the time of purchase award, and include all standard and required operational components at no additional cost to LACMTA. All components must be Original Equipment Manufacturer (OEM) items with no rebuilt, remanufactured, or unapproved aftermarket components acceptable. The equipment must comply with all applicable Federal, California State, and local regulations including FRA, AQMD, ARB, EPA Tier 4, and California Code of Regulations Title 8, section 8470. Payment terms are Net 30, with California sales tax applying to California dealers and use tax applying to out-of-state dealers. Final acceptance requires post-delivery inspection, verification of full operational status, compliance with technical specifications, resolution of all punch list items, and provision of operating and maintenance manuals along with training demonstrations.

View the file

Other files

File Type Posted
EXHIBIT E-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT J - 29 CFR 5.5.pdf PDF
OP143228.pdf PDF
EXHIBIT 9 - GENERAL CERTIFICATIONS.pdf PDF
Exhibit A Pre-Assessment Form.pdf PDF
FORM 2 - AFFIDAVIT.pdf PDF
FORM 6 - SBE-DVBE DEALER-DISTR AFFIRMATION.pdf PDF
Thumbs.db —
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (Non-Fed).pdf PDF
EXHIBIT A.1 - TECHNICAL SPECIFICATIONS.pdf PDF
EXHIBIT 12 - MISCELLANEOUS (RESERVED).pdf PDF
FORM 3 - BUSINESS DATA SHEET.pdf PDF
FORM 4 - SBE-DVBE AFFIRMATION.pdf PDF
Exhibit B Post-Assessment Form.pdf PDF
EXHIBIT 3 - RESERVED.pdf PDF
EXHIBIT 4 - LIST OF CERTIFIED FIRMS.pdf PDF
EXHIBIT 6 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
EXHIBIT B - PRICING AGREEMENT.pdf PDF
EXHIBIT E-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
EXHIBIT 8 - ETHICS DECLARATION.pdf PDF
EXHIBIT 10 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
EXHIBIT 5 - BID LETTER.pdf PDF
EXHIBIT 11 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER.pdf PDF
FORM 1 - SBE-DVBE SUBS & SUPPLIERS.pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS.pdf PDF
EXHIBIT H - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT F - RELEASE OF CLAIMS.pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (SET-ASIDE).pdf PDF
EXHIBIT I - RESERVED.pdf PDF
EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE (RESERVED).pdf PDF
EXHIBIT 7 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
FORM 5 - BIDDERS LIST FORM.pdf PDF
SUBCONTRACTOR LISTING FORM.pdf PDF
EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification Number MA-26-09

May 19, 2026

EXHIBIT A – SCOPE OF SERVICES

IFB No. OP143228

Equipment (Description): ADAS Calibration and Wheel Alignment System

1.0 Scope

1.1 This Contract is for the purchase of one (1) new ADAS Calibration and Wheel Alignment System. THE CONTRACTOR SHALL PROVIDE THE REQUESTED EQUIPMENT IN

FULL COMPLIANCE WITH LACMTA’S TECHNICAL REQUIREMENTS IDENTIFIED IN

EXHIBIT A.1.

1.2 The Contractor shall furnish, deliver, and warrant each equipment according to these specifications and shall include all items and/or accessories not mentioned, but required, for operation of the equipment.

2.0 General Requirements

2.1 All equipment classified as standard and/or required to operate the equipment shall be provided at no additional cost to LACMTA. Items inadvertently omitted from this specification that are classified and or otherwise designated by the equipment manufacturer as required to operate the specified equipment shall be brought to the attention of the designated LACMTA representative.

2.2 OEM & Aftermarket Components

The equipment with their components shall be new and of the latest factory model year released at the time the purchase order is awarded. They shall be complete, and ready to operate upon delivery. No rebuilt or remanufactured components will be acceptable. All components shall be Original Equipment Manufacturer (OEM), no aftermarket components shall be acceptable unless referenced in this specification and/or approved by the designated LACMTA representative.

All accessory installations shall be securely affixed and comply with OEM, Federal, State and OSHA standards. No installation shall interfere with the OEM systems nor render the equipment warranty invalid.

All electrical installations shall have all wires securely affixed to the running path. Wiring shall have protective shielding with loom, fabric, or PVC, as well as rubber grommets to protect wires that pass-through plates and panels, and insulated wire clamps for mounting. All accessory circuits shall have proper circuit protection adequately to prohibit damage to the unit’s OEM systems and prevent electrical shorts or fires.

2.3 Regulatory Compliance

The equipment shall be, at the date of the delivery, in compliance with all current applicable local, California State and Federal Code of Regulations.

Regulatory compliance shall include, but not limited to, compliance with all current and applicable Federal Railroad Administration (FRA), California State Air Quality Management District (AQMD), Air Resources Board (ARB), US Environmental Protection Agency (EPA)

Tier 4, California Code of Regulations, Title 8, section 8470 and local laws pertaining to this equipment. Contractors may be required to furnish proof of compliance.

2.4 Delivery Requirements

Requested delivery is within 150 days from date of Contract effective date.

Contractor must notify designated LACMTA personnel two (2) working days prior to equipment delivery to LACMTA so that LACMTA staff can make the necessary scheduling and travel arrangements to perform pre-delivery inspections and pre-acceptance of the equipment at the factory.

The equipment shall be prepared and cleaned before it is presented for the post-delivery inspection.

Delivery must be made Monday through Friday between 7:30am to 1:00pm.

It is the Contractor’s responsibility to make a delivery by a truck equipped with a lift gate to offload the equipment and any equipment to a location as designated by Metro personnel.

The equipment shall be delivered to Metro fully charged, if electric, or with a full fuel tank.

2.5 Delivery Location

All equipment shall be delivered to:

Los Angeles County Metropolitan Transportation Authority Division 10 - Non-Revenue Maintenance Operation 742 North Mission Road Los Angeles, CA 90033

Attention: Sona Darakjian Equipment Engineering Supervisor

2.6 Sales Tax & Use Taxes

California Sales Tax:

o California sales tax applies to all vehicles and/or other equipment purchased from a licensed California dealer.

o Dealers are required to collect taxes by invoicing LACMTA and then paying it directly to the BOE.

Use Tax:

o Use tax applies to all vehicles and/or other equipment purchased from an out-of-state dealer.

o Use tax is the liability of the buyer to pay at the time of registration either to the

DMV or BOE.

o Paying California use taxes on behalf of LACMTA by the sellers and/or manufacturers that are located out-of-state and not a licensed California dealer is not preferred per the California DMV manual and California Board of Equalization (BOE) publications.

If the Contractor elects not to pay use tax, tax will still be calculated on the price page at the rate indicated but will not be invoiced as LACMTA will pay use tax directly to the DMV.

If the seller unintentionally pays use taxes to California Board of Equalization (BOE) on behalf of Metro and then invoices Metro, the seller or manufacturer then must provide the following documents at the time of delivery:

o Proof of use tax payment to BOE o Seller’s BOE account/certificate

2.7 Inspection & Acceptance

The equipment shall not be inspected or accepted without prior compliance with this specification’s requirement.

The equipment shall be subjected to a pre-delivery inspection, if required, and to post-delivery inspection by LACMTA to determine if the equipment delivered are fully operational and in their final configuration, are in full compliance with the technical and performance specification and they did not sustain any damage upon delivery to LACMTA.

Final acceptance shall be made after post-delivery and installation inspection is performed by LACMTA to determine full compliance with the technical specification with all “punch list” items and pending issues are resolved and satisfied. This includes provision, if specified, operating and maintenance manuals, and training to demonstrate that the equipment is fully operational.

2.8 Technical Specification Compliance Requirements

The equipment must meet all requirements, including the technical requirements in Exhibit A.1.

2.9 Payments

Payment terms are Net 30. Refer to Contract Article IV – Compensation and Payment for additional requirements.

2.10 Invoices

Separate Invoices shall be provided for each equipment. The Contractor is responsible for submitting the original invoices to Accounts Payable. Refer to Contract Article IV – Compensation and Payment for additional requirements.

Each invoice must include the VIN number or serial number of the equipment delivered.

File details come from the government source that posted it. Updated .